




版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
中国能源建设集团湖南火电建设有限公司施工方案编号:版本号:状态:钻孔灌注桩基础施工方案编制:日期审核:日期批准:日期目录工程概况及工程量··································································11.1工程概况······································································11.2工程量和工期··································································12、编制依据···········································································13、作业前的条件和准备·······························································13.1技术准备·····································································13.2作业人员配备及资格···························································23.3工具、仪器、仪表·····························································34、作业程序、方法及措施·····························································44.1施工工艺及流程·······························································44.2作业方法、措施·······························································55、灌注桩质量保证措施·······························································65.1确保成孔质量控制措施·························································65.2确保钢筋笼施工质量措施·······················································75.3确保混凝土施工质量措施·······················································75.4钻孔灌注桩质量验收要求·······················································76、施工安全措施·····································································77、“五新”技术······································································88、绿色施工措施·····································································88.1施工现场扬尘控制·····························································88.2车辆运输防尘·································································99、附表··············································································91、工程概况及工程量1.1工程概况项目投资方:大同中电光伏发电有限公司项目名称:大同二期光伏发电应用领跑基地南郊区高山镇100MW光伏发电项目工程规模:100MW光伏发电项目工程地址:山西省大同市南郊区高山镇1.2工程量和工期1.2.1工程量序号名称单位数量备注1M22U型螺杆桩根45002预埋钢管桩根55001.2.2施工工期钻孔灌注桩基础施工计划从2018年08月01日开始施工,到2018年09月20日施工完成,施工工期50天。2、编制依据1)《工程建筑标准强制性条文》(建设部建标[2000]85号文)2)《建筑地基基础工程施工质量验收规范》GB502023)《建筑桩基技术规范》JGJ94-944)《建筑施工安全检查标准》JGJ59-995)《混凝土结构施工质量验收规范》GB50204-20026)《混凝土强度检验评定标准》GBJ107-877)《普通混凝土配合比设计规程》JGJ55-20008)《钢筋焊接及验收规程》JGJ18-200.9)《工程测量规范》GB50026-9310)《建筑工程施工质量验收统一标准》GB50300-200111)《建筑机械使用安全技术规程》JGJ33-200112)《施工现场临时用电安全技术规范》JGJ46-200513)《建筑地基基础技术规范》DB42/242-20033、作业前的条件和准备3.1、技术准备1)熟悉施工图纸及本工程相关技术资料,向施工人员进行技术和安全交底。2)按设计要求制作钢筋笼并对其进行验收。3)混凝土浇筑前应对施工人员进行全面的安全技术交底;操作前进行安全可靠的检查和试验,确保施工安全。4)检查验收:成孔以后必须对桩身直径、扩底尺寸、孔底标高、桩位中线、井壁垂直、虚渣厚度进行全面测定,办理隐蔽验收手续。混凝土浇筑时作好混凝土浇筑施工记录,全部符合要求后,方可进行浇筑。3.2作业人员配备及资格序号作业人员人数人员资格职责1工程负责人1人有组织协调能力,有现场管理经验。1.负责组织安排施工人力,物力。严格按照作业指导书的施工工艺要求、质量要求和安全环境要求进行施工。全面负责质量、安全工作。2.做好设备安装的质量自检和工序交接工作。3.施工过程中,图纸不清楚不施工,材料不合格不施工,技术、安全不交底不施工,上一级工序验收不合格不施工。4.发生质量、安全事故立即上报,同时组织本班组职工按照“四不放过”的原则认真分析。2技术人员2人熟悉锅炉钢结构施工技术及验收规范,有高强螺栓连接钢结构工程的施工经验。1.全面负责钢架安装的技术工作,参加相关图纸会审,处理设计变更,编制施工作业指导书、施工预算、技术、安全措施,并主持技术交底工作。2.深入现场指导施工,及时发现和解决施工中的技术、质量隐患,按照指导书的要求指导施工,3.配合班组长进行施工验收的自检工作。4.记录、整理施工记录和验收记录。5.对违章操作,有权制止,严重者可令其停工,并及时向有关领导汇报。3测量人员1人要求熟悉导线测量定位测量的方法,能熟练操作各种测量仪器。1、严格按照图纸尺寸对现场所需部位测量,进行施工验收。2参加图纸施工会审,4安全员1人熟悉《电力建设安全工作规程》,并经过安全员岗位培训,持证上岗。1.严格按照作业指导书的施工工艺要求、质量要求和安全环境要求进行施工。2.爱护施工所用工器具,严格按照操作规程作业。3.发生质量、安全事故应保护好现场,并迅速告知有关领导,做好处理工作。4.有疑难问题有权向技术人员、班组长请示解决办法,对自己的施工质量全面负责,对不正确、不明确的指挥有权不执行。1.严格按照作业指导书的施工工艺要求、质量要求和安全环境要求进行施工。2.爱护施工所用工器具,严格按照操作规程作业,3.发生质量、安全事故应保护好现场,并迅速告知有关领导,做好处理工作。4.有疑难问题有权向技术人员、班组长请示解决办法,对自己的施工质量全面负责,对不正确、不明确的指挥有权不执行。5质检员1人要求有质检工作经验,经过培训,有质检员上岗证,持证上岗。1.熟悉相关图纸内容和有关质量标准,参加图纸会审,技术交底。2.深入施工现场,掌握工程进度及质量情况,按照质量标准进行二级质量验收工作,配合项目部质检师,监理完成三级,四级质量验收。对工作要一丝不苟,不徇私情。3.对不能保证施工质量的方案提出否决建议,请有关领导部门处理。4.整理、汇总质量验收记录。6安装工20人经过培训,有上岗证,持证上岗。1.严格按照作业指导书的施工工艺要求、质量要求和安全环境要求进行施工。2.爱护施工所用工器具,严格按照操作规程作业。3.发生质量、安全事故应保护好现场,并迅速告知有关领导,做好处理工作。4.有疑难问题有权向技术人员、班组长请示解决办法,对自己的施工质量全面负责,对不正确、不明确的指挥有权不执行。7焊工5人有钢结构施工经验,熟练使用火焊,持证上岗。1.负责设备的焊接工作。2.负责焊接后的质量自检工作。3.严格按照作业指导书的施工工艺要求、质量要求和安全环境要求进行施工。8电工2人参加过劳动局培训并取的合格证者方可上岗。1.负责设备的焊接工作。2.负责焊接后的质量自检工作。3.严格按照作业指导书的施工工艺要求、质量要求和安全环境要求进行施工。9起重工8人熟练指挥吊装机械,持证上岗;1.负责设备的吊装作业。2.严格按照作业指导书的施工工艺要求、质量要求和安全环境要求进行施工3.3工机具、仪器、仪表3.3.1仪器、仪表:序号工机具/仪器仪表名称规格/型号单位数量备注1GPS定位仪台1检验合格2自动安平水准仪NAL124台1检验合格3钢卷尺50m把1检验合格4钢卷尺100m把1检验合格5钢角尺500mm把1检验合格6钢板尺1m把1检验合格7弹簧称拉力计LTZ-30件1检验合格注:以上仪器均计量检验合格,精度满足要求,计量鉴定证书、使用证、能力鉴定等资料应合格,并报监理单位审核、备案后方可使用。3.3.2施工作业工机具:序号名称规格/型号单位数量备注1电动初紧扳手300N.m把2检验合格2电动终紧扳手600N.m把2检验合格3力矩扳手250~750N•m把2检验合格4活扳手15#吋把25活扳手12#吋把36套筒扳手套17过冲(眼)Φ24个408大锤8磅把29电焊把套1010细钢丝0.6mmm50011钢丝绳扣φ26×15m对212钢丝绳扣φ21.5×20m对213钢丝绳扣φ17.5×20m对214钢丝绳扣φ15×5m对5见附录-115拖拉绳φ13×30m根20见附录-116拖拉绳φ13×60m根20见附录-117配重(地锚)3t块4见附录-118卸扣10t个219卸扣5t个2020卸扣3t个4021手拉葫芦2t、3t个各3022钢丝绳卡M12(用于φ13钢丝绳)个6023临时爬梯个37注:以上施工机械、机具进行检修,保证运转良好;做好易损、易坏件的备品工作;机械、机具有关的负荷试验应合格。3.3.3设备及材料:序号名称规格/型号单位数量备注1焊条3.2mm/J422Kg5002焊条3.2mm/J507Kg5003扁钢50×5mmm6004钢筋12mmm4005角钢∠75×75mmm1806钢管φ60m120注:以上设备和材料应按相关程序、规定进行入场验收和见证取样检验合格,并报监理单位审核、备案后方可使用。3.3.4安全器具及防护用品:序号名称规格单位数量备注1安全网3m×6m块8002注塑水平绳φ13m15003垂直拉索m10004攀登自锁器套185安全绳条306速差保护器5m个57速差保护器10m个58安全围栏及安全警示牌若干9安全帽个4010绝缘手套及绝缘鞋双4011防护镜副15注:实际施工应根据现场作业条件和环境的变化提前配备不限于以上安全器具的必备安全器具及防护用品。4作业程序、方法和措施4.1施工工艺流程场地平整→开钻前准备工作→钻孔→清孔→钢筋笼制作、安放→灌注混凝土→预埋件按放4.2作业方法、措施4.2.1开钻前施工准备工作开钻前选定施工测量定位点,对地质情况进行详细分析,并按设计要求制作点位。根据设计要求及现场地质条件,采用一台全站仪测出桩的中心线,在操作平台上标明桩号,并在岸上设二个控制点,以便埋设护套筒时,校核和浇桩时的正确位置。钻孔前对定位点进行淋水,水位渗至地平20cm以下以预防塌孔。4.2.2钻孔钻机就位前,应对钻孔前的各项准备工作进行检查,包括机具设备的检查和维修。钻机就位后,应认真调平对中,要求转盘中心同定位点在同一铅垂线上。在钻进过程中要经常检查,如稍有倾斜或位移,应及时纠正,使成孔后的垂直度不超过1/100。钻孔深度必须达到设计的要求方能终孔。钻孔时应注意以下事项:4.2.2.1开钻时应慢速钻进,待钻头全部进入地层后,方可加速钻进;4.2.2.2经常对泥浆指标等进行检测和试验,不合要求时,应随时改正,并注意地层变化,在地层变化处应捞取渣样,与地质剖面图核对;4.2.2.3钻孔作业应分班连续进行,交接班时应交代钻进情况及下一班应注意事项,并认真作好施工原始记录。4.2.3清孔为保证钻孔桩质量和提高支承能力,在灌注桩浇砼之前,对已钻成的桩孔必须进行清孔。清孔采用正循环为主,当部分地段圆砾含量较多,颗粒较大,正循环清孔有困难时采用反循环或气矩法清孔。清孔工作要及时,当钻孔终孔后,应立即进行清孔.4.2.4钢筋笼制作、安放钢筋笼制作前,应进行钢筋除锈、整直,主筋不得有局部弯曲。钢筋骨架分段制作,主筋接头应互相错开;所有箍筋与主筋的接触点要点焊,以确保钢筋笼的整体性;钢筋笼尺寸应符合设计要求并按规范要求的规格、间距固定好保护层垫块。清孔完毕后,经测探,孔径和竖直度检查符合要求,进行安放钢筋笼。钢筋笼在安装过程中,要保持居中。钢筋笼安放完毕后,应采取有效的加固措施(如孔顶反压槽钢等)防止砼浇筑过程中钢筋笼上浮。4.2.5灌注混凝土钢筋笼安装完毕后,进行二次清孔,经测探检查孔底沉淀物符合要求后,即进行砼浇筑工作。上口通过提升机挂在专设的型钢横梁上并与砼漏斗连接,形成一条灌注砼的作业线。砼漏斗采用钢制,其大小应满足砼灌注要求。浇筑砼时,在漏斗颈部设置一个隔水球栓,下面垫一层塑料布,球栓由细钢丝绳栓住挂在横梁上,当砼在漏斗内贮存满后,剪断钢丝可把砼球栓向下挤出,此时砼压在塑料布垫层与水隔绝,并挤走导管内的水,使漏斗内的砼顺利地通过导管并从导管底部流出,向桩四周和上面挤出,以保证砼的质量。浇筑时必须连续进行,中途不得中断,不得留施工缝,并采用插入式振动器将桩顶范围振捣密实,以便截除桩头软弱层砼后,保持桩的施工质量。遇有故障及时处理,并及时与有关人员汇报,研究处理措施。4.2.6预埋件安放待桩身浇筑完成后,将预埋件按入桩头顶部。确保预埋件中心与桩头中心重合,以满足预埋件周边桩头空隙大小宽度均匀。预埋件按入深度一致,使预埋件顶板与桩头平齐。5.灌注桩质量保证措施5.1确保成孔质量措施:5.1.1钻头外径不小于设计桩径,并应经常核验钻头直径,防止出现缩径。5.1.2预防孔斜措施:钻机定位要准确、水平、稳固,定位后要垫实,以保证钻机平衡运行;成孔过程中,转盘中心、钻孔中心应始终保持在同一铅垂线上,如发现异常情况,立即调整,确保桩孔倾斜率小于1%。操作人员、机长、施工员应加强钻进过程中的监测,发现有异常现象及时处理纠正。根据情况抽查成孔后的孔径及垂直度测试。5.1.3开机钻进时,应先轻压慢转,待进入正常工作状态后再逐渐加大转速和钻压;钻进不同地层时应及时调整钻压、转速。在软土层、淤泥质易坍地层中钻进时,还应防止坍孔。5.1.4在钻进过程中应适当串动钻具,上下扫孔,以便将孔内粘泥块打碎并使孔拉直。5.1.5在倾斜的软硬地层钻进时,应吊住钻杆,控制进尺,低速钻进,防止孔身偏斜。在发现孔身偏斜处吊住钻头,上下反复扫孔,使孔校直。5.1.6钻进过程中,保证正常成孔,防止孔内漏水、塌孔、缩孔。如有上述情况发生,应采取如下措施:控制钻进速度,低速钻进,如缩孔采用反复扫孔的方法;如纠正无效,应于孔中局部回填粘土至偏孔处0.5m以上,重新钻进。5.1.7预防缩径措施:根据孔径的测试结果,及时调整钻头的规格和钻进方法。操作人员应注意提升钻具时,发现有受阻现象,必须重新复钻。5.2确保钢筋笼施工质量措施:5.2.1钢筋笼主筋连接采用焊接,焊接长度应满足:单面焊不小于10d,双面焊不小于5d。5.2.2钢筋笼分节形成,必须由钢筋工班长自检,安放前会同监理进行验收,并当场进行隐蔽工程验收签证,未经验收的钢筋笼不得下放。5.2.3为保证钢筋笼的标高,由测量工测定钻机平面标高,由施工员测定搭接吊筋长度。5.3确保混凝土施工质量措施:5.3.1清孔结束后必须在三十分钟内灌注砼,否则必须重新清孔。5.3.2混凝土初凝时间宜控制在6~8小时。5.3.3混凝土灌注的充盈系数不得小于1.1,也不宜大于1.25。5.3.4混凝土坍落度应严格按要求控制在18~22cm。5.3.5混凝土试块的制作,保证每组桩子不少于4组。5.3.6灌注过程中,应认真做好灌注原始记录,并及时分析整理。5.4钻孔灌注桩质量验收要求实测项目项检查项目规定值或允许偏差检查频率1桩身强度(Mpa)C30规范要求2桩位(mm)100每桩检查3孔深(m)不小于设计每桩检查4孔径(m)不小于设计每桩检查5钻孔垂直度(mm)﹤1/100桩长每桩检查6沉淀厚度(mm)﹤10每桩检查6、施工安全措施1、进入现场施工人员必须正确佩戴安全帽,正确使用个人安全防护用具。在电箱及动用明火的场所需配置干粉灭火器。2、施工现场应遵循“随做随清、谁做谁清、工完料尽现场清”的原则,严格按照施工工艺方法进行施工,防止不合格品的出现,保证“清洁生产”。3、对施工中所使用的所有机械、工具,应定期进行检修,排除安全隐患,保证接地装置牢固可靠。4、钻孔机操作应由专职操作人员持证上岗,悬挂操作牌。5、钻机运转时,应防止电缆线被缠入钻杆中,必须有专人看护。电动机和控制箱应有良好的接地装置。6、钻孔时,严禁用手清除螺旋片中的泥土。发现紧固螺栓松动时,应立即停机,在紧固后方可继续作业。7、发生电气火灾时应立即切断电源,用干沙灭火,或用干粉灭火机灭火,严禁使用导电的灭火剂灭火。8、施工电源应按规定搭设,使用完毕后应及时拆除。所有施工电缆应绝缘良好。中间接头绝缘包扎应符合“安规”要求,严禁使用不防水的黑胶布包扎。9、电工必须持证上岗,操作时必须带好各种绝缘防护用品,不得违章操作。10、电气操作人员应严格执行电工安全操作规程,进入现场的机械检查机械是否漏电,对电气设备工具进行定期检查和试验,凡不合格的电气设备,工具应停止使用。11、用电设备应实行一机、一闸、一漏、一箱,一个刀闸不得控制2台以上的机械设备。电工人员严禁带电操作,操作时正确使用电工工具。12、电气设备的金属外壳必须做接地或零保护,在总箱、开关箱内必须按安装漏电保护器实行两级漏电保护。13、配电箱要防止漏水,下班前要切断电源,防止人,蓄触电。配电箱内的开关必须完好无损,电气设备所用的保险丝,不得用其他金属代替。14、施工现场严禁使用塑料线,所用绝缘导线型号及截面必须符合临电设计。严禁将电线直接钩挂在刀闸上或直接插入插座使用。7、“五新”技术无。8、绿色施工措施8.1施工现场扬尘控制散状颗粒物的防尘措施:回填土
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 医疗仪器使用和维护手册
- 医药研发项目管理方案
- 安全文明施工措施费怎么算
- 怀化沅陵垃圾焚烧发电项目
- 安全技术措施施工方案
- 健康产业在线健康咨询服务平台开发与运营策略
- 科技创新经济发展形势
- 医疗健康大数据平台数据共享手册
- 登高安全作业施工方案
- 医疗机构疾病预防控制预案
- 2025年道路运输企业主要负责人安全考试练习题(100题)含答案
- 2025届福建省莆田高中毕业班第二次质量检测英语试题(原卷版+解析版)
- 2025春苏少版(2024)美术小学一年级下册第二单元《有趣的肌理》教学设计
- 2025年安徽财贸职业学院单招职业技能考试题库及完整答案一套
- 2025年安徽中医药高等专科学校单招职业适应性测试题库有答案
- 北京大学DeepSeek系列-DeepSeek与AIGC应用
- 2025年无锡职业技术学院单招职业倾向性测试题库完整版
- 2025年皖西卫生职业学院单招职业技能测试题库及答案1套
- 宋代农书研究出版对宋代农业研究的价值4篇
- 2025年山东省泰安市东平县中考一模物理试题附参考答案
- 常用量具使用方法课件
评论
0/150
提交评论