天津市污水处理厂工程施工及验收标准_第1页
天津市污水处理厂工程施工及验收标准_第2页
天津市污水处理厂工程施工及验收标准_第3页
天津市污水处理厂工程施工及验收标准_第4页
天津市污水处理厂工程施工及验收标准_第5页
已阅读5页,还剩280页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

目次

1总则............................................................................................1

2术语............................................................................................2

3基本规定....................................................................................5

3.1施工基本规定..................................................................................5

3.2质量检验及验收基本规定..............................................................6

4测量..........................................................................................12

4.1一般规定........................................................................................12

4.2厂区控制测量................................................................................13

4.3厂区施工测量................................................................................13

4.4施工监测........................................................................................14

5地基与基础..............................................................................16

5.1一般规定........................................................................................16

5.2施工降排水....................................................................................16

5.3基坑开挖与支护............................................................................17

5.4地基处理与基础工程....................................................................18

5.5基坑回填........................................................................................19

5.6质量验收标准................................................................................19

6构筑物工程..............................................................................29

6.1一般规定........................................................................................29

6.2钢筋................................................................................................30

6.3模板................................................................................................31

6.4现浇混凝土结构..........................................................................33

6.5装配式混凝土结构......................................................................36

6.6预应力混凝土结构......................................................................38

6.7附属结构......................................................................................41

6.8保温与防腐..................................................................................41

6.9土建与设备连接部位..................................................................43

6.10质量验收标准..............................................................................43

7工艺管道................................................................................62

7.1一般规定......................................................................................62

7.2管道安装......................................................................................63

7.3质量验收标准..............................................................................67

8污水处理设备安装................................................................76

8.1一般规定......................................................................................76

8.2格栅设备......................................................................................78

8.3螺旋输送设备..............................................................................80

8.4泵类设备......................................................................................81

8.5除砂设备......................................................................................83

8.6曝气设备......................................................................................84

8.7搅拌设备......................................................................................86

8.8排泥设备......................................................................................87

8.9斜板与斜管..................................................................................89

8.10过滤设备......................................................................................89

8.11微(超)滤膜设备......................................................................90

8.12反渗透膜设备..............................................................................91

8.13加药设备......................................................................................91

8.14鼓风、压缩设备..........................................................................92

8.15臭氧系统设备..............................................................................93

8.16消毒设备......................................................................................94

8.17浓缩脱水设备..............................................................................95

8.18除臭设备......................................................................................96

8.19滗水器设备..................................................................................97

8.20闸、阀门设备..............................................................................98

8.21堰、堰板与集水槽......................................................................98

8.22巴氏计量槽..................................................................................99

8.23起重设备......................................................................................99

8.24质量验收标准............................................................................100

9污泥处理设备安装..............................................................118

9.1一般规定....................................................................................118

9.2钢制消化池................................................................................118

9.3消化池搅拌设备........................................................................119

9.4热交换器设备............................................................................120

9.5沼气脱硫设备............................................................................120

9.6沼气柜........................................................................................120

9.7燃气、燃油锅炉........................................................................121

9.8沼气发电机、沼气拖动鼓风机、沼气压缩机.........................121

9.9沼气火炬....................................................................................121

9.10混料机......................................................................................122

9.11布料机......................................................................................122

9.12带式输送机..............................................................................123

9.13翻抛机......................................................................................123

9.14筛分机......................................................................................123

9.15污泥贮仓..................................................................................124

9.16污泥干化设备..........................................................................124

9.17悬斗输送机..............................................................................125

9.18干泥料仓..................................................................................125

9.19污泥焚烧设备..........................................................................126

9.20消烟、除尘设备......................................................................126

9.21质量验收标准..........................................................................126

10电气设备安装......................................................................140

10.1一般规定..................................................................................140

10.2隔离开关、负荷开关、熔断装置、电容器及无功功率补

偿装置.......................................................................................141

10.3电力变压器..............................................................................141

10.4电动机......................................................................................142

10.5开关柜、控制盘(柜、箱)...................................................143

10.6不间断电源..............................................................................144

10.7电缆桥架..................................................................................144

10.8电缆及导管..............................................................................145

10.9接地装置、防雷设施及等电位联结.......................................147

10.10计量装置................................................................................148

10.11质量验收标准........................................................................148

11自动控制及监控设备安装..................................................153

11.1一般规定..................................................................................153

11.2中心控制系统设备..................................................................154

11.3控制盘(柜、箱)..................................................................155

11.4仪(器)表设备......................................................................155

11.5监控设备..................................................................................157

11.6执行机构、调节阀..................................................................157

11.7质量验收标准..........................................................................158

12厂区配套工程......................................................................163

12.1建筑工程..................................................................................163

12.2道路工程..................................................................................163

12.3景观绿化工程..........................................................................163

12.4照明工程..................................................................................164

12.5其他配套工程..........................................................................164

13功能性试验..........................................................................165

13.1一般规定..................................................................................165

13.2满水试验..................................................................................166

13.3消化池气密性试验..................................................................168

13.4联合试运转..............................................................................170

附录A污水处理厂工程验收划分...........................................171

附录B质量检验记录表..........................................................173

附录C混凝土强度的检验评定...............................................181

附录D钢筋混凝土结构外观质量缺陷评定方法..................184

附录E水泥混凝土抗渗性能试验...........................................185

附录F水泥砂浆强度评定.......................................................187

附录G水池满水试验记录......................................................188

附录H消化池气密性试验记录..............................................189

附录J设备单机试运转记录...................................................190

附录K设备联合试运转记录..................................................191

附录L常用材料进场复验试验项目与取样数量规定...........192

本标准用词说明..........................................................................213

引用标准名录..............................................................................214

条文说明......................................................................................217

Contents

1GeneralProvisions....................................................................1

2Terms..........................................................................................2

3BasicRequirements....................................................................5

3.1ConstructionBasicRequirements......................................................5

3.2QualityInspectionandAcceptanceBasicRequirements...................6

4Measure.....................................................................................12

4.1GeneralRequirements.....................................................................12

4.2ControlSurveyofPlantArea..........................................................13

4.3PlantConstructionSurvey..............................................................13

4.4ConstructionMonitoring.................................................................14

5Foundation................................................................................16

5.1GeneralRequirements.....................................................................16

5.2ConstructionDewatering&Drainage.............................................16

5.3FoundationExcavationandSupport...............................................17

5.4GroundBaseTreatmentandBasicEngineering..............................18

5.5BackfillofFoundationPit...............................................................19

5.6QualityAcceptanceCriteria............................................................19

6StructureEngineering...............................................................29

6.1GeneralRequirements.....................................................................29

6.2Reinforcement.................................................................................30

6.3Formwork.......................................................................................31

6.4Cast-in-situConcreteStructure.......................................................33

6.5PrefabricatedConcreteStructure.....................................................36

6.6PrestressedConcreteStructures......................................................38

6.7AccessoryStructures.......................................................................41

6.8InsulationandAnticorrosion.........................................................41

6.9ConnectionBetweenCivilWorksandEquipment........................43

6.10QualityAcceptanceCriteria..........................................................43

7ProcessPiping.........................................................................62

7.1GeneralRequirements...................................................................62

7.2PipeLaying...................................................................................63

7.3QualityAcceptanceCriteria..........................................................67

8WastewaterTreatmentEquipmentInstallation.......................76

8.1GeneralRequirements...................................................................76

8.2ScreenEquipment.........................................................................78

8.3ScrewConveyor............................................................................80

8.4Pumps...........................................................................................81

8.5GritRemovalEquipment..............................................................83

8.6Aerator..........................................................................................84

8.7Blender..........................................................................................86

8.8SludgeDischarger.........................................................................87

8.9InclinedBoardandTube...............................................................89

8.10FiltrationEquipment.....................................................................89

8.11Microfiltration/UltrafiltrationMembraneEquipment...................90

8.12ReverseOsmosisMembraneEquipment......................................91

8.13DosingEquipment........................................................................91

8.14BlowerandCompressor................................................................92

8.15OzoneGenerationSystem.............................................................93

8.16DisinfectionEquipment................................................................94

8.17DewateringandThickeningEquipment........................................95

8.18DeodorizationEquipment.............................................................96

8.19WaterDecanter..............................................................................97

8.20SluiceGateandValve...................................................................98

8.21Weir,WeirPlateandHeaderTank.................................................98

8.22ParshallFlume..........................................................................99

8.23Crane.........................................................................................99

8.24QualityAcceptanceCriteria....................................................100

9SludgeTreatmentEquipmentInstallation...........................118

9.1GeneralRequirements.............................................................118

9.2SteelSludgeDigester..............................................................118

9.3AgitatorinSludgeDigester.....................................................119

9.4Heat-exchanger.......................................................................120

9.5BiogasDesulfurizationEquipment.........................................120

9.6BiogasCabinet........................................................................120

9.7MarshGasandFuelBoiler.....................................................121

9.8BiogasAlternator,BiogasDrivingBlowerandBiogas

Compressor............................................................................121

9.9BiogasTorch...........................................................................121

9.10SludgeMixingEquipment......................................................122

9.11SludgeSpreader......................................................................122

9.12BeltConveyor.........................................................................123

9.13SludgeTurner..........................................................................123

9.14SludgeScreeningEquipment..................................................123

9.15SludgeStorage........................................................................124

9.16SludgeDryingEquipment.......................................................124

9.17BucketConveyer.....................................................................125

9.18DrySludgeStorage.................................................................125

9.19SludgeIncinerationEquipment...............................................126

9.20SmokeandDustEliminationEquipment................................126

9.21QualityAcceptanceCriteria....................................................126

10ElectricalEquipmentInstallation........................................140

10.1GeneralRequirements.............................................................140

10.2IsolatingSwitch、LoadSwitch、FusingDeviceCapacitorand

ReactivePowerCompensationDevice....................................141

10.3PowerTransformer..................................................................141

10.4Electromotor............................................................................142

10.5SwitchCabinetandControlPanel(CabinetorBox)...............143

10.6UninterruptiblePowerSystem(UPS)......................................144

10.7CableTray...............................................................................144

10.8CableandConduit...................................................................145

10.9EarthingEquipment,LightningProtectionDeviceand

EquipotentialBonding............................................................147

10.10MeteringDevice......................................................................148

10.11QualityAcceptanceCriteria....................................................148

11AutomationandMonitoringEquipmentInstallation............153

11.1GeneralRequirements.............................................................153

11.2CentralControlSystem...........................................................154

11.3ControlPanel(CabinetandBox).............................................155

11.4InstrumentEquipment.............................................................155

11.5MonitoringEquipment............................................................157

11.6ActuatorandRegulationValve................................................157

11.7QualityAcceptanceCriteria....................................................158

12AuxiliaryEngineering...........................................................163

12.1BuildingEngineering..............................................................163

12.2RoadEngineering....................................................................163

12.3LandscapeGreeningEngineering...........................................163

12.4LightingEngineering..............................................................164

12.5OtherAuxiliaryEngineering...................................................164

13FunctionalTest......................................................................165

13.1GeneralRequirements.............................................................165

13.2FullWaterTest........................................................................166

13.3GasTightnessTestinDigester................................................168

13.4CombinedTrialOperation.......................................................170

AppendixADivisionofWastewaterTreatmentPlant

Engineering...........................................................171

AppendixBQualityInspectionRecord.....................................173

AppendixCInspectionandEvaluationofConcreteStrength...181

AppendixDMethodforAssessingtheAppearanceQuality

DefectsofReinforcedConcreteStructures...........184

AppendixETestofCementConcreteAntiPermeability

Performance..........................................................185

AppendixFStrengthEvaluationofCementMortar..................187

AppendixGFullWaterTestRecord..........................................188

AppendixHGas-tightTestRecordofDigester.........................189

AppendixJRecordsforEquipmentSingleTrialOperation....190

AppendixKRecordsforEquipmentCombinedTrial

Operation..............................................................191

AppendixLRequirementsforEntryTestItemsandSampling

QuantityofCommonMaterials..........................192

ExplanationofWordinginThisStandard.....................................213

ListofQuotedStandards..............................................................214

Addition:ExplanationofProvisions.............................................217

1总则

1.0.1为加强城镇污水处理厂工程施工的管理,规范施工技术,

统一质量验收标准,确保工程质量,制定本标准。

1.0.2本标准适用于天津市新建、扩建和改建的污水处理、再生

水处理、污泥处置等工程的施工及验收。

1.0.3城镇污水处理厂工程施工及验收除应执行本标准外,尚应

符合国家、行业及天津市现行有关标准的规定。

1

2术语

2.0.1关联测量connectionsurvey

污水处理厂工程在施工前对相邻单体工程结合处的平面位置

及高程同时进行的测量。

2.0.2薄壁混凝土thin-walledconcrete

厚度小于等于300mm的池壁或隔墙、外墙。

2.0.3压力管道pressurepiping

最高工作压力大于或等于0.1MPa的管道。

2.0.4化学建材管chemicalmaterialpiping

玻璃纤维管或玻璃纤维增强热固性塑料管(简称玻璃钢管)、

硬聚氯乙烯管(UPVC)、聚乙烯管(PE)、聚丙烯管(PP)及其钢

塑复合管的统称。

2.0.5格栅barscreen

拦截水中较大尺寸漂浮物或其他杂物的装置。

2.0.6膜组件membranemodule

由膜元件、壳体、内联接件、端板和密封圈等组成的实用器件。

2.0.7单机调试singleunitdebugging

对各工艺、机械、电气、仪表等专业的处理设施设备,进行单

独设备的功能性测试和调整。

2.0.8联合试运转combinedtrialoperation

为验证系统安全可靠,系统处理设施、设备带负荷联动试车的

运转试验过程。

2.0.9试运行commissioningoperation

工程完成单机调试、联动调试和系统调试后,工程系统正常运

2

行前的运行阶段。

2.0.10检验inspection

对标准所列项目进行量测、检查、试验,并将结果与标准规定

要求进行比较,以确定每项性能是否合格所进行的活动。

2.0.11验收acceptance

建设工程质量在施工单位自检合格的基础上,由工程质量验收

责任方组织,工程建设相关单位参加,对检验批、分项、分部、单

位工程及其隐蔽工程的质量进行抽样检验,对技术文件进行审核,

并根据设计文件和相关标准以书面形式对工程质量是否达到合格

标准作出确认。

2.0.12检验批inspectionlot

按相同的施工条件或按规定的方式汇总起来供抽样检验用的,

由一定数量样本组成的检验体。

2.0.13主控项目dominantitem

对结构安全、使用功能和公众利益起决定性作用的检验项目。

2.

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论