目录一、编依据及编制则..................................................51、编制依..........................................................52、编制原..........................................................53、编制范..........................................................6二、工概况............................................................61、涵洞概..........................................................62、工程地质概......................................................73、水文地质概......................................................7三、施进度计划........................................................81、施工工..........................................................8⑴总体进度计划安排.............................................8⑵施工工期分解.................................................82、施工目..........................................................8⑴质量管理目标.................................................8⑵安全生产目标.................................................8⑶文明施工目标.................................................8四、人、机械安排.....................................................101、人员安.........................................................10⑴项目部主要管理人员..........................................10⑵劳动力配备计划表............................................102、施工机械安.....................................................11五、施准备...........................................................111、现场调.........................................................112、技术准.........................................................11六、框涵主要施工案.................................................12施工工艺流程......................................................121、地基处理双向水泥搅拌...........................................132、基坑开.........................................................143、基础施.........................................................154、框架施.........................................................15⑴钢筋加工、绑扎及安装........................................161
⑵模板安装及拆除..............................................21⑶混凝土浇....................................................215、洞口、铺砌及端翼墙施...........................................236、沉降缝施.......................................................247、养.............................................................25七、圆涵主要施工案.................................................251、地基处理双向水泥搅拌...........................................262、基坑开.........................................................263、基础施.........................................................264、管节安.........................................................265、防水层及沉降...................................................266、洞口、铺砌及翼墙施.............................................277、养.............................................................27八、涵工程施工技措施...............................................271、模板工程.......................................................272、混凝土工程.....................................................273、钢筋工.........................................................284、养护与成品保...................................................285、工艺标准及要...................................................29九、质保证措施.......................................................291、质量目.........................................................292、保证工程质量的措...............................................293、防止质量通病的措...............................................31⑴混凝土麻面..................................................31⑵露筋........................................................31⑶蜂窝、孔洞..................................................32⑷混凝土表面裂纹..............................................32十、工保证措施.......................................................32十一、季施工措施.....................................................33十二、全保证措施.....................................................341、安全目.........................................................342、保证安全的措...................................................34⑴交通行车安全................................................34⑵用电安全....................................................342
⑶机械设备使用安全............................................35⑷其它安全措施................................................35十三、境保护措施.....................................................361、施工生活场地环境保护措.........................................362、环境保护措.....................................................363、水土保持措.....................................................373
4
涵洞工程施工织设计一编依及制则1编依新<上发[号200公[2004]08施本我术实力以2编原施机施5
3编范V工二工概1涵概DK195+229.2,管段9座,共2涵一表名称
里程
孔径
净高(m)长(m)
地基处理桩长(m)
类别
备注圆管涵DK189+933.01-1.5m
1.5
25.21
13.5m
灌溉框架涵DK190+002.0框架涵DK190+405.0框架涵DK019+450.0
2-6m1-6m1-4m
5.34.53.7
15.1217.3217.58
13m13m15m
立交兼排水排水立交圆管涵DK190+515.31-1.5m
1.5
25.21
14m
灌溉框架涵DK190+621.0框架涵DK190+906.5框架涵DK190+980.0框架涵DK191+171.5框架涵DK194+930.0框架涵DK195+180.0
1-2m2-4m1-2m1-5m1-6m1-4m
2.54.72.54.55.33.7
22.4416.5622.116.1216.1116.06
14m13.5m12.5m16m12m12m
排水立交兼排水灌溉立交兼排水排水立交6
2工地概-硬-密密钻孔(静力触探)位置(m)
190+450.00(代表)孔口标高(m)层深(m)0.0~1.61.6~6.06.0~9.09.0~13.013.0~16.416.4~2323~26.826.8~2828~30.430.4~34.034.0~35.235.2~38.238.2~40.0
1.07土层名称粉土软粉土粉土淤泥质粉质黏土粉质黏土粉土粉质黏土粉土粉质黏土粉土粉质黏土粉土粉质黏土
地下水埋深土层描述饱和,稍密,Ⅱ级普通土饱和,稍密,Ⅱ级普通土饱和,稍密,Ⅱ级普通土软塑-流塑,Ⅱ级普通土软塑-硬塑,Ⅱ级普通土饱和,稍密-中密,Ⅱ级普通土硬塑,Ⅱ级普通土饱和,密实,Ⅱ级普通土硬塑,Ⅱ级普通土饱和,密实,Ⅱ级普通土软塑-硬塑,Ⅱ级普通土饱和,密实,Ⅱ级普通土软塑-硬塑,Ⅱ级普通土
0.45m以下地基承载力(KPa)904510060130110150160170170150180150地表水侵蚀性地下水侵蚀性
对钢筋混凝土中钢筋无氯盐腐蚀性对钢筋混凝土中的钢筋具氯盐腐蚀,环境作用等级为3水地概DK191+283DK191+714DK194+785对DK191+283DK191+714具~。7
三施进计1施工总排5月,年年月19序号12
计划开工2014年5月21日2014年6月26日
计划完成时间2014年8月20日2014年10月1日
施工内容双向水泥搅拌桩处理涵洞主体工程施工3
2014年8月20日2014年1019日
涵洞附属工程施工施个317;工3;框架主边;工天5天;1;涵1计天16;天;管1天;防工1;涵1天,2施目质,分项序)100%;争创安以创V标工程安全文8
3、施工组织机构)9
四人、械排1人安项序号123456789101112
姓名金立瑞杨士学刘二斌叶茂陈蛟朱正余夏有才陶冶鲁彪裴阳华汪秀秀冯勇
职务项目经理副书记副经理总工工程部长工程副部长物资部长安质部长试验室主任会计技术员兼调度综合办公室主任
备注项目总负责人对接协调生产负责人技术总负责人技术负责现场技术负责人物资负责人安全质量负责人工程试验负责人财务负责人调度及内业资料负责人后勤负责人劳劳动力计划表序号
工种
时间
单位
一季度
2014年二季度三季度
四季度123456711121314
钢筋工机械司机电焊工电工混凝土工汽车司机模板工起重工架子工普工合计
人人人人人人人人人人人
1038212210361066
20382242123121096
16382242123121092
2施机安投入本项目的主要施工机械设备表序号123456789101112
机械名称挖掘机水泥搅拌桩机汽吊车运输车水泵切割机电焊机弯曲机插入式震捣器千斤顶发电机柴油机
规格型号ZX200-HHESJB-ⅡZLJ5261H多种规格GT5-10型GWEOJD50多种规格KP2276135ZD
数量(台\套)2422826312322五施准1现调)施;)地1.2m,探用白灰标2技准
)组;接长施工设图纸准确;)组有;)检六框涵要工案施工流:
施工放样基础开挖基底处理底板钢筋绑扎及支模浇注砼及养生侧墙、顶板钢筋绑扎侧墙及顶板支模浇注砼及养生拆模板
测量放样砼拌合及运输试块制作试块检测砼拌合及运输试块制作防水材料检测防水层施工附属工程竣工验收
试块检测1地处双水搅桩机除涵洞
钻1m/min,;水0.25~水;水;水59.4kg/m桩0.5m双2基开水28开挖基坑基挖基坑40截水沟3m[6m。100cm+0.3m标高后在60×积水井,以
44446060
面
0
30
100
040
40沟
开土出挖至设计20cm左基1.5m,入0.3m,外漏1.2m,3m/6m,60cm3基施厚层施1厚C30混凝土垫4框施
88828882套。,平距3里,详见下图6030
50cm50cm00
00
2次浇20cm处30cm,钢)钢从上岗
浇、钢、钢、预钢)钢筋钢、钢、钢、加、当。拉热轧光的钩的dm得小,、受不得小5留3倍的1,
c12钢筋加的允许偏差符合下的规定:序号123
名称受力钢筋全长弯起钢筋的弯折位置箍筋内净尺寸
允许偏差(mm)±1020±3
检验方法尺量钢(双面焊序号1
接头类型双面帮条焊
接头简图
适用范围钢筋类钢筋直径别(mm)Ⅰ~Ⅲ10~40级钢筋单面帮
Ⅰ~Ⅲ2
10~40条焊
级钢筋双面搭
Ⅰ~Ⅲ3
10~40接焊
级钢筋
单面搭
Ⅰ~Ⅲ4
10~40接焊
级钢筋类别电弧焊接头
电弧焊接头允许偏项目帮条焊接头钢筋轴线的纵向偏移弯折角搭接焊接头的钢筋轴线偏移焊缝高度焊缝宽度焊缝长度咬肉深度
允许偏差0.5d4°0.1d,且不大于3mm+0.05d~0+0.1d~0-0.5d0.05d,且不大于0.5在2d长的焊缝表面上,
数量
2个焊缝的气孔及夹渣
面积
6mm
2为搭在应在脚手架
电,E5003焊搭2点固以上。焊采、用焊接接头钢、焊50%,轴心、绑,50%;筋接头应弯10同一根钢同1.3钢墩钢便箍筋绑
按施铺须对钢用接头严4净保护层钢筋安及钢筋保护厚度允偏差和检验法序号123
名称受力钢筋排距同一排中受力基础、板、墙钢筋间距分布钢筋间距
允许偏差(mm)±5±20±20
检验方法尺量两端间各一处45
箍筋间距
绑扎骨架焊接骨架
±20±10
尺量连续3处6
弯起点位置(加工偏差±20mm,包括在内)
30
尺量7
钢筋保护层厚度
≥35
±10,-5
尺量两端间各2处模)模
基边内模外模2排钢拉杆配.在模模模非承重部拆模拆拆人定地点堆以混用3#搅
20cm,多做的
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 苏科版(2016)五年级第8课 处事灵活能变通表格教学设计
- 微生物检验技巧与实战试题及答案
- 清晰的项目沟通流程设计思路试题及答案
- 2025年证券从业资格的定期考查试题及答案
- 农村小学一年级线上教学工作总结(12篇)
- 考后反思2025年证券从业资格证考试试题及答案
- 微生物检验技能考试指南试题及答案
- 教师个人述职报告范文简短(7篇)
- 一年级数学学科下册工作总结(7篇)
- 客服部人员工作总结(10篇)
- 青少年科技创新知识讲座
- 2025山东司法警官职业学院教师招聘考试试题及答案
- 植物地理学课件 苔原(最终版)学习资料
- 水库维修养护实施方案
- 2025中国农业银行个人房屋按揭贷款合同
- 吉林烟草工业有限责任公司招聘真题2024
- 水库运行安全风险评估-全面剖析
- 第二单元 声现象(大单元教学设计)(新教材)2024-2025学年八年级物理上册同步备课系列(人教版2024)
- 2025-2030中国舞蹈学校行业市场发展分析及发展趋势与投资机会研究报告
- 美好家园《8未来城市》课件 -2024-2025学年浙人美版(2024)初中美术七年级下册
- 2025年广东科贸职业学院单招职业技能测试题库必考题
评论
0/150
提交评论