隧道工程施工作业标准化图集
目录
总则...................................................................................................................错误!未定义书签。
第一章洞口工程.........................................................................................................................6
1.1边仰坡开挖.......................................................................................................................6
1.2边仰坡支护.......................................................................................................................8
1.3截排水沟.........................................................................................................................9
1.4洞门工程........................................................................................................................10
第二章明洞工程.........................................................................................................................11
2.1模型安装........................................................................................................................12
2.2钢筋安装........................................................................................................................13
2.3混凝土浇筑......................................................................................................................14
2.4防水层施工......................................................................................................................15
2.5回填.............................................................................................................................16
第三章超前预加固及洞身开挖............................................................................................................18
3.1超前地质预报....................................................................................................................19
3.2超前支护........................................................................................................................20
3.2.1超前小导管................................................................................................................20
3.2.2超前锚杆..................................................................................................................21
3.2.3管棚.......................................................................................................................22
3.2.4帷幕注浆..................................................................................................................23
3.3洞身开挖........................................................................................................................24
3.3.1全断面开挖................................................................................................................24
3.3.2两台阶法开挖..............................................................................................................25
3.3.3三台阶法开挖..............................................................................................................26
3.3.4中隔壁法开挖..............................................................................................................27
3.3.5交叉中隔壁法开挖..........................................................................................................28
3.3.6双侧壁导坑法开挖..........................................................................................................29
3.3.7中洞法开挖................................................................................................................30
3.3.8钻孔爆破..................................................................................................................31
第四章监控量测........................................................................................................................32
4.1测点布置........................................................................................................................33
4.2测点安装........................................................................................................................34
4.3量测及分析......................................................................................................................35
第五章初期支护........................................................................................................................36
5.1喷射混凝土......................................................................................................................37
5.2系统锚杆........................................................................................................................38
5.3钢架制作........................................................................................................................39
5.4钢架安装........................................................................................................................40
5.5钢筋网片制作及安装..............................................................................................................41
第六章仰拱及填充......................................................................................................................42
6.1清理基底........................................................................................................................43
6.2结构钢筋安装....................................................................................................................44
6.3模板安装........................................................................................................................45
6.4止水带安装......................................................................................................................46
6.5仰拱混凝土......................................................................................................................47
第七章防排水工程......................................................................................................................48
7.1透水盲管(含纵、环向).........................................................................................................49
7.2防水板..........................................................................................................................50
7.3中埋式止水带....................................................................................................................51
7.4外贴式止水带....................................................................................................................52
7.5遇水膨胀橡胶止水条..............................................................................................................53
第八章二次衬砌........................................................................................................................54
8.1钢筋安装........................................................................................................................55
8.2台车就位........................................................................................................................56
8.3端头模型安装....................................................................................................................57
8.4混凝土浇筑......................................................................................................................58
8.5拆模............................................................................................................................59
8.6回填注浆........................................................................................................................60
第九章水沟电缆槽......................................................................................................................61
9.1钢筋安装........................................................................................................................62
9.2模型安装........................................................................................................................63
9.3混凝土浇筑......................................................................................................................64
9.4水沟电缆槽盖板预制及安装.......................................................................................................65
第十章质量检测........................................................................................................................66
10.1初期支护检测...................................................................................................................67
10.2衬砌检测.......................................................................................................................68
第十一章施工通风......................................................................................................................69
11.1风机布置.......................................................................................................................70
11.2风管布置.......................................................................................................................71
第十二章施工排水......................................................................................................................72
12.1顺坡、反坡排水.................................................................................................................73
第十三章主要临时设施..................................................................................................................74
13.1拌合站.........................................................................................................................76
13.1.1拌和站建站与验收.........................................................................................................76
13.1.2拌和站施工作业标准化.....................................................................................................77
13.2钢构件加工场...................................................................................................................78
13.3弃硝场.........................................................................................................................79
13.4洞口设施.......................................................................................................................80
13.5便道...........................................................................................................................81
第十四章文明施工......................................................................................................................82
14.1七(或八)牌一图...............................................................................................................83
14.2门禁系统.......................................................................................................................84
14.3管线布置及照明.................................................................................................................86
14.3.1风水管安装...............................................................................................................86
14.3.2电力、照明线布置安装.....................................................................................................87
第十五章瓦斯监测.......................................................................................................................88
15.1人工监测.......................................................................................................................89
15.2自动化监测.....................................................................................................................91
第一章洞口工程
填不透水土,并分层夯实。置土
1.1边仰坡开挖①复测原地面。②根据洞口边仰坡设计坡率、平台100mm;
主要控制点:测量宽度、明暗洞交界点、边仰坡起坡点设计高程、宽平台宽
2
放线度,结合现场地形情况及山体自然坡度,进行洞口度
序工序质量控边仰坡开挖线测量放样。+50mm。
作业要点
号内容制要点①纵向分段、竖向分层、横向分区进行开挖,竖向
①检查边、仰坡以上的山体稳定情况,周围建筑物边坡允分层高度2〜3m。当地质条件不良时,采取稳定边
情况,处理危石,对建筑物进行加固或防护,施工许偏差:土石坡和仰坡的措施。
准备期间加强监测。变坡点3方开②尽量采用机械设备进行开挖,若须进行爆破,应
1
工作②洞口边坡、仰坡坡顶的天沟、截水沟应在隧道进位置土挖采用预裂爆破,做好爆破设计。
洞前施作完成,并与路基排水组成洞口排水系统。100mm:③开挖过程中及时检查开挖尺寸和边坡坡度,及时
③隧道洞顶地表不得积水,地表坑洼、钻孔等处应平台位修整边坡,做到开挖一层边坡修整完成一层。
④开挖1-2层放样一次,尤其是最后一层严格控
制开挖深度及位置,避免超挖。土方开挖预留10〜
20cm人工进行修整整平处理。
⑤尽量少刷或不刷,减少植被破坏,保护生态环境。
⑥应尽量避开雨季施工。
图片说明1:隧道边仰坡土方开挖,采用机械开挖。
隧道边仰坡开挖与支护
隧道边仰坡开挖
图片说明2:隧道边仰坡开挖,临时喷锚支护及时跟进。
重点卡控(1、排水系统、预加固体系必须先做,否则土体遭雨水侵袭滑
坡;2、喷射硅厚度、锚杆长度、压浆)
图片说明1:隧道边仰坡临时喷锚支护混凝土表面平整、密实,整体
边仰坡支护
1.2外观质量较好。
序工序
作业要点质量控制要点
号内容
①原材料检测合格,机具设备满足施工
施工要求。
1
准备②施工人员进场安全技术交底。
③坡面坡度、位置、尺寸符合设计要求。
①喷射混凝土表面
应平整,无空鼓、裂
缝,用2m靠尺检查,
边仰坡临时支护
表面平整度允许偏
图片说明2:在洞门完成后及时施做永久支护,并进行绿化。
差为lOOmnio
临时临时支护工程按设计施工,紧跟开挖,②喷射混凝土厚度
2
支护保证边坡稳定性。检查点数的80%及以
上大于设计厚度。
③检查梯、台阶尺寸
允许偏差不超过土
30mmo
④混凝土强度符合
设计要求。
永久
永久性支护工程按设计图施工,并在洞
3性支
门完成后及时施做。边仰坡永久性支护
护
图片说明1:隧道洞顶矩形浆砌片石排水沟,水沟断面尺寸符合设计
1.3截排水沟要求,线形顺直,排水通畅。
序工序
作业要点质量控制要点
号内容
①原材料检测合格,机具设备满足施工要
施工
1求。
准备
②施工人员进场安全技术交底。
①在边仰坡开挖线5m以外,根据施工图纸
及山体地形进行截水天沟开挖轮廓线测量
测量
2放样,确保线形圆顺,排水通畅。
放线①设置范围:土
②截水天沟应引入路基排水沟或引入地方
200mm;沟底高
水系。
程:±20mm;水
①先将山体凹坑处回填整平,再按照测量放隧道洞顶矩形排水沟
沟纵坡:设计坡
出的开挖轮廓线进行开挖。图片说明2:隧道洞顶梯形截水天沟,水沟断面尺寸符合设计要求,
度的0.5%,且无
②尽量采用人工或机械设备进行开挖,若须线形圆顺并接入自然排水系统。
沟槽积水;水沟宽
3进行爆破,应采用预裂爆破,做好爆破设计。
开挖度:+30mm、0;
③开挖完成后应对沟槽底部及侧壁进行平
水沟深度:
整、夯实。
-10mm;厚度:
④应尽量避开雨季施工。
lOnrnio
先浇筑沟底混凝土,然后安装沟壁模型,
混凝②强度符合设
模型一般采用定型钢模板,然后浇筑沟壁
4土浇计要求。
混凝土,浇筑时应振捣密实。沟壁顶面应
筑
略低于原地面,以保证地面水能流入沟内。
①混凝土终凝2h后,应进行养护。
②采用覆盖洒水养护。
5养护
③养护时间不小于14do隧道洞顶梯形截水天沟
④当气温低于+51时,不得洒水养护。
图片说明1:端墙式洞门,有景观要求的地段,应结合当地风景以及
洞门工程
1.4业主和设计院要求进行镶面装饰。
序工序
作业要点质量控制要点
号内容
测量根据洞门型式,按设计要求放出洞门点位和
1
放样基础开挖轮廓线
①基坑开挖中做好安全防护,地基承载力必
基础须经试验满足要求。②按设计要求采用浇筑
2
施工混凝土或砌筑浆砌片石基础,材料质量和结
结构几何尺寸
构尺寸符合设计要求
允许偏差:基
础边缘平面位
①砌筑或灌注混凝土与回填应两侧对称进端墙式洞门
置±10mm;基
行,不得对衬砌产生偏压,并保证其位置准图片说明2:削切式洞门,其中帽檐削切式洞门削切段完成后衬砌台
础宽度-10mm;
确和墙面平顺。车不动,以衬砌台车为帽檐内模支撑点,削切段衬砌为帽檐外模支撑点,
基础顶面高程
②墙身灌注混凝土时杜绝漏浆、跑模。安装帽檐定型钢模板,浇筑帽檐混凝土。
±2Omni;端、
③反滤层、泄水孔、变形缝设置符合设计要
墙身翼墙边缘平面
3求。
施工位置+10mm、
④砌体砂浆饱满,砌缝;整齐、无通舞,沉降
0mm;端、翼墙
缝整齐垂直、下下贯通。
边缘顶面高程
⑤洒水养护不得小于7天。
±20mm;表面
⑥混凝土拆模强度必须达到75%可拆模,模
平整度15mm。
板拆除时防止表面及棱角不受损伤
检查
梯与洞门检查梯及隧道名牌、号标的设置符合设
4
名牌计规定帽檐削切式洞门削切式洞门
施工
第二章明洞工程
图片说明1:明洞外模采用木模,模型加固采用环向箍筋+拱墙撑杆。
2.1模型安装
序工序
作业要点质量控制要点
号内容
准备①台车拼装并通过验收。1.模板安装允许偏
1
工作②仰拱及仰拱填充施工完成。差:①边墙脚允许偏
测量施工前进行中线、高程测量,实测仰拱差±15mm;②起拱线
2
放线填充顶面,形成交底资料。允许偏差±10mni;③
①台车验收合格后,涂刷脱模剂,启拱顶允许偏差+
动走行系统,走行台车就位。10mm,0;④模板表
②根据测量放样的端头线、中线、高程面平整度5mm;⑤相
台车对台车进行定位。邻浇筑段表面高低隧道明洞模型安装
3
就位③台车定位完成后,复测台车中线、高差±10mm。图片说明2:明洞外模采用定型钢模,配备型钢支架进行加固。
程、法向位置,根据复测情况进行调整。2.预留孔洞安装允
④启动模板液压系统,调整不同部位模许偏差:①中心线位
板位置,使之满足衬砌净空要求。置允许偏差士15mm;
①钢筋安装完成并通过验收。②尺寸允许偏差土
②根据测量放样的衬砌外轮廓线做好10mmo
外模
4定位桩。3.预埋件安装允许
安装
③外模可采用木模或定型钢模。偏差:①中心线位置
④在拱顶上坡端预留混凝土检查口。允许偏差±3imn;②
①挡头板宜采用端头半钢模+半木模组外露长度允许偏差
挡头
合形式。4-lOmm,0o
5板安
②端头半钢模安装完成后,安装中埋式4.模板与混凝土的隧道明洞模型安装
装
止水带并固定,然后安装外侧木模板。搭接长度NlOcm。
图片说明:钢筋在加工场集中制作,转运至现场进行安装,钢筋严格
2.2钢筋安装按照设计图纸进行施工。
序工序
作业要点质量控制要点
号内容
①台车就位、模板校正、涂刷脱模剂。①受力钢筋顺长度方
②原材料检测合格,并按照设计尺寸向的全长允许偏差土
准备下料,转运至施工现场分类堆码整lOninio
1
工作齐。②弯起钢筋的弯折位
③根据设计间距、保护层厚度,采用置允许偏差20mmo
角钢或型钢制做定位卡具。③箍筋内净尺寸允许
偏差±5mm。
④上排钢筋与下排钢
明洞钢筋安装图1
测量对衬砌外轮廓线进行测量放样,做好筋间距允许偏差土
2
放线定位桩。15mmo
⑤同一排中受力钢筋
水平间距:拱部允许偏
差±10mm,边墙允许偏
差士20mm。
①根据测量高程及中线,安装定位卡
⑥分布钢筋间距允许
具。
偏差±20mm。
②根据配筋图利用定位卡具安放钢
⑦箍筋间距允许偏差
钢筋筋,安装顺序先内层后外层。
3±20mm。
安装③采用绑扎丝进行绑扎。____________
⑧钢筋保护层厚度+
④随绑扎进度同步安装混凝土保护明洞钢筋安装图2
10mm,-5mmo
层垫块,垫块每平方米不少于a哧。
⑨钢筋应平直、无损
⑤钢筋定位后,取出钢筋定位卡具。
伤,表面无裂纹、油污、
颗粒状或片状铁锈。
图片说明1:明洞混凝土采用移动式混凝土输送泵车浇筑,插入式捣
混凝土浇筑
2.3固棒辅以附着式振动器进行捣固。
序工序
作业要点质量控制要点
号内容
①检查确认台车就位后、模板中线、高程、
净空断面、加固措施符合要求。
准备①砌混凝土浇
1②检查机械设备是否到位,设备是否完好,
工作筑完成后,根据
混凝土申请单是否送达拌和站,运输道路气候条件进行
是否通畅,振捣设备是否齐备、调试完成。
养护,气温低于
5匕时不得洒水
①首车混凝土到场,试验人员应检测混凝土养护。
坍落度、扩展度、含气量、入模温度等性②人工凿毛时
明洞混凝土浇筑
能指标,核实混凝土强度等级。混凝土应达到
图片说明2:明洞混凝土表面平整、密实,无蜂窝麻面,拱圈厚度符
②混凝土浇筑从最下一排窗口开始,分层2.5MPa,风动凿
合设计要。
左右对称浇筑,左右侧混凝土面高差不大
混凝毛时混凝土应
于50cm,混凝土分层浇筑厚度不大于40cm;
2土浇达到lOMpa,
③混凝土的自由下落高度不大于2m;
筑③二次衬砌厚
④混凝土从下坡端向上坡端,最后在上坡端度不小于设计
窗口完成浇筑;厚度。
⑤混凝土浇筑过程中,安排专人检查模板;④拱圈混凝土
⑥封顶时,应减缓泵送速度,当上坡端预留强度应达到设
检查口混凝土充满后,即可完成浇筑。计强度的70%,
且完成两侧拱
混凝
脚一下回填时,
土浇①留取校抗压试件和同条件养护试件;
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 【新】2024年高考地理一轮复习-第1.2讲-地球的宇宙环境和地球的圈层结构(测)
- 新解读《GB 51236-2017民用机场航站楼设计防火规范 》
- 24.1.4 圆周角 人教版数学九年级上册同步练习(含答案)
- 2025届山西省长治市高三上学期9月质量监测语文试题(解析版)
- 2024-2025学年广东省东莞市虎门镇二年级(上)第一次月考数学试卷
- 股权结构对公司财务预测准确性的影响
- 江苏省南京市江宁区重点达标名校2024届中考数学最后冲刺模拟试卷含解析
- 心理健康专题课件25心理健康
- 2023年广西工商技师学院招聘工作人员考试试题及答案
- 2023年都江堰市事业单位引进笔试真题
- 碳酸钠与碳酸氢钠教案教学设计
- 高中研究性学习课题结题报告
- 学生宿舍管理系统设计说明书
- 管道安全检查表
- 坏疽性脓皮病
- 绿色卡通风学校心理健康委员培训PPT
- 一节失控的卫生课教材
- 多邻国单词填空介词连词复习
- 项目管理学课件戚安邦全
- 关注心理健康主题班会
- 中国当代文学七十年知到章节答案智慧树2023年湘潭大学
评论
0/150
提交评论