标准解读
GB/T 44310-2024《海上固定平台总体设计规范》是中国针对海上固定平台设计制定的一项国家标准,旨在确保海上固定平台的安全性、可靠性及经济性。该规范详细规定了从设计原则、环境条件考虑、结构设计、设备配置到安全评估等多方面的技术要求和指导原则,适用于新建、改建或扩建的海上固定平台总体设计阶段。以下是对该标准主要内容的概述:
-
范围与适用性:明确了标准的应用范围,即适用于各类海上固定平台,包括但不限于钻井平台、生产平台、储油平台等,覆盖从浅海到深海的各种水深条件。
-
术语和定义:对海上固定平台设计中涉及的关键术语进行了解释和界定,确保设计过程中术语使用的统一性和准确性。
-
基本要求:强调了设计应遵循的基本原则,包括安全性、可操作性、环境保护以及经济合理性,要求在设计初期就要综合考虑这些因素。
-
环境条件分析:要求设计前需进行全面的环境调查,包括风速、浪高、水流、冰况、地震活动等因素,以确保平台设计能够抵御极端海洋环境的挑战。
-
结构设计:规定了平台结构的设计准则,包括强度、稳定性、疲劳寿命等方面的要求,以及材料选择、结构形式、防腐蚀措施等细节指导。
-
设备与系统:涵盖了平台上的主要设备和系统设计要求,如生产工艺系统、电气系统、控制系统、消防系统、救生与逃生设施等,确保平台运营的安全与高效。
-
安全与防护:强调了安全设计的重要性,包括风险评估、火灾与爆炸防护、紧急响应计划等,确保人员安全及环境保护措施到位。
-
施工与安装:提供了平台建造与安装过程中的技术指导,考虑施工可行性,确保设计能顺利转化为实体结构。
-
检验与验收:规定了平台设计完成后的检验标准和验收程序,确保所有设计符合规范要求,保障平台的整体质量和安全性能。
-
维护与管理:虽然主要是设计规范,但也提及了平台运营期间的维护管理和定期检查的重要性,为平台长期安全运行提供指导。
该标准通过上述各章节的详细规定,为海上固定平台的总体设计提供了全面的技术框架和实施指南,有助于提升我国海上工程项目的标准化水平和国际竞争力。
如需获取更多详尽信息,请直接参考下方经官方授权发布的权威标准文档。
....
查看全部
- 即将实施
- 暂未开始实施
- 2024-08-23 颁布
- 2025-03-01 实施
文档简介
ICS75.180.10
CCSE94
中华人民共和国国家标准
GB/T44310—2024
海上固定平台总体设计规范
Generaldesignspecificationsforoffshorefixedplatform
2024⁃08⁃23发布2025⁃03⁃01实施
国家市场监督管理总局
国家标准化管理委员会发布
GB/T44310—2024
目次
前言··························································································································Ⅴ
1范围·······················································································································1
2规范性引用文件········································································································1
3术语和定义··············································································································2
4总体要求·················································································································2
5总图·······················································································································2
5.1通则·················································································································2
5.2平台方位···········································································································3
5.3竖向布置···········································································································3
5.4井口区··············································································································3
5.5油气水处理区·····································································································3
5.6原油储存区········································································································3
5.7火炬臂和冷放空臂·······························································································3
5.8公用设备区········································································································4
5.9房间区··············································································································4
5.10吊机和卸货区····································································································4
5.11应急集合区和救生艇筏························································································4
5.12直升机甲板·······································································································4
5.13生活区·············································································································4
6工艺·······················································································································5
6.1通则·················································································································5
6.2工艺系统设置·····································································································5
6.3工艺参数选取·····································································································5
6.4备用原则···········································································································8
7消防与救逃生系统·····································································································8
7.1消防系统···········································································································8
7.2救逃生系统········································································································9
7.3脱险通道··········································································································10
8配管·····················································································································10
8.1布置················································································································10
8.2材料················································································································11
8.3应力分析··········································································································11
8.4隔热隔冷··········································································································12
Ⅰ
GB/T44310—2024
8.5标识················································································································12
9机械·····················································································································12
9.1通则················································································································12
9.2燃料要求··········································································································12
9.3主要设备··········································································································12
9.4暖通················································································································15
10电气····················································································································16
10.1通则··············································································································16
10.2电力负荷········································································································17
10.3电源系统········································································································17
10.4供配电系统·····································································································18
10.5保护测控········································································································18
10.6电力监控········································································································19
10.7主要电气装置··································································································19
10.8电缆··············································································································19
10.9无人驻守平台补充要求······················································································19
11仪表及控制系统·····································································································20
11.1总体要求········································································································20
11.2控制系统········································································································20
11.3过程控制系统··································································································20
11.4紧急关断系统··································································································20
11.5火气探测报警系统····························································································21
11.6现场仪表········································································································21
11.7控制盘···········································································································21
11.8中控室···········································································································21
11.9井口控制盘·····································································································21
11.10电源·············································································································22
11.11气源·············································································································22
11.12仪表电缆和管道······························································································22
11.13接地·············································································································22
11.14计量方案·······································································································22
11.15无人驻守平台的要求························································································22
12通信····················································································································22
12.1总体要求········································································································22
12.2通信设备配置··································································································23
12.3安全技术要求··································································································24
Ⅱ
GB/T44310—2024
12.4无线电室布置··································································································24
12.5电源··············································································································24
12.6天线··············································································································24
13结构····················································································································25
13.1通则··············································································································25
13.2结构总体布置··································································································25
13.3设计标高········································································································25
13.4构件选择········································································································26
13.5飞溅区和冰磨蚀区····························································································26
13.6在位静力分析··································································································27
13.7地震分析········································································································30
13.8疲劳分析········································································································31
13.9波浪动力分析··································································································31
13.10桩基础··········································································································32
13.11座底稳定性分析······························································································33
13.12施工分析·······································································································33
13.13浮托分析·······································································································35
14舾装····················································································································35
14.1生活区···········································································································35
14.2组块舾装········································································································36
15防腐····················································································································36
15.1通则··············································································································36
15.2阴极保护········································································································36
15.3防腐涂层········································································································36
15.4油气处理设备设施材料选择················································································37
附录A(资料性)消防员装备列表··················································································38
附录B(资料性)暖通·································································································39
B.1一般房间通风换气次数·······················································································39
B.2推荐风速·········································································································40
B.3库房温度值······································································································40
参考文献····················································································································41
Ⅲ
GB/T44310—2024
前言
本文件按照GB/T1.1—2020《标准化工作导则第1部分:标准化文件的结构和起草规则》的规
定起草。
请注意本文件的某些内容可能涉及专利。本文件的发布机构不承担识别专利的责任。
本文件由全国石油天然气标准化技术委员会(SAC/TC355)提出并归口。
本文件起草单位:中海油研究总院有限责任公司、海洋石油工程股份有限公司、中国石油集团海
洋工程有限公司、深圳海油工程水下技术有限公司。
本文件主要起草人:沈晓鹏、于春洁、夏志、衣华磊、徐海波、孙钦、常炜、孙友义、王丽勤、高磊、
巴砚、李强、白琳、金丹、陈子婧、郭华、王艳萍、万光芬、刘飞、吴露、林守强、刘培林、吴达华、王朝阳、
陈邦敏、付殿福、吴非、谭越、吕航、慈洪生、李达、邵卫东、易丛、马巍巍。
Ⅴ
GB/T44310—2024
海上固定平台总体设计规范
1范围
本文件规定了海上固定平台的总体设计要求,包括总则、总图、工艺、消防与救逃生系统、配管、机
械、电气、仪表及控制系统、通信、结构、舾装和防腐。
本文件适用于钢制固定平台新建和改扩建工程项目的各设计阶段,其他类型平台参照使用。
2规范性引用文件
下列文件中的内容通过文中的规范性引用而构成本文件必不可少的条款。其中,注日期的引用文
件,仅该日期对应的版本适用于本文件;不注日期的引用文件,其最新版本(包括所有的修改单)适用于
本文件。
GB/T3836.5爆炸性环境第5部分:由正压外壳“p”保护的设备
GB/T4208外壳防护等级(IP代码)
GB
温馨提示
- 1. 本站所提供的标准文本仅供个人学习、研究之用,未经授权,严禁复制、发行、汇编、翻译或网络传播等,侵权必究。
- 2. 本站所提供的标准均为PDF格式电子版文本(可阅读打印),因数字商品的特殊性,一经售出,不提供退换货服务。
- 3. 标准文档要求电子版与印刷版保持一致,所以下载的文档中可能包含空白页,非文档质量问题。
最新文档
- 包头2024年09版小学五年级下册英语第3单元寒假试卷
- 2023年过热蒸汽干燥设备资金申请报告
- 2023年环氧丙烷资金申请报告
- 2024年电源适配器项目资金需求报告代可行性研究报告
- 强化品德修养方面存在的问题-原因-措施
- 三维数字内容制作-三维动画材质师工作流程
- 【上海54】期中模拟卷01【24-25章】
- 质量月代表的发言稿(3篇)
- 校园招聘宣讲会演讲稿【汇编五篇】
- 质量分析会校长发言稿
- 2024内蒙古农牧业融资担保限公司公开招聘28人高频难、易错点500题模拟试题附带答案详解
- 6.3+价值的创造和实现课件-2024-2025学年高中政治统编版必修四哲学与文化
- 内斜视课件教学课件
- 湖南省长沙市明德天心中学2024-2025学年七年级上学期9月月考数学试题(无答案)
- 课件:《中华民族共同体概论》第十五讲:新时代与中华民族共同体建设
- 统编版(2024新版)七年级《道德与法治》上册第一单元《少年有梦》单元测试卷(含答案)
- 2024年广东深圳市光明区玉塘街道办事处招聘一般类岗位专干31人历年高频500题难、易错点模拟试题附带答案详解
- GB/T 44311-2024适老环境评估导则
- 北师大版(2024新版)七年级上册数学第一章《丰富的图形世界》大单元整体教学设计
- 【白夜行中唐泽雪穗人物形象特征探析7800字(论文)】
- 电商主播考勤管理制度
评论
0/150
提交评论