年6月23日上海申丝凯乐现代物流总部级管理中心项目技术标资料内容仅供参考,如有不当或者侵权,请联系本人改正或者删除。目录第一章编制依据及说1.1编制依据及内容1.1.1编制依据····································································71.1.2编制内容····································································71.1.3工程拟使用的标准····························································71.2编制说明及原则1.2.1编制说明····································································81.2.2编制原则····································································8第二章工程概况2.1工程情况·····································································102.2现场概况······································································112.3施工目标2.3.1工期目标····································································112.3.2质量目标····································································112.3.3安全文明施工目标····························································112.4工程的重点及难点······························································11第三章施工组织机构与施工部署3.1施工组织管理机构······························································123.1.1项目组织机构设置图··························································123.1.2管理人员及机构职责··························································133.2与业主、监理及其它分包单位的配合··············································143.3施工部署3.3.1施工顺序····································································143.3.2工程施工流程图························································153.3.3总体施工流程三维工况······················································163.3.4施工段划分及施工安排·······················································203.3.5分包单位组织及协调·······················································203.4施工总平面布置3.4.1现场当前现状································································213.4.2施工总平面布置依据··························································213.4.3施工总平面说明······························································213.4.4施工平面布置管理····························································213.4.5施工总平面附图·····························································22第四章施工准备4.1施工准备概述·································································294.2现场交接准备·································································304.3技术准备·····································································304.4试验准备·····································································314.5劳动力准备···································································314.6施工机具准备4.6.1施工机械投入情况···························································334.6.2保证机械设备供应的措施·····················································334.7周转材料准备·································································364.8临时水电准备4.8.1临时用电···································································374.8.2临时用水···································································394.9临时设施准备·································································40第五章施工方法5.1施工流程·····································································415.2施工测量及沉降观测···························································465.2.15.2.25.2.35.2.45.2.55.2.65.3基坑围护工程5.3.1SMW工法···································································525.3.2水泥搅拌桩································································545.3.3压密注浆···································································565.3.4圈梁、立柱施工······························································575.3.5支撑安装···································································575.3.6降水····································································585.3.7监测······································································595.4土方工程5.4.1基础承台土方开挖···························································605.4.2地下室外墙土方回填··························································605.4.3压密注浆···································································605.5混凝土垫层···································································615.6地下室防水工程·····························································615.6.1地下室防水设计概况·························································625.6.2水泥基防水施工·····························································625.6.3结构自防水施工·····························································625.7模板工程5.7.1设计概况···································································635.7.2模板选型···································································635.7.3模板施工···································································655.8钢筋工程5.8.1钢筋工程设计概述···························································715.8.2钢筋工程施工组织···························································715.8.3钢筋工程施工方法···························································715.9混凝土工程5.9.1混凝土工程概述·····························································815.9.2混凝土施工组织·····························································825.9.3混凝土运输及泵送···························································825.9.4混凝土的浇筑方法···························································835.9.5混凝土的养护·······························································865.9.6混凝土施工质量控制·························································865.10砌体工程5.10.1砌体工程设计概述···························································875.10.2材料要求···································································875.10.3砌筑技术措施·······························································875.10.4施工要点···································································885.10.5质量要求···································································895.11屋面及地下室防水层施工5.11.1屋面设计概况······························································895.11.2材料要求··································································905.11.3找坡及找平层的施工························································905.11.4防水层的施工······························································905.11.5上人屋面地砖铺设施工····················································925.11.6质量要求··································································925.11.7成品保护··································································925.12脚手架工程5.12.1脚手架搭设方案选择························································935.12.2外墙脚手架计算····························································935.12.3外墙脚手架搭拆方法························································1055.12.4内脚手架的搭设····························································1065.13细石混凝土楼地面施工······················································1065.14外墙施工·································································1085.15阳台及楼梯栏杆····························································1125.16试验、检验与计量施工方案5.16.1试验项目及项目取样试验方法················································1135.16.2试验管理··································································1165.16.3计量控制··································································1175.17重点难点分项工程5.17.1地下室底板大致积砼设计概述················································1185.17.2混凝土拌制和原材料要求····················································1185.17.3混凝土浇筑顺序和方法······················································1185.17.4混凝土运送和现场输送······················································1185.17.5混凝土振捣································································1185.17.6底板混凝土的温度裂缝的控制················································1195.17.7底板混凝土的封闭养护······················································1195.17.8大致积砼质量保证措施······················································120第六章施工总承包管理6.1施工总承包管理概述···························································1226.2施工总承包管理目标6.2.1工程质量目标·······························································1226.2.2工程进度目标·······························································1226.2.3工程施工安全目标···························································1226.2.4分包管理目标·······························································1226.3总承包管理体系6.3.1总承包组织机构·····························································1226.3.2总承包管理制度·····························································1236.4施工总承包管理原则6.4.1”公正”原则·································································1246.4.2”统一”原则·································································1246.4.3”控制”原则·································································1246.4.4”协调”原则·································································1246.4.5”服务”原则·································································1246.5施工总承包管理及措施6.5.1施工总承包管理方案·························································1256.5.2总承包管理方案的保证措施··················································1256.6总包与业主、监理、设计、分包单位的协调管理6.6.1与业主关系的协调··························································126.6.2与监理关系的协调···························································1276.6.3与设计关系的协调···························································1286.6.4总包与分包单位的关系协调···················································1286.7施工总承包施工技术管理6.7.1施工技术的管理概述·························································1296.7.2施工技术档案管理要求·······················································1296.8施工总承包施工质量的管理6.8.1总承包管理中的质量保证体系·················································1296.8.2总承包管理中的质量控制·····················································6.9施工总承包施工进度的管理6.9.1对分包商施工进度目标的确定·················································1326.9.2对分包商施工进度实施的管理·················································1326.9.3对分包商施工进度计划的控制·················································1326.9.4对分包商施工进度的调整·····················································1336.10施工总承包施工安全的管理6.10.1安全制度的管理····························································1336.10.2安全设施的管理····························································1346.10.3安全检查的落实····························································1346.10.4安全生产的控制····························································1346.11施工总承包对文件资料的控制6.11.1文件资料控制措施·····················第七章施工进度计划7.1设立进度控制点·······························································1357.2施工进度管理保证措施7.2.1合理的施工方案·····························································7.2.2严格的管理与控制7.3施工技术保证措施·····························································1417.4夏季施工保证措施·····························································1417.5冬季施工保证措施·····························································1417.6雨季施工措施·································································1467.7夜间施工措施·································································1477.8资金保障措施·································································148第八章质量保证措施8.1质量管理体系及保证体系8.1.1质量管理体系·······························································18.1.2质量保证体系·······························································18.2质量管理制度·································································1508.3质量保证措施8.3.1原材料质量保证措施·························································8.3.2施工过程质量控制···························································第九章施工安全技术措施9.1安全生产目标·································································1679.2安全生产管理组织机构·························································1679.3安全生产管理制度·····························································1689.4安全防护9.4.1脚手架防护·································································1689.4.2”四口”防护·······························································1699.4.3临边防护···································································1709.4.4交叉作业防护·······························································1709.5机械设备的安全使用···························································1709.6安全用电·····································································1719.7安全消防措施·································································171第十章文明施工及环境保护措施10.1现场文明施工10.1.1管理目标······················10.1.2管理措施··································································10.1.3文明施工设施布置··························································10.1.4对现场场容管理····························································10.1.5现场机械管理·····················10.1.6现场生活卫生管理(工人生活区租赁厂房)······················10.1.7施工垃圾清运及卫生防疫·····················10.1.8施工现场料具存放······················10.1.9现场标示警示宣传形式上标准················································110.1.10其它有关事项·····························································110.2降低污染,环境保护措施10.2.1防止水污染措施····························································110.2.2防止大气污染措施··························································1710.3环境保护措施································································17710.4治安保卫措施································································178
第一章编制依据及说明1.1编制依据及内容1.1.1编制依据表1.1编制依据序号分类名称内容1招标文件上海申丝凯乐现代物流总部级管理中心项目招标文件2施工图纸上海新建设建筑设计有限公司设计的上海申丝凯乐现代物流总部级管理中心项目的施工图纸3法律、法规国家及上海市地方的有关法律、法规之规定。1.1.2编制内容本施工组织设计内容包括项目组织管理、机构设置、施工部署、总图布置和管理、施工进度计划、人力及机械配置、主要工程施工方案和方法、质量、安全和文明施工、总包管理等自开工至竣工的全过程组织管理措施。1.1.3工程拟使用的标准表1.3规范标准目录(包括总包施工管理需要的规范)序号文件名称编号类别1法律法规《中华人民共和国建筑法》/国家2《中华人民共和国安全生产法》/国家3《建设工程质量管理条例》国务院第279号国家4《建设工程安全管理条例》国务院第393号国家5《工程测量规范》GB50026-国家6《建筑边坡工程技术规范》GB50330-国家7《混凝土结构工程施工规范》GB50666-国家8《混凝土结构工程施工质量验收规范》GB50204-国家9《建筑工程施工现场供用电安全规范》GB50194-国家10《屋面工程质量验收规范》GB50207-国家11《钢结构工程施工质量验收规范》GB50205-国家12《给水排水管道工程施工及验收规范》GB50268-国家13《地下防水工程质量验收规范》GB50208-国家14《建筑地面工程施工质量验收规范》GB50209-国家15《建筑电气工程施工质量验收规范》GB50303-国家16《建筑物防雷工程施工与质量验收规范》GB50601-国家17《建设工程文件归档整理规范》GB/T50328-国家18《施工现场临时用电安全技术规范》JGJ46-行业19《建筑施工扣件式钢管脚手架安全技术规范》JGJ130-行业20《建筑工程施工质量验收实施细则》DB21/1234-地标21《建筑消防安全技术规范》DB21/T2116-地标22《建筑深基坑工程施工安全技术规范》JGJ311-行业1.2编制说明及原则1.2.1编制说明本施工组织设计的进度计划是以桩基完工及验收合格后具备开工条件进行初步编制,具体以监理及业主批准的开工报告为准,暂定按9月20日为开工日期(编制的总进度计划可根据暂定日期与实际开工日期相差天数相应的调整)。本施工组织设计是根据建设单位的招标文件、设计的施工图、施工及验收规范、质量验评标准、有关安全技术操作规程、结合现场条件和工程特点,以及我公司多年的施工经验和当前我公司实际的施工技术力量,施工机具及其生产能力进行编制。针对工程的特殊性,本方案对工程做出了全面施工布置,切实有效地进行全面质量控制和进度控制,并在施工管理上进行详细的安排,编制有效的施工方案,做到安全生产,文明施工,确保合格工程。但方案未尽事项,将在工程施工中依据实际情况进行调整及补充。1.2.2编制原则(1)遵循设计文件、规范和质量验收标准的原则,在编制项目施工方法中,严格按设计要求,执行现行的规范及验收标准,优化施工方案,正确组织施工,确保工程质量优良。(2)坚持实事求是的原则,在制定施工方案中,坚持科学组织,合理安排均衡生产,确保高速、高质量、高效益地完成本工程建设。(3)用工程项目管理法组织工程的施工,经过与现场监理和设计单位充分合作,实现人力、机械、物资、方法的最佳组合。(4)经过周密的劳动组织,优化施工方案、施工方法、可靠的技术措施,实事求是地确定合理工期,确保按期、优质、安全、高效地完成本合同赋予的全部工作内容。(5)控制环境污染,搞好文明施工,为业主服务,向建设单位移交一个优质工程。
第二章工程概况2.1工程情况2.1.1工程名称:上海申丝凯乐现代物流总部级管理中心项目-车间及管理用房2.1.2建设单位:上海申丝凯乐供应链管理有限公司2.1.3建设地点:上海宝山城市工业园区,东至雄博精密仪器厂、南至市台路、西至真陈路2.1.4工程规模:建筑物性质火灾危险类别建筑物耐火等级占地面积(㎡)总建筑面积(㎡)层数建筑高度室内外高差车间丁类一级349227611.9地下1层,地上12层58.8300mm2.1.5分层面积表分层面积表(单位:平方米)地下-1F1F2F3F4F5-12F机房层计容面积(不含地下室)总建筑面积(含地下室)6997.934922936335912521173*8=93841912061427661.92.1.6结构形式:裙房框架结构,主楼框架剪力墙结构,合理使用年限50年,抗震设防烈度为7度。2.1.7耐火等级:一级
2.2现场概况正在进行桩基工程施工。2.3施工目标2.3.1工期目标开工日期为9月20日(暂定日期),编制的总进度计划可根据暂定日期与实际开工日期相差天数相应的调整。地下室结构在2月6日完成;裙房主体结构4月7日;主楼主体结构6月5日;裙房二次结构5月11日完成;主楼二次结构7月8日完成;整体工程竣工9月19日。2.3.2质量目标达到《工程施工质量验收规范》合格标准2.3.3安全文明施工目标施工现场安全文明施工符合”安全文明工地”;2.4工程的重点及难点本工程施工重点及难点为(1)基坑开挖支护,地下室开挖最深处-8.7m。具体施工质量控制详见专项施工方案。(2)地下室底板混凝土施工质量控制。地下室及主楼部分地下室承台厚度分别为0.8m、1m、1.4m等几种,底板厚度0.4m,0.45m,为大致积混凝土施工。(3)现场施工场地有限,施工现场组织协调难度大。(4)地下室施工工序多,制约因素多,工期紧,组织难度大。(5)各专业穿插施工较多,界面复杂,专业之间制约因素多,总承包管理难度大。
第三章施工组织机构与施工部署3.1施工组织管理机构本工程将按照国际工程施工惯例实施项目法施工,实行项目经理负责制,项目经理部由资深工程师组成,全面负责本工程的施工、技术、质量、安全、核算的管理工作。行使计划、组织、指挥、协调、控制、监督六项基本职能。项目部将本着科学管理、优质高速、开拓敬业的原则,以塑造精品、争创优质工程为目标,发挥企业集团优势,对工程施工进行综合的管理、组织、协调和控制,确保本工程实现一流的承包管理、一流的文明施工、一流的工程质量和一流的施工速度。我公司有大量熟练的专业施工技术工人作为施工作业层,能够熟练地施工大型、复杂的公共及民用建筑。经过管理层和作业层的精心挑选和合理组建,确保本工程的工期、质量、成本、安全生产、文明施工五项控制目标和各项经济技术指标得以实现。3.1.1项目组织机构设置图
工程名称:上海申丝凯乐现代物流总部级管理中心序号姓名本工程职务或岗位技术职称专业岗位资格证书等级及编号备注1张东旭项目经理高级工程师建筑工程一级建造师,京2苗坤技术负责人工程师建筑工程一级建造师JZ005065843丁琳机电技术负责人工程师机电工程师1311A0014张俊商务经理造价造价员沪5孙烨安全经理安全安全员京建安C()02254496靳杰质检员质量质量员3117周英材料员材料材料员3118阳政权施工员施工施工员3149陆艳俊资料员中级资料资料员3133.1.2管理人员及机构职责根据本工程的特点,项目管理的施工组织结构实行二级管理机构,其各部门及主要管理人员的职责如下:(1)项目经理职责1、代表公司履行对业主的工程承包合同,负责项目的日常管理工作;2、负责项目质量安全保证体系的建立和运行,负责组建项目文明施工领导小组并展开工作;3、建立和完善项目的组织机构,明确人员职责,建立适当的激励机制,充分发挥参与项目建设人员的积极性;4、主持项目工作会议,审核和签发对内对外的重要文件;5、组织编制项目职工的培训计划;6、采取有效的办法和措施,保证项目的质量、安全、工期等目标顺利实现。(2)项目技术负责人职责1、负责项目质量保证体系的建立和运行;2、组织项目各专业技术人员编制有关工程技术文件、绘制有关的工序流程图;3、指导、协调各专业技术人员的工作;4、安排进行图册、文件、资料的分配、签发、保管及日常处理;5、开展质量教育,保证公司的各项制度正常运行;6、其它应由项目总工程师担负的职责。(3)物资供应部门职责1、全面负责本项目物资供应,并保证质量满足业主、监理的要求;2、负责联络本工程所需材料的供货商,进行质量、价格综合评选;3、负责物资供应科的质量教育,明确采购、检验、保管员的职责;4、负责做好材料管理工作,材料仓库的材料堆放、标识等达到文明施工的相关要(4)质量安全员职责1、全面负责本工程的质量、安全工作,确保工程质量达到合格标准(外墙装饰优良),无任何质量安全事故发生;2、负责落实本工程的全部质量安全措施;3、组织本工程的质量、安全检查工作,配合监理、质量安全监督机构的检查工作。3.2与业主、监理及其它分包单位的配合本工程甲指分包单位较多(桩基、电梯、消防、门窗、景观工程等),搞好各分包单位之间的管理和协调合作是确保整个施工过程顺利进行的关键,也是确保工程奋斗目标顺利实现的关键。我公司将严格遵守招标文件及合同的约定,遵守业主工作区以及施工现场的各项管理制度,服从业主、监理的统一协调与管理,履行总承包管理职责,积极做好其它分包单位的的管理和配合,确保工程整体建设各项目标的实现。3.3施工部署3.3.1施工顺序考虑到本工程场地局限,并结合本工程设计特点及现场实际情况,经我公司经过重复研究,决定在施工安排上采取划分施工段,采用大小流水段施工作业,加大工程施工方面(特别是施工人员、机械设备和周转材料)的投入,砌体和粗装修也按分段验收,分段施工的方法进行,经过合理的组织,确保本工程的施工合同工期,降低工程成本。在现场平面布置时要考虑到塔吊、施工电梯等机械设备的布置要与现场实际情况相符合(临时用地紧张)及工程结构对应(包括设备的附着点)。尽量减少场地施工平面多次布置。3.3.2工程施工流程图根据本工程设计特点及施工工序安排、施工总进度计划要求,编制如下整个工程施工流程图。桩检测合格桩基及地基验槽承台土方人工开挖桩检测合格桩基及地基验槽承台土方人工开挖基础垫层及砖胎膜施工筑基础垫层及砖胎膜施工筑外墙防水施工预留、预埋(分包单位)地下室结构施工外墙防水施工预留、预埋(分包单位)地下室结构施工地上1~12层结构施工(主楼)基坑回填地上1~12层结构施工(主楼)基坑回填地上1~3层及屋面框架结构施工(裙房)地上1~3层及屋面框架结构施工(裙房)墙体砌筑施工墙体砌筑施工屋面防水施工屋面防水施工墙体抹灰施工墙体抹灰施工造型部位防水及保护层施工外墙面砖、石材施工水电安装(分包单位)造型部位防水及保护层施工外墙面砖、石材施工水电安装(分包单位)石材幕墙施工阳台栏杆、楼梯栏杆安装石材幕墙施工阳台栏杆、楼梯栏杆安装机电设备多专业安装(分包单位)机电设备多专业安装(分包单位)门窗安装(业主指定分包单位)门窗安装(业主指定分包单位)地面及卫生间防水施工地面及卫生间防水施工外脚手架拆除外脚手架拆除专业装饰装修施(业主指定分包单位)专业装饰装修施(业主指定分包单位)清理收尾清理收尾竣工验收竣工验收上海申丝凯乐现代物流总部级管理中心上海申丝凯乐现代物流总部级管理中心工程整体施工流程图3.3.3总体施工流程三维工况桩基围护施工9月-11月土方开挖10-11月
地下室底板施工完成时间12月地下室顶板施工完成时间2月
裙房结构封顶时间4月主楼结构封顶6月项目竣工结束9月
3.3.4施工段划分及施工安排根据设计图纸结构的特点及各部分工程量的大小,以建筑物间的伸缩缝或后浇带进行施工段的划分,地下室结构施工阶段以后浇带划分三个施工段,两个施工组,其中A区,B区为一个施工班组,C区为一个施工班组;见下图主体结构施工段划分按主楼裙楼进行划分,进行流水施工。3.5分包单位组织及协调 对指定分包,我们将根据施工总进度的要求,协助业主提前筛选确定,签订分包合同并纳入总包管理之中,对指定分包的进度、质量、安全和文明施工提出明确要求,并监督实施。每周至少召开一次协调会,协商解决多专业之间施工交叉的有关问题。为保证分包施工的顺利进行,我们将提供方便和各类服务。3.4施工总平面布置3.4.1现场当前现状本工程正在进行桩基施工,周边施工围墙已围蔽。3.4.2施工总平面布置依据本工程施工总平面图布置依据上海申丝凯乐现代物流总部级管理中心工程施工招标有关要求及施工图纸,现场界线、水源、电源位置、周围道路情况以及现场勘察结果,总进度计划要求及资源需用量计划,总体施工部署,主要施工方案及安全文明施工和环境保护要求。3.4.3施工总平面说明施工总平面布置按照经济适用、合理方便的原则,在保证场内交通运输畅通和满足施工对材料要求的前提下,最大限度地减少场内二次运输;符合施工现场卫生及安全技术要求和防火规范、满足施工生产和文明施工的需要。工程能否顺利进行,在很大程度上取决于合理的施工总平面布置,保持、优化施工现场各施工机械设备的布局,保证施工现场道路的畅通将是至关重要的。由于整个施工场地狭窄,四周均存在临街道路和拟建的建筑物,我项目部经过研究对工地现场进行科学、合理地布置施工平面图,按照总体施工部署,结合现场条件,整个施工过程分为三个施工阶段。具体详见基础结构施工阶段施工总平面布置图、主体结构施工阶段施工总平面布置图及装修阶段施工总平面布置图。对总平面管理首先建立总平面管理责任制,绘制施工平面分段图,具体责任到人;其次严格施工平面和道路交通管理,各种作业场地、机具、材料都按划定的区域和地点操作或堆放,车辆进场路线也要规划安排,避免混乱。基础结构施工时布置一台施工塔吊。二次砌筑时设置两台施工电梯,并根据进度需要,随时配置搅拌机。由于现场场地狭窄,在施工现场只布置管理人员办公室,管理人员及工人无生活区布置场地,根据业主指定位置进行搭设。3.4.4施工平面布置管理(1)管理原则根据施工总平面布置及各阶段布置,以充分保障阶段性施工重点,保证进度计划的顺利实施为目的。在工程实施前,制订详细的大型机具使用及进退场计划,主材及周转材料生产、加工、堆放、运输计划,同时制订以上计划的具体实施方案,严格执行、奖惩分明,实施科学文明管理。(2)平面管理体系由项目经理部工程部负责施工现场总平面的使用管理,由项目执行经理统一协调指挥。建立健全调度制度,根据工程进度及施工需要对总平面的使用进行协调和管理,并由工程部对总平面的使用负责日常管理工作。(3)管理计划的制定施工平面科学管理的关键是科学的规划和周密详细的具体计划,在工程进度网络计划的基础上形成主材、机械、劳动力的进退场、垂直运输等计划,以确保工程进度,充分均衡利用平面空间为目标,制订出切合实际的平面管理实施计划。并将计划输入微机电脑,进行有效的动态管理。(4)管理计划的实施根据工程进度计划的实施调整情况,分阶段发布平面管理实施计划,包含时间计划表、责任人、执行标准、奖罚条例,在计划执行中不定期召开生产调度会,经充分协调确定后,发布计划调整书。工程部负责组织阶段性的定期检查监督,确保平面管理计划的实施。其重点保证项目是:安全用电、场区内外环卫场区道路,给排水系统,垂直运输、料具堆放场地管理调整,机具、机械进退场情况,以及施工作业区域管理等。3.4.5施工总平面附图1.施工总平面布置图施工平面布置图三维视图
施工平面布置图俯视图2.临时道路布置场内的临时道路主要用于场内运输和规划车路线设置主干道,同时按照工程施工需要敷设临时施工便道。场内道路布设为南侧和东侧为5m,西侧和北侧因场地限制,布设为4m;路基为300mm厚毛石,100mm碎石上铺设200mm厚C20混凝土,临时道路剖面图如下图所示:3.现场临时水电水平布置1)现场临时水管采用φ65的PE管,布置在排水沟外侧,每隔约100m设置一个室外消防栓,每隔约50m设置一个临时用水接驳点。2)从业主提供的现场变压器就近接总配电箱,分配电箱沿临时道路放置,临时配电主要用于现场机械施工,现场临时照明,水泵等用电。3)临时水电水平布置图见总平布置图4.现场临时用水竖向布置给水总管设置规格为DN65,每层接出DN20支管,分别用于施工用水和楼层厕所冲洗用水。给水泵采用±0.000层手动控制,给水泵在正常运行时由设置在水箱内的电接点液位器或浮球阀自动控制;临时施工用水竖向布置见下图:现场施工用水竖向布置图5.现场临时用电竖向布置1)主楼和裙房楼由0#电箱接出4-5个一级配电箱,再由一级配电箱分出4-5路至每个楼层的二级配电箱2)为了防止施工工地上电缆损坏,所有主干线电缆均采用钢带或钢丝铠装电缆。3)垂直敷设的临时主干线每隔2米做一个固定支架固定敷设电缆;临时施工用电竖向布置见下图:现场临时用电竖向布置图6.材料临时堆场及集中加工场现场沿建筑物北侧设置钢筋堆场及模板堆场,钢筋堆场为20m*15m,模板堆场为30m*10m。材料堆场采用C15混凝土硬化。7.现场办公室现场办公室沿西侧围墙边布置,办公室采用两层彩钢板房,不燃和阻燃的碳素钢材料。办公室功能划分:业主及监理办公室5间,技术质量部、施工管理部、商务合约部、物资设备部、安全管理部以及会议室,配有空调及适当照明。
第四章施工准备4.1施工准备概述施工准备是工程建设的重要保证,也是施工过程中的一个重要环节和阶段。施工准备工作是为创造有利的施工条件,保证施工项目目标实现而进行的从技术上、组织上和人力、物力、财力的准备,必须根据工程特点、施工条件要求全面考虑,保证开工和施工活动的顺利进行。工程开工前所进行的一系列施工准备工作主要包括:外部环境方面的施工现场规划、人员、机械、物资调配,办理与桩基施工单位的交接手续。内部环境方面的技术准备、施工计划准备、施工劳动力准备、主要物资材料计划,以及临时设施施工准备等工作。工程开工前,由项目总工组织项目经理部有关技术人员认真熟悉图纸,参加由建设单位组织召开的设计交底、图纸会审和轴线桩交接、施工临时水电交接、施工现场勘察;根据施工现场的实际情况和建设单位的统一要求布置现场临时设施;施工技术部门根据投标方案大纲编制实施性的施工组织设计和分项工程施工方案并向施工工长和专业施工队进行技术交底和岗前培训,同时按照施工总进度计划的总体安排编制材料进场计划、设备进场计划、人员进场计划。上海申丝凯乐现代物流总部级管理中心工程施工准备工作内容一览表序号工作内容执行人员1图纸学习、会审、技术交底、编制施工组织设计工程师、技术员2基础、主体、装饰工程施工预算预算员3根据交接的基准点进行施工放线测量员4施工图纸翻样、报材料计划各专业施工员5临建搭设钢筋车间、水泥库房、试验室各专业施工员发电机房、木工车间施工员、电工班长生活用房、临时围墙各专业施工员道路和绿化各专业施工员6施工供电施工现场以外电源电工班长施工现场以内电源电工班长7施工供水管网铺设施工员、水工班长8木工机械、钢筋加工机械安装施工员、机械队长9塔吊安装钢筋混凝土基础施工专业施工员塔吊安装、验收机械队队长10砂浆搅拌机安装机械队队长11劳动力进场教育安全员、项目总工、各工长12上报开工报告项目经理4.2现场交接准备进入现场后,即着手对现场情况进行交接。对现场的平面控制网点进入交接,并根据需要进行导线点加密;对已完的基础桩基工程轴线、标高与设计要求是否相符进行复验,并办理相应的手续;对现场的水源、电源及排水设施进入踏勘、交接。进场后,搞好施工平面布置,注意排水与消防工作,根据现场实际情况,布置塔吊、及现场办公室以利施工;规划好料具堆放和加工场地,实行部分场地硬地化,做好文明施工。4.3技术准备(1)熟悉和审查施工图纸。由项目总工程师组织项目经理部技术人员尽快熟悉图纸,提出图纸问题及在施工中所要解决的问题和合理化建议等,进行图纸会审。(2)修改和完善施工组织设计。按设计图纸要求,根据工程特点结合地质构造、现场环境和本标段工程具体情况,进一步修改和完善已编制好的施工组织设计,确保工程好、快、省、安全地完成。(3)制定各分项工程专项施工方案1、混凝土工程施工方案:根据现场实际情况和招标文件规定,采用商品混凝土进行浇注,浇筑采用泵送工艺。由于墙柱混凝土强度等级与梁板不一致,施工时将分别浇筑,即先浇柱墙砼,再绑扎梁板钢筋和浇筑梁板砼。2、模板工程方案:模板将主要使用九夹板、木龙骨、外钢管龙骨,支撑主要采用扣件式钢管。3、钢筋工程方案:钢筋水平接头采用闪光对接焊、竖向用电渣压力焊和绑扎搭接4、垂直运输和脚手架方案:垂直运输采用1台塔吊和2台人货两用电梯,脚手架用双排扣件钢管脚手架,一到五层采用落地式脚手架,从第六层开始使用悬挑式脚手架,每四层悬挑一次,悬挑高度18m。(4)编制施工图预算和施工预算。由项目部预算人员根据施工图纸所确定的工程量、施工组织设计拟定的施工方法和进度计划、建筑工程预算定额和有关费用定额,进行施工图预算的编制。向材料部门提供详细的材料计划,并作好劳动力、材料及机械台班需用量分析。(5)进行施工技术交底。工程开工前由项目总工组织施工人员、质安人员、班组长进行交底,针对施工的关键部位、施工难点、质量和安全要求、操作要点及注意事项等进行全面的交底,各个班组长接受交底后组织操作工人认真学习,并要求落实在各个施工环节之上。(6)资料准备:施工中严格按国家和行业现行质量检验评定标准和施工技术验收规范进行施工和检查,且遵照上海市质量监督站的有关规定,开工前准备好各种资料样表,施工中及时填写整理,分册保管,待工程竣工后装订成册。4.4试验准备选定建设单位指定的并经上海市建委认证的工程质量检测有限公司。建立现场小型试验室,配备相应的试验器材,按国家现行有关标准对各项器材设备进行安装、调试及检测。施工前提前做好砂浆级配(混凝土采用商品混凝土),组织各种进场材料的检验及钢筋焊接试验工作,准备好各种砼试模,各种测量工具提前送检报验。4.5劳动力准备人员调配主要是对劳动力的调配,即对其实施有效的监督和管理,作好有关劳动力的计划、决策、组织、指挥、监督、协调等项的工作,达到最有效、最合理组织劳动力,以确保工期、质量、安全目标的实现。(1)劳动力的选择进行劳动力的选择时应考虑以下因素:劳动力素质的优化性选择。由于本工程工期紧、劳动强度大,对操作人员的技术水平、熟练程度要求较高。为此,需要选用素质较高、有类似工程施工经验的劳动力,并经过现场短期的培训不断提高劳动力的综合素质。劳动力数量的优化性选择。根据工程的规模和施工技术特性,按比例配备一定数量的劳动力,以避免窝工,又不出现缺人现象,使得现有劳动力得以充分利用。劳动力组织形式的优化性选择。建立适合于本工程特点的精干、高效的劳动力组织形式,本工程的劳动力组织形式拟采用结合项目两制实施的专业工种包清工形式,该种方式具有管理到位、人员调动灵活、降低管理费用等优点。根据本工程的特点结合我单位的实际情况,调遣具有较高施工技术水平和丰富施工经验的施工队,作为该工程的作业层,作业层包括钢筋施工队、模板施工队、混凝土施工队、瓦工施工队、防水施工队、装饰工程施工队(栏杆、涂料、外墙饰面砖)等。各专业施工队伍,根据施工进度与工程状况按计划、分阶段进退场,并保证人员的稳定和工程的顺利展开。根据本工程的施工合同内容规模与施工进度,劳务层的劳动力(土建)用量高峰期约为800人左右。按照施工合同文件施工进度计划的安排、月度工程量的大小、施工作业段的划分、工种的安排、工程质量的要求,本工程劳动力安排如下表:(2)保证劳动力及时供应的措施1、编制劳动力需用量计划施工前根据施工进度计划、施工阶段的划分、各个专业工种的需要,编制切实可行的劳动力需用量计划,并根据工程实际进展情况,由项目经理部负责对各施工队劳动力进退场时间、数量提出指导性计划并及时调整,避免劳动力资源的浪费。2、根据本工程分项工程的特殊要求,做好现场岗位技术培训,提高劳动者的操作技能,加强质量意识教育,组织学习国家有关规范、标准、规程、进行施工组织设计的总设计交底,使施工人员了解该工程的特点,以熟练规范的要求,高质量地完成额定任务,确保计划用量,满足施工生产需要。3、在本工程范围内根据施工进度的需要对各个施工队进行必要的调节,实行动态管理,使之合理流动,达到最佳劳动效率。4、制定合理可行的激励机制,充分调动广大职工的积极性、创造性,为工程成本的降低尽力。4.6施工机具准备4.6.1施工机械投入情况本工程基础施工期间投入1台ST5015型塔吊;主体施工期间按投入1台塔吊,同基础施工阶段;装修施工期间投入1台施工电梯。各种中小型机具根据工程具体情况和进度要求进行布置。具体详见基础施工阶段总平面布置图、主体结构施工阶段总平面布置图、二次结构及装修施工阶段总平面布置图。主要施工机械及检验、测量和试验设备详见下表中所示。4.6.2保证机械设备供应的措施(1)编制合理的机械设备供应计划,在时间、数量、性能方面满足施工生产的需要。合理安排各类机械设备在各个施工队(组)间和各个施工阶段在时间和空间上的合理搭配,以提高机械设备的使用效率及产出水平,从而提高设备的经济效益。(2)根据供应计划作好供应准备工作,编制大型机械设备运输、进场方案,保证按时、安全地组织进场。上海申丝凯乐现代物流总部级管理中心工程主要施工机械配备表序号设备名称型号规格数量国别产地制造日期用于施工部位备注1塔吊ST50151中国全场良好2三轴搅拌桩PAS-200VAR1中国基坑围护良好3垂直升降机Q6010中国外墙装饰,屋面施工良好4汽车吊QY-252徐州材料、设备倒运良好5汽车吊QY-502徐州材料、设备倒运良好6挖掘机CAT2006徐州土方施工良好7载重汽车JNJ508t12长春土方运输良好8水泵KXJ-8055兖州排水良好9电锯电刨MIBZ-904国产模板良好10钢筋调直机JT4-122天津钢筋良好11钢筋切断机GQ402沧州钢筋良好12钢筋弯曲机GW402天津钢筋良好13木工圆锯机MJ2252咸阳模板良好14交流电焊机NC5002沧州钢筋良好15插入式振捣棒ZN1.54安阳混凝土良好16磨光机1502浙江混凝土良好17蛙式打夯机HW-2010河北场地、地坪良好18砂轮切割机J35G2-400-1006河北安装良好19手枪式电钻GBM1012上海安装良好20电动套丝机7Q-1003河北安装良好21砂轮磨光机Z512-2A-100A4河北安装良好22冲击电锤Æ6~2510上海安装良好23空压机WW-0.9/7型1北京钢筋模板良好24电空压机ZV-0.5/10-A1山东钢筋模板良好25直流电焊机ZX-4005南京钢筋良好26砂轮切割机Ф4005北京机电良好27CO2焊机500A1北京钢筋良好28手砂轮φ1005北京机电良好29手砂轮φ1505北京机电良好30切割锯Φ6002南京模板良好31砂轮锯J3G2-40025浙江模板良好32手电钻J22210浙江模板良好33电锤φ8-φ3/815浙江基础良好34稳压电源WD-2412北京全场良好35开孔器ZG-3X3212河北机电良好36对讲机MOTOROLA32北京全场良好主要检验、测量和试验设备配备表序号名称规格型号单位数量备注1全站仪TS-802N台2合格2水准仪DZS3-1台1合格3经纬仪DJD2台1合格3游标卡尺200mm,0.02mm只2合格4百分表10mm只1合格5焊缝检验尺0-60只4合格6钢板尺1000mm只3合格7直角尺500×250只6合格8钢卷尺50m只2合格9钢卷尺20m只1合格10钢卷尺5m只12合格11塞尺0.5-10mm只6合格12磁力线坠5m只6合格13压力表0-10Mpa块4合格13万用表U-201块1合格14接地摇表ZC-8块1合格15绝缘摇表1000V块1合格16转速表30-1200rpm块1合格4.7周转材料准备由于本工程前期主要施工项目为钢筋混凝土结构。为保证工期,我公司在主体结构施工时将采取流水的方法进行施工,土建工程周转工具较多,主要周转工具数量如下:覆膜九夹板8800m2,木方19000条,Φ48钢管300t,扣件16200套。4.8临时水电准备4.8.1临时用电根据施工程序安排,本工程主要用电负荷为基础及主体结构钢筋混凝土工程施工期间的各种机械设备以及钢筋加工和混凝土施工时的各种机具设备。装饰施工阶段的用电负荷相对结构施工要小,为此,本方案用电量计算主要依据基础及主体结构施工阶段进行施工用电负荷验算。(1)总用电量负荷计算施工区域各种机具设备用电量统计见一览表序号用电设备名称型号及铭牌技术数据数量设备覆盖区域总功率1塔吊ST5015,40KW,380V,Jc=15%(东侧,余同此)140B、C区2施工电梯SCD200/200,46kW,380V,cosφ=0.7146C区3砂浆搅拌机WJ350,7.5KW,380V,cosφ=0.83,η=0.8215A、B、C区4插入式振动器HZ-50,1.5KW,380V,csφ=0.85,η=0.8557.5A、B、C区5钢筋弯曲机GWB40,4KW,380V,cosφ=0.83,η=0.85416A、B、C区6钢筋切断机QJ40-1,5.5KW,380V,cosφ=0.82,η=0.85316.5A、B、C区7闪光对焊机DN125,125KW,380V,cosφ=0.87,JC=65%2250A、B、C区8交、直流电焊机BX3-500,15KW,380V,cosφ=0.87,JC=65%230A、B、C区BX3-500,15KW,380V,cosφ=0.87,JC=65%230A、B、C区JJM-3,7.5KW,380V,cosφ=0.7215A、B、C区JJM-3,7.5KW,380V,cosφ=0.7215A、B、C区9圆盘锯MJ104,3KW,380V,cosφ=0.83,η=0.8539A、B、C区MJ104,3KW,380V,cosφ=0.83,η=0.8510切割机JSG-400,3KW,380V,cosφ=0.83,η=0.85412A、B、C区11施工现场及办公区白炽灯、碘钨灯5A、B、C区日光灯、高压水银荧光灯,共20KW6空调9台15镝灯每台塔吊4盏28KW(东侧配电房)28注:上述未特殊注明的,东、西配电房均配置相同的用电设备考虑到各用电设备满负荷运行并非用时出现(即不在用一施工阶段施工),故确定用电系数采用需用系数法确定。553总用电量计算公式:P=1.1(K1ΣP1+K2Σp2+K3Σp3)式中P—计算用电量(kVA);1.1—用电不均衡系数;P1—全部施工用电设备额定用量之和(kW);P2—全部电焊机设备额定用电量之和(kW);P3—照明设备额定用电量之和(kW);K1—全部施工用电设备同时使用系数,总台数在10台以内时,K1=0.75;10~30台时,K1=0.7;30台以上时,K1=0.6;K2—全部电焊机同时使用系数,取K2=0.8;K3—全部照明设备同时使用系数,取K2=1.0;∑P1=553kw,∑P2=340kw,∑P3=54kwP=1.1(K1ΣP1+K2Σp2+K3Σp3)=1.1*(0.7*553+0.8*340+1.0*54)=782kw<800kw。业主需提供的一个施工区域上总功率为800KVA的电力,能满足施工要求。我公司尽量避免用电高峰期的长时间出现,保证正常施工。(2)线路敷设1、主供电线路采用三相五线制架空线路或采用电缆埋地铺设,其中部分穿越道路埋地部分增设PVC管保护。电线从电箱至所有用电设备均采用相应容量的橡胶电缆线,以保证用电安全。2、统一采用H=6m的镀锌钢管电线杆布线,30m3、线路沿临地围蔽内侧架设。(3)备用电源现场备用电源采用发电机供电。除提供因短期停电造成的施工用电中断后的设备机具正常见电外,尚在个别施工用电高峰期超过变压器最大负荷时对个别施工机具、设备供电,以保证施工顺利进行。在施工加工区的总配电间安装一台Se=200KVA柴油发电机,并同时安装具有互锁装置电源切换装置,防止两类电源工作时不致出现互冲现象。4.8.2临时用水(1)、用水量计算建筑工地的用水主要包括施工用水量q1,施工机械用水量q2,施工现场用水量q3,消防用水量q4四部分。根据总进度计划,确定施工高峰期和用水高峰期在4
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 毕业实习生自我鉴定
- 银行安全生产会议
- 在医院的实习报告范文集合七篇
- 感恩主题演讲稿锦集5篇
- 幼儿园防空防灾安全教育
- 防止金融诈骗讲座
- 学生会成员工作总结
- 2022年大学生积极分子思想汇报
- 教学设计方案范文集锦7篇
- 捐资助学倡议书范文汇编10篇
- 黑龙江龙江森工集团招聘笔试题
- 大班美术教案:拉手小人教案及教学反思
- 《Python Web 企业级项目开发教程(Django 版)》课后答案
- 铜及铜合金物理冶金基础-相图、紫铜
- 智慧酒店无人酒店综合服务解决方案
- 考研英语一新题型历年真题(2005-2012)
- 健身房会籍顾问基础培训资料
- 9脊柱与四肢、神经系统检查总结
- 秀场内外-走进服装表演艺术智慧树知到答案章节测试2023年武汉纺织大学
- 【高分复习笔记】王建《现代自然地理学》(第2版)笔记和课后习题详解
- TSGD0012023年压力管道安全技术监察规程-工业管道(高清晰版)
评论
0/150
提交评论