版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
目次
1总则............................................................................................1
2术语............................................................................................2
3基本规定....................................................................................5
3.1施工基本规定..................................................................................5
3.2质量检验及验收基本规定..............................................................6
4测量..........................................................................................12
4.1一般规定........................................................................................12
4.2厂区控制测量................................................................................13
4.3厂区施工测量................................................................................13
4.4施工监测........................................................................................14
5地基与基础..............................................................................16
5.1一般规定........................................................................................16
5.2施工降排水....................................................................................16
5.3基坑开挖与支护............................................................................17
5.4地基处理与基础工程....................................................................18
5.5基坑回填........................................................................................19
5.6质量验收标准................................................................................19
6构筑物工程..............................................................................29
6.1一般规定........................................................................................29
6.2钢筋................................................................................................30
6.3模板................................................................................................31
6.4现浇混凝土结构..........................................................................33
6.5装配式混凝土结构......................................................................36
6.6预应力混凝土结构......................................................................38
6.7附属结构......................................................................................41
6.8保温与防腐..................................................................................41
6.9土建与设备连接部位..................................................................43
6.10质量验收标准..............................................................................43
7工艺管道................................................................................62
7.1一般规定......................................................................................62
7.2管道安装......................................................................................63
7.3质量验收标准..............................................................................67
8污水处理设备安装................................................................76
8.1一般规定......................................................................................76
8.2格栅设备......................................................................................78
8.3螺旋输送设备..............................................................................80
8.4泵类设备......................................................................................81
8.5除砂设备......................................................................................83
8.6曝气设备......................................................................................84
8.7搅拌设备......................................................................................86
8.8排泥设备......................................................................................87
8.9斜板与斜管..................................................................................89
8.10过滤设备......................................................................................89
8.11微(超)滤膜设备......................................................................90
8.12反渗透膜设备..............................................................................91
8.13加药设备......................................................................................91
8.14鼓风、压缩设备..........................................................................92
8.15臭氧系统设备..............................................................................93
8.16消毒设备......................................................................................94
8.17浓缩脱水设备..............................................................................95
8.18除臭设备......................................................................................96
8.19滗水器设备..................................................................................97
8.20闸、阀门设备..............................................................................98
8.21堰、堰板与集水槽......................................................................98
8.22巴氏计量槽..................................................................................99
8.23起重设备......................................................................................99
8.24质量验收标准............................................................................100
9污泥处理设备安装..............................................................118
9.1一般规定....................................................................................118
9.2钢制消化池................................................................................118
9.3消化池搅拌设备........................................................................119
9.4热交换器设备............................................................................120
9.5沼气脱硫设备............................................................................120
9.6沼气柜........................................................................................120
9.7燃气、燃油锅炉........................................................................121
9.8沼气发电机、沼气拖动鼓风机、沼气压缩机.........................121
9.9沼气火炬....................................................................................121
9.10混料机......................................................................................122
9.11布料机......................................................................................122
9.12带式输送机..............................................................................123
9.13翻抛机......................................................................................123
9.14筛分机......................................................................................123
9.15污泥贮仓..................................................................................124
9.16污泥干化设备..........................................................................124
9.17悬斗输送机..............................................................................125
9.18干泥料仓..................................................................................125
9.19污泥焚烧设备..........................................................................126
9.20消烟、除尘设备......................................................................126
9.21质量验收标准..........................................................................126
10电气设备安装......................................................................140
10.1一般规定..................................................................................140
10.2隔离开关、负荷开关、熔断装置、电容器及无功功率补
偿装置.......................................................................................141
10.3电力变压器..............................................................................141
10.4电动机......................................................................................142
10.5开关柜、控制盘(柜、箱)...................................................143
10.6不间断电源..............................................................................144
10.7电缆桥架..................................................................................144
10.8电缆及导管..............................................................................145
10.9接地装置、防雷设施及等电位联结.......................................147
10.10计量装置................................................................................148
10.11质量验收标准........................................................................148
11自动控制及监控设备安装..................................................153
11.1一般规定..................................................................................153
11.2中心控制系统设备..................................................................154
11.3控制盘(柜、箱)..................................................................155
11.4仪(器)表设备......................................................................155
11.5监控设备..................................................................................157
11.6执行机构、调节阀..................................................................157
11.7质量验收标准..........................................................................158
12厂区配套工程......................................................................163
12.1建筑工程..................................................................................163
12.2道路工程..................................................................................163
12.3景观绿化工程..........................................................................163
12.4照明工程..................................................................................164
12.5其他配套工程..........................................................................164
13功能性试验..........................................................................165
13.1一般规定..................................................................................165
13.2满水试验..................................................................................166
13.3消化池气密性试验..................................................................168
13.4联合试运转..............................................................................170
附录A污水处理厂工程验收划分...........................................171
附录B质量检验记录表..........................................................173
附录C混凝土强度的检验评定...............................................181
附录D钢筋混凝土结构外观质量缺陷评定方法..................184
附录E水泥混凝土抗渗性能试验...........................................185
附录F水泥砂浆强度评定.......................................................187
附录G水池满水试验记录......................................................188
附录H消化池气密性试验记录..............................................189
附录J设备单机试运转记录...................................................190
附录K设备联合试运转记录..................................................191
附录L常用材料进场复验试验项目与取样数量规定...........192
本标准用词说明..........................................................................213
引用标准名录..............................................................................214
条文说明......................................................................................217
Contents
1GeneralProvisions....................................................................1
2Terms..........................................................................................2
3BasicRequirements....................................................................5
3.1ConstructionBasicRequirements......................................................5
3.2QualityInspectionandAcceptanceBasicRequirements...................6
4Measure.....................................................................................12
4.1GeneralRequirements.....................................................................12
4.2ControlSurveyofPlantArea..........................................................13
4.3PlantConstructionSurvey..............................................................13
4.4ConstructionMonitoring.................................................................14
5Foundation................................................................................16
5.1GeneralRequirements.....................................................................16
5.2ConstructionDewatering&Drainage.............................................16
5.3FoundationExcavationandSupport...............................................17
5.4GroundBaseTreatmentandBasicEngineering..............................18
5.5BackfillofFoundationPit...............................................................19
5.6QualityAcceptanceCriteria............................................................19
6StructureEngineering...............................................................29
6.1GeneralRequirements.....................................................................29
6.2Reinforcement.................................................................................30
6.3Formwork.......................................................................................31
6.4Cast-in-situConcreteStructure.......................................................33
6.5PrefabricatedConcreteStructure.....................................................36
6.6PrestressedConcreteStructures......................................................38
6.7AccessoryStructures.......................................................................41
6.8InsulationandAnticorrosion.........................................................41
6.9ConnectionBetweenCivilWorksandEquipment........................43
6.10QualityAcceptanceCriteria..........................................................43
7ProcessPiping.........................................................................62
7.1GeneralRequirements...................................................................62
7.2PipeLaying...................................................................................63
7.3QualityAcceptanceCriteria..........................................................67
8WastewaterTreatmentEquipmentInstallation.......................76
8.1GeneralRequirements...................................................................76
8.2ScreenEquipment.........................................................................78
8.3ScrewConveyor............................................................................80
8.4Pumps...........................................................................................81
8.5GritRemovalEquipment..............................................................83
8.6Aerator..........................................................................................84
8.7Blender..........................................................................................86
8.8SludgeDischarger.........................................................................87
8.9InclinedBoardandTube...............................................................89
8.10FiltrationEquipment.....................................................................89
8.11Microfiltration/UltrafiltrationMembraneEquipment...................90
8.12ReverseOsmosisMembraneEquipment......................................91
8.13DosingEquipment........................................................................91
8.14BlowerandCompressor................................................................92
8.15OzoneGenerationSystem.............................................................93
8.16DisinfectionEquipment................................................................94
8.17DewateringandThickeningEquipment........................................95
8.18DeodorizationEquipment.............................................................96
8.19WaterDecanter..............................................................................97
8.20SluiceGateandValve...................................................................98
8.21Weir,WeirPlateandHeaderTank.................................................98
8.22ParshallFlume..........................................................................99
8.23Crane.........................................................................................99
8.24QualityAcceptanceCriteria....................................................100
9SludgeTreatmentEquipmentInstallation...........................118
9.1GeneralRequirements.............................................................118
9.2SteelSludgeDigester..............................................................118
9.3AgitatorinSludgeDigester.....................................................119
9.4Heat-exchanger.......................................................................120
9.5BiogasDesulfurizationEquipment.........................................120
9.6BiogasCabinet........................................................................120
9.7MarshGasandFuelBoiler.....................................................121
9.8BiogasAlternator,BiogasDrivingBlowerandBiogas
Compressor............................................................................121
9.9BiogasTorch...........................................................................121
9.10SludgeMixingEquipment......................................................122
9.11SludgeSpreader......................................................................122
9.12BeltConveyor.........................................................................123
9.13SludgeTurner..........................................................................123
9.14SludgeScreeningEquipment..................................................123
9.15SludgeStorage........................................................................124
9.16SludgeDryingEquipment.......................................................124
9.17BucketConveyer.....................................................................125
9.18DrySludgeStorage.................................................................125
9.19SludgeIncinerationEquipment...............................................126
9.20SmokeandDustEliminationEquipment................................126
9.21QualityAcceptanceCriteria....................................................126
10ElectricalEquipmentInstallation........................................140
10.1GeneralRequirements.............................................................140
10.2IsolatingSwitch、LoadSwitch、FusingDeviceCapacitorand
ReactivePowerCompensationDevice....................................141
10.3PowerTransformer..................................................................141
10.4Electromotor............................................................................142
10.5SwitchCabinetandControlPanel(CabinetorBox)...............143
10.6UninterruptiblePowerSystem(UPS)......................................144
10.7CableTray...............................................................................144
10.8CableandConduit...................................................................145
10.9EarthingEquipment,LightningProtectionDeviceand
EquipotentialBonding............................................................147
10.10MeteringDevice......................................................................148
10.11QualityAcceptanceCriteria....................................................148
11AutomationandMonitoringEquipmentInstallation............153
11.1GeneralRequirements.............................................................153
11.2CentralControlSystem...........................................................154
11.3ControlPanel(CabinetandBox).............................................155
11.4InstrumentEquipment.............................................................155
11.5MonitoringEquipment............................................................157
11.6ActuatorandRegulationValve................................................157
11.7QualityAcceptanceCriteria....................................................158
12AuxiliaryEngineering...........................................................163
12.1BuildingEngineering..............................................................163
12.2RoadEngineering....................................................................163
12.3LandscapeGreeningEngineering...........................................163
12.4LightingEngineering..............................................................164
12.5OtherAuxiliaryEngineering...................................................164
13FunctionalTest......................................................................165
13.1GeneralRequirements.............................................................165
13.2FullWaterTest........................................................................166
13.3GasTightnessTestinDigester................................................168
13.4CombinedTrialOperation.......................................................170
AppendixADivisionofWastewaterTreatmentPlant
Engineering...........................................................171
AppendixBQualityInspectionRecord.....................................173
AppendixCInspectionandEvaluationofConcreteStrength...181
AppendixDMethodforAssessingtheAppearanceQuality
DefectsofReinforcedConcreteStructures...........184
AppendixETestofCementConcreteAntiPermeability
Performance..........................................................185
AppendixFStrengthEvaluationofCementMortar..................187
AppendixGFullWaterTestRecord..........................................188
AppendixHGas-tightTestRecordofDigester.........................189
AppendixJRecordsforEquipmentSingleTrialOperation....190
AppendixKRecordsforEquipmentCombinedTrial
Operation..............................................................191
AppendixLRequirementsforEntryTestItemsandSampling
QuantityofCommonMaterials..........................192
ExplanationofWordinginThisStandard.....................................213
ListofQuotedStandards..............................................................214
Addition:ExplanationofProvisions.............................................217
1总则
1.0.1为加强城镇污水处理厂工程施工的管理,规范施工技术,
统一质量验收标准,确保工程质量,制定本标准。
1.0.2本标准适用于天津市新建、扩建和改建的污水处理、再生
水处理、污泥处置等工程的施工及验收。
1.0.3城镇污水处理厂工程施工及验收除应执行本标准外,尚应
符合国家、行业及天津市现行有关标准的规定。
1
2术语
2.0.1关联测量connectionsurvey
污水处理厂工程在施工前对相邻单体工程结合处的平面位置
及高程同时进行的测量。
2.0.2薄壁混凝土thin-walledconcrete
厚度小于等于300mm的池壁或隔墙、外墙。
2.0.3压力管道pressurepiping
最高工作压力大于或等于0.1MPa的管道。
2.0.4化学建材管chemicalmaterialpiping
玻璃纤维管或玻璃纤维增强热固性塑料管(简称玻璃钢管)、
硬聚氯乙烯管(UPVC)、聚乙烯管(PE)、聚丙烯管(PP)及其钢
塑复合管的统称。
2.0.5格栅barscreen
拦截水中较大尺寸漂浮物或其他杂物的装置。
2.0.6膜组件membranemodule
由膜元件、壳体、内联接件、端板和密封圈等组成的实用器件。
2.0.7单机调试singleunitdebugging
对各工艺、机械、电气、仪表等专业的处理设施设备,进行单
独设备的功能性测试和调整。
2.0.8联合试运转combinedtrialoperation
为验证系统安全可靠,系统处理设施、设备带负荷联动试车的
运转试验过程。
2.0.9试运行commissioningoperation
工程完成单机调试、联动调试和系统调试后,工程系统正常运
2
行前的运行阶段。
2.0.10检验inspection
对标准所列项目进行量测、检查、试验,并将结果与标准规定
要求进行比较,以确定每项性能是否合格所进行的活动。
2.0.11验收acceptance
建设工程质量在施工单位自检合格的基础上,由工程质量验收
责任方组织,工程建设相关单位参加,对检验批、分项、分部、单
位工程及其隐蔽工程的质量进行抽样检验,对技术文件进行审核,
并根据设计文件和相关标准以书面形式对工程质量是否达到合格
标准作出确认。
2.0.12检验批inspectionlot
按相同的施工条件或按规定的方式汇总起来供抽样检验用的,
由一定数量样本组成的检验体。
2.0.13主控项目dominantitem
对结构安全、使用功能和公众利益起决定性作用的检验项目。
2.
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 多发性创伤的急救与护理
- 2023年材料员考试试题及答案
- 2023年高考全国卷3语文真题及答案解析
- 第三部分数控车床综合练习题
- 2023年西医综合真题及答案
- 安徽省滁州市凤阳县2023-2024学年七年级下学期期末数学试题(解析版)
- 卧式车床项目可行性报告
- 铍箔及铍合金箔项目可行性报告
- 中国近现代史纲要学习大纲
- 鲁科版高中化学必修第一册第3章物质的性质与转化微项目论证重污染天气“汽车限行”的合理性课件
- 电气焊工操作安全指导书
- 2024年高考物理上海卷试题解读及答案详解(深度)
- 充电桩及监控系统安装工程采购项目招标文件模板
- 甘肃省兰州市城关区第一中学2024年高一数学第二学期期末学业质量监测模拟试题含解析
- 水文勘测高级工考点巩固(强化练习)
- 实验室生物安全保障工作方案
- 大班幼儿体育学情分析
- 中国航天日知识竞赛题库(64题含答案)
- 2024年深圳市龙岗区投资控股集团有限公司招聘笔试冲刺题(带答案解析)
- 【中考真题】2021年广东省中考英语试卷(附答案)
- 走向世界的中国文学智慧树知到期末考试答案章节答案2024年哈尔滨工业大学
评论
0/150
提交评论