文档简介
难燃型挤塑聚苯板外墙外保温系统保温工程施工方案编制单位:技术负责人:编制人:编制时刻:目录一编制说明及依据1.编制依据·····································32.编制说明及内容·······························3二工程概况1.工程简介·····································4三施工组织1.施工阻击机组成立······························52.施工组织的启动与高效动作······················53.施工组织机构高效运作保障方法··················74.工程治理流程及目标····························8四施工预备1.组织学习图纸,进行会审························122.编制施工方案、进度打算、资金利用打算··········123.技术施工预备··································134.施工前对基层的要求和标准······················14五系统特点与技术··································15六施工工艺1.系统的施工程序································182.施工条件······································193.施工要点······································204.施工图集······································24七质量标准········································26八技术质量保证方法及体会··························29九成品爱惜方法····································31十平安文明施工1.平安施工······································312.环保方法、文明施工····························343.外墙节能查验批划分及原材料试压件的留置图······36十一平安生产紧急员方法····························37第一章编制说明及依据
编制依据《重庆市居住建筑节能设计标准》(DB50/5024-2002)《民用建筑热工设计标准》GB50176-2002《民用建筑节能设计标准》(采暖居住建筑部份)JGJ26-95《夏热冬冷地域居住建筑节能设计标准》JGJ134-2001《夏热冬冷地域居住建筑节能设计标准》JGJ75-2003《公共建筑节能设计标准》GB50189-2005《外墙外保温施工技术规程》JGJ144-2004《建筑节能工程施工质量验收标准》GB50411-2007《建筑工程施工质量验收统一标准》GB50300-2021《墙体节能建筑构造图集(一)》06J123-2006《建筑装饰装修工程质量验收标准》GB50210-2020《建筑施工高处作业平安技术标准》JGJ80-91编制说明及内容1.针对施工进度打算、施工机械设备、劳动力打算、要紧项目施工方式、工程质量保证对本工程实际情形的要求,在施工组织设计中咱们把施工整体目标、工期保证方法、平安文明施工保证方法、避免噪音及环境爱惜方法、推行应用新工艺、新技术、新材料在本施工组织设计中作为重点论述,其他常规性施工项目的施工方式仅作了一样性论述,以表现本施工组织设计的全面性、可行性、科学性和针对性。本公司机构健全,技术质量部、生产平安数是指导、催促、检查履行工期,执行标准、标准、规程、施工组织设计及其公司规章制度的职能部门,使工程的质量、平安文明施工、工期取得了保证。在本施工组织设计中,咱们编制了推行应用新工艺、新材料、新技术的打算。在科技进步领域里以实现不断进取,推动生产力的进展。第二章工程概况
工程简介工程名称:********项目***楼建设单位:重庆***房地产开发设计单位:*****建筑设计研究院建筑面积:2#楼建筑面积(其中住宅面积㎡;物管用房㎡;社区用房㎡;商业面积㎡)。建筑层数:2#楼共29层;建筑总高度:米工程地址:重庆*********结构类型:剪力墙结构监理单位:重庆*****工程监理施工单位:重庆********建筑设计概况:本工程建筑构造及装修作法如下:墙体与墙面:外墙采纳B1级难燃型挤塑聚苯板保温材料;外墙喷涂施工要紧采纳涂料饰面,保温厚度为20mm。第三章施工组织施工组织机构的成立 工程部经理现场项目经理工程部经理现场项目经理质检员安全员材料员资料员现场项目技术负责人施工员治理体系框图:施工组织机构的启动与高效动作依照本工程的情形及特点,有针对性的组建项目班组,而且人选通过甲、乙两边确认后,全班人马将处于应急工作状态,未进场之前,可依照设计要求踊跃为本工程做好动工前的预备工作(材料、机械、技术等预备工作与策划工作),而且以无条件知足本工程需要为前提,未经甲方同意不半途变换人选。依照项目领导的工作实际,具体明确每一个项目治理人员的责、权、利,使全部治理人员有条不紊、忙而有序地开展工作,从而较大幅度地提高项目领导部的工作效率,有效增进整体治理实力的强化,使项目领导部治理体系有更多的精力和时刻来分析运筹各类复杂的治理局面,做到项目整体下活一盘棋,充分发挥每一个棋子的作用,而且决策有的放矢,胸有成竹,不打无把握之仗。以已制定的各项治理制度来指导、催促、标准每一个治理人员的工作质量、效率。变“人治理人”、“人盯人”为“制度治理人”,做到项目治理“有章可循、执法必严、违章必纠”,如此形成奖惩分明的先进治理模式。在劳动力调配上,由项目领导部会同公司劳动力调配部门,组织优秀施工班组,选择具有丰硕实践体会和施工技术水平的操作人员。专门值得一提的是:我公司项目治理看重经济效益,但更看重社会效益,将项目职业第一作为专项考核制度,并在项目治理中大力提倡和推行,收到了良好的成效和较多老客户和新任务的回报。具体做法是把项目施工职业第一的具体含义,标准分解落实到项目每一个治理人员和操作人员头上并与他们的收入挂勾,形成了自觉杜绝施工质量和材料质量上的以次充好、偷工减料、弄虚作假等不良行为,施工质量做到建设单位工地代表与监理是不是在场都一个样,让业主和用户安心享受精品外墙外保温工程的高品质利用价值。有口皆碑的质量,为我公司在重庆的进展博得一个又一个的新老朋友,而优秀的治理和真诚的效劳又为我公司知名度的提高起到了锦上添花的作用。施工组织机构高效运作保障方法组织强有力的项目班子。成立健全项目领导、工长、内业、材料、机械、劳资等职位责任制,由工程领导小组按期对各专业进行考核。强化鼓励与约束机制,制定业绩评比制度,对各个施工队进行按期信誉评定,制度奖罚分明,按期组织项目领导部治理人员会议,检查工作质量。成立工程领导小组现场办公制,每礼拜召开一次现场办公会,重点解决项目的质量、进度等难题,以确保质量为前提,带动项目各项工作的高效运转。天天下午召开由项目领导主持的班后碰头会,对第二天的工作进行和谐安排。按时参加业主方、监理、项目部组织的例会,重点解决质量、进度、施工技术等难点。明确各项问题的解决方法及时刻,并形成会议记要。实行劳动用工治理,选派组织能力强、技术水平高,能打硬仗的作业队伍,发扬持续作战的精神,确保工期的按时和提早完成。工程治理流程及目标:在全面熟悉施工图,充分领会设计用意的前提下,成立以公司总领导、总工程师为首的质量保证体系,全面操纵施工项目的工程质量。学习图纸和技术资料学习图纸和技术资料学习操作规程和质检准备准备工作材料劳动力准备搭设临时设施测量仪器准备机器设备准备清理、排水办上道要序交接手续技术交底分部分项工程书面交底施工方案交底图纸会审工长向班组长交底自检互检施工交接检查隐蔽工程验收签证现场文明施工按图纸及规范要求施工严格执行操作规程合理安排工序间搭接不合格者返工处理质量评定执行检评标准原材料合格证各类复检试验报告自检记录事故处理记录施工档案质量评定记录隐蔽验收记录施工员施工日记回访使用过程充分发挥施工企业的优势,发扬“团结、实干、创新、奉献”的精神,依据公司质量体系文件规定,制定出严格的质量、平安、工期的操纵方法,大力采纳新技术、新工艺、新材料,以科技进步推动施工生产,紧密与建设单位、设计单位及其它周边相关单位之间的联系,强化项目治理,精心组织施工,确保优质高速地完成施工任务。确保各项目标全面实现,现详述如下:工期目标本工程项目外墙外保温工程合理安排有效工期,我公司在整个施工进程中精心组织现场指导、跟踪监督,力争在此基础上提早完工。工期保证方法从打算上保证该工程工期目标的实现。应结合工程实际情形,依照大体施工顺序进行操纵,为了保证操纵节点工期的实现,天天下班前应付施工部位进行检查,对达不到打算的部位,其方法:一是增加劳动力,二是充分保证工作时刻,三是依照节点工期对各时期施工打算进行合理的调整,必需达到各部们打算的要求。对施工进度打算实行动态治理,及时统计、及时检查、及时调整,使其时期性问题在进程中取得操纵和解决,幸免时期问题的累加造成整体工期的拖延。从质量上保证工期的目标实现。严格操纵每一道工序的进程检查及验收,避免不合格品的显现,幸免返工。与其他分包单位紧密配合,对工程进度、质量、平安全面负责,及时解决各类问题,从组织上保证总进度的实现。对工程量认真计算,合理安排施工,确保工程质量、工期。为实现工期的目标治理,对工程技术复杂的部份必需优选最正确技术方案,编制对限期完成打算的操纵方法。对工程材料、设备必需具有预见性和自行调剂能力,在施工进程中避免因材料供给不及时和设备事故造成停工。在现场条件许诺及必要时采取组织工人倒班的做法。持续施工充分利用有效时刻;尽可能利用有限空间,结合现场实际情形,进行流水施工。在现场条件可能的情形下,雨天或大晴天采取适当的挡雨遮阳降温方法,争取能正常施工。雨季具体施工方法:治理目标增强气象预报的信息搜集工作,把握天气转变情形,备好防雨物资,确保工程雨季期间施工正常。
雨季施工准备
根据工程特点制定相应措施,责任到人。依照工程情形预备必然数量的防雨材料,以备急用。
现场临设应进行检查检修,做好防漏措施,以防遭雨淋和浸泡。
原材料应存入库房,垫起离地约30cm,离墙亦应在30cm以上,且做到先收先发,后收后发,临时露天暂存水泥也应用防雨篷布盖严,堆垛要垫高50cm,四周设排水沟,垛底采取防潮措施。
现场机电设备应提前搭设好防雨棚,每次雨后必须检查机电设备的接零接地保护装置,以保证机电设备的正常运转。雨季施工技术方法
原材料应注意防雨、防潮;预备足够的塑料布,遇雨时可及时进行覆盖防护。适量减小配合比用水量;大雨天严禁施工。下班时,在当日施工部位上用编织布覆盖。钢脚手架必需有良好的防电、避雷装置,并应靠得住接地。雨季施工平安防护必需常常检查用电线路、设备的绝缘情形、漏电爱惜器的灵敏有效性,并做好记录,发觉隐患当即整改;各类电气设备要采取防雨方法,必需保证施工现场的电气开关闸刀、插座、插头的完好,如有破损及时改换,施工完后,要做到人走拉闸。雷雨天气禁止登杆作业,禁止倒闸操作,利用手持电动工具,要保证良好的供电线路必需有漏电爱惜器,潮湿作业施工照明用电必需采纳平安电压。吊篮、钢管脚手架碰到暴雨或5级以上大风等劣天气,应当停止作业,大风、大雨后要检查脚手架是不是牢固,如有倾斜、松扣、崩扣和平安网脱落等现象,要及时进行处置。劳动力配置外墙保温施工班组的劳动力组织,必需选择业绩好、高素养的专业性的施工班组,并依照工程量及工期要求,合理的组织施工所需用的人员数量,既要保证工程的工期不延误,又不造成人员的浪费。劳动力配置图工作范围人员基层处理基层处理干净基层修补平整6人拌料粘接浆料的配制抹面胶浆的拌制2人送料运送拌制的材料6人保温结构施工难燃型挤塑聚苯板保温层施工抹面胶浆施工嵌入玻纤网格布完成抹面胶浆施工30人检查与修补/2人(基层处理人员承担)注:施工人员人数视其实际工程进度作适当调整;上述人员不包括治理人员第四章施工预备组织学习图纸,进行会审通过学习图纸,熟悉图纸内容,了解设计要求和施工达到标准明确工艺流程,把握和了解设计图纸细节。由建设单位、设计单位、施工单位、外墙保温单位一起进行图纸会审,完全将施工图纸所存在的问题排除在施工之前。编制施工方案、预算、加工打算、进度打算、资金利用打算施工方案是统筹计划该工程进行施工预备和正常施工的全面性技术经济文件,同时也是编制施工图预算以保证施工顺利进行的先行技术文件之一,是施工交叉搭接、流水顺畅进行的先决步骤,作好施工前的预算、加工、进度打算步骤安排,方可保证原材料等按时进场待用。该工程采取公司领导下的项目法施工的组织形式,由公司所属丰硕施工体会的施工队承担施工。项目班子职能部门齐全,包括技术、现场工长治理、质量、平安、材料、预算、财务、劳资、机械、治安、后勤等,对工程施工进行全面全进程的系统治理。技术施工预备技术预备在工程进场施工前,项目领导组织项目部治理人员、施工班组长认真熟悉有关的技术文件,结合施工现场实际情形,编制切实可行的施工方案、作业指导书,做好技术交底工作,施工方案报批工作。现场预备依照施工现场场地实际情形,合理布置材料堆放区,分区码放。做好施工班组的临时设施、临电、临水安排工作,合理布置配电箱、电缆、输水管道。劳动力组织外墙保温施工班组必需选择业绩好、高素养的专业性施工队伍,并依照工程量及工期要求,合理的组织施工所需用的人员数量,既要保证工程的施工工期,又不造成人员的浪费。施工前对基层的要求和标准本标准为企业内部标准,其质量验收依据国家质量验收标准,适用于工业与民用建筑外墙面的装饰工程。施工前的基层验收检查;结构工程全数完成,经有关部门验收达到合格标准。对已完成的墙面做分项的验收检查;墙体:表面滑腻干净、接槎平整、线脚顺直清楚,含水率<10%,PH<10阴阳角:滑腻、顺直、没有缺楞掉角的现象。窗、洞、槽:方正、整齐、滑腻,所包括的阴阳角顺直。分格线:宽窄、深度一致均匀,条(缝)平整、滑腻、横平竖直、能顺。外墙门窗安装完成且验收合格。验收墙面时常常显现的问题:空鼓、开裂现象:是由于抹灰前对基层底部处置不到位,抹灰一次过厚或气温太低造成。窗台口:窗口不在同一标高,是施工中不拉通线,找平所造成。墙面接槎明显:缘故是由于结构模板施工时误差较大,且抹灰处置不行,造成墙面有严峻的接槎现象。基层验收对保温施工的阻碍:好的结构基层质量才会有好的保温施工质量,假设基层施工只是关,将直接阻碍保温的施工质量,因此基层验收是保温优质施工的有力保障。如在保温施工前,不做好基层的验收检查,交接时易显现扯皮现象,责任难以划分,阻碍成效,进而阻碍整个工程的验收,给工程带来损失。第五章系统特点与性能难燃型挤塑聚苯板薄抹灰系统中采纳通过严格耐候性实验的系统材料,系统组成的材料强度高、柔性好,与基层粘结牢固,有效地解决了过去保温层开裂的问题;而且施工方便,专门是特殊部位(边、角、孔洞等)的处置。系统要紧材料组成及性能指标序号材料名称规格型号生产厂家1界面砂浆干混重庆首科实业有限公司2胶粘剂干混重庆首科实业有限公司3难燃型挤塑聚苯板1200x600x20mm重庆铂睿建材有限公司4锚栓¢8×80重庆首科实业有限公司5抹面胶浆干混重庆首科实业有限公司6耐碱网格布160g/㎡重庆首科实业有限公司界面砂浆性能指标项目单位性能指标试验方法剪切粘接强度(Mpa)7dMpa≥JC/T90714d≥拉伸粘接强度未处理7dMpa≥14d≥浸水处理≥热处理冻融循环处理碱处理胶粘剂性能指标项目单位性能指标试验方法拉伸粘接强度(与水泥砂浆)原强度Mpa≥JGJ144耐水强度≥拉伸粘接强度(与难燃型挤塑聚苯板)原强度Mpa≥耐水强度拉伸粘接强度(与基层)Mpa≥可操作时间h~JG149锚栓剂性能指标项目单位性能指标试验方法塑料圆盘直径mm≥50游标卡尺测量塑料套管外径原强度mm7~10单个锚栓抗拉承载力标准值(C25混凝土基层)KN≥JG149单个锚栓对系统传热系数增加值W/(㎡·K)~难燃型挤塑聚苯板性能指标项目单位技术要求外墙(架空楼板)外保温不上人屋面一般上人屋面试验方法干表密度Kg/m³25~35GB/T6343导热系数(平均温度25℃±2℃)W/(m·K)≤GB/T10294垂直于板面方向的抗拉强度MPa≥JG149压缩强度(形变10%)kPa≥150≥150≥250GB/T8813体积吸水率,浸水96h%≤GB/T8810尺寸稳定性(70℃±2℃下,48h)%≤GB/T8811燃烧性能级别-B或C级GB8624耐碱玻纤网性能指标项目单位性能指示试验方法标称单位面积质量g/㎡≥160GB/耐碱拉伸断裂强力(经、纬向)N/50mm≥1300GB/耐碱断裂强度保留率(经、纬向)%≥75GB/T20102氧化锆含量%±JC935氧化钛含量%±涂塑量g/㎡≥20GB/抹面胶浆性能指示项目单位性能指标试验方法拉伸粘接强度(与难燃型挤塑聚苯板)原强度MPa≥JGJ144耐水强度耐冻融强度吸水量g/㎡≤500不透水性-试样抹面层内侧无水渗透压折比——≤JG149可操作时间(水泥基)h~第六章施工工艺系统的施工程序:涂料饰面难燃型挤塑聚苯板薄抹灰外墙外保温系统施工程序:基层处理、验收基层处理、验收吊垂直线、弹控制线制备抹面胶浆浆粘贴难燃型挤塑聚苯板安装锚栓抹第一层抹面胶浆压铺耐碱玻纤网抹第二层抹面胶浆浆配制胶粘剂施工条件施工材料配制:胶粘剂或抹面胶浆的配制配料比例:干拌粘接砂浆/水=1/~(重量比)抹面砂浆的配制配料比例:抹面砂浆/水=1/(重量比)配料要求:采纳干混砂浆专用搅拌机进行搅拌,严格操纵加水量和搅拌时刻,确保均匀度和粘稠度;每次应严格操纵配置数量,操纵在2h内用完或按产品说明书要求利用。耐碱网格布:操作方式:抹面砂浆均匀涂抹于保温面层后随即铺贴耐碱网格布,最后在抹面砂浆面层找平。作业条件:外墙墙体工程平整度达到要求,外门窗安装完毕,经质量平安检查验收合格。外墙面上的雨水管件,预埋件设备穿墙管道应提早安装完毕,并留出外保温层的厚度。施工现场环境温度和基层墙体表面温度不能低于5℃,风力不大于5级。施工要点挤塑聚苯板薄抹灰外墙外保温系统大体构造:涂料饰面难燃型挤塑聚苯板的敷设方式:在外墙外侧和架空楼板底侧铺设难燃型挤塑聚苯板采纳粘锚结合方式,平屋面上铺设难燃型挤塑聚苯板采纳干铺或粘接方式,坡屋面上铺设难燃型挤塑聚苯板采纳粘贴方式;难燃型挤塑聚苯板板面应满涂表面处置剂;粘贴难燃型挤塑聚苯板宜采纳点框粘法或条粘法,应用于外墙和坡屋面保温工程的粘贴面积不该小于被粘贴板面面积的50%,应用于架空楼板保温工程的粘贴面积不该小于被粘贴板面面积的60%;墙面难燃型挤塑聚苯板排列应按顺砌方式,竖缝应逐行错缝,墙角处应交织互锁;门窗洞口四角处难燃型挤塑聚苯板不得拼接,应采纳整块难燃型挤塑聚苯板切割成型,难燃型挤塑聚苯板接缝应离开角部至少200mm;难燃型挤塑聚苯板板长度不宜大于1200mm,宽度不宜大于600mm.涂料饰面难燃型挤塑聚苯板的工艺要求:基层的处置:进场进行基层验收,要求大面平整、阴阳角顺直。找平层应与基层粘接牢固,无脱层、空鼓、裂痕,面层不得有粉化、起皮、爆灰等现象。弹、挂操纵线的要求:施工前先看懂图纸,了解建筑立面设计和外墙保温工程的技术要求,在墙面弹出操纵线,测量相关尺寸并确信排版方案;在建筑物外墙阴阳角及其他必要处挂出垂直基准操纵线,每一个楼层适当位置挂水平线,以操纵难燃型挤塑聚苯板粘贴的垂直度和平整度。粘贴难燃型挤塑聚苯板的施工要求:粘贴难燃型挤塑聚苯板前,应利用表面处置剂对板面满涂处置;由勒脚部位开始,由下而上,沿水平方向铺设,竖缝应逐行错缝,在墙角处保温板应交织互锁,并应保证墙角垂直度;按设计粘贴面积及布料位置要求在板面涂抹胶粘剂;粘贴时应轻揉、均匀挤压,及时用2m靠尺和托线板检查平整度和垂直度,清除板面溢出的胶粘剂,板应粘贴牢固,不得有松动和空鼓;粘贴架空楼板底侧难燃型挤塑聚苯板前,应付架空楼板底侧粘贴面满涂界面砂浆。耐碱玻纤网的铺设方式应知足的要求:涂料(饰面砂浆、柔性饰面块材)饰面难燃型挤塑聚苯板薄抹灰外墙外保温系统中,建筑物首层、易受冲击或碰撞部位墙面抹面层内铺设双层160g/㎡耐碱玻纤网;其余墙面抹面层内铺设单层160g/㎡耐碱玻纤网;门窗洞口周边的耐碱玻纤网应翻出墙面100mm,并应在四角沿45度方向加铺一层200mm×300mm的耐碱玻纤网;耐碱玻纤网之间搭接长度不该小于100mm;难燃型挤塑聚苯板的保温墙面与非保温墙面交接处应采纳耐碱玻纤网搭接,搭接宽度不小于200mm;在门窗洞口、管道穿墙洞口、勒脚、阳台、雨篷、女儿墙顶部、变形缝等统的终端部位应用耐碱玻纤网对耐燃型挤塑聚苯板进行翻包,翻包时耐碱玻纤网在难燃型挤塑聚苯板粘接层中的长度不小于100mm;锚固件的设置方式和设置点数的要求:当基层墙体为砼、烧结空心砖、砼小型空心砌块时,锚固件的有效锚固深度应不小于25mm;当基层墙体为加气砼砌块时,有效锚固深度应不小于50mm;建筑高度在50m以下的墙面每平方米设置很多于4个;50m以上的墙面每平方米设置很多于6个;架空楼板保温系统构造中每平方米设置很多于4个;外墙阳角、门窗洞口周围及檐口下均应加密设置,其间距不大于300mm,锚栓距基层墙体边缘应不小于60mm;在外墙阴阳角、门窗洞口周边宜利用塑料护角网增强;难燃型挤塑聚苯板抹面层施工时要求:严格操纵抹面胶浆层的厚度和耐碱玻纤网的铺设位置;单层耐碱玻纤网抹面层施工时,应先用锚栓锚固保温板,然后在其表面均匀抹一道厚度为3mm左右的抹面胶浆,及时将耐碱玻纤网压入,待抹面胶浆干硬至可触碰时,再抹第二道厚度为2mm左右的抹面胶浆,直至全数覆盖耐碱玻纤网,使耐碱玻纤网处于两道砂浆中的中间偏外处;门窗洞口、阴阳角等部位应做好增强网施工。早转角部位,每侧耐碱玻纤网绕角后延伸的宽度不小于200mm;耐碱玻纤网之间不得干搭接,搭接宽度不该少于100mm;外墙外保温系统在门窗洞口周边及檐口、勒脚等处的耐碱玻纤网包边。粘接难燃型挤塑聚苯板前,第一在翻包处基层墙表面涂抹宽度100mm,厚度2mm的粘接胶浆,将窄幅耐碱玻纤网的一端100mm压入胶粘剂内,余下的另一端甩出备用,待难燃型挤塑聚苯板粘接牢固后,在翻包部位的正面和侧面,均涂抹上抹面胶浆,将预先甩出的窄幅耐碱玻纤网沿板厚翻包,并压入抹面胶浆内;施工间歇处应留在自然断开或留茬断开处,以方便后续施工的搭接,如伸缩缝、阴阳角、跳台等部位。在持续面上如需分段施工,抹面胶浆不该万全覆盖已铺好的网格布,须与网格布、底层胶浆呈台阶型坡茬,留茬间距不小于150mm,以避免网格布搭接处整度超出许诺误差;抹面胶浆和耐碱玻纤网铺设施工完毕后,不得扰动,静置养护很多于24h,才可进行下一道工序施工。在严寒潮湿气候条件下,还应适当延长养护时刻;对已经完工的部份,应采取适当爱惜方法,幸免雨水的渗透和冲洗。难燃型挤塑聚苯板建筑外墙外保温系统设置防火隔离带及其他防火构造时,应知足以下要求:防火隔离带采纳的保温材料的燃烧性能品级应为A1或A2级;外墙防火隔离带设置位置应符合相关标准规定及设计要求,防火隔离带高度方向尺寸不该小于300mm,其厚度与建筑外保温系统厚度相同;防火隔离带应与基层满粘。防火隔离带抹面层和建筑外保温系统面层宜为同一种材料,同时施工制作,应将保温材料和锚栓万全覆盖;防火隔离带与其他保温材料交接处应用附加耐碱玻纤网增强处置。施工图集参照国标建筑标准设计06J123《墙体节能筑构造》图集 第七章质量标准难燃型挤塑聚苯板薄抹灰外墙(架空楼板)质量标准:主控项目:难燃型挤塑聚苯板材料外保温系统的性能指标必需符合下表的要求:项目单位性能指标试验方法耐候性外观-外墙架空楼板耐候性试验后,不得出现饰面层起泡或剥落、保护层空鼓或脱落等破坏,不得产生渗水裂缝JGJ144抹面层与难燃型挤塑聚苯板拉伸粘接强度MPa≥吸水性浸水24hg/㎡≤500JG149抗冲击性J1.建筑物墙面不易受碰撞部位:≥3;2.建筑物首层墙面及易受碰撞部位:≥10≥3JGJ144水蒸气湿流密度g/(㎡·h)≥耐冻融性能外观-30次冻融循环后保护层无空鼓、脱落,无渗水裂缝抹面层与难燃型挤塑聚苯板拉伸粘接强度MPa≥抹面层不透水性-浸水2h,试样防护层内无水渗漏-抗风压值kPa不小于工程项目的风荷载设计值,抗风压安全系数K应不下于本系统利用的所有材料品种、质量和技术性能均应知足国家有关标准、地址标准、行业标准及本图集的要求,应检查出厂合格证及进行复检。难燃型挤塑聚苯板薄抹灰外墙(架空楼板)外保温系统保温工程利用难燃型挤塑聚苯板,其导热系数、密度、紧缩强度、燃烧性能应符合设计要求,应检查质量证明文件及进场复检报告。难燃型挤塑聚苯板薄抹灰外墙(架空楼板)外保温系统保温工程利用粘接剂、抹面胶浆和耐碱玻纤网,其拉伸粘接强度,抹面胶浆的压折比,耐碱玻纤网的力学性能、抗侵蚀性能均应符合设计要求,随机抽样送检核查复检报告。难燃型挤塑聚苯板薄抹灰外墙(架空楼板)外保温系统保温工程保温板的厚度符合设计要求;保温板与基层及咯构造层之间的粘接或链接必需牢固,粘接强度和连接方式符合设计要求;保温板与基层的粘接强度应作现场拉拔实验;锚固件数量、位置、锚固深度和拉拔力应符合设计要求。后置锚固件应进行锚固力现场拉拔实验。难燃型难燃型挤塑聚苯板薄抹灰外墙(架空楼板)外保温系统保温工程各类饰面层的基层及面层施工,应符合设计和《建筑装饰装修工程质量验收标准》GB50210的要求;饰面层施工与基层应无脱层、空鼓和裂痕,基层平整、干净,含水率应符合饰面层施工要求。一样项目:难燃型难燃型挤塑聚苯板薄抹灰外墙(架空楼板)外保温系统组成材料的外观和包装应完整无破损,符合设计要求和产品标准的规定。保温板面标识必需有生产企业名称、燃烧性能品级和重庆市建筑节能技术备案编号等信息,不符合要求的不得用于保温工程。耐碱玻纤网的铺贴和搭接应符合设计和施工要求,抹面胶浆抹压要密实,不得空鼓,耐碱玻纤网不得皱褶、外漏。施工产生的墙体缺点,如穿墙套管、脚手眼、孔洞等,应依照施工方案采取隔间热桥方法,不得阻碍墙体热工性能。墙体上容易碰撞的阳角、门窗洞口及不同材质基体的交接处等特殊部位,应采取避免开裂和破损的增强方法。许诺误差项目:难燃型挤塑聚苯板安装许诺误差应符合下表的规定:外墙外保温系统许诺误差指标项目允许偏差(mm)检查方法普通高级1表面平整42用2m靠尺和锲形尺检查2立面垂直53用2m托线板检查3阴阳角垂直42用2m托线板检查4阴阳角方正42用20cm方尺和锲形塞尺检查5接缝高差1用直尺和锲形塞尺检查第8章技术质量保证方法及体会为了增强外墙外保温粘贴牢固性和抗裂性,而采取的方法和体会如下:基础工作施工前认真读懂图纸,严格依照国家现行施工标准编制的施工组织设计进行施工。认真组织学习执行有关规章制度,对全部人员进行质量意识教育,牢固树立“质量是企业的生命”和“为用户效劳”的思想。依照IS09001体系运行文件的要求成立质量保证组织体系,设立专职质检员和成品爱惜治理员职位,成立职位责任制,并成立相应的台帐,单位和领导要常常检查质量保证体系的运转情形。要依照专业特点制定本工程的质量治理重点,并成立质检小组,常常开展质量分析活动和劳动竞赛活动,做好记录。选用首科保温砂浆,均确保材料精巧,其各项技术指标均优于国产同类产品。物资查验规定对所有进场的原材料、半成品组织检查验收,成立台帐。所有进场物资均需提供合格的材质证明、出厂合格证和实验报告。对进场的物资必需进行标识,依照已经通过查验、未经查验和经查验不合格等三种状态进行分种类堆放,严格保管,幸免将不合格的材料用于施工。对不合格物资,坚决要求不准进场,同时需注明处置结果和材料去向。对不合格材料的处置,应成立台帐。进程查验及报验规定材料进场,在监理监督下,当即进行现场封样,并送往国家承认的相关部门进行检测。严格执行国家现有标准、标准及企业的各项规定,严格依照设计要求组织施工。严格按工艺标准要求对操作班组进行技术、质量交底。工程施工实行“三检制度”,应认真抓好班组的自检工作,设立专职质检员,催促班组的自检及填写自检记录,然后通知总包方复检,最后由总包方通知监理及涂料单位进行验收。质检人员必需严格操纵施工进程中的质量,在施工进程中严格把关,不得隐瞒施工中的质量问题,并催促操作者及时整改。工程质量查验评定规定工程质量评定应依照国家质量验评标准规定进行实事求是的评定。技术质量保证体系公司总经理公司总经理工程部经理现场项目经理材料员技术员安全员质检员施工工长施工组班长施工人员第九章成品爱惜方法施工中各专业工种应紧密配合,合理安排工序,严禁倒置施工。施工完的墙面、色带、滴水槽、门窗框、管道、槽盒上残余砂浆,应及时清理干净。翻拆架子应避免碰撞己完成的保温墙体,其它工种作业时应不得污染或损坏墙面,严禁踩踏窗口。施工完毕的墙体不得随意开凿,如确属需要,应在聚合物水泥砂浆达到设计强度后方可施工,施工完毕后周围应恢恢复状,并注意对接缝做防水处置。保温层、抗裂防护层、装饰层在干燥前应避免水冲、撞击、振动。严格禁止重物撞击墙体。第十章平安文明施工平安施工平安治理方针:严格依照《建筑施工高处作业平安技术标准》(JGJ80-91)执行,平安治理方针是“平安第一、预防为主”。平安组织保证体系以现场领导为首,各方面的治理人员组成平安保证体系。平安治理严格执行国家及重庆市有关现场平安治理条例及方式。成立严格的平安教育制度,坚持入场教育、坚持每周按班组召开平安教育研讨会,增强平安意识,使平安工作落实到广大职工上。编制平安方法,设计和购买平安设施。强化平安法制观念,严格执行平安工作文字意识,两边认可,坚持特殊工种持有平安操作证上岗制度等。成立按期检查制度。领导部每周组织各部门、各分包方对现场进行一次平安隐患检查,发觉问题当即整改,关于日常检查,发觉危急情形应当即停工,及时采取方法排除险情。严格执行国家和地址有关建筑施工操作规程和检查标准及我公司《消防、平安治理规定》。成立平安、消防组织体系,制定平安捍卫制度,现场设专职消防、平安、捍卫人员,对各关键职位成立台帐,实行动态治理。实行施工生产平安责任制,分级治理,落实到人。并制定以下方法:平安方法工人进场后必需针对该工程的特点进行全面教育,考试合格后方可上岗。架子工、电气焊工、机械操作手等特殊工种的人员必需持证上岗,严禁无证操作各类机电设备。分项工程施工前,经对作业人员进行全面的有针对性的平安技术交底,各方签认齐全,并做好记录。施工现场应有明显、齐全的相应平安标志。现场利用的吊篮,必需经安监站检考试收后才能投入利用,如因施工要求须进行改动,必需报请相关部门,严禁擅自搭拆吊篮。做好临时用电工程的施工组织设计,严格贯彻“一机一闸一漏一箱”的临时用电制度。增强现场用电治理,照明采纳低压电;电闸箱、照明电路应常常检查无违章。针对恶劣天气可能带电的危险,制度并催促落实平安方法。增强对小型电机工具的日常检查和监督,幸免违规操作和意外损害。进入现场必需戴好平安帽。施工现场的楼梯、通道应维持畅通,并有足够的光线。施工前,应认真检查利用工具是不是牢固靠得住,以避免因滑脱、断裂等意外造成伤人。施工进程中跟班检查,并按期进行平安检查评比。高空作业必需设置防护方法;进行洞口作业和在因工程和工序需要而产生的,令人与物有坠落危险或危及人身平安的其他洞口进行高处作业时,必需按规定设置防护设施。作业人员应从规定的通道上下,不得在阳台之间等非规定通道进行攀登,也不得任意利用吊车臂架等施工设备进行攀登。消防、捍卫治理方法进场前依据工程情形制定应急与响应预案。施工现场未经批准不得动用明火,运用明火必需执行“一证一器一监护”制,施工现场必需成立防火档案。除指定抽烟区外,施工现场、油漆间、木工棚及易燃易爆场所严禁抽烟。非电工严禁擅自拉用电器具、拉设电线。禁止擅自利用非生产性电加热器明火器具。现场应按规定配置足够的消防器材,并按指定的位置安放,消防器材不得挪做它用,周围不得堆物,保证道路畅通。易燃易爆物品应设专门库房堆放,并远离火源,室内装修时,层间必需至少有两个平安通道,楼梯间、通道上下不得堆放材料及杂物。重点部位必需有相应的防火规定,设专人治理,挂设标志牌。施工现场实行周密的警卫护场。施工人员凭证件出入现场,由总包单位制作发放。各分包单位进场时,应进行入场教育,把制度、规定和要求交给工人。按期进行检查,排除隐患。检查的范围是:现场的治安秩序,各项规章制度的落实及存在的隐患、消防设备、灭火器材的完好等。环保方法、文明施工:文明施工是建筑施工形象的窗口,是施工现场综合治理水平的表现,贯穿于项目施工治理的始终,文明施工不仅涉及项目每位员工的生产、生活及工作环境,我公司在文明施工方面一直注重治理,强调落实,并形成了标准化、制度化。结合本工程特点,我领导部制定了文明施工的保障体系,责任到人,层层把关。现场治理:现场临设工程按平面图搭设,井然有序,有必然良好的生产、工作、生活环境。现场临时水电设有专人治理。料具和构配件码放整齐,符合要求。施工材料和工具及时回收、维修保养、利用、归库,做到工完、料净、场清。松散材料、垃圾运输应有覆盖和防护方法,不得将垃圾洒漏在道路上。料具治理建筑物内外寄存的各类料具分规格码放整齐,符合要求。现场余料、包装容器回收及时,堆放整齐。现场无长流水,无长明灯。环境爱惜治理在添加材料时,施工人员必需带口罩等防护用品。要减少空气紧缩机、搅拌机的噪声及震动或采取相应的隔离方法。施工时应考虑居民的休息时刻,躲开在22:00~6:00时刻段施工。施工垃圾遵循总包方的要求妥帖处置。现场水泥、砂子等易产生粉尘的建筑材料要选择适合的地址堆放,并进行有效遮蔽。生活污水、生产污水要按规定排放。维持施工现场整洁。外墙节能查验批划分及原材料试件留置表依照《建筑节能工程质量验收标准》GB50411-2007、DBJ50/T-159-2021要求,而且与监理单位(建设单位代表)协商决定:同一厂家同一品种材料,当单位工程建筑面积在20000㎡以下送检很多于3次,当单位建筑面积在20000㎡以上很多于6次。故外墙每栋楼:原材料复检三组(每组材料包括界面砂浆、粘接砂浆、难燃型挤塑聚苯板、锚栓、耐碱网格布、抹面砂浆)外墙同条件试件依照查验批划分,每一个查验批送检3组。如下表:楼号保温系统保温形式层数检验批试件备注2#楼难燃型挤塑聚苯板外保温29层29-26层3组25-21层3组20-16层3组15-11层3组10-7层3组6-4层3组3-1层3组第十一章平安生产紧急预案方法本工程施工的特点该工程位于重庆市南岸区学府大道,建筑总高度,总建筑面积;受施工环境、季节、气候、自然条件阻碍,随着施工进程,不平安的因素随时都可能存在;在建筑施工中,每道工序不同,不平安因素也不同,随着工程进度的进展,施工状况和不平安因素也随着转变。工地现场可能发生的平安事故有:物体冲击、机械损害、起重损害、触电、烫伤、火灾、高处坠落、坍塌、中毒等,应急预案的人力、物资、技术预备要紧针对这几类事故。预案的编制依据中华人民共和国《建筑法》、《平安生产法》、《消防法》;国务院《危险化学品平安治理层次》;《建筑工程平安操作规程》;预案的编制原那么;贯彻“平安第一,预防为主”原那么;贯彻“以人为本,快速有效”原那么;“属地救援”原那么;贯彻“三不放过”的原那么。重大事故(危险)进展进程及分析高处脚手架发生部份整体倒塌及塔拆作业发生人员伤亡事故;压力容器受外力作用或违背平安规程发生爆炸及由此引发的连锁反映事故(如起火);运行中的电气设备故障或发生严峻漏电;其他作业可能发生的重大事故(高处坠落、物体冲击、起重损害、触电、塌方等)造成的人员伤亡、财产损失、环境破坏。应急区域范围划定工地现场内应急区域范围制定塔吊、脚手架事故,以事故危害形成后的任何平安区域为应急区域范围;基坑边坡及自然灾害事故等危害半径之内的任何平安区域为应急区域范围;电气设备故障、严峻漏电事故以任何绝缘区域(如木材堆放场、配电房)为应急区域范围。工地现场外应急区域范围制定对事故可能涉及工地处,引发人员伤亡或财产损失的,需要本地政府的和谐,属政府职能;在事故(危害)发生后及时与政府相关部门确信应急区域范围;应急:火灾11九、医疗救护120、公安110。应急预案的组织方法紧急救援预案流程图落实责任到人发生事故落实责任到人发生事故公司公司外部援救启动预案报告人外部援救启动预案报告人质安部项目经理项目经理质安部项目经理项目经理部公司落实救援资金协助项目援救公司落实救援资金协助项目援救项目经理项目经理部成立应急预案的独立领导小组(指挥中心)组长:吕海峰组员:吕海锋胡文群外部应急援救效劳机构:火灾:119交通事故:122急救:120外部应急救援医院:南岸区急救中心应急组织的分工职责组长职责:组长负责在发生平安事故时组织人员进行抢救,参与决策是不是启动本预案,负责起动本预案的批准进程,爱惜现场,组织调查。假设组长不能及时赶到现场,可委托副组长进行工作,保证应急的资金、物资到位。决定是不是要求应急效劳机构提供帮忙并实施场外应急打算,在不受事故阻碍的地址进行直接操作操纵;复查和评估事故(事件)可能进展的方向,确信其可能的进展进程;与领导小组成员的关键人员配合指挥现场人员撤离,确保任何损害者都能取得足够的重视;在与场外应急机构取得联系后对紧急情形的记录作业安排;在场内实行交通管制,协助场外应急机构开展效劳工作;紧急状态终止后,受阻碍地址的恢复,并组织人员参加事故的分析和处置。副组长职责:副组长在事故发生后应当即赶往现场,组织人员进行抢救,爱惜现场,受组长委托组织事故调查,写出调查报告并进行善后处置。在救援效劳机构来之前直接参与救护活动;安排寻求受伤者及安排非重要人员撤离到集中地带;组员职责:组员在发生平安事故后,必需及时的赶到事故现场,组织人员进行抢救,爱惜现场,参与事故的调查。平常应急领导小组成员连番值班,值班者必需住在工地现场,电话24小时开通,发生紧急事故时,在项目部应急组长抵达工地前,值班者即为临时救援组长。应急预案的技术方法大体装备特种防护品:如绝缘鞋、绝缘手套等一样防救护品:平安带、平安帽、平安网、防护网、救护担1副、医药1个及临时救护担架及经常使用的救护药品等;专用饮水源、盥洗间和冲洗设备。专用装备:医疗器材:担架、绷带、塑料袋、小药箱;抢救工具:一样工地常备工具即大体知足利用;照明器材:手电筒、应急灯36V以下平安线路、灯具;通信器材:、电话、对讲机、报警器;灭火器材:消防栓及消防水带、灭火器等;灭火器日常按要求就位,紧急情形下集中利用。应急知识培训制定应急培训打算,对应急救援人员的培训、员工应急的培训要分开进行。培训内容:伤员急救常识、灭火器材利用常识、各类重大事故抢险常识等。使应急小组成员在发生重大事故时能较熟练地履行抢救职责,员工能发生重大事故时会采取正确有自救方法。应急预案方法的演练成立演练组织,由最高治理者或其代表适时组织实施;演练时必需预备充分;划分演练的范围和频次;演练应有记录。通信联络项目部必需将110、11九、120、122及项目部应急领导小组成员的电话号码、企业应急领导组织成员电话号码、本地平安监督部门号码明示于工地显要位置。抢险指挥、保安员应熟知这些号码。事故报告、调查与处置规定工地发生平安事故后,企业、项目部除当即组织抢救伤员,采取有效方法避免事故扩大和爱惜事故现场,做好善后工作外,还应按以下规定报告有关部门;轻伤事故:项目部在24小时内报告企业领导、生产办公室和企业工会;重伤事故:企业应在接到项目部报告后24小时内报告上级主管单位、平安生产监督治理局和工会组织;重伤三人以上或死亡一至二人的事故:企业应在接到项目部报告后4小时内报告上级主管单位、平安监督部门、工会组织和人民检查机关,填报《事故快报表》企业工程部负责平安生产的领导接到项目部报告后4小时应抵达现场;员工受伤,轻伤的送工地现场医务室治;重伤、中毒的送就近医院救治。伤势过重抢救无效死亡的,企业应在8小时内通知劳动治理部门处置。项目领导部负责提供平安事故有关资料,证件及相关证人,同意政府部门及执法部门的调查:事故通过:项目平安施工许可证,(总、分包)许可证,分包资源共享质证明;分包合同或总包与分包签定的“平安协议书”,项目平安生产责任制;施工组织设计或平安技术方法、方案;受损害者的个人资料(教育试卷、平安上岗证、注册名单、身份证、特种作业操作证、健康证等);平安技术交底及班组活动记录(总、分包);事故现场平面图,事故现场照片等。违章人和事故责任者的惩罚惩罚范围;违章指挥或经项目部专职平安员及以上专职监督部门下达隐患整改通知单在整改限制期内不予纠正,致使作业人员仍处于不平安环境的;违章操作,不严格执行平安技术交底要求,违背公司平安治理规定及项目《平安治理方法》、《建筑机械利用平安技术规程》其操作行为有可能致使如下后果的:自身或他人受到损害;2)机械设备受到损坏、损失;3)可能诱发火灾火灾及压力容器爆炸;4)引发化学中毒窒息损害的。违背劳动纪律,不服从治理指令或作业指导书要求,不按规定配戴劳动防护用品、破坏防护设施、设备、劳动进程中酗酒等。损害事故的应急抢救方式创伤止血救护出血常见于割伤、刺伤、物体冲击和碾伤等。如伤者一次出血量达全身血量的30%(800左右毫升)以上时,生命就有危险。因此,及时止血是超级必要和重要的。遇有这种创伤时不要惶恐,用现场物品如毛巾、纱布、绷带、工作服等当即采取止血方法。若是创伤部位有异物不在重要器官周围,能够拔出异物,处置好伤口。如无把握就不要随意将异物拔掉,应当即送医院,经医生检查,确信未伤及内脏及较大血管时,再拔出异物,以避免发生大出血措手不及。烧伤急救处置在生产进程中有时会受到一些明火、高温物体烧烫损害。严峻的烧伤会破坏躯体防病的重要屏障,血浆液体迅速外渗,血液浓缩,体内环境发生猛烈转变,产生难以抑制的疼痛。这时伤员委容易发生休克,危急生命。因此烧伤的紧急救护不能延迟,要在现场当即进行。大体原那么是:排除热源、灭火、自救互救。烧伤发生是,最好的救治方式是用冷水冲洗,或伤员自己浸入周围水池浸泡,避免烧面积进一步扩大。衣服着火时应当即脱去用水浇灭或当场躺下、滚压灭火。冬季身穿棉衣时,有时明火熄灭,暗火仍燃,衣服如冒烟现象应当即脱下或剪去以避免继续烧伤。身上起火不可惶恐奔跑,以避免风助火旺,也不要站立呼唤,免得造成呼吸道烧伤。烧伤通过初步处置后,要及时将伤员送往就近医院进一步医治。触电急救人触电以后,可能由于痉挛或失去知觉等缘故此紧抓带电体,不能自行摆脱电源。使触电者尽快离开电源是救活触电者的首要因素。依照具体情形,以快为原那么,选择适合的方式,并应注意以下问题:救护人不可直接用手或其他金属及潮湿的物体作为救护工具,而必需利用适当的绝缘工具。救护人员最好用一只手操作,以防自己触电。避免触电者离开电源后可能的摔伤,专门是当触电者在高处的情形下,应考虑防摔方法。即便触电者在平地,也要注意触电者倒下的方向,注意防摔。若是事故发生在夜间,应迅速解决临时照明问题,以利于抢救,并幸免扩大事故。在未切断电源之前,救护者切不可用手拉触电者,也不能用金属或潮湿的东西挑电线。把触电者抬至平安地址后,当即进行人工呼吸。其具体方式如下:口对口人工呼吸法:方式是把触电者放置仰卧状态,救护者一手将伤员下颌合上、向后托起,使伤员头尽可能向后仰,以维持呼吸道畅通。另一手将伤员鼻孔捏紧,现在救护者先深吸一口气,对准伤员口部使劲吹入。吹完后嘴离开,捏鼻手放松,如此反复实施。如吹气时伤员胸臂上举,吹气停止后伤员口鼻有气流呼出,表示有效。每分钟吹气16次左右,直至伤员自主呼吸为止。心脏按压术:方式是将触电者仰卧于平地上,救护人将双手重叠,将掌根放在伤员胸骨下部位,两臂伸直,肘关节不得弯曲,凭借救护者体重将力传至臂掌,并有节拍性冲击按压,使胸骨下陷3~4cm。每次按压的随即放松,往复循环,直至伤员自主呼吸为止。手外伤急救在工作中发外行外伤时,第一采取止血包扎的方法。如有断手、断肢要应当即拾起,把断手用干净的手绢、毛巾、布片包好,放在没有裂痕的塑料袋或胶皮带内,袋口扎紧。然后在口袋周围放冰块雪糕等降温。做完上述处置后,施救人员当即随伤员把断肢迅速送医院,让医生进行断肢再植手术。切记万万不要在断肢上涂碘酒、酒精或其他消毒液。如此会使组织细胞变质,造成不能再植的严峻后果。骨折急救骨骼受到外力作历时,发生完全或不完全断裂时叫做骨折。依照骨折端是不是与外相通,骨折分为两大类:即闭合性骨折与开放性骨折。前者骨折端不与外界相通,后者骨折端与外界相通,从受伤的程度来讲,开放性骨折一样伤情比较严峻。遇有骨折类损害,应做好紧急处置后,再送医院抢救。为了伤员在输送途中平安,避免断骨刺伤周围的神经和血管组织,加重伤员的痛楚,对骨折处置的大体原那么是尽可能不让骨折肢体活动。因此,要利用一切可利用的条件,及时、正确的对骨折做好临时固定、临时固定应注意以下事项:如有开放性伤口和出血,先止血包扎好伤口后进行骨折固定。不要把刺出的断骨送回伤口,以避免加重损伤,增加疼痛。夹板或简便材料不能与皮肤直接接触,要用棉花或代替品垫好,以防局部受压。搬运时要轻、稳、快,幸免震荡,并随时注意伤者的病情转变没有担架时,可利用门板、椅子、梯子等制做简单担架输送。眼睛受伤急救:发生眼伤后,可做如下急救处置:轻度眼伤如眼进异物,可叫现场同伴掀开眼皮干净手绢、纱布将异物拔出。如眼中溅进化学物质,要及时用水冲洗后看医生。严峻眼伤时,可让伤者仰躺,施救者设法支撑其头部,并尽可能使其维持静止不动,万万不要试图拔出入眼中的异物。见到眼球鼓出或从眼球脱出的东西,不可把它推回眼内,如此做十分危险,可能会把能恢复的伤眼弄坏,当即用消毒纱面轻轻盖上,如没有纱布可用刚洗过的新毛巾覆盖伤眼,再缠上布条,缠时不可使劲,以不压及伤眼为原那么。做出上述处置后,当即送医院再做进一步的医治。脊柱骨折急救脊柱骨俗称背脊骨,包括颈椎、胸椎、腰椎等。关于脊柱骨折伤员若是现场急救处置
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025下半年贵州贵阳市花溪区事业单位引进高层次人才12人高频重点提升(共500题)附带答案详解
- 2025下半年四川内江市市本级部分事业单位招聘工作人员20人高频重点提升(共500题)附带答案详解
- 2025下半年云南红河蒙自市事业单位招聘工作人员105人高频重点提升(共500题)附带答案详解
- 2025上海地铁第二运营限公司退役军人招聘120人高频重点提升(共500题)附带答案详解
- 2025上半年四川广元青川县事业单位招聘97人历年高频重点提升(共500题)附带答案详解
- 2025上半年台州市级事业单位公开招聘工作人员历年高频重点提升(共500题)附带答案详解
- 纸张消防班组施工合同
- 高铁建设简易合同模板简化版
- 土石方工程招标文
- 设计合同履行与监督细节
- 辽宁2025年高中学业水平合格性考试物理试卷试题(含答案详解)
- 2024年人教版三年级上数学教学计划和进度安排
- 《电能计量知识介绍》课件
- 2025届甘肃省武威市重点中学高三六校第一次联考英语试卷含解析
- 2023-2024学年山东省潍坊市高新区六年级(上)期末数学试卷(含答案)
- 东方明珠课件
- 2024年教师师德师风工作计划(2篇)
- 物流行业服务质量保障制度
- 养老院物资采购流程及制度
- 眼镜店年终总结及计划
- 公务用车车辆安全培训课件
评论
0/150
提交评论