




版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、Petroleum Engineering 406Lesson 18 Directional Drilling,Lesson 10 - Directional Drilling,When is it used? Type I Wells (build and hold) Type II Wells (build, hold and drop) Type III Wells (build) Directional Well Planning & Design Survey Calculation Methods,Homework:,READ. “Applied Drilling Engineer
2、ing”Ch. 8, pp. 351-363 REF. API Bulletin D20, “Directional Drilling Survey Calculation Methods and Terminology”,What is Directional Drilling?,Directional Drilling is the process of directing a wellbore along some trajectory to a predetermined target. Basically it refers to drilling in a non-vertical
3、 direction. Even “vertical” hole sometimes require directional drilling techniques.,Examples: Slanted holes, high angle holes (far from vertical), and Horizontal holes.,North,Direction Angle,Direction Plane X,Inclination Angle,Z Axis (True Vertical Depth),Inclination Plane Y,q, a or I,f, e or A,Non-
4、Vertical Wellbore,Figure 8.2 - Plan view of a typical oil and gas structure under a lake showing how directional wells could be used to develop it. Best locations? Drill from lake?,Lease Boundary,Surface Location for Well No. 1,Bottom Hole Location for Well 2,Surface Location for Well No. 2,Houses,O
5、il-Water Contact,Figure 8.3 - Typical offshore development platform with directional wells.,NOTE: All the wells are directional,Top View,5 - 50 wells per platform,Figure 8.4 - Developing a field under a city using directionally drilled wells.,Drilling Rig Inside Building,Fig. 8.5 - Drilling of direc
6、tional wells where the reservoir is beneath a major surface obstruction.,Why not drill from top of mountain?,Maximum lateral displ.?,Figure 8.6 - Sidetracking around a fish.,Sidetracked Hole Around Fish,Fish Lost in Hole and Unable to Recover,Cement Plug,Figure 8.7 - Using an old well to explore for
7、 new oil by sidetracking out of the casing and drilling directionally.,Possible New Oil,Sidetracked Out of Casing,Oil Producing Well Ready to Abandon,Old Oil Reservoir,Figure 8.8 - Major types of wellbore trajectories.,Build and Hold Type,Continuous Build,Build-hold Drop and/or Hold (Modified “S” Ty
8、pe),Build-hold and Drop (“S Type”),Horizontal Departure to Target,Type I,Type III,Type II,Figure 8.10 - Geometry of the build section.,Build Section,Build Radius:,Build Section:,Build-hold-and drop for the case where:,Target,Drop Off,End of Build,Start of Buildup,Type II,Build-hold-and drop for the
9、case where:,Kickoff,End of Build,Maximum Inclination Angle,Drop Off,Target,Type II,Fig. 8-14. Directional well used to intersect multiple targets,Target 1,Target 2,Target 3,Projected Trajectory,Projected Trajectory with Left Turn to Hit Targets,Fig. 8-15. Directional quadrants and compass measuremen
10、ts,N18E,S23E A = 157o,N55W A = 305o,S20W,Figure 8-16: Plan View,Lead Angle,Lake,Surface Location for Well No. 2,Projected Well Path,Target at a TVD 9,659,Example 1: Design of Directional Well,Design a directional well with the following restrictions: Total horizontal departure = 4,500 ft True vertic
11、al depth (TVD) = 12,500 ft Depth to kickoff point (KOP) = 2,500 ft Rate of build of hole angle = 1.5 deg/100 ft,Example 1: Design of Directional Well,This is a Type I well (build and hold) (i) Determine the maximum hole angle (inclination) required. (ii) What is the total measured depth of the hole
12、(MD)?,2500,10,000,Imax,Imax,TVD1,4,500,12,500,Type I: Build-and-Hold,HD1,Uniform 130” Increase in Drift per 100 ft of hole drilled,10,000 Vert. Depth,4,500 Horizontal Deviation,0,Try Imax = 27o ?,Solution,Type I Well 1.5 deg/100,2500,Available depth = 12,500-2,500 = 10,000,10,000,Imax,Imax,From Char
13、t, Try = 27o,Imax,TVD1,HD1,Build Section,Imax,Imax,TVD1,HD1,MD1 = 1,800 (27/1.5) TVD1 = 1,734 HD1 = 416 Remaining vertical height = 10,000 - 1,734 = 8,266,From chart of 1.5 deg/100, with Imax = 27o In the BUILD Section:,8,266,Solution,Horizontally: 416 + 8,266 tan 27o = 4,628 We need 4,500 only: Nex
14、t try Imax = 25 30 min,Imax,8,266,MD2 = 1,700 (25.5/1.5) TVD2 = 1,644 HD2 = 372,Solution:,Remaining vertical depth = 10,000-1644 = 8,356 ft. Horizontal deviation = 372+8,356 tan 25.5 = 4,358 ft. 4500 Approx. maximum angle = 26 What is the size of target?,MD = MDvert + MDbuild + MDhold,Type II Patter
15、n,Given:KOP = 2,000 feet TVD = 10,000 feet Horiz. Depart. = 2,258 feet Build Rate = 20 per 100 feet Drop Rate = 10 30 per 100 feet The first part of the calculation is the same as previously described.,Procedure - Find:,a) The usable depth (8,000 feet) b) Maximum angle at completion of buildup (180)
16、 c) Measured depth and vertical depth at completion of build up (M.D.=900 ft. and TVD = 886) d) Measured depth, horizontal departure and TVD for 1 /100 ft from chart.,Solve:,For the distances corresponding to the sides of the triangle in the middle. Add up the results. If not close enough, try a dif
17、ferent value for the maximum inclination angle, Imax,Example 1: Design of Directional Well,(i) Determine the maximum hole angle required. (ii) What is the total measured depth (MD)? (MD = well depth measured along the wellbore, not the vertical depth),(i) Maximum Inclination Angle,(i) Maximum Inclin
18、ation Angle,(ii) Measured Depth of Well,(ii) Measured Depth of Well,We may plan a 2-D well, but we always get a 3D well (not all in one plane),Horizontal,Vertical,View,N,View,Fig. 8-22. A curve representing a wellbore between survey stations A1 and A2,MD, a1, e1,DMD,a2, e2,b = dogleg angle,Direction
19、al Drilling,1. Drill the vertical (upper) section of the hole. 2. Select the proper tools for kicking off to a non-vertical direction 3. Build angle gradually,Directional Tools,(i) Whipstock (ii) Jet Bits (iii) Downhole motor and bent sub,Whipstocks,Standard retreivable CirculatingPermanent Casing,S
20、etting a Whipstock,Small bit used to start Apply weight to: set chisel point & shear pin Drill 12-20 Remove whipstock Enlarge hole,Jetting Bit,Fast and economical For soft formation One large - two small nozzles Orient large nozzle Spud periodically No rotation at first,Small Jets,Jetting,Wash out p
21、ocket Return to normal drilling Survey Repeat for more angle if needed,Mud Motors,Drillpipe,Non-magnetic Drill Collar,Bent Sub,Mud Motor,Rotating Sub,Increasing Inclination,Limber assembly Near bit stabilizer Weight on bit forces DC to bend to low side of hole. Bit face kicks up,Hold Inclination,Pac
22、ked hole assembly Stiff assembly Control bit weight and RPM,Decrease Inclination,Pendulum effect Gravity pulls bit downward No near bit stabilizer,Packed Hole Assemblies,Drillpipe,HW DP,String Stabilizer,Steel DC,String Stabilizer,String Stabilizer,MonelDC,Steel DC,NB Stab,Vertical Calculation,Horiz
23、ontal Calculation,3D View,Dog Leg Angle,Deflecting Wellbore Trajectory,0,90,180,270,Bottom Hole Location,Survey Calculation Methods,1. Tangential Method = Backward Station Method = Terminal Angle Method Assumption: Hole will maintain constant inclination and azimuth angles between survey points,Poor
24、 accuracy!,A,B,IA,IB,IB,Average Angle Method = Angle Averaging Method,Assumption: Borehole is parallel to the simple average drift and bearing angles between any two stations. Known: Location of A, Distance AB, Angles,(i) Simple enough for field use (ii) Much more accurate than “Tangential” Method,A
25、,B,IA,IB,IAVG,IAVG,Average Angle Method Vertical Plane:,A,B,IA,IB,IAVG,IAVG,Average Angle Method Horizontal Plane:,N,B,AA,AB,AAVG,E,DE,DN,A,Change in position towards the east: Change in position towards the north:,Change in depth:,Where L is the measured distance between the two stations A & B.,Example,The coordinates of a
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 沈阳市皇姑区2025届三年级数学第二学期期末复习检测试题含解析
- 湖南中医药大学湘杏学院《食品工程与机械2》2023-2024学年第二学期期末试卷
- 天府新区航空职业学院《高级朝鲜语I》2023-2024学年第二学期期末试卷
- 河北女子职业技术学院《生物信息学实践》2023-2024学年第二学期期末试卷
- 各行各业职业探索家长进课堂五花八门的行业工作教育课件
- 皮鞋品牌的社会责任与可持续发展报告考核试卷
- 电动车维修与保养考核试卷
- 渔业资源保护与海洋资源恢复工程考核试卷
- 冷藏车运输与国际冷链标准对接考核试卷
- 畜牧兽医技术研究与推广考核试卷
- 纸箱厂质量管理制度模版
- TSDACM 001-2023 高血压病常见中医证候诊断标准
- pu鞋底制作工艺
- 浙江空气盒子新材料有限责任公司年产20000吨功能性塑料薄膜及多用途包装制品项目环境影响报告
- 电工学(第8版)(上册 电工技术) 课件全套 秦曾煌 第1-14章 电路的基本概念与基本定律- 传感器
- 正念减压疗法的神经机制及应用研究述评
- 2023年成都市金牛区社区工作者招聘考试真题
- 教师发展营造积极学习环境的策略与方法
- 【原创】23祖先的摇篮(第一课时)
- 值日生表格模板
- 胆源性胰腺炎教学查房记录
评论
0/150
提交评论