1、附录二 外文参考文献及翻译NATM tunnel design principle in the construction of major and Construction TechnologyW.BroereI.The NATM Design Principle1.Tunnel design and construction of two major theoretical and development process Since the 20th century, human space on the ground floor of the growing demand, thus t
2、he underground works of the study of a rapid development. In a large number of underground engineering practice, it is generally recognized that the tunnel and underground cavern project, the core of the problem, all up in the excavation and retaining two key processes. How excavation, it will be mo
3、re conducive to the stability and cavern facilitate support : For more support, Supporting how they can more effectively ensure stability and facilitate the cavern excavation. This is the tunnels and underground works two promote each other and check each others problems. Tunnels and underground cav
4、erns, and focusing on the core issues with the above practice and research, in different periods, People of different theories and gradually established a system of different theories, Each system includes theory and resolve (or are studying the resolution) from the works of understanding (concept),
5、 mechanics, engineering measures to the construction methods (Technology), a series of engineering problems. A theory of the 20th century the 1920s the traditional load relaxation theory. Its core content is : a stable rock self-stability, no load : unstable rock may have collapsed. need shoring str
6、ucture to be supported. Thus, the role of the supporting structure of the rock load is within a certain range may be due to relaxation and collapse of rock gravity. This is a traditional theory, and their representative is Taishaji and Principes and others. It works similar to the surface issues of
7、the thinking is still widely used to. Another theory of the 20th century made the 1950s the modern theory of timbering or rock for the theory. Its core content is : rock stability is clearly bearing rock to their own self-stability : unstable rock loss of stability is a process, and if this process
8、in providing the necessary help or restrictions will still be able to enter the rock steady state. This theoretical system of representative characters Labuxiweici, Miller-Feiqieer, Fenner - Daluobo and Kashitenai others. This is a more modern theory, it is already out of the ground works to conside
9、r the ideas, and underground works closer to reality, the past 50 years has been widely accepted and applied. demonstrated broad development prospects. Can be seen from the above, the former theory more attention to the findings and the results of treatment : The latter theory is even more attention
10、 to the process and the control of the process, right from the rock for the full utilization of capacity. Given this distinction, which both theory and methods in the process, each with different performance characteristics. NATM theory is rock for the tunnel engineering practice in the representati
11、on method.2. NATM NATM that the new Austrian Tunneling Method short the original is in New Austrian Tunneling Method, referred to as the NATM. France said it convergence bound or some countries alleged to observe the dynamic design and construction of the basic principles. NATM concept of filibuster
12、ing Xiweici Austria scholars in the 20th century, Professor age of 50. It was based on the experience of both the tunnel and rock mechanics theory, will bolt and shotcrete combination as a major means of supporting a construction method, Austria, Sweden, Italy and other countries, many practical and
13、 theoretical study in the 1960s and patented officially named. Following this approach in Western Europe, Scandinavia, the United States and Japan and many other underground works with a very rapid development, have become modern tunnels new technologies landmark. Nearly 40 years ago, the railway se
14、ctor through research, design, construction combining, in many construction of the tunnel, according to their own characteristics successfully applied a new Austrian law, made more experience, have accumulated large amounts of data, This is the application stage. However, in the road sector NATM of
15、only 50%. Currently, the New Austrian Tunneling Method almost become weak and broken rock section of a tunnel construction method, technical and economic benefits are clear. NATM the basic points can be summarized as follows : (1). Rock tunnel structure is the main loading unit, the construction mus
16、t fully protect the rock, it minimize the disturbance to avoid excessive damage to the intensity of rock. To this end, the construction of sub-section should not block too much, excavation should be used smooth blasting, presplit blasting or mechanical tunneling.(2). In order to give full play to ro
17、ck the carrying capacity should be allowed to control and rock deformation. While allowing deformation, which can be a rock bearing ring; The other hand, have to limit it, Rock is not so lax and excessive loss or greatly reduced carrying capacity. During construction should be used with rock close t
18、o, the timely building puzzle keeps strengthening Flexible support structure, such as bolting and shotcreting supporting. This adjustment will be adopted supporting structural strength, Stiffness and its participation in the work of the time (including the closure of time) to control the deformation
19、 of the rock mass. (3). In order to improve the support structure, the mechanical properties, the construction should be closed as soon as possible, and to become a closed cylindrical structure. In addition, the tunnel shape with a round should, as far as possible, to avoid the corner of the stress
20、concentration. (4). Construction right through the rock and supporting the dynamic observation, measurement, and reasonable arrangements for the construction procedures, changes in the design and construction management of the day-to-day. (5). To lay waterproof layer, or is subject to bolt corrosion
21、, deterioration of rock properties, rheological, swelling caused by the follow-up to load, use composite lining. (6). Lining in principle, and the early rock deformation Supporting the basic stability of the conditions under construction. rock and supporting structure into a whole, thereby improving
22、 the support system of security. NATM above the basic elements can be briefly summarized as : less disturbance, early spray anchor, ground measurements, closed tight.3With a spring to understand the principle NATM (1). Cavern brink of a point A in the original excavation ago with stress (stress self
23、-respect and tectonic stress) in a state of equilibrium. As an elastic stiffness of the spring K, P0 under compression in a state of equilibrium. (2). Cavern excavation, A point in attacking lose face constraints, the original stress state to be adjusted, if the intensity of rock big enough, After l
24、ess stress adjustments may cavern in a stable condition (without support). But most of the geological conditions of the poor, that is, after the stress cavern adjustments, such as weak protection, we could have convergence deformation, even instability (landslides), must be provided to support power
25、 PE, in order to prevent landslides instability. Equivalent to the Spring of deformation u, in the role of PE is now in the midst of a state of equilibrium. (3). By the mechanical balance equation, we can see in the spring P0 role in a state of equilibrium; Spring in the event of deformation u, PE i
26、n the role they will be in equilibrium, assuming spring elasticity of K, were : P0=PE+Ku Discussion : (1) When u = 0, that is not allowed P0=PE rock deformation, is a rigid support, not economic; (2) when u , PE ; When u , PE . That is, rock deformation occurred, the release of some of the load (unl
27、oading), we should allow some extent rock deformation, to give full play to rock the capacity for self. Is an economic support measures, the rock self-stability P=P0-PE=Ku;(3) When u=umax, landslides, have relaxation load and unsafe. 4. Points(1). Rock cavern excavation is affected by that part of r
28、ock (soil) body, the rock is a trinity : have a load bearing structure, building materials. (2). Tunnel construction is in the rock stress is of special architectural environment, which can not be equated with the construction on the ground. (3). Tunnel structure rock + = bracing system.II. The new
29、Austrian highway construction in the basic methodNATM one of the characteristics is the scene monitoring, measurement information to guide construction, through the tunnel construction measure receipts and excavation of the geological observation for prediction and feedback. And in accordance with t
30、he established benchmark for measuring the tunnel construction, excavation section steps and sequences, Supporting the initial parameters for reasonable adjustments to guarantee the safety of construction, a tunnel rock stability, the quality of the project and supporting structure of the economy an
31、d so on. The author of commitments (Chengde) Chek (Chifeng) East Maojingba Tunnel NATM basic construction method for investigation concluded, synthesis of a new highway tunnel Natm the selection of different types and the basic characteristics of the construction methods and tips. 1. A tunnel constr
32、uction method of choice tunnel construction method of choice, mainly based on the engineering geological and hydrogeological conditions Construction, rock type, buried deep tunnel, the tunnel section size and length lining types, Construction should be the premise of safety and engineering quality a
33、t the core, and with the use of the tunnel function, the level of construction technology, Construction machinery and equipment, time requirements and economic feasibility of factors to consider in selection. When choosing the method for tunnel construction on the surrounding environment negatively
34、affected, should also be a tunnel, the environmental conditions as the method to choose one of the factors, taking into rock changes the method and the applicability of the possibility of change. Tunnel project to avoid mistakes and unnecessary increase investment in public works. NATM new construct
35、ion, we should also consider the entire process of construction of auxiliary operations and changes in the surrounding rock to measure control methods and the tunnel through special geological lots of construction means for a reasonable choice. 2. New Austrian Tunneling Method program New Austrian T
36、unneling Method used all methods can be divided into sections, Division level and the three major types of excavation method and some changes in the program.(1) Full-face method. That whole section excavation method is based on the design of an excavation face excavation molding. Excavation order is
37、 its full face excavation, steel bracing, pouring concrete lining. Often choose to IV-VI Class Rock Hard Rock Tunnel, which can be used blasting deep hole.Excavation whole section of the law is a larger space operations, introducing supporting large mechanized operations, improving the speed and pro
38、cess small, less interference and facilitate the construction organization and management. Excavation is due to shortcomings in the larger, lower relative stability of rock, and with each cycle of the relatively large workload, it requires the construction units should have a strong excavation, tran
39、sport and slag out and support capability, Maojingba VI : Class V rock used in the full-face excavation to achieve the desired results.Full-face excavation face, drilling and blasting construction more efficient use of deep focus to accelerate the excavation blasting speed, and the rock blasting vib
40、ration frequency less conducive to a stable transfer rocks. The drawback is every deep hole blasting vibration larger. Therefore require careful drilling and blasting design and strict control of blasting operations. Full-face excavation method is the main process : the use of mobile carts (or platf
41、orms), the first full-face a bored, and installed a line, and then drilling platform car outside 50m back to a safe place and then detonate, Blasting to make a shape out after drilling Jardine car again moved to the excavation face in place, began a cycle of drilling and blasting operations, Anchor
42、sprayed simultaneously supporting or after the first arch wall lining.(2) step method. Step method of design is generally divided into sections on the half-section and the lower half section two excavation molding. Excavation order is its first half excavation arch bolt jet concrete bracing, arch li
43、ning, the central part of the second half of excavation, sidewall of excavation, concrete wall jet bolt support and lining. The more applicable to the II, III and soft joint development of the surrounding rock, which were used Tim change program.Long-step method : The next stage distance away, on th
44、e general level above 50m ahead, Construction can be assigned to the Department of next larger machine with parallel operations, when mechanical deficiencies can be used interchangeably. When the case of a short tunnel, the upper section will be all dug later, and then dug under the section, the con
45、struction of which less interference, single process can work.Short step method : on the stage length 5-50m apply to , rock can be shortened Invert closing time, Supporting improve early stress conditions, but larger construction interference, in the event of Soft Rock need to consider carefully, Au
46、xiliary shall be applied measures to stabilize the excavation excavation face, in order to ensure the safety of construction. Ultrashort step method : The only step ahead 3-5m, section closed faster. The method used for the high level of mechanization of various rock section, in the event of the sie
47、ge soft rock when required careful consideration. Auxiliary shall be applied measures to stabilize the construction excavation face to ensure the safety of construction. Excavation level of character is the first step to using light excavation drilling machine drill a hole, rather than through large
48、 drilling platform car. Two step method of excavation operations with sufficient space and a faster rate of construction. Level is conducive to the stability of excavation face. Especially Excavation in the upper, lower operational safety. Three step method of excavation is the next shortcomings of
49、operations interfere with each other. It should be noted at the bottom of the upper operational stability, level of excavation will increase the number of country rock. (3) Segment excavation method. Excavation Law Division can be divided into five changes in the program : Excavation Division level,
50、 from top to bottom hole lead, heading advance on the excavation, single (double) and lateral pit method. Excavation will be conducted Section Division excavation by the Ministry of shape, and to advance some of excavation, it may be called derivative ahead excavation pit method. Law Division level
51、: general application or soil collapse easily lots of soft rock, with its advantages - stage method, height can be lengthened, the two-lane tunnel for a hole-fold, cycling Road Tunnel - hole 2 times; rather than single (double) PENDANTS Heading a high degree of mechanization, can accelerate the prog
52、ress of the projects.The next heading advance excavation method (that is guided pit wall first arch) : This Act applies to , rock. in the soft ground tunneling, to be adopted next general guide advance excavation pit wall first arch Act. Its advantages are : Heading advance excavation, the use of pr
53、oven geological conditions in advance to facilitate change in the method. Face to facilitate started procedures applicable to the labor arrangements for the use of small machinery and construction. The drawbacks : The next section will guide small, slow construction and construction processes more,
54、construction and management difficult. Unilateral-arm pit Law : rock instability, the tunnel span larger, ground subsidence is difficult to control when using this method. Its characteristics are : a positive step and arms Heading Act advantages. Bilateral arm Heading law : in large-span shallow tun
55、nels, surface subsidence require strict, especially poor rock used. Advantages of this method are : Construction of safe, reliable, but slow construction, high cost. III.The main tunnel construction technology1. Cave construction : (1) excavation slope around : Lofting total station measurements, th
56、e use of excavators from top to bottom, paragraph by paragraph excavation, not the amount of excavation or the end of next overlapping excavation, remove pits with the above may slump topsoil, shrubs and rock slopes, rock strata of slope excavation needs blasting, Discussion should focus mainly loos
57、e blasting. Also partial artificial finishing, when excavation and inspection slope of slope, if sliding and cracking phenomenon and slowing down due slope. (2).Cheng Tung-supporting :Yang Brush Singapore Singapore after the completion of timely inspection plate slope gradient, the gradient to pass
58、the inspection, the system set up to fight time anchor, and the exposed bolt heads, hanging metal based network expansion and bolt welding into first overall. Linked network immediately after the completion of shotcrete and repeatedly jet until it reaches the thickness of the design so far. (3).as o
59、f gutter construction : Yang slope away from the groove 5 meters excavation ditch interception, interception gutter mainly mechanical excavation, artificial finishing, after dressing, 7.5# immediately masonry made of mortar and stones, and the floor surface with mortar. 2. Auxiliary construction : (1)A long pipe roof : Sets arch construction : construction Lofting, template installation, assembling reinforcement, the guidance of lofting 127 in
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 微生物检验项目的审批流程试题及答案
- 项目计划的编制与实施步骤详解试题及答案
- 深入研究2025年国际金融理财师试题及答案
- 八年级语文上册 第五单元 19《苏州园林》教学设计 新人教版五四制
- 2025年注册会计师考试会计软件对企业管理效率的提升试题及答案
- 系统化学习项目管理课程的必要性试题及答案
- 微生物检验技师课程设置分析
- 微型课题申报书 口算
- 课题申报书指导
- 项目管理能力提升的有效途径试题及答案
- 缓和医疗-以死观生的生活智慧智慧树知到期末考试答案2024年
- 《石油化工企业场地地下水污染防治技术指南》(T-CAEPI 39-2021)
- 基于STM32的智能避障循迹小车系统设计答辩模板
- 自考00537中国现代文学史押题精华考点汇总
- 特种设备使用单位风险管控清单
- 中医养生讲义
- 工厂供电安全课件
- 肺癌一病一品护理框架护理方案
- 视神经脊髓炎护理课件
- 中国卒中急救地图申报流程
- 2024年机载电子设备行业分析报告及未来发展趋势
评论
0/150
提交评论