




已阅读5页,还剩8页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
河南理工大学万方科技学院本科毕业论文 1 河南理工大学万方科技学院 电气与自动化工程系 2012 届毕业生 英 文 文 献 专业: 电气工程及其自动化 班级: 08 电气 6 班 学号: 0828100023 姓名: 叶国印 时间: 2012 年 5 月 31 日 河南理工大学万方科技学院本科毕业论文 2 外文资料与中文翻译 外文资料: Converter reference design (1) Converter Selection: Selection to determine the frequency converter when the following points: 1) The purpose of a variable frequency; constant pressure to control or constant current control. 2) the load converter types such as leaves or pump volume pumps, with special attention to load the performance curve, the performance curve of the decision of the ways and means. 3) the frequency converter and load matching Voltage match: a rated voltage converter with a rated voltage line with the load. Current matches: ordinary pump, the rated current inverter and motor rated current match. For special load such as deep-water pumps, and so on need to refer to the electrical performance parameters to determine the most current inverter current and Guozainengli. Torque match: in this case constant torque load or slow down when the device may have occurred. 4) the use of high-speed motor drive inverter, because of the high-speed motor, anti-small, high harmonics lead to increased output current value increases. So for high-speed motor inverter Selection, its capacity to be slightly larger than the ordinary motor selection. 5) If the frequency converter to a long cable run, this time to take measures to curb the long cable to the impact of capacitive coupling, inadequate efforts to avoid converter, so in this case, the drive to enlarge the capacity of a file or the converter Output installed output reactor. 6) For the application of some special occasions, such as high temperatures, high altitude, at this time would cause the down converter capacity, the drive to enlarge the capacity of a block. 河南理工大学万方科技学院本科毕业论文 3 (2) inverter control schematic design: 1) First confirmation of the installation environment Converter Operating temperature: high-power converter is the internal electronic components, vulnerable to the effects of temperature, product general requirements for 0 55 , but in order to ensure the safe, reliable, the use of room to be taken into account, the best control in 40 below. In the control box, the converter box should generally be installed in the upper and strictly comply with the Manual of installation requirements, absolutely not be allowed to heating elements or components easily fever close to the converter installed at the bottom. Ambient temperature: the temperature is too high and large temperature changes, within easy converter there is dew, the insulation properties will be greatly reduced, or even short-circuit caused the accident. When necessary, to be added to the desiccant in the box and heater. In water treatment, generally heavier than water vapor, if the temperature changes, then this problem would be more prominent. Corrosive gases: the use of the environment if the corrosive gas concentrations, will not only lead corrosion of components, printed circuit boards, but it will also accelerate the aging of plastic devices, reducing insulation properties. Vibration and shock: the control cabinet with converter by vibration and mechanical shocks will cause electrical connection is bad. Huaian thermoelectric there such a problem. Apart from raising the control cabinet at this time of the mechanical strength, vibration and shock away from the source, we must also use seismic rubber pad fixed within and outside the control cabinet, such as electromagnetic switches have a vibration components. Equipment operation after a period of time and should conduct inspections and maintenance. Electromagnetic interference: Inverter at work due to rectification and frequency, produce around a lot of electromagnetic interference, these high-frequency electromagnetic waves in the vicinity of the instrument, apparatus, a certain interference. Therefore, the cabinet instrumentation and electronic systems, it should be optional metal, shielding the inverter instrument interference. All the components should be reliable grounding, in addition, the electrical components, equipment and 河南理工大学万方科技学院本科毕业论文 4 instrumentation should use the connectivity between the shielding control cables, and the shield should be grounded. If handled properly electromagnetic interference, often cause the entire system does not work, leading to the control unit failure or damage. 2) Drives and determine the distance between the electrical cables and wiring methods Drives and motor the short distance should be as much as possible. This reduces the capacitance of the cable, reducing the emission source of interference. Control cables optional shielded cable, power cable or optional shielding from the cable converter to use all the threads of the electrical shield. Electric cables should be independent of the other cable alignment, the minimum distance of 500 mm. At the same time should avoid the electrical cables and other long-running cable lines, in order to reduce the output voltage inverter rapid changes in the electromagnetic interference. If the control cables and power cables cross, as far as possible so that they cross the 90-degree angle. Converter and analog signals on the line and back to the main line of separation of alignment, even in the case also in the control cabinet. And the analog signal converter line the best choice of unshielded twisted pair, shielded power cables selection of the three-core cable (its specifications than ordinary electrical cables in the files) or to comply with the user manual converter. 3) inverter control schematics Main circuit: the role of reactor is to prevent the high-frequency converter harmonic power through the input circuit to return to the grid by the impact of other electronic devices, in accordance with the capacity size converter to decide whether to increase reactor; filter Converter is installed in the output, the output of high-frequency converter to reduce harmonics, when the electrical inverter to the longer distance, we should install filters. Although the frequency converter itself has all kinds of protection, but the lack of protection is not perfect, the main circuit breaker played overload, lack the same protection, selection, in accordance with the capacity to choose the frequency converter. Converter itself can be used to replace thermal overload protection relay. 河南理工大学万方科技学院本科毕业论文 5 Control loop: the frequency with the frequency manually switch to the failure frequency can be manually cut-operation, not because of output voltage, frequency and frequency-be interlocked. 4) Inverter grounding Inverter correct grounding is to improve the system stability, the ability to inhibit an important means of noise. Inverter grounding resistance grounding terminal of the smaller the better, the grounding wire cross-section of not less than 4 mm, the length of not more than 5 m. Inverter should be grounded and power equipment to the sites separately, not in total. The shield signal converter from one end of the grounding end, the other floating air. Inverter and control of electrical between the same counter. (3) Inverter Control Design Converter should be installed in the control cabinet internal control counters in the design should pay attention to the following issues 1) heat: Inverter fever is the internal loss. In the frequency converter in the main part of the loss mainly to the main circuit, or about 98 percent, accounting for 2% of control circuits. In order to ensure reliable operation of the normal inverter, Thermal must inverter are usually used for cooling fan; converter fan of the contents of the converter box can be removed internal heat, if the fan does not work, should immediately stop inverter Operation; the high-power inverter also need to increase control Guishang fan, Control of the wind, to design a reasonable, all outlet into the net to set up dust, exhaust open, to avoid over the counter in a swirl, in a fixed location dust Accumulation, according to the statement converter ventilation fans to select the match, fans installed to the attention of earthquake problems. 2) the problem of electromagnetic interference Converter in its work due to rectification and frequency, produce around a lot of electromagnetic interference, these high-frequency electromagnetic waves in the vicinity of the instrument, apparatus, a certain interference, and will produce high harmonics, the high harmonics will be available for adoption Xinhua loop into the whole power supply network, thus affecting other instruments. If the power inverter system as a whole lot of more than 25 percent, to be considered the anti-jamming 河南理工大学万方科技学院本科毕业论文 6 measures to control supply. When the system in the high-frequency welding machine such as the impact load, electroplating power, the converter itself will appear as interference protection, to consider the whole system of power quality problems. 3) protection issues need to pay attention to the following points Waterproof anti-condensation: If the converter on the scene, the need to pay attention to the frequency converter Guishang not have the flange or other pipeline leak, the inverter can not be near the water splash, sum up the scene OEM Switchgear Kits & level of security to IP43 above. BOOT: All outlet into the net to set up dust debris into the barrier floc, dust network should be designed to be removable, to facilitate the clean-up, maintenance. Dust of the grid network in accordance with the specific circumstances at the scene determined that dust around the net and Control Department to handle the combination of tight. Anti-corrosive gases: the chemical industry in this relatively Most of this can be on the frequency counters in the control room. (4) converter cable norms Signal lines and power lines must be separately alignment: the use of analog signal converter for remote control, in order to reduce the analog converter and other equipment from the interference, please control signal converter line with the strong electric circuit (H Circuit-and-loop) separate alignment. Distance should be 30 cm above. Even in the control cabinet, the same connection to maintain such a standard. The signal converter and the control should not be longer than the road back to 50 m. Signal lines and power lines must be placed in different metal pipe or metal hose internal: connect PLC and the signal converter if not placed in metal tubes, Drives and vulnerable to external interference equipment; because the converter No built-in the reactor, so the converter input and output level of external power line will have a very strong interference, placing the signal lines of metal or metal hose has to be extended to the inverter control terminal, to ensure that the signal Line and the complete separation of power lines. 河南理工大学万方科技学院本科毕业论文 7 1) analog control signal line should use two-strands shielding line, cable specifications for 0.75 mm2. When the wiring must pay attention to, to the extent possible, the cable Baoxian short (5-7 mm or so), while Bao Xian after the shield should wrap insulating tape to prevent shielding lines and other equipment contact with the introduction of interference. 2) To improve the simple wiring and reliability, signal recommend the use of online video pressure bar. (5) converter and the operation of the relevant parameters set Inverter setting parameters, the parameters of each have a certain range of options, often encountered in the use of individual set of parameters for misconduct, leading converter does not work phenomenon. Control: that is, speed control, transferred from the control, PID control or other means. To take control, according to the general control precision, the need for static or dynamic identification. Running a minimum of: that is, the minimum speed motor running, the motor running at low speed, its poor performance cooling, electrical long run on low speed, it can cause burning motor. And at low speed, the cable will increase in the current, cable will lead to fever. The maximum operating frequency: the general maximum frequency converter to 60 Hz, and some even to 400 Hz, high-frequency will enable high-speed motor operation, which the ordinary motor, its bearings can not be over-speed long run, whether the motor rotor To be capable of such a centrifugal force. Carrier frequency: the higher the carrier frequency setting its high harmonics greater weight, and the length of cable, the electrical heating, cable converter fever fever and other factors are closely related. Electrical parameters: the frequency converter to set parameters of the motor power, current, voltage, speed, maximum frequency, these parameters can be directly in the motor nameplate. FH: In a frequency point, there may be a resonance phenomenon, particularly in the relatively high when the entire device in control of the compressor, the 河南理工大学万方科技学院本科毕业论文 8 compressor to avoid the surge point. (6) common fault analysis 1) flow failure: over-current fault can be divided into acceleration, deceleration, constant speed over-current. May be due to the increase in frequency converter too little time to slow down, load mutations, the unequal distribution of load, output short-circuit, and other causes. At this time can be extended by the general acceleration and deceleration time, reduce the load of mutations, plus braking energy components, load distribution design, the lines to be checked. If off-load converter or a failure that has been Central converter inverter circuits, to be replaced converter. 2) overload fault: overload fault, including frequency and overload the electrical overload. May be accelerated their time is too short, too low voltage power grids, Fuzaiguochong and other causes. General can be accelerated through the extension of time to extend the braking time, such as check-voltage power grid. Fuzaiguochong, selected motor and inverter can not drag the load, but also may be due to poor machinery lubrication caused. If the former is the need to replace high-power motors and inverter, if the latter will have to carry out maintenance on production machinery. 3) under-voltage: the importation of some of the power inverter that there are problems, need to check before you can run. 变频器设计使用参考 ( 1)变频器选型: 变频器选型时要确定以下几点: 1) 采用变频的目的;恒压控制或恒流控制等。 2) 变频器的负载类型;如叶片泵或容积泵等,特别注意负载的性能曲线,性能曲线决定了应用时的方式方法。 3) 变频器与负载的匹配问题 电压匹配:变频器的额 定电压与负载的额定电压相符。 河南理工大学万方科技学院本科毕业论文 9 电流匹配:普通的离心泵,变频器的额定电流与电机的额定电流相符。对于特殊的负载如深水泵等则需要参考电机性能参数,以最大电流确定变频器电流和过载能力。 转矩匹配:这种情况在恒转矩负载或有减速装置时有可能发生。 4) 在使用变频器驱动高速电机时,由于高速电机的电抗小,高次谐波增加导致输出电流值增大。因此用于高速电机的变频器的选型,其容量要稍大于普通电机的选型。 5) 变频器如果要长电缆运行时,此时要采取措施抑制长电缆对地耦合电容的影响,避免变频器出力不足,所以在这样情况下,变频器容量 要放大一档或者在变频器的输出端安装输出电抗器。 6) 对于一些特殊的应用场合,如高温,高海拔,此时会引起变频器的降容,变频器容量要放大一挡。 ( 2)变频器控制原理图设计: 1) 首先确认变频器的安装环境 工作温度:变频器内部是大功率的电子元件,极易受到工作温度的影响,产品一般要求为 0 55,但为了保证工作安全、可靠,使用时应考虑留有余地,最好控制在 40以下。在控制箱中,变频器一般应安装在箱体上部,并严格遵守产品说明书中的安装要求,绝对不允许把发热元件或易发热的元件紧靠变频器的底部安装。 环境温度:温度太 高且温度变化较大时,变频器内部易出现结露现象,其绝缘性能就会大大降低,甚至可能引发短路事故。必要时,必须在箱中增加干燥剂和加热器。在水处理间,一般水汽都比较重,如果温度变化大的话,这个问题会比较突出。 腐蚀性气体:使用环境如果腐蚀性气体浓度大,不仅会腐蚀元器件的引线、印刷电路板等,而且还会加速塑料器件的老化,降低绝缘性能。 振动和冲击:装有变频器的控制柜受到机械振动和冲击时,会引起电气接触不良。淮安热电就出现这样的问题。这时除了提高控制柜的机械强度、远离振动源和冲击源外,还应使用抗震橡皮垫固定控制柜外和内电 磁开关之类产生振动的元器件。设备运行一段时间后,应对其进行检查和维护。 河南理工大学万方科技学院本科毕业论文 10 电磁波干扰:变频器在工作中由于整流和变频,周围产生了很多的干扰电磁波,这些高频电磁波对附近的仪表、仪器有一定的干扰。因此,柜内仪表和电子系统,应该选用金属外壳,屏蔽变频器对仪表的干扰。所有的元器件均应可靠接地,除此之外,各电气元件、仪器及仪表之间的连线应选用屏蔽控制电缆,且屏蔽层应接地。如果处理不好电磁干扰,往往会使整个系统无法工作,导致控制单元失灵或损坏。 2) 变频器和电机的距离确定电缆和布线方法 变频器和电机的距离应该尽量的短。这 样减小了电缆的对地电容,减少干扰的发射源。 控制电缆选用屏蔽电缆,动力电缆选用屏蔽电缆或者从变频器到电机全部用穿线管屏蔽。 电机电缆应独立于其它电缆走线,其最小距离为 500mm。同时应避免电机电缆与其它电缆长距离平行走线,这样才能减少变频器输出电压快速变化而产生的电磁干扰。如果控制电缆和电源电缆交叉,应尽可能使它们按 90 度角交叉。与变频器有关的模拟量信号线与主回路线分开走线,即使在控制柜中也要如此。 与变频器有关的模拟信号线最好选用屏蔽双绞线,动力电缆选用屏蔽的三芯电缆(其规格要比普通电机的电缆大档)或遵从 变频器的用户手册。 3) 变频器控制原理图 主回路:电抗器的作用是防止变频器产生的高次谐波通过电源的输入回路返回到电网从而影响其他的受电设备,需要根据变频器的容量大小来决定是否需要加电抗器;滤波器是安装在变频器的输出端,减少变频器输出的高次谐波,当变频器到电机的距离较远时,应该安装滤波器。虽然变频器本身有各种保护功能,但缺相保护却并不完美,断路器在主回路中起到过载,缺相等保护,选型时可按照变频器的容量进行选择。可以用变频器本身的过载保护代替热继电器。 控制回路:具有工频变频的手动切换,以便在变频出现故障时可 以手动切工频运行,因输出端不能加电压,固工频和变频要有互锁。 4) 变频器的接地 变频器正确接地是提高系统稳定性,抑制噪声能力的重要手段。变频器的接地端子的接地电阻越小越好,接地导线的截面不小于 4mm,长度不超过 5m。变频河南理工大学万方科技学院本科毕业论文 11 器的接地应和动力设备的接地点分开,不能共地。信号线的屏蔽层一端接到变频器的接地端,另一端浮空。变频器与控制柜之间电气相通。 ( 3)变频器控制柜设计 变频器应该安装在控制柜内部,控制柜在设计时要注意以下问题 1) 散热问题:变频器的发热是由内部的损耗产生的。在变频器中各部分损耗中主要以主电路 为主,约占 98%,控制电路占 2%。为了保证变频器正常可靠运行,必须对变频器进行散热我们通常采用风扇散热;变频器的内装风扇可将变频器的箱体内部散热带走,若风扇不能正常工作,应立即停止变频器运行;大功率的变频器还需要在控制柜上加风扇,控制
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 酱油化学知识培训课件
- 2025年后备人才培养方案
- 护理健康教育的方法与技巧
- 旅拍技巧课程介绍
- 幼儿园保育员2025年工作方案及目标
- 2025年元旦主题晚会的策划方案模板
- 会展客户关系管理概述
- 煤矿建设安全
- 物流专业知识你熟悉吗
- 白酒加工技术
- 运输供应商年度评价表
- 中层干部任期考核民主测评表
- 旅游项目融投资概述
- 全旅馆业前台从业人员资格证考试答案解析
- 十二经络及腧穴课件
- 立式圆筒形储罐罐底真空试验记录
- 公司新员工入职登记表(模板)
- 新疆大地构造单元划分论文(董连慧)2017最新整理
- 办公室工作存在问题(总结12篇)
- 住宅改为经营性用房证明(参考样本)
- BD 420008-2015 全球卫星导航系统(GNSS)导航电子地图应用开发中间件接口规范
评论
0/150
提交评论