版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
PAGE/r/n53/r/n//r/nNUMPAGES/r/n53/r/n/r/n目录/r/n/r/n/r/n/r/n/r/n/r/n/r/n第一章工程概况/r/n /r/n2/r/n/r/n/r/n/r/n1.1/r/n编制依据/r/n /r/n2/r/n/r/n/r/n/r/n1.2/r/n工程概况/r/n /r/n2/r/n/r/n/r/n/r/n1./r/n3/r/n场平土方/r/n工程概况/r/n /r/n4/r/n/r/n/r/n/r/n1./r/n4/r/n自然条件/r/n /r/n/r/n4/r/n/r/n/r/n/r/n第二章施工部署/r/n /r/n/r/n6/r/n/r/n/r/n/r/n第三章施工进度打算/r/n /r/n/r/n8/r/n/r/n/r/n/r/n第四章施工预备及资源配置措施/r/n /r/n/r/n8/r/n/r/n/r/n/r/n第五章施工方案/r/n /r/n1/r/n0/r/n/r/n/r/n/r/n第/r/n六/r/n章/r/n工程质量保证措施/r/n /r/n15/r/n/r/n/r/n/r/n第/r/n七/r/n章/r/n安全生产/r/n保证措施/r/n /r/n/r/n20/r/n第八章/r/n/r/n雨季施工保证措施/r/n/r/n /r/n/r/n23/r/n/r/n第九章/r/n地下地上管线及其他设备加固措施/r/n /r/n/r/n24/r/n/r/n第十章/r/n工程进度保证措施/r/n /r/n/r/n25/r/n/r/n第十一章/r/n/r/n确保文明施工、文物爱护措施 /r/n/r/n26/r/n/r/n第十二章/r/n/r/n环境爱护及水土保持措施 /r/n/r/n27/r/n/r/n/r/n/r/n附表一:拟投入本工程的要紧施工设备表/r/n /r/n/r/n31/r/n/r/n/r/n/r/n附表二/r/n:/r/n拟投入本工程的要紧材料试验、测量及质检仪器设备表/r/n /r/n/r/n31/r/n/r/n/r/n/r/n附表三:劳动力打算表/r/n /r/n/r/n31/r/n/r/n/r/n/r/n附/r/n图四/r/n:/r/n场平土方回填路径图/r/n /r/n/r/n3/r/n2/r/n第一章工程概况/r/n1.1编制依据/r/n1.1.1、《丹江口港陈家港港区物流园码头工程施工图设计》。/r/n1.1.2、采纳的标准、规范、图集:/r/n1)、《港口工程荷载规范》/r/n2)、《港口工程质量验收检测评定标准》/r/n3)、GBJ301-88《建筑工程质量检验统一标准》/r/n4)、《港口工程地基规范》/r/n5)、GB50202-2002《建筑地基基础施工质量验收规范》/r/n6)、GBJ201-83《土方与爆破工程施工及验收规范》/r/n7)、《城镇道路工程施工与质量验收规范》/r/n1.1.3、《丹江口港陈家港港区物流园码头工程地质勘查报告》。/r/n1.1.4、本单位拥有的科技成果、治理水平、技术设备力量,多年积存的港口码头/r/n、/r/n民用建筑施工经验及对施工现场及周围环境的调查所掌握有关资料。/r/n1.1.5、丹江口港陈家港港区物流园码头工程招投标文件及答疑。/r/n1.1.6、丹江口港陈家港港区物流园码头工程施工合同及附件。/r/n1.1./r/n7/r/n、国家差不多建设方针、政策、法令。/r/n1.1./r/n8/r/n、国家现行/r/n其它/r/n相关规范、强制性标准、四新技术、防火、防爆、环境爱护及职业健康标准。/r/n1/r/n./r/n2工程概况/r/n丹江口港陈家港港区物流园码头工程位于汉江中游左岸、丹江口市内付家寨河段,紧邻丹江口城区南部,朔江而上7km可达丹江口大坝,顺江而下642km可抵达武汉市汇入长江。新建500T级杂货泊位和散货泊位各一个(水工结构兼靠1000t级),年设计吞吐量55万t,其中杂货15万t,散货40万t。/r/n陆域纵深198.3~236.8m,陆域宽度175.0m。港区占地总面积3.9万㎡。陆域按照生产作业区、办公区和辅助生产区分区布置。码头前沿线距离后方江堤约60m,2个泊位总长175m。码头前沿线依照水流方向和水下地形条件顺岸式布置,杂货泊位布置在上游侧,散货泊位布置在下游侧。杂货库场作业区布置在上游侧,对应杂货泊位后方,共布置了一个杂货堆场和一个杂货仓库。散货堆场布置在下游侧,对应散货泊位后方,布置了一个散货进口堆场。港区/r/n西/r/n北侧场地上布置了综合办公楼/r/n(待规划)/r/n、食堂、职工活动中心,港区东南侧场地上布置了候工房、工具库、机修间、蓄水池等生产辅助建筑物。港区道路呈网状布置,主干道宽度均为12m,次干道宽度为9m。港区大门设置在港区后方/r/n西/r/n北角,通过疏港公路与302省道连通。/r/n杂货堆场采纳轮胎起重机完成物资堆取作业,仓库配备叉车。散货水平运输采纳带式输送机系统,堆料作业采纳高架双臂堆料机,取料作业采纳单斗装载机。/r/n道路、堆场概况/r/n道路铺砌总面积11960.28㎡,道路宽9m、12m,采纳现浇沥青砼结构。路面上面层采纳40㎜厚AC-13C细粒式沥青混凝土,采纳A级70号道路石油沥青;下面层采纳80㎜厚AC-16C细粒式沥青混凝土,采纳A级70号道路石油沥青;路面基层为200㎜厚的6%水泥稳定碎石层,下基层为200㎜厚的3%水泥稳定碎石层。/r/n杂散货堆场铺砌面积为7184㎡,结构从上向下为C50高强砼连锁块10㎝,粗砂垫层5㎝,6%水泥稳定碎石垫层20㎝,碎石垫层25㎝。其它铺砌面积4164㎡,结构同上。/r/n散货堆场双臂堆料机栈桥宽度4m,排架间距12m,基础采纳2根/r/nф/r/n800㎜钻孔灌注桩,现浇C30钢筋砼承台,600㎜/r/n×/r/n600㎜现浇C30钢筋砼方型立柱,400㎜/r/n×/r/n400㎜现浇C30钢筋砼方型系梁,上部结构采纳钢引桥。/r/n要紧技术指标如下表:/r/n系号/r/n项目名称/r/n单位/r/n工程数量表/r/n备注/r/n1/r/n泊位长度/r/nm/r/n175/r/n2/r/n占用陆域岸线长度/r/nm/r/n175/r/n3/r/n陆域纵深/r/nm/r/n198.3~236.8/r/n4/r/n陆域占地面积/r/n㎡/r/n39002/r/n5/r/n拆迁面积/r/n㎡/r/n1010/r/n6/r/n散货堆场面积/r/n㎡/r/n4248/r/n7/r/n杂货堆场面积/r/n㎡/r/n2375/r/n8/r/n杂货仓库面积/r/n㎡/r/n2016/r/n9/r/n辅助生产建筑面积/r/n㎡/r/n2348/r/n1/r/n0/r/n港内道路面积/r/n㎡/r/n12560/r/n1/r/n1/r/n其他铺砌面积/r/n㎡/r/n12435/r/n1/r/n2/r/n绿化面积/r/n㎡/r/n3020/r/n1/r/n./r/n3场平土方/r/n工程概况/r/n本码头工程陆域纵深198.3~236.8/r/nm,/r/n占用陆域岸线长度175/r/nm,占地面积38071.25㎡,场地现地面标高90.5m。场地南半部较平坦,有稀疏的杂草分布;北面场地坑洼不平,建筑垃圾较多,零星分散堆放,杂草全场分布,且较茂盛。北面场地小块菜地较多,有大小二十块,分散分布。北面场地另有四个大坑,一个位于北面围墙边上,体积约为621.6m/r/n³/r/n(长/r/n×/r/n宽/r/n×/r/n高=21m/r/n×/r/n18.5m/r/n×/r/n1.6m),一个位于北面场地西面围墙边,体积约为900m/r/n³/r/n(长/r/n×/r/n宽/r/n×/r/n高=30m/r/n×/r/n15m/r/n×/r/n2m),另两个分不位于北面场地中部,体积约为900m/r/n³/r/n(长/r/n×/r/n宽/r/n×/r/n高=20m/r/n×/r/n15m/r/n×/r/n3m)和75m/r/n³/r/n(长/r/n×/r/n宽/r/n×/r/n高/r/n=10m/r/n×/r/n5m/r/n×/r/n1.5m)。/r/n另外,北面场地分布大小不等菜地约45块,面积约1850㎡,占北面场地约10%;电线杆7根;待拆房子一间,占地面积约54㎡(长/r/n×/r/n宽=8.3m/r/n×/r/n6.4m)。/r/n现场地往常存在三个大鱼塘,鱼塘占整个场地/r/n2/3/r/n,在/r/n2014年5月份进行了回填作业,将三个大鱼塘全部填平,同时全场地整体回填1.5m厚。但目前场地标高约90.5m,完成面91.5m,相差约1m,扣除路面、堆场结构层,需要回填厚度为50㎝,需要回填土方量约25130.6m/r/n³/r/n(加上四个大坑共2496.6m/r/n³/r/n)。/r/n场平土方回填范围为整个红线内范围,临建办公区场平后回填土方完成面标高91.5m,砂石堆场、钢结构堆场场平后回填土方完成面标高90.9m,其余部位回填后土方完成面标高为91m。/r/n整个场地表层基土较酥松,特不是北面场地基土专门酥松,通过场地平坦后,需要压路机进行辗压密实,然后才能进行回填土作业。/r/n1./r/n4/r/n自然条件/r/n1./r/n4/r/n.1地形、地貌/r/n、地质条件/r/n拟建码头工程场地陆域地形较平坦,地貌单元属河流地貌,港区位于汉江高漫摊上,场地岩土要紧由第四系冲积物组成,场地平坦,场地西侧为预制块堆场,东侧有池塘分布,北侧为丹奥医药化工,西南侧领汉江,港区陆域天然地面高程在89.1m~90.83m之间。/r/n该工程为一般工程,由岩土工程问题造成破坏的后果不严峻,判定工程重要性等级为二级;建设场地经山地、冲沟地段改造平坦而成,地形地貌复杂,地址环境受到一定程度破坏,为中等复杂场地;场区内岩土种类单一,性质变化不大,为简单地基。/r/n场地层位相对稳定,力学强度由上而下逐渐增大,承载力逐渐提高,横向上各层层位变化小。场地无液化沙土,无滑坡、倒塌、震陷等不良地质现象和作用,场地无埋藏的河道、沟滨、坟墓、防空洞及孤石,场地无不良地质作用,场地内无全新活动断裂带建筑抗震地段为一般地段,场地稳定性为差不多稳定,工程建设适宜性为较适宜。/r/n1./r/n4/r/n./r/n2/r/n地下水/r/n拟建场区紧临汉江,场地地下水要紧为储存于素填土层、细砂层级卵石层中的孔隙潜水。地下水与汉江水联系紧密,相互补给,富水性较好。/r/n场地附近无污染源,场地水、土对混凝土结构具微腐蚀性,对钢筋混凝土结构中的钢筋具微腐蚀性。本场地无承压水分布/r/n。/r/n1./r/n4/r/n./r/n3/r/n水文、气象/r/n丹江口市属亚热带半湿润季风气候区,由于秦岭山脉的屏障作用,加之丹江口水库的水全效益及垂直地貌的阻碍,构成了丹江口市优越的山区区域性小气候,差不多是/r/n“/r/n四季分明、光照充足、热量丰富、雨热同季、无霜期长、相对湿度大/r/n”/r/n。/r/n多年平均气温15.8/r/n℃/r/n,多年平均最高与最低气温分不29.2/r/n℃/r/n、-0.9/r/n℃/r/n,极端最高与最低气温分不为41.5/r/n℃/r/n、-12.4/r/n℃/r/n。/r/n多年平均降水量817.3㎜,历年日最大降水量179.6㎜,历年最大降水日113d,丹江口市降水要紧集中在7-9月份,三个月的降水量约占全年觉得63%。/r/n多年平均风速2.3m/s,冬季主风向东北风,夏季主风向东南风。/r/n港口汉江水域无冰冻史,常年通航。/r/n拟建码头上游约1200m设有黄家港水文站,依照该水文站的水位资料进行特征值统计为:历年最高水位94.43m,历年最低水位84.81m,多年平均水位86.59m。然后进过一系列计算得到码头区域的设计高水位90.44m,设计低水位85.58m。由图纸知,施工水位为86.38m,设计河底高程为83.30m。依照现场踏勘情况,初步可能平均水深为/r/n4/r/nm。/r/n1./r/n4/r/n./r/n4/r/n交通/r/n项目所在场地西北角目前有一条宽4m、长300m便道与樊丹线相通。项目场地东南角处沿汉江下游河堤上也有一条宽4m、长度大约700m土便道与樊丹线相通。/r/n1./r/n4/r/n./r/n5/r/n水、电、通讯/r/n施工期间办公区用水及施工用水采纳自来水,养护用水与冲洗用水采纳汉江抽取水。施工临时用水由业主提供接驳点。/r/n依照负荷等级、用电负荷容量及当地电网条件,本工程采纳一台10KV专线供电,供电电源由附近的110KV的区域变电站接引。/r/n通讯采纳手机与座机联系,专门方便。/r/n1./r/n4/r/n./r/n6/r/n土方料/r/n码头紧邻丹江口城区,所需/r/n土源地距离场地/r/n10km以内/r/n,价格适中,能够满足工程建设需要。/r/n第二章施工部署/r/n2/r/n.1/r/n施工组织机构/r/n我公司组建项目经理部,按项目法组织施工,并实行项目经理负责制。项目经理作为项目的独立主体在法人授权的情况下,全面履行本项目合同义务、责任、权利,保质量、保工期完成施工任务。/r/n为确保工程的顺利开展,项目部由具备丰富施工经验的专业人员组成,在项目经理的领导下,该部将全面负责施工、技术、质量、安全、核算等工作,依照作业打算和施工预算提出劳动力、材料、机具需要用量打算,统一指挥生产,协调落实资金和保证施工物资的供应。确保本工程的工期、质量、成本、安全和文明施工等五项操纵目标的实现。/r/n2./r/n2/r/n工程治理的组织机构形式/r/n丹江口港陈家港港区物流园码头工程项目经理部/r/n丹江口港陈家港港区物流园码头工程项目经理部/r/n施工员/r/n质检员/r/n安全员/r/n材料员/r/n预算员/r/n安装工程师/r/n材料工程师/r/n计量工程师/r/n质/r/n安/r/n工程师/r/n码头工程师/r/n土建工程师/r/n测量工程师/r/n土建工程师/r/n各专业施工队/r/n(/r/n组/r/n)/r/n项目经理/r/n技术负责人/r/n项目执行经理/r/n技术组/r/n施工组/r/n质安组/r/n预算合约/r/n组/r/n物资/r/n组/r/n后勤保卫组/r/n丹江口市交通投资有限公司/r/n2./r/n3/r/n工程施工目标/r/n本项目的工程施工目标:质量达到合格标准;无重大安全事故,减少一般事故,人员因施工负伤率小于3/r/n‰/r/n,重伤率小于0.5/r/n‰/r/n。/r/n2./r/n4/r/n本/r/n土方/r/n工程难点与特点/r/n本工程难点及特点:1、/r/n场平面积大,且各部分基土条件都不相同,处理要有针对性;/r/n2、/r/n场地菜地多,还有没拆除的旧房子,拆迁协调难度大;/r/n3、/r/n场地有四个大坑,地质条件差,场平压实要求高,处理难度较大,压实度难以保证。/r/n第三章施工进度打算/r/n3/r/n./r/n1施工打算安排原则/r/n本项目部通过认真学习招标文件,依照企业的综合能力,要紧是资金拥有额、机械设备配置数量、进场人员数量及素养、综合治理水平,在保证工程质量的基础上,积极配合业主,力争提早完成合同内各项工程,经认真研究分析全部图纸/r/n与现场情况/r/n,细致安排工期,按/r/n10/r/n日历天完成全部工程任务,打算开工时刻为2016年/r/n12/r/n月/r/n1/r/n日,具体开工时刻依开工令为准,接到开工令后3天内开工。/r/n3/r/n.2/r/n场平土方/r/n工程施工工期/r/n⑴/r/n施工预备:/r/n1/r/n天时刻内陆续完成施工预备工作,要紧完成临时设施、便道施工、机械设备的进场、水电管线架设接通、测量定位、征地拆迁/r/n等/r/n工作。/r/n(2)/r/n场平土方/r/n工程打算工期:/r/n10日历天/r/n第四章/r/n/r/n施工预备及资源配置/r/n措施/r/n4/r/n./r/n1施工总体布置/r/n4.1.1施工队/r/n选择/r/n:/r/n依照本工程项目的特点,为了方便施工和治理/r/n,选择公司的土方施工队伍,/r/n负责本/r/n项目场平土方施工与筑岛土方施工/r/n。/r/n4/r/n./r/n1/r/n./r/n2/r/n临时施工道路/r/n项目场地西北角目前有一条长300m,宽4.5m的村级原有道路与樊丹线相通,路面大部分差不多硬化,靠近项目办公区约90m通过修理并硬化能够作为人行进场道路。具体做法:/r/n先用素土夯实,然后用厚/r/n度10㎝粒径碎石进行铺设压实,最后15㎝厚C25混凝土捣实抹光。/r/n项目场地/r/n东南角/r/n沿汉江下游河堤上有一条宽4m、长700m土便道与樊丹线相通,项目开工后,需对该便道进行扩宽至6m,并清除道路两边的杂物,对路面进行铺填、修理、压实,使道路满足施工需要。具体做法:/r/n先用道渣填筑30㎝,然后面层用厚/r/n度10㎝粒径10㎜~30㎜碎石进行铺设压实。/r/n该段道路作为土方自卸车与挖机等施工机械进场道路。/r/n施工期要紧是做好交通组织治理,以保证畅通。/r/n4.1./r/n3/r/n施工材料/r/n、/r/n临时道路/r/n:/r/n采纳附近砂石场的砂石料以及附件道渣/r/n。/r/n、土方回填料:采纳丹江口范围内/r/n10km范围的路基土源。/r/n4.2施工技术预备/r/n4.2.1施工技术交底/r/n项目部进场后,统一组织有关技术人员学习有关技术规范。抓紧熟悉设计图纸、领会设计图纸,对设计图纸及讲明有不理解的问题,请业主组织设计单位进行施工技术交底会,明确要求并澄清有关问题。/r/n项目部技术治理人员对班组施工治理人员进行技术交底,使班组充分领会图纸内容,对他们释疑解惑,并签定技术交底记录。/r/n4.2.2施工前期进行测量工作/r/n本工程设置测量组,负责/r/n全场地/r/n测量工作。/r/n测量人员经计量检验鉴定后的测量仪器,会同业主、监理进行测量并移交操纵点工作,复核原导线网点、水准点,同时对全/r/n场地/r/n的原地面进行复测记录,经监理业主审核认能够后作为计量依据。/r/n4.3/r/n场平土方施工/r/n机械设备配置及进场打算/r/n本/r/n土方/r/n工程施工需要/r/n土方/r/n机械设备和施工机具,其中/r/n挖掘机、推土机、压路机/r/n和运输车辆更是施工的主力。我公司将依照现有装备的数量、质量情况,依照工程施工及技术要求,制定周密的打算,组织相应的机械设备进场。其中需要维修、租赁和购置的,将按打算落实,并要适当留有备份,以保证施工的需要。拟配备的/r/n场平土方施工/r/n机械设备表附后。/r/n4.4试验和检测仪器设备/r/n依照本/r/n土方/r/n工程的特点,我公司将依照现有试验设备的数量、质量情况,依照工程施工及技术要求,配置充足周密的试验和检测仪器设备。拟配备的试验和检验仪器设备表附后。/r/n4.5拟投入的专业技术力量/r/n序号/r/n人员类不/r/n数量(人)/r/n具体人员/r/n备注/r/n1/r/n项目经理/r/n1/r/n2/r/n项目执行经理/r/n1/r/n3/r/n项目总工/r/n1/r/n4/r/n土建工程师/r/n1/r/n5/r/n机械设备工程师/r/n1/r/n6/r/n测量工程师/r/n1/r/n7/r/n试验工程师/r/n1/r/n8/r/n道路工程师/r/n2/r/n10/r/n计量工程师/r/n1/r/n11/r/n质检工程师/r/n2/r/n12/r/n材料工程师/r/n1/r/n13/r/n安全工程师/r/n2/r/n14/r/n施工员/r/n3/r/n15/r/n会计/r/n1/r/n16/r/n专职协调员/r/n1/r/n17/r/n其他司机/r/n2/r/n18/r/n电工兼修理工/r/n1/r/n总计/r/n2/r/n4/r/n4.6劳动力打算表/r/n劳动力打算表附后。/r/n第五章/r/n/r/n施工方案/r/n5/r/n./r/n1/r/n土方/r/n平衡原则/r/n先施工区域先平衡,后施工区域做补充;先低洼地段处理,后高处范围调配;最大限度地减少土方来回调运概率,降低成本消耗,满足工期要求;并尽早制造结构施工条件。/r/n5./r/n2/r/n场平土方工程/r/n施工顺序/r/n土方/r/n施工队伍进场后,首先着手施工前的预备工作,即施工便道、临时设施、水电、通讯线路等以及机械设备、材料的预备工作/r/n,/r/n为/r/n场平土方工程/r/n施工制造必要的施工条件。/r/n测量放线/r/n→/r/n机械进场/r/n→/r/n修施工便道/r/n→/r/n清表/r/n→/r/n局部推土填坑并压实/r/n→/r/n测场地标高/r/n→/r/n第一层回填土施工并检测/r/n→/r/n第二层回填土施工并检测/r/n→/r/n局部处理/r/n→/r/n测量回填完成面标高,形成方格网,计算土方量/r/n。/r/n5./r/n3/r/n场平土方工程/r/n施工/r/n区段划分与压实度要求/r/n整个场地面积较大(整个红线范围内),为确保场平土方工程的施工质量,使土方施工有序进行,将场平施工与土方回填施工区域进行合理的划分区段。/r/n整个场地土方回填之前,进行四个大坑的回填施工作业,采纳分层压实进行施工,分层厚度/r/n30㎝,采纳打夯机进行夯实,压实度/r/n≥/r/n96%。/r/n整个场地土方分层厚度30公分,采纳压路机进行压实,压实度/r/n≥/r/n96%。/r/n沿东西方向(顺河堤走向)将本场地从北面高围墙处开始向南按照/r/n20m宽度/r/n划分为/r/n12条块。东西方向按98m长度每个条块分为两段。全场地分为22个条块。条块施工先后顺序:从西北角开始施工,先西后东,从北向南推进,具体施工路线见后附图。/r/n实际施工采纳流水作业,同层流水和上下层流水作业同步进行,上层施工延后下层2个施工条块。上下层施工缝接头错开,搭设进行。/r/n5./r/n4/r/n施工方/r/n法/r/n5./r/n4.1/r/n/r/n场地测量放线/r/n施工队进场前,先对现场进行操纵点的布设测量,现场红线桩的布设,通过打设木桩或撒白灰进行标示场地红线范围。/r/n5./r/n4.2/r/n/r/n清表并场地平坦/r/n施工队进场后,对现场/r/n30㎝厚度土方进行清表工作,进行场地平坦。场地南半部,用堆土机或挖机对表层30㎝松土进行清除,对杂草挖除,然后利用压路机进行压实。场地北半部堆积土方、建筑垃圾较多,杂草较多,还有部分生活垃圾。先将北半部分场地的生活垃圾、树枝清除,并外运,然后用挖机清除30㎝松土进行清除,对杂草挖除,将堆积土方进行推平,厚度/r/n≤/r/n30㎝,并用压路机反复压实。/r/n四个大坑先清除坑底垃圾土,在测量所需方量后,进行土方分层回填。回填厚度/r/n≤/r/n30㎝,土方质量达到路基土方质量要求。不得掺杂垃圾土或生活垃圾。用电动打夯机对每层进行夯实,直至每层压实度达到要求为止,方可进行下层回填。四个大坑回填至整个场地场平标高为止。/r/n清表注意事项如下:/r/n(1)/r/n土方回填前,对所填范围基底进行处理,经监理验收合格后方可进行。/r/n(2)/r/n基底上的树墩、禾苗、杂草应完全拔除。/r/n(3)/r/n关于种植土、松土采纳机械碾压密实。/r/n(4)/r/n在农田、沟渠和池塘填方前,应依照实际情况采纳排水疏干、挖除淤泥或抛填块石、沙砾、矿渣等方法处理合格后再行填土。/r/n(5)/r/n对表面湿润,不利于及时回填的部位,应晾晒干燥。/r/n5./r/n4.3/r/n方格网的建立/r/n清表场平工作完成后,即对整个场地进行测量,建立方格网。/r/n土方平衡前,应按现场平面图进行测量定位,定出要紧操纵基点。平衡时分区段建立10*10m平面方格网(临时),每方格网内测定1个标高点,计算其算术平均值,作为每方格内的自然地坪标高。/r/n在现场施工区域范围内,按每50m范围设立高程网点,以操纵土方平衡标高。/r/n通过方格网,初步确定现场各个区块所要回填土方量以及总土方量,确定土方平衡打算。/r/n5./r/n4.4/r/n场地挖方工程/r/n本场地西北角有一大堆原有土方,土方质量满足回填土方质量要求,土方量约/r/n3000m/r/n³/r/n,需要对该部位土方进行挖除,然后回填在附近区域。/r/n/r/n(/r/n1/r/n)挖土方法/r/n采纳反铲式挖掘机分层分段依次挖方/r/n,将挖除土方抛运到较远处/r/n,/r/n然后用/r/n装载机、推土机配合/r/n,将挖方土方推运至附近区段进行回填并压实。如推运距离较远/r/n,/r/n用/r/n自卸汽车/r/n进行/r/n外运/r/n,然后用推土机将土方推平。每次推土机推平后,用压路机反复压实土方,直到压实度、标高、平坦度达到要求为止/r/n。/r/n挖掘过程中,严禁产生较大陡坡,坡度须/r/n≤/r/n1:0.75,分层厚度/r/n≤/r/n1m,确保土方施工过程中不产生塌方、滑坡现象。/r/n挖方时应区不淤泥、杂土、建筑垃圾等不利于回填土料,选择良好原土进行场地填土。/r/n/r/n(/r/n2/r/n)/r/n标高操纵/r/n土方开挖设专人进行测量,操纵/r/n场地挖方/r/n标高。挖至距/r/n场地土方完成面/r/n标高/r/n20㎝/r/n左右/r/n后/r/n,/r/n即对该/r/n20㎝土进行精确挖掘/r/n。作业人员严格操纵好地面标高,幸免高低不平/r/n,幸免超挖,挖掘完成面比场地土方完成面标高高/r/n10㎝,然后利用压路机进行压实,直到压实到场地土方完成面标高/r/n。/r/n(3)/r/n局部处理并验收/r/n挖方范围内挖方作业、压实作业完成后,即对完成面进行测量,局部修整,并进行检测压实度,报监理验收。/r/n5./r/n4.5/r/n场地填方工程/r/n(1)/r/n施工工艺流程/r/n/r/n/r/n检验基土/r/n/r/n分/r/n区/r/n段分层铺土/r/n/r/n分层铺土、分层碾压循环操作/r/n/r/n分段分层碾压密实/r/n/r/n检验/r/n土方压实度/r/n/r/n/r/n修整找平/r/n/r/n验收/r/n/r/n/r/n(/r/n2/r/n)土质要求/r/n/r/n①/r/n淤泥和淤泥土质、橡皮土及含盐植物根茎不得用做回填土。/r/n/r/n②/r/n回填土方应手捏成团、落地开花为宜。/r/n/r/n③/r/n回填土中不得含有砖头、瓦块等建筑垃圾。/r/n/r/n(/r/n3/r/n)填土方法/r/n/r/n①/r/n填方应从低处开始,由下而上水平分层铺填碾压。本工程在填方时,在场区北侧应按平面尺寸8/r/n8/r/nm长/r/n×/r/n20/r/nm条块有规律按照回填路线前进,切忌随意填方。/r/n/r/n②/r/n采纳自卸汽车运土,推土机推填土方,碾压机碾压。每层铺土30~40㎝,每层压实6-8遍,每层压实后/r/n厚度/r/n≤/r/n25㎝。/r/n/r/n③/r/n填土可用汽车行使做部分压实工作,再用推土机来回行使找平碾压,履带/r/n应重叠一半;平坦后用8-15T重的/r/n压路机进行压实/r/n,且先静压后振压。推土机及碾压机械压实行使速度2/r/nkm/r/n//r/nh/r/n。/r/n/r/n④/r/n填筑土方应填至项目红线范围,并形成自然坡度,再用推土机、压路机并由人工配合夯填密实将回填外边缘压实,填土区外边缘自然坡面人工夯实,并应拉线修理整齐。/r/n/r/n⑤/r/n在地形起伏之处,应做好接茬,并修建1:2阶梯形边坡,每步台阶高500,宽1000;分段填筑时,每层接茬处应做成大于1:1.5的斜坡,碾迹重迹0.5-1.0m,上下错缝,距离不小于1.0m。/r/n/r/n⑥/r/n施工时候应测定土的含水率,填土压实应操纵在土的最优含水率内。当土料含水量过大,可采纳翻松晾干、风干和换土。/r/n5./r/n4.6/r/n/r/n场平土方工程/r/n检验试验/r/n本/r/n场平土方/r/n工程填土/r/n后/r/n要求压实系数大于0.9/r/n6/r/n。/r/n采纳环刀方法取样,场地填方按400-900/r/nm2/r/n取样一组,取样部位为每层压实后的下半部。必要时可采纳小型轻便触探仪进行测试。/r/n填土压实后的干容重,应有95%以上符合要求,其余5%的最低值与设计值的差不大于0.08/r/ng/r/n//r/ncm/r/n3,且不应集中。/r/n5./r/n4.7/r/n应注意的质量问题/r/n/r/n(/r/n1/r/n)/r/n回填土中不得有大块、垃圾等杂物,基底清理洁净,回填前应检查合格。/r/n/r/n(/r/n2/r/n)/r/n碾压时,碾迹相互搭接,防止漏压;分段填方时,每层接缝应处理到位。/r/n/r/n(/r/n3/r/n)/r/n填土应选用透水性较好的土方或在粘土中掺入砂石做填料。/r/n/r/n(/r/n4/r/n)/r/n回填每层应测定夯实后的干土重力密度,检验其压实系数和压实范围,符合设计要求并经监理验收合格后方能铺摊上层土。/r/n/r/n(/r/n5/r/n)/r/n注意边缘、角落部位的土方压实质量。/r/n第/r/n六/r/n章/r/n/r/n质量保证措施/r/n6.1工程质量目标/r/n依照该段施工工期紧迫的特点,我公司牢固树立/r/n“/r/n质量第一/r/n”/r/n的思想,充分认识到质量安全责任重于泰山。工程质量目标是:/r/n“/r/n确保全部工程达到现行工程质量验收标准,工程一次交验合格率100%,达到合格标准,并满足全线规划要求/r/n”/r/n。/r/n6.2质量保证体系/r/n/r/n/r/n业主/r/n/r/n/r/n监理公司/r/n/r/n质检站/r/n/r/n质检站/r/n公司总部/r/nISO9002质量体系/r/n项目经理/r/n公司总部/r/nISO9002质量体系/r/n项目经理/r/n/r/n/r/n总工程师/r/n/r/n生产经理/r/n/r/n生产经理/r/n区域责任工程师/r/n区域责任工程师/r/n区域责任工程师/r/n区域责任工程师/r/n劳务分包商/r/n劳务分包商/r/n劳务分包商/r/n劳务分包商/r/n兼职质量员/r/n兼职质量员/r/n兼职质量员/r/n兼职质量员/r/n/r/n施工班组/r/n/r/n/r/n施工班组/r/n/r/n施工班组/r/n作业人员/r/n作业人员/r/n作业人员/r/n作业人员/r/n/r/n6.3质量操纵程序图/r/n/r/n施工预备/r/n施工方案监理审批/r/n作业人员图纸学习、操作规程和质量标准/r/n/r/n施工预备/r/n施工方案监理审批/r/n作业人员图纸学习、操作规程和质量标准/r/n检修机械设备进场验收/r/n坐标高程操纵网验收确认/r/n检修机械设备进场验收/r/n坐标高程操纵网验收确认/r/n/r/n/r/n/r/n/r/n项目经理三级教育/r/n技术人员书面交底/r/n技术交底/r/n项目经理三级教育/r/n技术人员书面交底/r/n技术交底/r/n区域责任工程师口头交底/r/nHSE工程师安全文明交底/r/n区域责任工程师口头交底/r/nHSE工程师安全文明交底/r/n/r/n基底处理/r/n/r/n基底处理/r/n/r/n范围操纵/r/n标高操纵/r/n标高操纵/r/n/r/n基底检查/r/n/r/n基底检查/r/n工序操作/r/n/r/n隐蔽验收/r/n/r/n挖方/r/n/r/n/r/n隐蔽验收/r/n/r/n挖方/r/n/r/n填方/r/n分时期范围操纵/r/n安全文明/r/n安全文明/r/n分时期范围操纵/r/n安全文明/r/n安全文明/r/n挖土/r/n外运/r/n填/r/n方/r/n挖土/r/n外运/r/n填/r/n方/r/n碾压密实/r/n执行标准/r/n质量评定/r/n执行标准/r/n质量评定/r/n每层土抽样试验/r/n每层土抽样试验/r/n不合格返工/r/n标高操纵/r/n不合格返工/r/n标高操纵/r/n自检记录/r/n资料汇总/r/n/r/n自检记录/r/n资料汇总/r/n/r/n试验报告/r/n/r/n质量评定/r/n/r/n试验报告/r/n/r/n质量评定/r/n/r/n其他资料/r/n/r/n/r/n其他资料/r/n/r/n施工日志/r/n/r/n验收/r/n方案、交底/r/n/r/n验收/r/n方案、交底/r/n/r/n竣工图/r/n/r/n竣工图/r/n6.4质量保证措施/r/n施工中我们将采取以下措施确保工程质量:/r/n(1)把质量目标作为项目全面标准化治理的重要内容/r/n我公司的质量方针是/r/n“/r/n兑现合同承诺,留下时代精品/r/n”/r/n,在业主监理的指导下,严格质量体系文件运行,将质量目标作为项目标准化治理的重要内容,通过全员、全方位、全过程的质量操纵,确保质量目标的实现,做到干一项工程,留一方信誉。/r/n(2)建立完善的质量治理体系和质量保证体系/r/n行政治理对工程质量和进度的作用是至关重要,设立科学合理工程治理机构是充分发挥各个部门职能前提条件。为确保工程质量,我公司将成立以项目经理负责创优领导小组和以项目总工程师负专责技术治理体系,建立三级质量治理网络,科学严格地制定各工序、施工工艺的质量预控措施,实施标准工法作业。/r/n(3)严格实行质量终身责任制/r/n严格实施质量负责制和质量终身责任制,实行企业法人代表、项目负责人、各级技术人员及工班负责人对工程质量负相应责任,层层签订质量终身责任书,做到责任落实到位、责任落实到人,从而提高全员的质量意识。坚决做到奖优罚劣,规范化施工,实行持证上岗。使各级参建人员在实施组织指挥施工中始终坚持/r/n“/r/n质量第一/r/n”/r/n的方针,确保工程质量。/r/n(4)施工操纵中的技术保证建立项目总工程师负责的施工技术体系/r/n项目经理部配足各专业技术、质量、测试人员,定员定岗定责,施工前项目总工程师组织有关技术人员详细审核设计图,了解设计意图,制定科学合理的施工技术方案。严格按照施工合同、设计图、技术规范的要求进行施工。/r/n技术人员深入现场了解实际情况,精心指导施工。质量检查和测试人员准确检测,严把质量关,及时发觉和解决问题,做到防患于未然,强化工序、工种、工艺的质量操纵,对其中的关键工序施工工艺开展QC活动,组织技术攻关,确保工程质量。/r/n(5)建立和落实各项规章制度/r/n/r/n①/r/n测量资料的复核和换手测量制度/r/n测量工作实行项目部、队二级治理网络操纵,项目部测量队负责定位操纵测量,队测量班负责施工测量放样。严格操纵/r/n坐标与/r/n标高/r/n测量/r/n。建立复核测量和换手测量制度,同时加强测量人员的思想教育工作,提高对测量工作重要性的认识,增强其工作责任感。施工中认真做好测量的原始记录工作工保存好测量资料。/r/n/r/n②/r/n技术交底制度/r/n第一道工序施工前,由项目总工程师或有关技术人员对施工中质量标准、技术要求、工艺操纵及有关注意事项等进行详细的技术交底,提出具体要求,并以书面形式下发有关施工队,双方签字,将责任落实到人头,增强技术人员与施工人员的责任感。/r/n/r/n③/r/n仪器设备的标定制度/r/n项目部设试验室,本标段工程施工中测量试验和检测的仪器、仪表均应按计量法的有关规定进行定期或不定期限的标定。工地设专人负责计量工作,设立帐本档案,监督检查仪器设备的使用情况,确保其使用正常。/r/n/r/n④/r/n工序/r/n“/r/n三检/r/n”/r/n制度/r/n施工中严格按照自检、互检、交接检的/r/n“/r/n三检/r/n”/r/n制度进行施工,上道工序不合格,不准进入下一道工序,树立下一道工序确实是用户的意识,确保各道工序的施工质量,从而确保整治个工程的质量。/r/n/r/n⑤/r/n施工过程质量检测制度/r/n在整个工程施工中,始终坚持/r/n“/r/n跟踪检测/r/n”/r/n、/r/n“/r/n复测/r/n”/r/n与/r/n“/r/n抽检/r/n”/r/n三级进行,及时发觉和解决问题,以便为质量验收打下良好基础,确保工程验收顺利进行。/r/n/r/n⑥/r/n资料治理制度/r/n项目部及施工队分不设专人收集、整理、保存施工原始资料,分类整理归档。资料的整理应确保数据的真实性和准确性。工程结束时按照竣工资料移交归档要求,汇编成册移交业主。/r/n/r/n⑦/r/n质量奖惩制度/r/n项目部及下属施工单位分不制定质量奖罚制度和措施,质量与经济挂钩,定期或不定期进行质量评比,关于质理好的集体和个人,给予荣誉和经济上的表彰奖励,落实奖罚制度,确实做到奖优罚劣,进而提高全员的质量意识,保证上工程质量。/r/n6.5质量监控点/r/n序号/r/n质量操纵点/r/n监控内容/r/n1/r/n测量定位/r/n方格网设置情况、坐标高程点,过程检查/r/n2/r/n范围操纵/r/n挖填方局部范围,各建构筑物基槽界限/r/n3/r/n标高操纵/r/n挖填方局部范围,设计地坪标高,排水坡度或平坦度/r/n4/r/n基底检查/r/n回填基底积水、地表水、淤泥、原土情况,各类杂物/r/n5/r/n回填检查/r/n按顺序回填,土质,每层填土厚度,碾压密度,接茬处理/r/n6/r/n内业资料/r/n自评、质检、隐蔽、试验、交底同步进行/r/n6.6要紧质量措施/r/n6./r/n6/r/n.1做好方案交底、技术交底工作,不明确不得施工。/r/n6./r/n6/r/n.2严格质量检验程序,执行自检/r/n—/r/n互检/r/n—/r/n专职检/r/n—/r/n监理(甲方)检和质量/r/n“/r/n一票否决/r/n”/r/n制度,做到上道工序未检查或检查不合格,不同意下道工序施工。/r/n6/r/n.6/r/n.3夜间施工时,应合理安排施工项目,防止超挖或铺填超厚。/r/n6./r/n6/r/n.4土方施工中,应经常测量和校核其平面位置、水平标高和边坡坡度,防止开挖表面高低悬殊大;平面操纵桩和水准点也应定期复测和检查。/r/n6./r/n6/r/n.5填土料的土质情况、填土区段搭接、土层碾压密实与抽样试验是重点,应特不重视。/r/n6.7交工资料/r/n6./r/n7/r/n.1测量定位及方格网设置、高程操纵图(可分时期)/r/n6./r/n7/r/n.2场区回填(隐蔽)检查记录;/r/n6./r/n7/r/n.3设计变更和补充设计的图纸和文件;/r/n6./r/n7/r/n.4工程交接记录;/r/n6./r/n7/r/n.5土方试验记录;/r/n6./r/n7/r/n.6隐蔽工程验收记录;/r/n6./r/n7/r/n.6质量检查和验收记录;/r/n6./r/n7/r/n.7永久性操纵桩和操纵点测量成果/r/n6.5.8施工记录;/r/n第七章/r/n/r/n安全生产保证措施/r/n7/r/n./r/n1/r/n安全目标/r/n施工期内达到无亡人事故,无重大火灾、爆炸和交通事故,年度职工重伤率小于0.6/r/n‰/r/n,轻伤率操纵在0.5/r/n‰/r/n以内。/r/n7/r/n./r/n2/r/n安全保证体系/r/n实行项目经理部、施工队和作业班组三级安全治理,项目经理部和施工队设置专职安全员,班组设兼职安全员,形成上下齐抓共管的安全治理网络。制定安全措施和目标,定期或不定期组织安全检查,并进行安全标准工地建设。安全保证体系从组织、思想、技术、经济四个方面建立,见安全保证体系框图。/r/n7.3安全保证措施/r/n(1).认真贯彻执行/r/n“/r/n安全第一、预防为主/r/n”/r/n的方针。经常组织职工学习安全法规、条例和安全操作规程,提高职工的安全意识和安全操作技能/r/n。/r/n施工人员进场后,必须同意公司组织的三级安全教育并考试合格,施工前同意安全技术交底。设置安全标志网和专门安全保障措施。/r/n(2).各级治理人员,坚持/r/n“/r/n管生产必须管安全/r/n”/r/n的原则,布置任务安排工作都必须讲安全,工序前做好安全技术交底,方可施工。落实安全生产责任制,逐级签订安全承包合同,使各级明确自己的安全工作职责,制定安全规划,达到全员参加、全面治理的目的,做到/r/n“/r/n安全生产,人人有责/r/n”/r/n。/r/n(3).制定安全技术措施,高空作业必须设置防护网,作业人员要戴安全帽、安全带、安全绳;机械操作手必须建立机组责任制,持证上岗,定人定机,遵守使用及操作规程/r/n,自卸车/r/n司机、电工、电气焊工、/r/n挖机操作工、推土机操作工、压路机操作工/r/n等专门工种必须持证上岗,并年检合格,非专门工种人员严禁从事专门作业/r/n;/r/n施工现场的用电线路、用电设施的安装和使用必须符合安装规范和安全操作规程,夜间施工,应依照需要安设照明设施,保证施工场区照明充分。在危险地段应设置明显警示标志牌;施工机械进场必须通过安全检查,合格后方可使用。/r/n(4).坚持/r/n“/r/n创安/r/n”/r/n工作评比,每月定期检查工地一次,平常进行不定期的检查,做到及时发觉隐患及时整改。/r/n(5).建立健全各项安全制度及防护措施/r/n①/r/n各类机械的运行规则及安全作业制度;/r/n②/r/n用电安全须知及电路架设养护作业制度;/r/n③/r/n用水管路安装及养护作业制度;/r/n④/r/n施工现场保安制度;/r/n⑤/r/n施工现场防洪、防火、防风措施;/r/n⑥/r/n有关劳动爱护法规定的执行措施;/r/n⑦/r/n施工现场各类信号及标示牌的设置规则及维护措施。/r/n(6).深化安全教育,强化安全意识。工地操作人员必须持证上岗,做到上岗必有证无证不上岗,严禁无证上岗操作;工作人员上岗前必须进行工作技术培训和安全教育,牢记/r/n“/r/n安全第一/r/n”/r/n宗旨,安全员坚持持证上岗。/r/n(7).抓好现场治理是做好安全工作的一个重要环节,易燃易爆品的妥善保管,工程材料合理堆放,各种交通、施工信号的标识,正确使用风水管路、供电线路。/r/n(8).加强班组建设,选好班组长、安全员。集思广益发觉问题,找隐患,杜绝/r/n“/r/n三违/r/n”/r/n,把事故消灭在萌芽状态。/r/n(9).认真实施标准化作业,严肃施工纪律和劳动纪律,杜绝违章指挥与违章操作,保证防护设施的投入,使安全建立在治理科学,技术先进,防护可靠的基础上。/r/n(/r/n10/r/n)./r/n土方施工具体安全注意事项。/r/n1)/r/n每班工作前,设备人员应认真检查设施情况并进行空运转,保证安全运行。机械设备做到专人专机。/r/n2)/r/n场区行人应按指定线路行走,注意力集中,以防车辆伤人。/r/n3)/r/n操作中进铲不应过深,提斗不应过猛;不在输电线路2m范围内工作。/r/n4)/r/n车辆行使道路应检视,如地基过差应采取加固措施,防止翻车。/r/n5)/r/n所有人员进入施工现场都必须戴好安全帽;配合挖掘机的作业人员不准在回转半径下工作。/r/n6)/r/n挖土时,应注意土壁的稳定性,发觉有裂纹及倾斜可能时,人员应及时疏散,并妥善处理。/r/n7)/r/n向汽车内卸土,应待车子停稳后进行,并鸣笛示意。禁止铲斗从汽车驾驶室上越过。/r/n8)/r/n电气线路必须按临时用电施工规范进行布设,箱柜标准规范、一机一闸一漏保,并做到班前班后检查记录。/r/n9)/r/n使用打夯机时,施工人员应戴绝缘橡胶手套。往返电缆专人拉牵。/r/n10)/r/n在挖方边坡上倒堆土或材料及移动施工机械时,应与挖方边缘保持2m以上距离,以保证边坡和土壁稳定。/r/n11)/r/n严禁施工人员酒后操作,疲劳驾驶。/r/n12)/r/n在挖方、填方区域设立专人指挥倒土和卸土。/r/n13)/r/n在形成较大高差的开挖范围,应先围护后施工;采纳红白道钢管栏杆,立杆间距1.5m,高1.2m。/r/n7.4施工安全风险分析/r/n序号/r/n工作内容/r/n可能的危害或损失/r/n严峻性/r/n可能性/r/n风险值/r/n对危害的控制方法/r/n剩余危险/r/n1/r/n挖土方/r/n机械伤人/r/n3/r/n1/r/n3/r/n进场戴好安全帽、注意车行路线,专人指挥/r/n无/r/n环境污染/r/n1/r/n3/r/n3/r/n容易起灰尘的道路派专人洒水/r/n无/r/n机械事故/r/n3/r/n1/r/n3/r/n班前检查,严格操作规程/r/n无/r/n人员摔伤/r/n2/r/n3/r/n6/r/n先围护后施工,坑壁设置防护栏杆,设立警示标志,夜间照明充分/r/n无/r/n破坏地上/r/n地下设施/r/n2/r/n2/r/n4/r/n提早交底并设立明显标志,专人看管/r/n无/r/n2/r/n填土方/r/n机械伤人/r/n3/r/n1/r/n3/r/n进场戴好安全帽、注意车行路线,专人指挥/r/n无/r/n环境污染/r/n1/r/n3/r/n3/r/n无/r/n破坏地上地下设施/r/n2/r/n2/r/n4/r/n提早交底并设立明显标志,专人看管/r/n无/r/n3/r/n电气作业/r/n触电伤亡/r/n引起火灾/r/n3/r/n2/r/n6/r/n班前班后雨后检查,漏电灵敏,非电气专业人员禁止一切电气作业,线路布设符合规范要求/r/n无/r/n可能性分为:1/r/n—/r/n事故可能发生;2/r/n—/r/n事故可能发生但不经常发生;3/r/n—/r/n事故专门可能发生/r/n严峻性分为:1/r/n—/r/n对人员造成可不能阻碍的微小损害;2/r/n—/r/n可能导致轻伤、对健康有轻微损害、有较小的财产经济损失、轻微污染;3/r/n—/r/n可能导致死亡、重伤、严峻危害健康、重大财产经济损失、严峻污染环境。/r/n风险值=可能性值*严峻性值/r/n风险值:9、6高度危险,3、4中度危险,1、2低度危险。/r/n第八章雨季施工措施/r/n8/r/n.1开挖土方应注意边坡稳定,必要时候应适当放缓坡度或设置支撑,并加强对边坡和支撑的检查。/r/n8/r/n.2应做好地面截水疏水、排洪与坑内抽水、排水工作。施工平面应形成1-1.5%的排水坡度,保证水流畅通;周边设立1.0*0.5m排水沟,将平面雨水排出至甲方指定区域。在基坑的四周工作面外做排水沟,排水沟宽0.3m、深0.3m,坡度0.3-0.5%,坡向集水坑,积水采纳污水泵(潜水泵)抽出/r/n,/r/n当天填筑的土层应当天完成压实。/r/n8/r/n.3雨后施工,应分专业对临时道路、机械设备、电气设施、临边防护等进行全面检查,合格后方可进行。/r/n8/r/n.4雨期施工的工作面不宜过大,不得大范围全面进行,应按照平衡顺序逐段、逐片分期进行。/r/n8/r/n.5项目部成立以项目经理为第一责任人的防汛领导小组,制定防汛打算和预案措施。/r/n8/r/n.6雨季施工,应保证现场运输道路畅通,道路路面应依照需要加铺炉渣、砂砾或其他防滑材料,必要时依照需要加固路基。/r/n8/r/n.7填方施工中,填土、运土、铺填、压实等各道工序应连续进行,雨期应及时压完已填土层或将表面压光,并作成一定坡度,以利于排除雨水。/r/n8/r/n./r/n8/r/n加强天气预报工作,设立天气预报员,及时收听和公布天气情况,防止暴雨突然突击。现场施工负责人应按照天气变化,灵活调整施工打算,合理安排当日工作。/r/n8/r/n./r/n9/r/n利用挖方土做填方时应随挖随填及时压实,含水量过大应晾干后使用。/r/n第九章地下地上管线及其他设备加固措施/r/n9.1/r/n土方开挖前,应以书面形式通知甲方、监理及市政有关部门,了解施工区域内地下地上管线、电缆线路,地上设施等情况,制定相应的施工措施。/r/n9.2/r/n施工前应以书面形式向有关作业人员做好土方施工安全、技术交底,详细/r/n讲明/r/n地上地下管线和设施加固方案和安全规程,施工期间派专人监护执行。/r/n9.3/r/n遇有管道、电缆、文物、古墓等国家财产,应立即停止施工,及时与有关部门取得联系,并做好现场爱护工作。任何人不得擅自处理。/r/n9.4在建构筑物、道路或管线等附近进行土方作业时,应慎重进行,必要时增加临时支撑件,以防止发生下沉或变形。本工程施工区域尚有专门多架空电缆电线,施工中应特加小心,防止机械碰撞接触。/r/n9.4/r/n地上管线、井、电气设施及测量用永久性标桩等应加强防护,幸免破坏或出现不安全隐患。地上以钢管脚手架进行加固,地下以打木护桩及地面标记为主。/r/n9.5因该场区周围农田、树木专门多,施工前要明确可开挖范围,幸免与当地居民发生冲突。施工期间还应爱护好临近农林设施。/r/n第十章/r/n/r/n工程进度保证/r/n措施/r/n保证合同工期是发挥投资效益、降低工程成本的有效途径,也是业主与施工企业的共同目标。在本项目中本承包人将严格遵守合同工期,为此在施工组织中,充分考虑了工期的重要性。在实施过程中,我们将积极组织动态治理,确保打算进度目标的实现。/r/n10/r/n./r/n1/r/n操纵进度的措施/r/n具体/r/n有组织措施、技术措施、合同措施、经济措施和信息治理措施等。/r/n/r/n(/r/n1/r/n)/r/n、组织措施要紧是落实各层次进度操纵人员、任务和责任,建立组织系统,对项目进行分解,确定其进度目标,建立目标操纵体系,确定工作制度,对阻碍进度的因素进行分析和预测。/r/n/r/n(/r/n2/r/n)/r/n、技术措施要紧是采取加快施工进度的技术方法。/r/n/r/n(/r/n3/r/n)/r/n、合同措施指对保作业队及班组签订合同工期与有关进度打算目标协调。/r/n/r/n(/r/n4/r/n)/r/n、经济措施指实现进度打算的资金保证措施。/r/n/r/n(/r/n5/r/n)/r/n、信息治理措施指不断收集施工实际进度的有关资料进行数理统计与打算进度比较,以不断纠编。/r/n10/r/n.2保证工期的具体措施/r/n/r/n(/r/n1/r/n)/r/n、严格遵守承诺工期。充分认识工期重要性,加强宣传教育,配足生产资源。/r/n/r/n(/r/n2/r/n)/r/n、投入配套机械设备,提高设备利用率和机械化作业程度,节约时刻,确保工期。/r/n/r/n(/r/n3/r/n)/r/n、备足建筑材料。采取超前思维,提早介入材料的采购、运输和储备,不因缺料而阻碍工期。/r/n/r/n(/r/n4/r/n)/r/n、充分做好施工预备工作。保证/r/n“/r/n进场快、安家快、开工快/r/n”/r/n,确保工程尽快开工。/r/n/r/n(/r/n5/r/n)/r/n、精心编制实施性施工组织设计。采纳网络打算技术原理,及时调整各分项工程的进度打算和劳力、机械设备投入,注入足够资金,保证施工需要。/r/n/r/n(/r/n6/r/n)/r/n、明确目标操纵点。充分利用网络技术,分析各工作的总时差和自由时差,确定并遵守循环作业的要求,安排各工点水平推进、立体交叉作业。/r/n/r/n(/r/n7/r/n)/r/n、施工中充分发挥/r/n“/r/n科技是第一生产力/r/n”/r/n作用。对重、难点项目实施科技攻关,创出一流速度。/r/n/r/n(/r/n8/r/n)/r/n、每周召开工程进度会议,每日进行进度检查和安排。/r/n/r/n(/r/n9/r/n)/r/n、大力推广/r/n“/r/n四新/r/n”/r/n成果,加快施工进度。/r/n/r/n(/r/n10/r/n)/r/n、强化施工调度与协调工作,超前布局谋势,紧密监控落实,及时解决问题。重点项目或工序采取垂直治理,横向强制协调的手段,减少中间环节,提高工作效率。/r/n/r/n(/r/n11/r/n)/r/n、经理部与相关人员及施工队签订工期奖罚合同,严格履行合同条款。/r/n第十一章/r/n/r/n确保文明施工及文物爱护/r/n措施/r/n11/r/n.1确保文明施工的措施/r/n/r/n(/r/n1/r/n)/r/n、认真贯彻国家关于文明施工的要求,推行现代治理方法,科学组织施工,做好施工现场的各项治理工作。/r/n/r/n(/r/n2/r/n)/r/n、施工总平面布置图设置各项临时设施。堆放大宗材料、成品、半成品和机具设备,不得侵占场内道路及安全防护等设施。/r/n/r/n(/r/n3/r/n)/r/n、施工现场入口处设置明显的标示牌,标明工程项目名称、项目概况、建设单位、设计单位、施工单位、项目经理和项目总工的姓名,工程开、竣工日期,质量要求,技术操纵参数,现场建设负责人,现场监理等。/r/n/r/n(/r/n4/r/n)/r/n、机械按规定的位置行驶和停放,不得任意侵占场内其他位置。/r/n/r/n(/r/n5/r/n)/r/n、保证现场道路畅通,排水系统处于良好使用状态;保持场容场貌整洁,随时清理建筑垃圾;在车辆、行人通行地点施工设置沟井坎穴覆盖物和施工标志。/r/n/r/n(/r/n6/r/n)/r/n、设置各类必要的职工生活设施,并符合卫生、通风、照明等要求,职工的膳食、饮水供应等应符合卫生要求。/r/n/r/n(/r/n7/r/n)/r/n、在施工场地设置围档,非施工人员不得擅自进入施工现场。并在围档上书宣传口号和工地规则,包括廉政建设实施细则、安全防卫措施、工程安全措施、工地出入治理制度、环境卫生制度、防火措施、水土保持措施等。/r/n/r/n(/r/n8/r/n)/r/n、对工人进行教育,从生活上给一些人性化的关怀,对工人情绪及时疏导,幸免发生冲突、打架等。/r/n11/r/n.2文物及周围建筑物爱护措施/r/n开展学习和教育,贯彻执行《文物爱护法》。在施工过程中发觉文物或有考古、地质研究价值的物品时,立即停工封闭现场,在派专人爱护现场的同时,派人迅速通知建设单位和当地文物部门。通过文物部门处理后,再进行施工,确保祖国文化遗产不受侵害。严禁对发觉文物私自占有或非法转卖。/r/n第十二章/r/n/r/n环境爱护/r/n及水土保持/r/n措施/r/n本公司将把环保作为头等大事来抓,采取/r/n“/r/n环保与设计同时,环保与施工同时,环保与验收同时/r/n”/r/n的三同时措施,实现/r/n“/r/n经济效益,社会效益和环境效益/r/n”/r/n的统一。建立环境质量评价体系,对污染源和污染状况进行监测,取得第一手的数据和资料,进行分析,确定要紧污染源和污染物质及其排放特征,了解污染程度和污染范围,并提出切实有效的治理措施。采取/r/n“/r/n预防为主,防治结合,综合治理/r/n”/r/n的原则,采纳新技术新方法,切实搞好环保工作。/r/n要紧做到以下几点:/r/n1)进场伊始,就组织全体职工认真学习《中华人民共和国环境爱护法》、《大气污染防治法》、《环境污染法》、《环境噪声污染防治法》、《野生动物爱护法》、《水土保持法》等一系列相关法律、法规,使每个参与建设的职工都明白法、守法、依法施工。同时,自觉同意当地环保及其它相关行政部门的监督和治理。/r/n2)在各项施工中应尽量减少对原有自然环境的破坏。/r/n3)加强对施工技术的改造,积极推广清洁生产,减少污染源。/r/n4)加强环境治理,全面推行污染物排放操纵原则,将污染降低到最低限度。/r/n5)制定和健全排污法规体系,加强排污治理。/r/n6)接着加强施工污染的终端处理,操纵污染物排放总量,降低污染。/r/n7)加强环境监测与事故预防,幸免污染事故的发生。必要时,邀请有关环保科研部门来工地现场监测,以确定是否发生环境污染。/r/n8/r/n)健全环保治理组织保障体系/r/n(1)施工区必须设专兼职环保治理人员,并明确岗位责任。/r/n(2)施组中必须有完整的环保措施,现场环保人员必须参与施组中环保措施的制订,以确保措施具体、有用,符合现场要求。/r/n(3)施工现场必须按有关规定建立健全各种组织,做到措施有效,责任到人。如:现场防空气污染、防扬尘、防施工扰民、防道路遗洒等措施。/r/n(4)施工现场必须与施工队签订环保协议书,切实把环保工作落到实处/r/n(5)积极配合有关部门的环保检查,对提出的问题必须认真整改,第一治理者抓落实。/r/n(6)采取多种形式进行环保宣传教育活动,不断提高职工的环保意识和法制观念并进行考核。依照现场环保工作治理情况定期召开分析会,制定具体措施。/r/n(7)现场必须严格执行环境爱护有关规定,严格把关。/r/n9/r/n)环保治理人员职责/r/n/r/n(1)参与施工组织设计中环保方案的制定,并依照现场情况编制相应的环保措施、打算,对贯彻执行情况进行监督检查。/r/n/r/n(2)经常对施工人员进行环保教育,积极深入现场检查环保情况,及时发觉问题进行整改,抓典型,总结经验,对做得好的单位和个人提出奖励意见,对做得差的单位或个人有权制止,或令其停止作业,并视情节给予适当的处罚。/r/n/r/n(3)认真做好不同施工季节的环保工作,积极与各级部门取得联系,做到不污染空气,不污染水源,不超标噪声扰民。/r/n/r/n(4)健全环保内业台帐,定期进行环保工作分析,每月有工作小结,有下月工作打算。/r/n/r/n(5)出现问题必须采取可行措施并及时向公司报告。/r/n/r/n(6)努力学习有关环保知识,不断提高自己的业务水平。/r/n/r/n(7)做好群众来访工作及政府有关部门监督检查工作。/r/n第一节文物爱护/r/n施工时如发觉文物古迹,应立即停止施工,并及时向当地政府、文物治理部门报告。并采取必要的措施爱护好现场,防止文物流失,待文物治理部门作出处理后方可接着施工。施工中需要借土弃土时,应远离现有的或规划的爱护文物遗址。/r/n第二节林木、植被、土地及地下水资源爱护措施/r/n1)对施工人员加强爱护自然资源及植物的教育,严禁和随意砍伐树木。生活及取暖所用燃料,采纳块煤或液化气,不准使用柴火。/r/n2)爱护原有植被。对合同规定的施工界限内、外的植物、树木等尽力维持原状;砍除树木和其它经济植物时,应事先征得所有者和业主的批示同意,严禁超范围砍伐。/r/n3)严禁在有植被和林木的地点燃火取暖,以防引起火灾。/r/n4)永久用地范围内的裸露地表用植被加以覆盖。/r/n5)营造良好环境。在施工现场和生活区设置足够的临时卫生设施,经常进行卫生清理,同时在生活区周围种植花草、树木,美化生活环境。/r/n6)及早作防护工程、排水工程和裸露地表的植被覆盖,防止水土流失。/r/n7)对由于开挖引起的山坡坍塌、滑坡等,将给予及时处理,以防止水土流失。/r/n第三节水环境爱护措施/r/n1)弃土运输时,溢出土石应及时清扫至适当地点处理,以防污染或堵塞交通。/r/n2)改进施工工艺,减少施工废水的污染程度,并操纵废水的排放。/r/n3)加强循环利用施工用水,使污染物的排放量降到标准范围内。/r/n4)充分利用水体的自净能力,对通过处理的废水,合理布置排放点,满足水质排放要求。/r/n5)关于由施工造成的水资源污染,立即责成有关人员给予治理,并对相关污染源进行妥善处理。/r/n6)严禁人为污染水资源。对水质随机进行抽检,发觉问题,立即处理。/r/n第四节动物爱护措施/r/n1)全体职工自觉爱
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2024货物赊欠买卖合同样本范文
- 物业保洁承包合同
- 个人借款合同参考
- 2024不可撤销居间合同
- 2024年商业用途日照房屋租赁合同
- 建筑安装分包合同
- 2024的厂房转让合同范文
- 2024承包施工合同范文
- 2024车辆承包经营合同书雇用车辆合同书
- 2024标准版商务咨询服务合同模板
- 24秋国家开放大学《当代中国政治制度》形考任务1-4参考答案
- “以德育心,以心育德”
- 封条模板A4直接打印版
- 吉林省义务教育阶段新课程计划表(新)
- 35kV配电系统调试试验方案
- 临床用药管理制度
- 多层工业厂房施工组织设计#现浇框架结构
- 消防控制室值班记录(制式表格).doc
- 艰辛与快乐并存-压力与收获同在——我的课题研究故事
- 混凝土拦挡坝的施工方案
- 四带混合球罐分瓣尺寸、表面积、重量及旋梯计算
评论
0/150
提交评论