施工图预算表,,,,,,,,,,,,,,
工程编号,,,,,,,,,,,,,,
工程名称:司家营Y5移置式胶带输送机,,,,,图号,,,预算编号,,,,,,
序,工程项目名称,单位,数量,定额编号,单价,其中,,,,总价,其中,,,
号,,,,,,人工费,材料费,机械费,人工日,,人工费,材料费,机械费,人工日
一、,图纸部分,,,,,,,,,,,,,
1,驱动单元(1)及驱动单元(2)装配,,,,,,,,,,,,,
,560kw电机倒运、装封、卸车,台,2,04年14-0327,464.34,162.54,,210.15,,928.68,325.1,,420.3,14
,560kw电机安装2台,台,2,04年14-0636,2057.56,1121.53,,477.42,,4115.12,2243.1,,954.8,96.60034453
,LTZ12高速联轴器安装2台,t,0.742,1-5-2,659.43,325.08,,283.52,,489.29706,241.2,,210.4,10.388
,高速联轴器护罩安装2个,t,0.09,1-5-2,659.43,325.08,,283.52,,59.3487,29.3,,25.5,1.26
,CST变速箱安装2台,t,9.78,1-5-2,659.43,325.08,,283.52,,6449.2254,3179.3,,2772.8,136.92
,GICLZ15鼓形齿式联轴器安装2台,t,1.556,1-5-2,659.43,325.08,,283.52,,1026.07308,505.8,,441.2,21.784
,电机支架安装2台,t,4.947,1-5-2,659.43,325.08,,283.52,,3262.20021,1608.2,,1402.6,69.258
,CST变速箱支架安装2台,t,3.807,1-5-2,659.43,325.08,,283.52,,2510.45001,1237.6,,1079.4,53.298
,低速联轴器护罩安装2个,t,0.026,1-5-2,659.43,325.08,,283.52,,17.14518,8.5,,7.4,0.364
3,Φ1000传动滚筒安装2个,t,17.26,1-5-2,659.43,325.08,,283.52,,11381.7618,5610.9,,4893.6,241.64
4,Φ1400改向滚筒安装1个,t,11.534,1-5-2,659.43,325.08,,283.52,,7605.86562,3749.5,,3270.1,161.476
5,Φ800改向滚筒安装4个,t,13.036,1-5-2,659.43,325.08,,283.52,,8596.32948,4237.7,,3696.0,182.504
6,Φ630改向滚筒安装1个,t,2.401,1-5-2,659.43,325.08,,283.52,,1583.29143,780.5,,680.7,33.614
7,槽形吊挂上托辊组安装88组,10组,8.8,1-3-199,617.22,325.08,,185.73,,5431.536,2860.7,,1634.4,123.2
8,V形吊挂下托辊组安装34组,10组,3.4,1-3-199,617.22,325.08,,185.73,,2098.548,1105.3,,631.5,47.6
9,30°过度托辊组安装3组,10组,0.3,1-3-199,617.22,325.08,,185.73,,185.166,97.5,,55.7,4.2
10,20°过度托辊组安装3组,10组,0.3,1-3-199,617.22,325.08,,185.73,,185.166,97.5,,55.7,4.2
11,10°过度托辊组安装3组,10组,0.3,1-3-199,617.22,325.08,,185.73,,185.166,97.5,,55.7,4.2
12,平行上托辊组安装5组,10组,0.5,1-3-199,617.22,325.08,,185.73,,308.61,162.5,,92.9,7
13,平行下托辊组安装5组,10组,0.5,1-3-199,617.22,325.08,,185.73,,308.61,162.5,,92.9,7
14,头架安装1个,t,6.365,1-5-2,659.43,325.08,,283.52,,4197.27195,2069.1,,1804.6,89.11
施工图预算表,,,,,,,,,,,,,,
工程编号,,,,,,,,,,,,,,
工程名称:司家营Y5移置式胶带输送机,,,,,图号,,,预算编号,,,,,,
序,工程项目名称,单位,数量,定额编号,单价,其中,,,,总价,其中,,,
号,,,,,,人工费,材料费,机械费,人工日,,人工费,材料费,机械费,人工日
15,传动滚筒支架安装1个,t,6.074,1-5-2,659.43,325.08,,283.52,,4005.37782,1974.5,,1722.1,85.036
16,中部改向滚筒支架安装1个,t,7.76,1-5-2,659.43,325.08,,283.52,,5117.1768,2522.6,,2200.1,108.64
17,液压自动拉紧装置安装1个,t,3.587,1-5-2,659.43,325.08,,283.52,,2365.37541,1166.1,,1017.0,50.218
18,液压杠支架安装1个,t,1.438,1-5-2,659.43,325.08,,283.52,,948.26034,467.5,,407.7,20.132
19,绞车支架安装1个,t,1.561,1-5-2,659.43,325.08,,283.52,,1029.37023,507.4,,442.6,21.854
20,拉紧车安装1个,t,2.183,1-5-2,659.43,325.08,,283.52,,1439.53569,709.6,,618.9,30.562
21,拉紧车轨道架安装2个,t,4.261,1-5-2,659.43,325.08,,283.52,,2809.83123,1385.2,,1208.1,59.654
22,尾架安装1个,t,2.31,1-5-2,659.43,325.08,,283.52,,1523.2833,750.9,,654.9,32.34
23,头部托盘安装1个,t,108.697,1-5-2,659.43,325.08,,283.52,,71678.06271,35335.2,,30818,1521.758
24,尾部托盘安装1个,t,27.975,1-5-2,659.43,325.08,,283.52,,18447.55425,9094.1,,7931.5,391.65
25,受料装置,t,9.286,1-5-2,659.43,325.08,,283.52,,6123.46698,3018.7,,2632.8,130.004
26,标准中间架13个,t,9.4,1-5-2,659.43,325.08,,283.52,,6198.642,3055.8,,2665.1,131.6
27,非标准中间架4个,t,2.96,1-5-2,659.43,325.08,,283.52,,1951.9128,962.2,,839.2,41.44
31,有轨轨枕安装40个,t,16.4,1-5-2,659.43,325.08,,283.52,,10814.652,5331.3,,4649.7,229.6
32,头部中间节1安装两个,t,0.401,1-5-2,659.43,325.08,,283.52,,264.43143,130.4,,113.7,5.614
33,头部中间节2安装一个,t,0.154,1-5-2,659.43,325.08,,283.52,,101.55222,50.1,,43.7,2.156
34,头部中间节支腿安装5个,t,0.914,1-5-2,659.43,325.08,,283.52,,602.71902,297.1,,259.1,12.796
35,沉箱安装6个,t,65.02,1-5-2,659.43,325.08,,283.52,,42876.1386,21136.7,,18434,910.28
36,空段清扫器安装2个,个,2,1-3-211,103.58,58.05,,15.85,,207.16,116.1,,31.7,5
37,钢丝绳安装150m,t,0.51,1-5-2,659.43,325.08,,283.52,,336.3093,165.8,,144.6,7.14
38,钢丝绳头安装160个,t,0.277,1-5-2,659.43,325.08,,283.52,,182.66211,90.0,,78.5,3.878
39,5t手拉葫芦安装6个,个,6,参1-411,305,194,,98,,1830,1164.0,,588.0,50.12919897
40,料流检测器安装1个,个,2,参1-3-211,103.58,58.05,,15.85,,207.16,116.1,,31.7,5
施工图预算表,,,,,,,,,,,,,,
工程编号,,,,,,,,,,,,,,
工程名称:司家营Y5移置式胶带输送机,,,,,图号,,,预算编号,,,,,,
序,工程项目名称,单位,数量,定额编号,单价,其中,,,,总价,其中,,,
号,,,,,,人工费,材料费,机械费,人工日,,人工费,材料费,机械费,人工日
41,双向拉绳开关安装6个,个,6,参1-3-211,103.58,58.05,,15.85,,621.48,348.3,,95.1,15
42,钢丝绳夹安装6个,t,0.065,1-5-2,659.43,325.08,,283.52,,42.86295,21.1,,18.4,0.91
43,附塑钢丝绳Φ4安装160m,m,160,实际,3,3,,,,480,480.0,,0.0,
44,钢丝绳架安装218个,t,0.033,1-5-2,659.43,325.08,,283.52,,21.76119,10.7,,9.4,0.462
45,两级跑偏开关6个,个,6,参1-3-211,103.58,58.05,,15.85,,621.48,348.3,,95.1,15
46,跑偏开关支架6个,t,0.017,1-5-2,659.43,325.08,,283.52,,11.21031,5.5,,4.8,0.238
47,流槽堵塞检测器2个,个,2,参1-3-211,103.58,58.05,,15.85,,207.16,116.1,,31.7,5
48,测速盘安装1个,个,1,参1-3-211,103.58,58.05,,15.85,,103.58,58.1,,15.9,2.5
49,测速检测仪安装1个,个,1,参1-3-211,103.58,58.05,,15.85,,103.58,58.1,,15.9,2.5
50,纵向撕裂检测器安装1个,个,1,参1-3-211,103.58,58.05,,15.85,,103.58,58.1,,15.9,2.5
51,钢轨P50安装144m,t,7.5,1-5-2,659.43,325.08,,283.52,,4945.725,2438.1,,2126.4,105
52,重轨用鱼尾板安装24个,t,0.45,1-5-2,659.43,325.08,,283.52,,296.7435,146.3,,127.6,6.3
57,ST1000*B1400*(6+4+6)钢丝芯胶带安装312m,50m,6.24,1-3-219,1029.65,557.28,,445.47,,6425.016,3477.4,,2779.7,149.76
58,ST1000*B1400专用皮带机钢芯皮带接头胶接接头,个,1,实际,10000,4200,,5800,,10000,4200.0,,5800.0,
二、,图纸以外部分,,,,,,,,,,,,,
59,机尾下料溜槽制作,t,3.15,3-8-31,4005.62,401.24,,522.35,,12617.703,1263.9,,1645.4,54.43178295
,扣除甲方主材费,t,3.15,,-2649,,,,,-8344.35,,,,0
60,机尾下料溜槽安装,t,3.15,3-6-41,955.58,291.64,,534.56,,3010.077,918.7,,1683.9,39.56356589
61,制作清扫器两个,t,0.095,3-8-49,4313.03,650.16,,600.3,,409.73785,61.8,,57.0,2.66
,扣除甲方主材费,t,0.095,,-2670,,,,,-253.65,,,,
62,机头支架制作2个,t,0.71,3-8-49,4313.03,650.16,,600.3,,3062.2513,461.6,,426.2,19.88
,扣除甲方主材费,t,0.71,,-2670,,,,,-1895.7,,,,
63,机头支架安装2个,t,3.15,3-6-41,955.58,291.64,,534.56,,3010.077,918.7,,1683.9,39.56356589
施工图预算表,,,,,,,,,,,,,,
工程编号,,,,,,,,,,,,,,
工程名称:司家营Y5移置式胶带输送机,,,,,图号,,,预算编号,,,,,,
序,工程项目名称,单位,数量,定额编号,单价,其中,,,,总价,其中,,,
号,,,,,,人工费,材料费,机械费,人工日,,人工费,材料费,机械费,人工日
64,机头清扫器加负钢L75*6共2m,t,0.015,3-6-41,955.58,291.64,,534.56,,14.3337,4.4,,8.0,0.188397933
65,箱变箱体及下部轨枕安装,t,17,1-5-2,659.43,325.08,,283.52,,11210.31,5526.4,,4819.8,238
66,灯架子制作3个,t,0.2,3-8-49,4313.03,650.16,,600.3,,862.606,130.0,,120.1,5.6
66,扣除甲方主材费,t,0.2,,-2670,,,,,-534,0.0,,0.0,0
66,灯架子安装3个,t,0.2,3-6-41,955.58,291.64,,534.56,,191.116,58.3,,106.9,2.511972438
67,安装水泵电机一台,台,1,04年14-0626,286.33,97.52,,123.52,,286.33,97.5,,123.5,4.199827735
68,安装水泵一台,台,1,04年14-0628,286.33,97.52,,123.52,,286.33,97.5,,123.5,4.199827735
69,安装DN100管道,100m,0.003,5-1-32,637.45,266.57,,311.52,,1.9,0.8,,0.9,0.034440568
70,安装DN100阀门,个,1,5-2-34,42.24,21.59,,15.85,,42.24,21.6,,15.9,0.929801895
71,安装DN100法兰,副,2,5-3-266,26.27,10.91,,10.11,,52.54,21.8,,20.2,0.939707149
72,安装DN100短节,个,3,5-3-124,330.05,110.53,,157.69,,990.15,331.6,,473.1,14.28036176
73,安装DN100变径,个,1,5-3-124,330.05,110.53,,157.69,,330.05,110.5,,157.7,4.760120586
74,安装DN80阀门,个,4,5-2-32,34.37,16.25,,14.16,,137.48,65.0,,56.6,2.799310939
75,安装DN80法兰,副,10,5-3-264,21.74,9.75,,8.09,,217.4,97.5,,80.9,4.198966408
76,安装DN80短节,个,11,5-3-123,232.99,87.08,,108.5,,2562.89,957.9,,1193.5,41.25236865
77,制作安装水泵及电机支架2个,t,0.12,3-8-49,4313.03,650.16,,600.3,,517.5636,78.0,,72.0,3.36
78,扣除甲方主材费,t,0.12,,-2670,,,,,-320.4,0.0,,0.0,0
79,机头支架安装2个,t,0.12,3-6-41,955.58,291.64,,534.56,,114.6696,35.0,,64.1,1.507183463
80,配电箱支架制作3个,t,0.16,3-8-49,4313.03,650.16,,600.3,,690.0848,104.0,,96.0,4.48
,扣除甲方主材费,t,0.16,,-2670,,,,,-427.2,0.0,,0.0,0
81,配电箱支架安装3个,t,0.16,3-6-41,955.58,291.64,,534.56,,152.8928,46.7,,85.5,2.00957795
82,斜撑加固中间支架用焊工2个,工,2,实际,70,,,,,140,,,,
,斜撑加固中间支架用氧气2瓶,瓶,2,实际,20,,,,,40,,,,
施工图预算表,,,,,,,,,,,,,,
工程编号,,,,,,,,,,,,,,
工程名称:司家营Y5移置式胶带输送机,,,,,图号,,,预算编号,,,,,,
序,工程项目名称,单位,数量,定额编号,单价,其中,,,,总价,其中,,,
号,,,,,,人工费,材料费,机械费,人工日,,人工费,材料费,机械费,人工日
,斜撑加固中间支架用乙炔2瓶,瓶,2,实际,80,,,,,160,,,,
85,处理溜槽加沟子及机尾加挡板用焊工2个,工,4,实际,70,,,,,280,,,,
,处理溜槽加沟子及机尾加挡板用氧气2瓶,瓶,1,实际,20,,,,,20,,,,
,处理溜槽加沟子及机尾加挡板用乙炔2瓶,瓶,1,实际,80,,,,,80,,,,
,处理溜槽加沟子及机尾加挡板用焊条,kg,10,实际,5,,,,,50,,,,
,直接工程费(A)合计:,,,,,,,,,295735,143132,,,5963
,设备安装脚手架搭拆费,A1,143132,,5.00%,,,,,7156.60,,,,
,临时设施费,A1,143132,,4.80%,,,,,6870.34,,,,
,其它措施费,A1,143132,,6.04%,,,,,8645.17,,,,
,企业管理费,A1,143132,,32.72%,,,,,46832.8,,,,
,计:,,,,,,,,,365240.0,,,,
,,,,市场价,定额价,价差,,,,,,,,
,人工费调价(大小工平均),工,5963,50,23.22,26.78,,,,159679,,,,
,计:,,,,,,,,,524919,,,,
,利润,A1,143132,,18.00%,,,,,25763.8,,,,
,计:,,,,,,,,,550683,,,,
(1),皮带机机头机尾及中间平整场地用工,工,50,实际,70,,,,,3500.0,,,,
(2),"机械设备进厂卸车,库房领料用零工",工,39,实际,70,,,,,2730.0,,,,
(3),"机械设备进厂卸车,库房领料用25t吊车台班",个,1,实际,1200,,,,,1200.0,,,,
(4),库房领皮带用25t吊车台班,个,1,实际,1200,,,,,1200.0,,,,
(5),库房领皮带用板车台班,个,1,实际,600,,,,,600.0,,,,
(6),做溜槽领钢板用8t吊车台班,个,1,实际,600,,,,,600.0,,,,
(7),08年12.8日至09年5.30现场看护用工,工,2073,实际,70,,,,,145110,,,,
施工图预算表,,,,,,,,,,,,,,
工程编号
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025年技术许可合同范本
- 不动产附负担赠与合同
- 2025商业房产租赁合同和转租合同模板
- 2025区域授权代理合同范本
- 2025【签订股权转让合同】股权转让合同范本
- 2025四川商品房买卖合同
- 和解协议书模板简单
- 2025年03月广东深圳大学黄惠教授团队诚聘1名研究助理笔试历年典型考题(历年真题考点)解题思路附带答案详解
- 2025年03月国家体育总局体育科学研究所应届毕业生(3名)笔试历年典型考题(历年真题考点)解题思路附带答案详解
- 江苏省扬州市江都区八校2025年初三下学期精英对抗赛英语试题含答案
- 2025年广东能源集团云浮蓄能发电有限公司招聘笔试参考题库含答案解析
- 2024年考生面对挑战时的心理调整试题及答案
- 2025-2030全球及中国4,4-二氟二苯甲酮行业市场现状供需分析及市场深度研究发展前景及规划可行性分析研究报告
- 【初中地理】撒哈拉以南非洲课件-2024-2025学年人教版地理七年级下册
- 2024年信息安全试题及答案
- 药物治疗管理MTM
- 广东省佛山市南海区2024-2025学年七年级外研版英语期中练习题(含答案)
- 钢筋精算管理操作手册
- 2025年河南水利与环境职业学院单招职业技能测试题库审定版
- 近十年英语中考完形填空试题
- 教学课件:密织法律之网和强化法治之力
评论
0/150
提交评论