版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
TECHNICALSPECIFICATIONSFORAUTOMATIONINSTRUMENTINSTALLATIONWORKS
Technicalrequirementsforconstruction
1.1 ConditionsforInstrumentInstallation
1.1.1 Theconstructiondrawings,relatedtechnicaldocumentsandnecessaryinstallationandoperationinstructionsoftheinstrumentsareallreadyandonhand.
1.1.2 Jointcheckupofconstructiondrawingshasbeenmade.
2.1.3 Technicalpreparationsuchastechnicalexplanationandtraininghasbeencompleted.
2.1.4 Theconstructionsitehasbeenmadereadyforinstrumentationworks,andconstructionprocedureshavebeenpreparedandapproved.
2.2GeneralSpecificationofInstrumentInstallation
2.2.1 Theinstrumentinstallationworksmustbecompliedwiththeconstructiondrawingsandtheoperationinstructionsoftheinstruments.Themodel,specificationandqualityoftheequipmentandmaterialmustbecompliedwiththeInstrumentSpecifications.
2.2.2 Goodcooperationmustbemadebetweentheinstrumentconstructionworksandotherspecialties,suchasbuilding,structure,electric,processequipment,pipingandsoon.
2.2.3 Amongtheinstrumentinstallationworks,theinstallationofpowersupplyequipment,layingofelectriclinesandconstructionofelectricexplosion-proofingandgroundingworksmustbecompliedwiththeCodeforConstructionandAcceptanceofIndustrialAutomationandInstrumentationEngineering(GBJ93-86)andStandardforQualityInspectionandAssessmentofAutomationInstrumentInstallationWorks(GBJ131-90).
2.2.4TheweldingoftheinstrumentinstallationworksmustbecompliedwithCM-QC-TR-009CodefortheFieldWeldingofEquipmentandIndustrialPiping.
2.2.5 Thepurgingoftheairsupplysystem,cleaningofliquidsupplysystem,cuttingmethodofthepipeline,andprocessingofhigh-pressurescrewthreadandsealingsurfaceforthreadedflangeconnectionaswellasconnectionofpipingmustbecompliedwiththespecificationintheCodeforConstructionandAcceptanceofIndustrialMetallicPiping.
2.3InstallationofSensingElements
2.3.1 GeneralSpecification
(1) Theinstallationofsensingelementsshallbemadeatthesametimeastheprocessequipmentmanufacturingorprefabricationandinstallationofprocesspiping.
(2) Openingandweldingforsensingelementinstallationmustbedonebeforetheanti-corrosion,lining,purgingandpressuretestofprocesspipingorequipment.
(3) Holes/Openingsinthehighpressure,alloysteelandnon-ferrousmetalprocesspipingandequipmentmustbeboredwithmechanicalmethod.
(4) Thesensingelementstobeinstalledonmasonryorconcretecastpiecemustbeembeddedatthesametimewhenthemasonryorcastingisbeingmade.Ifitcannotbedoneso,themountingholesshallbereserved.
(5) Openingandweldingforinstallationofthesensingelementsisnotpreferredatornearweldingseams.
(6) Thesensingelementsusedinhighpressure,negativepressure,hightemperature,flammable,explosive,poisonousandnoxiousmediamustbeallinspected.
(7) Thesensingelementsusedininnoxiousmediaatnormaltemperatureunderlowandmediumpressuremusthavespotinspectionatrateof30%accordingtosortoftheelementsandonepieceofeachsortshallbeinspectedasminimum.
2.3.2TemperatureSensingElement
ThetechnicalrequirementsforconstructionofthetemperaturesensingelementsshallbecompliedwiththeTable1.
Table1
Item
TechnicalRequirements
Material
Conformedtothedesignrequirements
Location
Farawayfromstrongmagneticfield,vibrationandavoidingfluiddeadangle
Verticalinstallation
Axesofpipingandelementareperpendicularlycrossed.
Installationatthebendofpiping
Axesofpipingandelementarecoincident.
Inclinedinstallation
Countercurrenttomediumflow
Installationwithexpandedtube
ConformedtoSection2.2.4ofGBJ93-86
Tightness
Noleakage
Pressureresistance
ConformedtoSection8.6ofGBJ93-86
2.3.3PressureSensingElement
ThetechnicalrequirementsforpressuresensingelementconstructionshallbecompliedwithTable2.
Table2
Item
TechnicalRequirements
Material
Conformedtodesignrequirements
Location
Conformedtodesignrequirements
Installationorientationonhorizontalandinclinedpiping
Gasmedium
Abovehorizontalcenterlineofthepiping
Liquidmedium
Within45°corneranglebelowhorizontalcenterlineofthepiping
Steammedium
Within45°cornerangleaboveorbelowhorizontalcenterlineofthepiping
Installedonpipingofturbidmediacontainingdustorsediments
Vertical
Inclinedupward
Horizontal
Tobeanacuteanglealongtheflowdirectionofthemediumattheuppersegmentofthepipeline
Adjacenttotemperaturesensingelementhole
Attheupperstreamofthetemperaturesensingelementhole
Sensingelementstubextendingintothepipingorequipmentinnerwall
Shallnotexceedtheinnerwall
Tightness
Noleakage
Pressureresistance
ConformedtoSection8.6ofGBJ93-86
2.3.4FlowSensingElement
ThetechnicalrequirementsfortheflowsensingelementconstructionshallbecompliedwiththeTable3.
Table3
Item
TechnicalRequirements
Check-upbeforeInstallationoftheThrottlingElements
Material,modelandspecification
Conformedtothedesignrequirements
Appearance
Cleanandsmooth
Orientationoforificeplateandcarriertap
Inlinewith“+”and“-”
Innerringofcarrier(D1)
D≤D1≤1.02D
Deviationoforificediameter
Conformedtothedesignrequirements
Edgeoforificeplateinletandnozzleoutlet
Noburrandroundangle
InstallationofFlowSensingElements
Material,modelandspecification
Conformedtothedesignrequirements
Min.lengthofthestraightrunbeforeandafterthethrottlingelement
ConformedtothedesignrequirementsandISO-5167Standard
Distancefromthethermometerinstalledattheupperstreamtothrottlingelement
Thermowelldiameterofthethermometer≤0.03D
L≥5D
Thermowelldiameterofthethermometerbetween0.03Dand0.13D
L≥20D
Distance(L1)fromthethermometerinstalledatthedownstreamtothrottlingelement
L1≥5D
Item
TechnicalRequirements
InstallationofFlowSensingElements
Installationoftheflangeusedtoclampthethrottlingelement
Weldingofflangewiththepiping
Thenozzleshallbeflushwiththeflangeface.
Perpendicularityoftheflangefacetopipingaxis
Allowablevariation1°
Coaxialitybetweenflangeandthepiping
T0.015D(1/B-1)
Insidediameterofthebuttweldedflanges
D2=D
Orientationofsensingelementonhorizontalandinclinedpiping
Gasmedium
Abovethehorizontalcenterlineofthepipeline
Liquidmedium
Within45°corneranglebelowthehorizontalcenterlineofthepipeline
Steammedium
Within45°cornerangleabovethehorizontalcenterlineofthepipeline
Flangeused
assensingelement
Distancebetweentheaxesoftheupperanddownstreamsensingholesandtheupperanddownstreamsideendfaceoftheorificeplate(L3)
L3=25.4±0.8mm
Diametersoftheupperanddownstreamsensingholes
Equal
Theaxisofsensingholeandtheprocesspipingaxis
Crossedperpendicularly
2.3.5LevelMeasurementElement
ThetechnicalrequirementsfortheconstructionofthelevelsensingelementsshallbecompliedwiththefollowingTable4.
Table4
Item
TechnicalRequirements
Material
Conformedtothedesignrequirements
Location
Conformedtothedesignrequirements
Guidingdeviceofthefloatlevelgauge
Verticalandtheliquidflowintheguidingdeviceshallbeunblocked.
Two-chamberbalancecontainer
Positionofthecontainer
Vertical
Centerpoint
Coincidedwithnormalliquidlevelandtheallowabledeviationbeing2mm
Sing-chamberbalancecontainer
Positionofthecontainer
Vertical
Elevation
Conformedtothedesignrequirements
Compensationtypebalancecontainer
Providedwithheatexpansionpreventiondevice
Connectingpipebetweentheflangeofthefixedfloatlevelgaugeandtheprocessequipment
Assuringthefloattomovefreelywithinfullrange
Tightness
Noleakage
Pressureresistance
ConformedtoSection8.6ofGBJ93-86
2.3.6CompositionSensingElement
ThetechnicalrequirementsfortheconstructionofthecompositionsensingelementsshallbecompliedwiththefollowingTable5.
Table5
Item
TechnicalRequirements
Material
Conformedtothedesignrequirements
Location
Conformedtothedesignrequirements
Orientationofinstallationonhorizontalandinclinedpiping
Gasmedium
Abovethehorizontalcenterlineofthepipeline
Liquidmedium
Within45°corneranglebelowthehorizontalcenterlineofthepipeline
Steammedium
Within45°cornerangleaboveandbelowthehorizontalcenterlineofthepipeline
Elevationangle(θ)ofthesensingelementforgascontainingsolidorliquidimpurity
θ>15°
Tightness
Noleakage
Pressureresistance
ConformedtoSection8.6ofGBJ93-86
2.4InstrumentPanelsandOperatingConsoles
2.4.1 FormedSteelBaseoftheInstrumentPanelandOperatingConsole
ThetechnicalrequirementsfortheconstructionoftheformedsteelbasesoftheinstrumentpanelsandoperatingconsolesshallbecompliedwiththeTable6.
Table6
Item
TechnicalRequirements
Fabrication
Material,modelandspecification
Conformedtothedesignrequirements
Outlinedimensions
Inlinewiththepanelandoperatingconsole
Linearity
Permeter
Allowabledeviation1mm
Totallengthbeingmorethan5m
Allowabledeviation5mm
Installation
Position
Conformedtothedesignrequirements
Uppersurfaceofthebase
Horizontalandhigherabovetheground
Horizontalobliquity
Permeter
Allowabledeviation1mm
Totallengthbeingmorethan5m
Allowabledeviation5mm
Installation
Fixation
Firm
Painting
Intact
Grounding
Conformedtothedesignrequirements
2.4.2InstrumentPanelandOperatingConsole
ThetechnicalrequirementsfortheconstructionoftheinstrumentpanelsandoperatingconsolesshallbecompliedwiththeTable7.
Table7
Items
TechnicalRequirements
Installation
Verticality(permeter)
Allowabledeviation1.5mm
Topelevationdifferencebetweentwoadjacentpanels(consoles)
Allowabledeviation2mm
Maximumtopelevationdifferencebetweenthepanels(thejointsbetweenthepanelsbeingmorethantwo)
Allowabledeviation5mm
Flatnessofthepanels(consoles)
Atthejointseambetweentwoadjacentpanels(consoles)
Allowabledeviation1mm
Atjoints(morethan5)betweenpanels
Allowabledeviation5mm
Jointclearancebetweenpanels(consoles)
Allowabledeviation2mm
Fixation
Firm
Painting
Intact
Grounding
Conformedtothedesignrequirements
Bolt
Providedwithanti-rustlayer
Vibrationreduction
Conformedtothedesignrequirements
Sealing
Conformedtothedesignrequirements
2.5 Instruments
2.5.1 GeneralSpecification
2.5.1.1 Theinstrumentsusedinhighpressure,negativepressure,hightemperature,flammable,explosive,poisonousandnoxiousmediamustbeallinspected.
2.5.1.2Spotcheckmustbemadeatrateof30%fortheinstrumentsusedforinnoxiousmediumatlow-andmediumpressureandnormaltemperatureaccordingtotheirsystemandservices.Atleastonesystemoronepieceofequipmentforoneserviceshallbecheckedasmin.
2.5.2TemperatureInstruments
2.5.2.1TemperatureMeasuringElement
Thetechnicalrequirementsfortheconstructionofthetemperature-measuringelementsshallbecompliedwiththeTable8.
Table8
Item
TechnicalRequirements
Installation
Modelandspecification
Conformedtothedesignrequirements
Itemnumber
Conformedtothedesignrequirements
Position
ConformedtothedesignrequirementsorSection4.1.1ofGBJ93-86
Protectivemeasures
ConformedtoSection4.2.1and4.1.2ofGBJ93-86
Materialofthegasket
Conformedtothedesignrequirements
Tightness
Noleakage
InsertionDepth
Inthepipeline
Conformedtothedesignrequirements
Intheequipment
Conformedtothedesignrequirements
Wiring
Correctandorderly
2.5.2.2TemperatureTransmitter
ThetechnicalrequirementsfortheconstructionofthetemperaturetransmittersshallbecompliedwiththeTable9.
Table9
Item
TechnicalRequirements
Installation
Modelandspecification
Conformedtothedesignrequirements
Itemnumber
Conformedtothedesignrequirements
Position
ConformedtothedesignrequirementsorSection4.1.1ofGBJ93-86
Accessories
Complete
Fixation
Firmandright
Centralizedinstallation
Conformedtothedesignrequirements
Wiring
Modelandspecification
Conformedtothedesignrequirements
Connection
Correct
Connectionoftheterminal
Firmandhavinggoodconductivity
Lead-ininletoftheterminalbox
Shallnotfaceupwardandshallbesealed
Signofthelinenumber
Correctandclear
2.5.3PressureInstruments
2.5.3.1PressureGauge
ThetechnicalrequirementsfortheconstructionofthepressuregaugesshallbecompliedwiththeTable10.
Table10
Item
TechnicalRequirements
Installation
Modelandspecification
Conformedtothedesignrequirements
Itemnumber
Conformedtothedesignrequirements
Position
Conformedtothedesignrequirements,convenientforoperationandmaintenance
Sensingjoint
Connection
Tomaketheinstrumentnottobearmechanicalstress
Tightness
Noleakage
Materialofthegasket
Conformedtothedesignrequirements
Fixation
Firmandright
Wiring
Correct
Installationheight
Forlowpressuremeasurement
Instrumentcentershallbe1.2to1.5mabovetheground.
Forhighpressuremeasurement
Instrumentcentershallbe1.8mabovetheground.
2.5.3.2PressureTransmitter
ThetechnicalrequirementsfortheconstructionofthepressuretransmittersshallbecompliedwiththeTable11.
Table11
Item
TechnicalRequirements
Installation
Modelandspecification
Conformedtothedesignrequirements
Itemnumber
Conformedtothedesignrequirements
Position
ConformedtothedesignrequirementsorSection4.1.1ofGBJ93-86
Accessories
Allreadyandcomplete
Fixation
Firmandright
Sensingjoint
Connection
Tomaketheinstrumentnottobearmechanicalstress
Tightness
Noleakage
Centralizedinstallation
Conformedtothedesignrequirements
Installation
Pipingconnectionorwiring
Noleakageandcorrect
Connectionoftheterminalend
Firmandhavinggoodconductivity
Signofthelinenumber
Correctandclear
2.5.4FlowInstruments
2.5.4.1DifferentialPressureTransmitter
ThetechnicalrequirementsfortheconstructionofthedifferentialpressuretransmittersshallbecompliedwiththeTable12.
Table12
Item
TechnicalRequirements
Installation
Modelandspecification
Conformedtothedesignrequirements
Itemnumber
Conformedtothedesignrequirements
Position
ConformedtothedesignrequirementsorSection4.1.1ofGBJ93-86
Accessories
Allreadyandcomplete
Fixation
Firmandright
Inclineddirectionandslopingofthepressure-leadingtube
Conformedtothedesignrequirements
Positive/negativepressurechamberandsensingjoint
Connectionposition
Correct
Connection
Tomaketheinstrumentnottobearmechanicalstress
Tightness
Noleakage
Isolatorandcondenser
Conformedtothedesignrequirements
Pipingconnectionorwiring
Noleakageandcorrect
2.5.4.2VortexFlowMeter
ThetechnicalrequirementsoftheconstructionofthevortexflowmetershallbecompliedwiththeTable13.
Table13
Item
TechnicalRequirements
Installation
Modelandspecification
Conformedtothedesignrequirements
Itemnumber
Conformedtothedesignrequirements
Position
Conformedtothedesignrequirements
Lengthofstraightrun
Conformedtothedesignrequirements
Installationdirection
Conformedtothedesignrequirementsortheoperationmanual
Installationofthefilter
Conformedtothedesignrequirementsortheoperationmanual
Installationofthegasremovingunit
Conformedtothedesignrequirementsortheoperationmanual
Wiring
Modelandspecification
Conformedtothedesignrequirements
Connection
Correct
Connectionoftheterminal
Firmandhavinggoodconductivity
Signofthelinenumber
Correctandclear
2.5.4.3ElectromagneticFlowMeter
ThetechnicalrequirementsfortheconstructionoftheelectromagneticflowmetersshallbecompliedwiththeTable14.
Table14
Item
TechnicalRequirements
Installation
Modelandspecification
Conformedtothedesignrequirements
Itemnumber
Conformedtothedesignrequirements
Position
Conformedtothedesignrequirements
Lining
Completeandintact
Fixation
Firm,flatandright.Tomaketheinstrumentnottobearmechanicalstress
Wiring
Modelandspecification
Conformedtothedesignrequirements
Connection
Correct
Connectionoftheterminal
Firmandhavinggoodconductivity
Installationonverticalpipeline
Tomakethefluidflowingupwardly
Installationonhorizontalorinclinedpipeline
Noneofthemeasuringelectrodesshallberightoverorunderthepipeline.
Grounding
Theliquid,connectingflange,caseoftheflowmetershallbeconnectedatthesamegroundpotential.
Signofthelinenumber
Correctandclear
2.5.5LevelInstruments
Thetechnicalrequirementsfortheconstructionofthefloattype(displacementtype,ballfloatorbuoy)levelgaugesshallbecompliedwiththeTable15.
Table15
Item
TechnicalRequirements
Installation
Modelandspecification
Conformedtothedesignrequirements
Itemnumber
Conformedtothedesignrequirements
Installationheightofthefloat
Conformedtothedesignrequirements
Heightofthecenteroftheflange
Conformedtothedesignrequirements
Verticalityoftheguidingdeviceofthefloat
Theallowabledeviationpermetershallbe2mmandthetotallengthshallnotmorethan20m.
Movementofthefloat
Movingfreelywithoutblocking
Verticalityoftheoutsidefloatbowl
Allowabledeviationpremeter2mm
Pipingconnectionorwiring
Noleakage,correct
Tightness
Noleakage
Pressure-resistance
ConformedtoSection8.6ofGBJ93-86
2.5.6 AnalyzingInstrument
ThetechnicalrequirementsfortheconstructionoftheanalyzinginstrumentsshallbecompliedwiththeTable16.
Table16
Item
TechnicalRequirements
PretreatmentInstallation
Modelandspecification
Conformedtothedesignrequirements
Fixation
Firmandright
Pipingconnection
Noleakage,conformedtothedesignrequirements
Distancetotransmitter
Conformedtothedesignrequirements
Pretreatmentdevice
Mediumhavingdustorimpurities
Purificationdevicebeingcomplete
Hightemperaturemedium
Coolingdevicebeingcomplete
Highpressuremedium
Pressure-reducingandstabilizingdevicebeingcomplete
InstallationofAnalyzer
Modelandspecification
Conformedtothedesignrequirements
Itemnumber
Conformedtothedesignrequirements
Appearancecheck
Ingoodcondition
Accessories
Allreadyandcomplete
Fixation
Firmandright
Pipingconnection
Noleakage,conformedtothedesignrequirements
Wiring
Modelandspecification
Conformedtothedesignrequirements
Connection
Correct
Grounding
Conformedtothedesignrequirements
Lengthofthesignalline
Conformedtothedesignrequirements
Connectionoftheterminalend
Firmandhavinggoodconductivity
Signofthelinenumber
Correctandclear
Dischargepipe
Connectedwiththeheaderpipe,unblockedwithoutleakage,conformedtothedesignrequirements
2.6ControlValve,ActuatorandSolenoidValve
2.6.1 ThetechnicalrequirementsfortheconstructionofthecontrolvalvesshallbecompliedwiththeTable17.
Table17
Item
TechnicalRequirements
Installation
Modelandspecification
Conformedtothedesignrequirements
Itemnumber
Conformedtothedesignrequirements
Accessories
Allreadyandcomplete
Fixation
Firmandright
Position
Conformedtothedesignrequirements
Directionoftheinlet/outlet
Correctandmarkedclearly
Airtubingconnectionorwiring
Noleakageandcorrect
Gasketoftheflange
Conformedtothedesignrequirements
Tightness
Noleakage
2.6.2Electric(Pneumatic)Actuator
Thetechnicalrequirementsfortheconstructionoftheelectric(pneumatic)actuatorsshallbecompliedwiththeTable18.
Table18
Item
TechnicalRequirements
Installation
Modelandspecification
Conformedtothedesignrequirements
Itemnumber
Conformedtothedesignrequirements
Accessories
Allreadyandcomplete
Fixation
Firmandright
Airtubingconnectionorwiring
Noleakage,correct
Movementoftheterminalswitch
Freeandcorrect
Movementofthemechanicaldrivingmechanism
Free,smooth,stable,andcorrectwithoutidletravel
Directionoftheswitch
Inlinewiththeregulatingmechanism,markedclearly
Travel
Matchingthecontrolvalve
Positionofhightemperature
Equippedwiththermalcompensationdevice
2.6.3SolenoidValve
ThetechnicalrequirementsfortheconstructionofthesolenoidvalvesshallbecompliedwiththeTable19.
Table19
Item
TechnicalRequirements
Installation
Modelandspecification
Conformedtothedesignrequirements
Itemnumber
Conformedtothedesignrequirements
Directionoftheinlet/outlet
Correctandclearlymarked
Fixation
Firmandright
Tightness
Noleakage
Airtubingconnectionorwiring
Noleakage,correct
Explosion-proofclassification
Conformedtothedesignrequirements
2.7 LayingofPowerLinesforInstrumentation
2.7.1BusTray
ThetechnicalrequirementsfortheconstructionofthebustraysshallbecompliedwiththeTable20.
Table20
Item
TechnicalRequirements
Check-up
Appearance
Nodistortionaldeformationandingoodshape
Specification
Conformedtothedesignrequirements
Galvanizedcoatingorpainting
Intact
Position
Conformedtothedesignrequirements
Installation
Horizontalinclination
Permeter
Allowabledeviationpermeter2mm
Totallengthbeingmorethan5m
Allowabledeviationpermeter10mm
Verticality
Permeter
Allowabledeviationpermeter2mm
Totallengthbeingmorethan5m
Allowabledeviationpermeter10mm
Turning
Thereshallbenorightangleattheinnerside.Wheninrows,theradianshallbeconsistent.
Compensationdevice
Whenthestraightrunexceeds50m,thereshallbethermalexpansioncompensationdevice.
Connectionofbus-bartroughswithdifferentwidth(height)
Thetransitionshallbegradual.
Joint
Thereshallbenointerlacededge.
Installationofthecoverboard
Firmandconvenientfordisassembling
Fixation
Bolt
Thenutshallbeatoutersideofthetray.
Welding
Firmwithoutdistortion
2.7.2ProtectingTubesoftheWire(Cable)
Thetechnicalrequirementsfortheconstructionoftheprotectingtubesofthewire(cable)shallbecompliedwiththeTable21.
Table21
Item
TechnicalRequirements
Fabrication
Material,modelandspecification
Conformedtothedesignrequirements
Bendingradius(r)
Notarmored
r≥6D
Armored
r≥10D
Bentangle(θ)
θ≥90°
Surfaceofthebend
Nocrackorindentation
Numberoftherightanglesofasingletube
Notmorethantwo
Smoothnessofthenozzle
Smoothwithoutburr
Laying
Layingthroughhightemperaturezone
Theheatinsulationmeasureshallbeadopted.
Extensionoutofthewallwhengoingthroughwalls(L1)
L1≥30mm
Height(h)oftheprotectingtubeextendedabovethefloor(platform)
H≥1m
Distanceofthenozzlefromtheequipment(L2)
L2=200-300mm
Layinginrows
Height
Consistent
Bendingradian
Consistent
Arrangement
Beingflushhorizontally,straightverticallyandthearrangementshallbetidy.
Connectionofcommontubes
Firm
Connectionofexplosion-prooftubes
FirmandconformedtorelatedregulationsinGB50257-96
Spacingbetweenthesupportclips
Uniform
Fixation
Firm
Protection
Thereshallbecorrosionpreventionandprotectionprovisions.
2.8 SeparateTestingandCalibrationofInstruments
2.8.1 GeneralSpecification
2.8.1.1 Theinstrumentsusedathighpressure,negativepressure,hightemperature,flammable,explosive,poisonous,noxiousmediaandforkeyprocessparametersaswellasmeteringandalarminstrumentsmustbecheckeduptotally.
2.8.1.2 Spottestatrateof30%shallbemadefortheinstrumentsusedforinnoxiousmediaatlow,mediumpressureandnormaltemperatureaccordingtotheirsystemandservices,atleastonesystemoronepieceofinstrumentshallbetestedasminimum.
2.8.2 PointerInstruments
ThetechnicalrequirementsforseparatetestandcalibrationofpointerinstrumentsshallbecompliedwiththeTable22.
Table22
Item
TechnicalRequirements
Check-up
Modelandspecification
Conformedtothedesignrequirements
Itemnumber
Conformedtothedesignrequirements
Appearance
Ingoodshape,intact
Zeroreset
Flexible,havingenoughregulatingwidth
Insulationresistance
Conformedtotheproductspecifications
Correctingvalueofliquidcolumn
Correct
Test&Calibration
Balanceofthemovingparts
Thechangeofthepointervalueshallnotbemorethantheabsolutevalueofallowablebasicerror.
Basicerrorvalue
Conformedtotheproductspecifications
Returndifferencevalue
Conformedtotheproductspecifications
Motionofthepointer
Smoothandstable,withoutbouncingorblocking
Actionofsignals
Deviationofalarmingvalue
Conformedtotheproductspecifications
Givenpointermotion
Freeandreliable
On/offofthecontact
Normal
Calibrationrecord
Thewritingshallbelegible,thedatashallbeaccurate,theitemsshallbecompleteandtheresponsibilityshallbeclear.
2.8.3RecordingInstrument
ThetechnicalrequirementsfortheseparatetestofrecordinginstrumentsshallbecompliedwiththeTable23.
Table23
Item
TechnicalRequirements
Check-up
Modelandspecification
Conformedtothedesignrequirements
Itemnumber
Conformedtothedesignrequirements
Appearance
Ingoodshapeandintact
Movementofpointer
Freeandstable
Insulationresistance
Conformedtothespecificationsoftheproduct
Test&Calibration
Printingrecord
Symbolandwritingshallbeclear.
Markingrecord
Thelineshallbeuniformandclear.
Recordingpapermovingandspeed
Smoothandstable,withoutbouncingorblocking;Conformedtotheproductspecifications
Durationofthepointergoingthroughthetotaltravel
Conformedtotheproductspecifications
Basicerroroftheindicatedvalue
Conformedtotheproductspecifications
Theerrorvalueoftherecord
Conformedtotheproductspecifications
Returndifferencevalue
Conformedtotheproductspecifications
Item
TechnicalRequirements
Test&
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 《2024年 阴山北麓荒漠草原群落特征研究》范文
- 《2024年 特色中小城市体检与更新联动工作探索-以景德镇市为例》范文
- DB32-T 4831-2024 拖拉机牵引性能综合测试系统通.用技术条件
- 制冷行业节能环保与资源利用方案
- 农产品追溯体系在物流行业的构建方案
- 农业资源环境监测中心建设规划
- 第二单元 位置(单元测试)-2024-2025学年五年级上册数学人教版
- 《安培力的应用》参考课件
- 中国氟塑料制品产业市场深度剖析与投资风险评估报告2024-2030年
- 2017年新版人教版七年级下册英语导学案(全册)
- (精品)优秀教师评分表
- 中医医院关于护理人员试用期考核办法的通知
- 黑龙江省齐齐哈尔市各县区乡镇行政村村庄村名居民村民委员会明细
- (领导管理技能)领导能力测验(A)
- 平曲线要素计算表
- 沪粤版八年级上册物理全册精品教案
- 工作分解结构表(WBS)
- (新教材)苏教版一年级上册科学 2.1 认识感官 教学课件
- 2022年建设工程造价鉴定规范
- 工业大数据白皮书
- 物联网安全研究报告
评论
0/150
提交评论