全文预览已结束
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
16930s09- sequence of operation1.variable air volume (vav) system with tracking return fan 1. variable air volume control 1.on start up the inlet vanes shall be in the minimum position. 2.a static pressure controller shall, through the ddc panel, modulate the variable volume vanes as required to maintain the desired end of line duct static and space static where applicable. end of line duct static shall be sensed approximately 2/3 the distance from the supply fan to the end of the duct. actual end of line duct static sensor location shall be determined by system design and shall be the responsibility of the ddc installer to insure correctness of operation. 2.occupied cycle 1.the unit fan shall be started and stopped from the central monitoring and control fms system. return fan s/s shall be interlocked with supply fan. 2.when the unit supply fan is started, the outdoor air dampers shall assume their minimum design position (approx. 10%). the mixed air and exhaust air dampers shall assume their corresponding design positions. provide a morning warmup cycle, which shall maintain the outdoor air dampers in a closed position until return air temperature is 70 degree f (adjustable). 3.a mixed air sensor, averaging type, shall (through its ddc panel) override the control of the outdoor air, mixed air, return air and exhaust air dampers as required to prevent the mixed air temperature from falling below 55 degree f. 4.summer/winter switch-over switch system to summer operation when the following conditions have been met: 1.space temperature indicates cooling is required. 2.outside air temperature indicates cooling is required. 3.cooling is available. e.g. chilled water is available from central chilled water system or local package unit. 4.cws temperature sensor indicates that cooling is available if needed.note:the exact numbers specifying the variables in the conditions above shall be initially installed with the building function in mind and shall be modifiable from the central fms system by uk personnel as required.when conditions are met for summer operation, the outdoor air damper shall be returned to their minimum design position with the return and exhaust dampers going to their corresponding design position. 3.unoccupied cycle 1.the unit fan shall be deenergized and outdoor air dampers shall go to the closed position. 2.night cycle an rtd space sensor shall (through the ddc panel) cycle the unit fan as required to maintain the design unoccupied temperature in summer approx. (78 degree f) and the design unoccupied temperature in winter approx. (65 degree f). the outdoor air dampers shall remain closed when chilled water is available in summer and heating is needed in winter. outdoor air shall be utilized for cooling in summer when no chilled water is available and cooling is required. 4.temperature control 1.an rtd temperature sensor in the duct, shall (through the ddc panel) modulate the twoway valve on the cooling coils, return air dampers, mixed air dampers and the heating coil threeway valve as required to maintain the desired space temperature, approximately (78 degree f). 2.unit discharge temperature shall be capable of being set from the central system. the absolute setpoint shall be reset and by space temperature load reset schedule. an increment/decrement setpoint reset algorithm is not acceptable. 5.fire alarm interlock 1.supply and return fan shall be hard wire electrically interlocked to stop upon actuation of the building fire alarm system. 2.install smoke detectors in the supply and return air plenums in accordance with uk standard 16720s01. 6.freeze stata low limit thermostat on the inlet to the chilled water coil shall be hard wire electrically interlocked to stop the supply fan and close all unit dampers below 40 degree f.2.fan powered vav terminal units 1.for each fan terminal unit, provide a heating coil control valve. provide pneumatic thermostats to control individual units or multiple units in parallel as indicated on the drawings. uks preference is to have a dedicated thermostat for each room. 2.occupied cycleduring the day (occupied) cycle, the fan terminal unit shall be energized and run continuously through the pe switch and the day/night zone signal line. day night cycles for each individual zone shall be indexed from the delta 5600 system through the 540 ddc panel. each air handling system shall have separate day/night zones and each floor served shall be a separate day/night zone also.during the day (occupied) cycle, the room thermostat shall maintain space temperature by modulating the unit primary air damper and the heating coil valve. upon demand for cooling, heating coil shall be off, and the box damper shall modulate flow of primary air through the box to control space temperature to setting of cfm limiter. when room temperature begins to fall below the setting of the room thermostat, the primary air damper shall modulate to its closed or minimum position. if the space temperature continues to fall below room thermostat setting, the thermostat shall modulate the heating coil valve to maintain room temperature. 3. unoccupied cycleduring the night (unoccupied) cycle when floor zone is indexed to night by the delta 5600 system, the heating coil valve shall be full open, the primary air damper shall be closed and the unit fan shut down by the zone day/night pe switch. the zone night cycle sensor, shall through the 540 ddc panel cycle a separate pe switch for each zone which shall index all units to day to maintain reduced night thermostat setting. after night thermostat setting is satisfied, pneumatic switch shall open, shutting down all fan terminal units. 4.on lab vav terminal units, see exact sequence of operation for the unit in question, reference to fume hood interlocks must be addressed. 3.variable air volume terminal units 1.a pneumatic space thermostat shall modulate the vav unit actuator from full open to minimum position to maintain the design space temperature (adjustable). uks preference is to have a dedicated thermostat for each room. 2.on lab vav terminal units, see exact sequence of operation for the unit in question, reference to fume hood interlocks must be addressed.4.chiller(s) 1.operation of the chiller shall be enabled and disabled from the 5600 fms. 2.when evaporator flow is proven the chiller shall start and operate under the control of the manufacturer unit mounted control panel to maintain 55 degree f (adjustable) return water temperature. the evaporative condenser control damper shall modulate to maintain the head pressure via a modulating proportional controller furnished by the unit manufacturer. 3.provide individual start/stop of chilled water pumps. 4.when the chiller is energized the closed circuit evaporative condenser spray pump and fan(s) shall be energized. 5.chiller shall be factory equipped with safeties and these shall not be defeated by the fms system in any way.5.gasfired hot water boiler 1.the boilers shall be enabled and disabled form the 5600 fms. when heating water flow is proven, the lead boiler shall be able to fire in response to the load under the control of the unit mounted control panel to maintain the discharge water temperature. then the lead boiler is unable to maintain the load the second boiler shall fire under the control of the unit mounted control panel to maintain the discharge water setpoint. 2.the heating hot water supply temperature to the building loop shall be maintained by a modulating three-way mixing valve. the valve shall act in response to a panel mounted, adjustable ratio controller that receives the outdoor air and hot water supply temperature signals. the controller shall have a remote setpoint input port for future connection to a remote setpoint adjustment signal from the fms. the controller shall modulate the control valve to reset the hot water supply temperature in an inverse ratio to outdoor air temperature variations according to the following reset schedule:outdoor air temphot water temp0 degree f180 degree f70 degree f90 degree f 3.provide a high limit in the hot water supply header, which shall override the reset controls to prevent the hot water supply temperature from exceeding 200 degree f. 4.boiler shall be factory equipped with safeties and these shall not be defeated by the fms system in any way. 5.provide start/stop control of hot water pumps. 6.hot water convertor 1. temperature control 1.an rtd temperature sensor in the outdoor air and in the space being served shall (through the ddc panel) modulate steam valves to maintain the design water temperature in accordance with the following be reset algorithm. 2. given the design reset schedule for the building:for example:oathwtoathwtoat1hwt1 0of200ofoat2hwt2 65of120ofhwt = hot water temperature hwt1= design low hot water temperaturehwt2= design high hot water temperatureoat = outside air temperatureoat1= design low outdoor air temperatureoat2= design high outdoor air temperaturehwsp =converter temperature setpoint entered at 5600 terminalst = space temperaturestsp = space temperature setpoint entered a 5600 terminalm1 =
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- GB 4234.3-2024外科植入物金属材料第3部分:锻造钛-6铝-4钒合金
- 高考物理总复习专题七电场第2讲电势能、电势、电势差练习含答案
- 《品牌规划方案》课件
- 高中信息技术 《虚拟现实初探》教案 沪教版选修5
- 八年级物理下册 第九章 压强 第1节 压强第2课时 压强的综合运用教案(新版)新人教版
- 2024年五年级数学上册 三 游三峡-小数除法信息窗2 除数是小数的小数除法除法教案 青岛版六三制
- 2024-2025版新教材高中化学 第2章 第2节 第2课时 离子反应教案 鲁科版必修第一册
- 2023九年级数学下册 第24章 圆24.4 直线与圆的位置关系第3课时 切线长定理教案 (新版)沪科版
- 2024年七年级生物下册 2.1.3营养物质的吸收和利用教学设计 (新版)冀教版
- 应急管理工作格言
- 【8物(科)期中模拟】合肥市2023-2024学年八年级上学期期中模拟物理作业试卷
- 情商与智慧人生学习通超星期末考试答案章节答案2024年
- 部编人教版《道德与法治》六年级上册第6课《人大代表为人民》课件
- 液化气站双重预防体系手册
- 盘扣式卸料平台施工方案
- 《无人驾驶航空器飞行管理暂行条例》考试复习题库(含答案)
- 2024年榆林交通投资建设集团有限公司招聘笔试冲刺题(带答案解析)
- 空乘人员生涯发展展示
- 新探索研究生英语(基础级)读写教程参考答案Language-focus
- 习近平总书记关于教育的重要论述研究学习通章节答案期末考试题库2023年
- 部编 二年级语文上册 第七单元【教材解读】
评论
0/150
提交评论