PAGE/r/n50/r/n//r/nNUMPAGES/r/n53/r/n国网北京检修分公司2017年变电站绿化维护(第四包)/r/n招标/r/n技术标/r/n投标人:/r/n/r/n(盖单位章)/r/n编制日期:/r/n201/r/n7/r/n/r/n年/r/n/r/n4/r/n/r/n月/r/n/r/n20/r/n/r/n日/r/n/r/n/r/n目录/r/nTOC\o"1-2"\h\u/r/n12918/r/n目录/r/n /r/n/r/n1/r/n23551/r/n前言/r/n /r/n/r/n1/r/n12169/r/n第/r/n一/r/n章项目治理人力资源配置/r/n /r/n2/r/n3759/r/n一、项目部组织机构图及各岗位职责/r/n /r/n2/r/n352/r/n二、治理工作流程图/r/n /r/n6/r/n18964/r/n三、人员安排/r/n和培训/r/n /r/n7/r/n23055/r/n四、劳动力季节安排表/r/n /r/n/r/n1/r/n3/r/n18057/r/n五、项目部建立的规章制度/r/n /r/n/r/n1/r/n4/r/n23499/r/n第/r/n二/r/n章/r/n总体施工方案、绿化服务整体设想及策划/r/n /r/n/r/n1/r/n5/r/n15401/r/n一、园林绿化养护技术措施/r/n /r/n/r/n1/r/n5/r/n27150/r/n二、绿化养护工作流程图/r/n /r/n/r/n2/r/n6/r/n20726/r/n第/r/n三/r/n章/r/n施工网络打算及实现招标人质量目标的要紧措施/r/n /r/n2/r/n7/r/n4199/r/n第/r/n四/r/n章施工安全体系目标及措施/r/n /r/n/r/n3/r/n0/r/n24108/r/n一、安全生产操纵措施/r/n /r/n/r/n3/r/n0/r/n12646/r/n二、安全保证体系流程图/r/n /r/n/r/n3/r/n2/r/n8019/r/n第/r/n五/r/n章文明生产及环境爱护体系治理措施/r/n /r/n3/r/n2/r/n23620/r/n一、治理措施/r/n /r/n3/r/n2/r/n19907/r/n二、文明生产及环境爱护体系流程图/r/n /r/n35/r/n153/r/n第/r/n六/r/n章施工大型及要紧机具分时期配置表及材料需用打算/r/n /r/n36/r/n32439/r/n一、投入要紧施工设备及机具表/r/n /r/n36/r/n二、/r/n材料需用打算/r/n……………………/r/n37/r/n11822/r/n三、养护临建设/r/n施/r/n /r/n37/r/n6335/r/n第/r/n七/r/n章/r/n应急预案/r/n /r/n39/r/n25586/r/n一/r/n、/r/n应急预案/r/n /r/n39/r/n/r/n前言/r/n本文件为/r/n国网北京检修分公司2017年变电站绿化维护(第四包)/r/n招标/r/n技术文件/r/n/r/n二、编制依据/r/n1、绿/r/n化服务/r/n招标文件。/r/n2、养护施工现场的实际条件。/r/n3、公司具有完备的治理、技术和施工人员,各类施工机具设备,多年积存的大型园林景观工程施工及绿地养护治理经验等。/r/n三、技术条件/r/n1、执行北京市《都市园林绿化养护治理标准》(DB11/T213/r/n—/r/n2003/r/n)/r/n和有关技术操作规程。/r/n2、招标文件的技术条款。/r/n第/r/n一/r/n章项目治理人力资源配置/r/n一、项目部组织机构图及各岗位职责/r/n1、组织机构图/r/n项目经理/r/n项目经理/r/n项目副经理/r/n技术负责人/r/n项目副经理/r/n技术负责人/r/n /r/n施工员/r/n资料员/r/n核算员员/r/n安全员/r/n质检员/r/n施工员/r/n资料员/r/n核算员员/r/n安全员/r/n质检员/r/n作业队/r/n作业队/r/n作业队/r/n作业队/r/n作业队/r/n作业队/r/n2、/r/n各岗位职责分工表/r/n序号/r/n岗位/r/n工作任务分工/r/n1/r/n项目经理/r/n①/r/n代表公司履行对业主的工程承包合同,组织贯彻执行公司质量方针、目标、质量手册和程序文件,确保质量体系的有效运行;/r/n②/r/n负责本项目质量打算的实施,负责本项目部职员的质量教育和培训;/r/n③/r/n组织实施不合格品的纠正和落实预防措施,对分供方进行评价和监督。/r/n④/r/n主持召开本项目部质量工作会议,积极开展各项治理活动,保证实现项目质量目标;/r/n⑤/r/n主持对项目质量打算执行情况的检查,及时解决质保体系运行中的问题;/r/n⑥/r/n配合内、外部质量体系审核,对审核中发生的不合格项及时采取纠正措施;认真贯彻落实上级治理评审纪要、决议。/r/n⑦/r/n参加图纸会审,负责组织编制项目治理实施规划。/r/n⑧/r/n负责组织工程竣工验收预备、交付结算和分析总结,同意内部验收。处理项目收尾工作。工程完工时,施工的全部资料要分类建档,组装成册,移交工程部归档。/r/n⑨/r/n负责对项目实施过程中的人力、材料、机械设备、资金、技术、信息等生产要素进行优化配置和动态治理。/r/n⑩/r/n严格执行安全治理制度。强化现场文明施工,及时发觉和妥善处理突发事件。/r/n2/r/n项目副经理/r/n①/r/n负责了解和掌握分管部门职能的实施情况,负责检查本项目质量打算在职责范围内的实施效果,对质量体系运行状况提出改进意见;/r/n②/r/n依照项目部分工,由副经理负责分管质量部门的质量打算的落实情况。/r/n3/r/n技术负责人/r/n①/r/n贯彻执行公司质量手册、程序文件和有关技术治理规定,组织实施公司规定的技术改造和科技攻关打算,组织制定本项目有关质量治理方法。/r/n②/r/n组织项目质量打算、实施性施工组织设计、施工方案的编制,确定本项目的专门过程和关键过程,组织制订专门操纵措施,并确定作业指导书的编写分工和工艺标准、工法的引用,指导各级人员做好质量记录;/r/n③/r/n负责项目质量体系的有效运行,对施工过程中产生的不合格品进行操纵和处理,制定并组织实施纠正和预防措施,指定专人跟踪检查验证;/r/n④/r/n积极配合内、外质量体系审核,负责审核中不合格项纠正措施的落实;/r/n⑤/r/n负责项目部工程技术、质量治理等人员素养的培养,监督检查其履行质量职责。/r/n4/r/n施工员/r/n①/r/n在项目经理领导下负责项目的现场施工治理,对施工现场出现的一些施工问题负要紧责任。
/r/n②/r/n审查施工图并参加施工图的会审工作,学习掌握和贯彻工程施工中的各项操作规程、规范和标准,并严格按照施工图、规范、规程、标准和专项施工方案要求组织施工。/r/n③/r/n编制施工现场的进度打算,编制相应材料、周转材料、施工人员、机械设备使用打算,并报项目经理核准后实施。
/r/n④/r/n协助项目经理做好对分包单位的施工技术要求、质量要求、安全文明施工要求、现场治理要求等的交底工作,并经常性的检验与督促。/r/n⑤/r/n贯彻执行上级相关部门下达的各种指令,贯彻设计变更,材料代换,绘制施工大样。如实记录好施工日志。/r/n⑥/r/n负责对施工现场存在的质量、安全、环保、文明施工等方面的事故隐患和问题进行检查和整改。/r/n⑦/r/n协助项目经理解决施工中遇到的各类问题。配合质检人员对分部、分项工程进行检查验收,把好质量关。参加分部分项工程的隐蔽验收,中间验收和质量评定工作。/r/n⑧/r/n将在施工过程中形成的各种技术资料,及时、如实、完整的整理建档,并做好施工技术总结。按标准完成进度要求。/r/n⑨/r/n完成领导交办的其他工作。/r/n5/r/n质检员/r/n①/r/n在项目经理领导下负责对工程施工质量进行监督治理和检查验收工作,对施工现场的质量治理工作负要紧责任。/r/n②/r/n协助项目经理做好对分包单位的施工技术要求、质量要求及项目部执行制度等的交底工作,并经常性的检查和整改。
/r/n③/r/n监督检查各分包单位,做好自检、互检、交接检,对分部、分项工程应跟班进行质量检查和验收。发觉问题及时处理,严格操纵工程质量。/r/n④/r/n负责技术资料的监督、检查及收集,负责技术质量资料的完善与工程施工质量目标的完成。
/r/n⑤/r/n参加隐蔽工程验收和分项工程技术复核工作,检查评定分项工程质量等级,及时办理有关质量检查记录手续。
/r/n⑥/r/n严格按施工技术、质量交底要求对违章现象进行及时制止和处罚,检查督促质量整改的落实情况,参加工程质量事故的调查分析工作,提出处理意见和防范措施。/r/n⑦/r/n完成领导交办的其他工作。/r/n⑧/r/n参加对质量事故的调查、分析、处理、总结、上报等工作。/r/n6/r/n安全员/r/n①/r/n在项目经理领导下负责对项目的安全治理,对施工现场的安全工作负要紧责任。/r/n②/r/n贯彻执行国家、地点有关部门关于安全的方针政策、规范、制度的规定,坚持/r/n“/r/n安全第一,预防为主/r/n”/r/n的方针。/r/n③/r/n协助项目经理做好对分包单位的安全生产要求、文明施工要求、现场治理要求等交底工作,并经常性的检查整改。/r/n④/r/n认真检查督促施工现场的文明施工布置、安全生产的劳动爱护及各项安全规定的落实。/r/n⑤/r/n参加施工方案中安全文明施工技术措施条款的拟定工作,检查督促条款的实施,负责安全措施标识的治理和使用。/r/n⑥/r/n负责项目的安全检查,并做好检查记录,严格按安全文明施工交底和项目制度要求执行,对违章现象进行制止和处理,并做好记录。/r/n⑦/r/n对进入施工现场的施工人员进行安全教育工作。严格按有关规定要求对进出工地的人员进行登记治理。/r/n⑧/r/n参加对工伤事故的调查、分析、处理、总结、上报等工作。/r/n⑨/r/n完成领导交办的其他工作。/r/n7/r/n资料员/r/n①/r/n认真贯彻执行公司的各项治理规章制度,建立健全工程资料治理记录。按工程进度同步收集、整理施工技术资料,并按有关规定编目、建档。/r/n②/r/n负责做好工程项目的各种会议记录,并负责整理好交参会人员签章完整后存档和分发各与会人员。/r/n③/r/n负责整理施工资料,确保资料的真实性、完整性和有效性。负责施工资料的治理、归档和移交。/r/n④/r/n贯彻执行公司文件和资料的有关治理方法,保证本项目部文件和资料治理有序。/r/n⑤/r/n负责项目部文件和资料的发放、回收、借阅、传阅等工作。建立健全文件和资料有效操纵和各种记录,防止文件和资料损坏、丢失。/r/n⑥/r/n负责及时收集到场材料的合格证、质检资料,并负责到场材料的及时抽样复检和施工抽样试件的及时送检工作,及时跟踪回收送样试件的试验报告。为各种验收及时预备好资料。/r/n⑦/r/n在工程竣工验收前,及时按有关规范要求收集、整理、装订好检验批、分部分项验收、竣工图等竣工档案资料,协助项目经理作好竣工验收预备。/r/n⑧/r/n完成领导交办的其他工作。/r/n8/r/n核算员/r/n①/r/n严格遵守国家和公司的成本开支范围和费用开支标准,结合公司生产经营特点和治理要求,制定成本核算方法。/r/n
/r/n②/r/n依照公司生产经营打算编制成本、费用、利润等打算,并将指标分降落实,确保打算实现。/r/n
/r/n③/r/n按照成本核算方法的规定,确定成本核算对象,正确归集、分配生产费用。/r/n
/r/n④/r/n按时编制产品成本、费用报表。对比成本打算找出成本升降缘故,提出降低成本、费用的途径,加强成本治理。/r/n
/r/n⑤/r/n协助有关部门定期对产成品进行盘库,核对产成品库存情况。/r/n
/r/n⑥/r/n开展班组群众性核算,落实经济责任制。/r/n
/r/n⑦/r/n完成领导交办的其他工作。/r/n二、治理工作流程图/r/n开始/r/n作业打算书/r/n作业打算书/r/n作业技术讲明书/r/n作业技术讲明书/r/n作业质量标准书/r/n作业质量标准书/r/n作业打算时限/r/n作业打算时限/r/n下发到作业队/r/n下发到作业队/r/n作业队执行/r/n作业队执行/r/n质量否决/r/n质量检查/反馈/r/n/r/n完成通过/r/n/r/n/r/n完成/r/n三、人员安排/r/n和培训/r/n1、项目经理1人/r/n2、项目副经理1人/r/n3、技术负责人1人/r/n4、施工员1人/r/n5、质检员1人/r/n6、安全员1人/r/n7、资料员1人/r/n8、核算员1人/r/n9、生产操作人员:绿化工等200人以上(依照季节、工作程度相应调整)。/r/n一、内部治理系统和服务系统/r/n
/r/n(一)绿地景观机构设置:在公司领导下的治理部,对景观实行主任负责的垂直指挥与职能部门的监督专业职能相结合治理体制,有关专业性部门充分发挥服务、协调、保障的作用。/r/n
/r/n(二)在内部运作流程中,坚持全过程治理,保证指挥、监督的封闭性。各职能部门各司其职,做好服务、监督、指导、协调工作。/r/n
/r/n二、养护治理部治理和服务系统/r/n
/r/n(一)治理和服务系统的组织原则是精干高效、一专多能。治理部实行主任领导下的治理部负责制,实行股份公司职能部门整体治理与分片治理的治理方式;/r/n
/r/n(二)绿地治理部实行内部垂直治理。设专职项目负责人1名,为治理层。要紧职责是依据岗位职责,对全面工作的指挥、协调、检查、校正、总结。不设中间环节,以提高工作效率。保洁、绿化、维护主管各1人。绿化主管协助主任落实具体工作事项。不设治理部门。其他为作业层实施服务工作的全过程。治理部实行365天工作日,节假日由主任、各主管轮值处理日常事务,夜间由男性治理人员轮流值班。/r/n
/r/n(三)护卫治理队长由维护主管分管,护管队负责景区的治安执勤巡逻与消防治理,处理各种突发事件和调解各类纠纷,提供便民服务。实行365天24小时轮休工作制;/r/n
/r/n(四)保洁队由保洁主管分管,负责公园环境爱护、道路和水面的清洁卫生,垃圾收集和通缉出运工作。设专职人员负责水面卫生保洁工作;保洁人员6天工作轮休制,实行365天工作制;/r/n
/r/n(五)绿化队由绿化主管分管,专职负责景区的绿化治理养护(浇水、施肥、病虫害防治、除草、修剪、补种等)。实行6天工作制;/r/n
/r/n(六)工程维修由维护主管治理,负责公共建筑、共用部位、公共设施设备、景区小品的维修维护。配备通信工具,实行365天值守。/r/n
/r/n三、人员编制和治理服务系统:/r/n
/r/n(一)治理人员(4名):专职项目负责人1名,保洁、维护、绿化主管各1名;/r/n
/r/n(二)专职养护队伍成员(26名):电工1名,驾驶员2名,保洁员8名,保安4名,绿化11名(其中造型树2名、绿化普工9名);维修人员不定编,由本公司专业维修人员定期检查,统一安排。/r/n
/r/n(三)公司ISO2000质量标准和项目的实际情况,科学、合理的设置机构和安排人员,力求实现物业治理各项目标,本着"精干、合理、高效,以岗定人"的原则确定人员编制。/r/n职员培训打算/r/n一、目的/r/n
/r/n规范职员培训程序和内容,确保职员培训系统化、规范化,使职员具备工作需要的知识和技能。/r/n
/r/n二、适用范围/r/n
/r/n适用于园林绿化全体职员的培训。/r/n
/r/n三、职责/r/n
/r/n1、公司经理负责监督及抽查培训实施情况,验证培训效果及对外联系培训教师。/r/n
/r/n2、园林绿化主管负责制定年度培训打算,并负责具体组织实施。/r/n
/r/n3、班组长及园艺师、技术员负责协助主管进行职员培训。/r/n
/r/n四、程序要点/r/n
/r/n1、培训打算的制定/r/n
/r/n1)园林绿化主管于每年的12月15日前做出下年度的职员培训打算,并上报公司审批。/r/n
/r/n2)职员培训打算必须符合以下要求:/r/n
/r/n符合国家及公司的规章制度;有具体的实施时刻;有明确的培训范围;有考核的标准;有培训经费的预算。/r/n
/r/n2、新职员的培训/r/n
/r/n1)入职的第一天,由绿化领班负责介绍部门工作性质、内容、公司的差不多情况、部门的差不多动作程序,带领新职员熟悉工作环境。/r/n
/r/n2)第二天,由部门主管培训学习公司的规章制度、安全知识、相关岗位责任、作息时刻、职员服务标准、奖惩规定等。/r/n
/r/n3)第三天,由园艺师及技术员结合岗位实际工作进行常规技术培训。/r/n
/r/n4)从第四天起,由主管安排到各相关岗位,由原岗位的老职员进行以老带新的岗位实际操作培训,每个岗位约两天。/r/n
/r/n5)轮岗结束后进行理论与实操考试,不合格的辞退;合格的依照实际能力定岗,由主管填写新职员情况汇报,上报公司领导及人事部。/r/n
/r/n3、物业治理知识的培训/r/n
/r/n1)全体职员参加由公司统一安排的专项物业治理知识培训及物业治理ISO9000质量治理体系知识培训。/r/n
/r/n2)物业治理知识的培训每半年至少安排一次,每次培训时刻许多于两小时。/r/n
/r/n3)职员经培训后参加由公司统一举办的考核。/r/n
/r/n4、园林绿化专业知识培训/r/n
/r/n1)剪草培训:/r/n
/r/n草坪分级标准;常用的剪草机器及使用范围;剪草频度及留茬高度;常用机械使用方法及注意事项;行走方法;草边及花木周围草地修剪方法;坡地草坪的修剪方法;过度过密草坪的修剪方法;坡地草坪的修剪方法;现场操作示范及其他相关知识。/r/n
/r/n2)花木种养培训:/r/n
/r/n时花播种、栽培技术;观叶植物生殖及种养;苗木的常用生殖方法技术;华南地区常用观赏植物及其栽植;盆景的养护治理方法。/r/n
/r/n3)施肥原理与技术培训:/r/n
/r/n常见肥料分类及其习性;各种花木施肥周期;施肥时刻及技巧;施肥注意事项;肥害推断及抢救方法。/r/n
/r/n4)日常养护培训:/r/n
/r/n淋水;巡查及清枯黄叶、残花、杂物;杂草防除;日常修剪;花木基地日常治理。/r/n
/r/n5)病虫害防治培训:常见病害辩不及其防治方法;常见虫害辩不及其防治方法;常用农药及其防治对象;农药使用方法及注意事项;室内外喷药方法;病虫害的综合防治方法。/r/n
/r/n6)乔灌木及绿篱修剪培训:/r/n
/r/n绿篱修剪方法技巧及注意事项;造型花木修剪方法技巧及注意事项;乔木修剪方法技巧;月季修剪及花木基地花抹芽方法技巧。/r/n
/r/n7)环境布置培训:/r/n
/r/n室内花木摆放、更换;会场、展场、舞台布置;花坛花境布置设计;小型园林景观的设计施工。/r/n
/r/n8)插花艺术培训:/r/n
/r/n东方插花特点与插制技巧;西方插花特点与插制技巧;现代插花的特点与插制技巧;插花的配色原理;花蓝的制作方法;花束的制作方法;家庭插花的服务程序与要求;切花的进花标准及保鲜方法;花店的治理与日常动作程序。/r/n
/r/n9)绿化工程施工治理与验收培训:/r/n
/r/n图纸审核培训;园林工程预算、决算培训;园林施工现场治理培训;花木验收标准及注意事项;新栽花木的治理;绿化工程的标准要求;绿化工程验收标准;绿化工程验收接治理程序。/r/n
/r/n10)机械使用与维修保养培训:/r/n
/r/n旋刀剪草机使用及维修保养;滚筒剪草机的使用及保养;割灌机的使用及保养;绿篱机的使用及保养;高压喷药机的使用及保养;常见机械故障推断及维修方法;/r/n
/r/n11)花木出租出售培训:/r/n
/r/n花木进货及出售质量标准;花木定价方法;出租出售手续;与顾客打交道注意事项。12)外观参观学习。/r/n
/r/n5、其他方法培训:凡公司统一安排的培训,按照公司的安排参加培训。/r/n
/r/n6、培训频率/r/n
/r/n1)园林绿化专业知识培训每周进行一次,每次两小时,时刻定于每周三下午1:00/r/n—/r/n3:00点。/r/n
/r/n2)物业治理知识培训至少每半年进行一次,时刻由公司统一安排。/r/n
/r/n7、培训成果考核/r/n
/r/n1)笔试考核方法。要紧用于理论性较强的专业知识如植物病虫害知识及物业治理知识,培训主讲人在培训完后的五天内出一套题进行闭卷考试,其成绩视理论重要性点培训成绩的30%~60%,成绩长期存档于园林绿化部,作为职员绩效考评的依据之一。/r/n
/r/n2)实际操作考核方式。用于操作性较强的内容如机器操作等,由该内容培训主讲人员在培训结束后的一周内亲自到现场监督评分,其成绩占培训成绩的30%~70%,成绩存档于园林绿化部,作为职员绩效考评的依据之一,关于一些安全要求较高的内容如机器操作等,如实际操作只是关不同意上岗。/r/n
/r/n3)总结报告方式。用于外出参观学习类培训的考核。/r/n
/r/n4)考核不合格的处理/r/n
/r/n新入职职员考核不合格者立即予以辞退。关于考核不合格的老职员,按公司有关规定给予一定的惩处警告,并集中安排补考,需重新培训的,其培训费用由本人出。若经第一次补考不合格,降一级工资并给予第二次补考;第二次补考不合格者将视其工作能力及责任调动工作岗位,按新岗位新入职职员的标准调低工资,并在半个月内对其在新岗位工作进行考核,不合格者予以辞退;若原岗位已为最低薪水岗位的,应给予辞退。/r/n
/r/n8、培训记录每次培训及考核完毕,由部门主管填写《培训记录表》及《培训成绩登记表》,记录报人事部作为职员绩效考评、工作或工资调动及晋升依据之一。/r/n四、劳动力季节安排表/r/n月份/r/n人数/r/n1月/r/n2月/r/n3月/r/n4月/r/n5月/r/n6月/r/n7月/r/n8月/r/n9月/r/n10月/r/n11月/r/n12月/r/n42/r/n42/r/n200/r/n200/r/n200/r/n200/r/n200/r/n200/r/n200/r/n200/r/n200/r/n42/r/n五、项目部建立的规章制度/r/n1、职员守则/r/n2、职员考勤制度/r/n3、职员过失行为处理方法/r/n4、职工岗位责任制/r/n5、安全治理制度/r/n6、设备治理制度/r/n7、技术质量治理制度/r/n8、财务治理制度/r/n9、合同治理制度/r/n10、质量治理制度/r/n11、三规一制/r/n第/r/n二/r/n章总体施工方案、绿化服务/r/n整体设想及策划/r/n一、园林绿化养护技术措施/r/n1.园林树木/r/n1.1土肥治理/r/n1.1.1/r/n植物生长季节要适时进行中耕除草。采纳化学药剂除草时,应先试验再应用。/r/n1.1./r/n2/r/n应依照树木长势、土壤肥力情况,合理施肥,平衡土壤中各种矿质营养元素,保持土壤肥力和合理结构。分春、秋两季进行,每年1-2次。乔木施肥量为1公斤/株,灌木施肥量为0.5公斤/株。/r/n/r/n①/r/n休眠期施肥以有机肥为主,采纳穴施、环施和放射状沟施等方法。/r/n/r/n②/r/n生长季节可依照需要,进行土壤追肥或叶面喷肥。/r/n/r/n③/r/n施肥用量要准确,应依照树龄、肥料种类及土壤肥力状况而定。施后浇水,严禁肥料裸露。/r/n1.2水分治理/r/n1.2.1/r/n应依照本地区气候特点、树木习性、栽植年限等情况,适时适量进行浇水,促其正常生长。/r/n/r/n①/r/n春季,返青水,一般于3月中旬-5月上旬左右进行灌水。/r/n/r/n②/r/n生长期灌水,依照树木不同生理时期需水量进行灌水。/r/n/r/n③/r/n休眠期灌水,一般于11月底至12月初进行灌水。/r/n/r/n④/r/n在雨季可采纳开沟、埋管、打孔等排水措施及时对绿地和树穴排涝,防止植物因涝至死。/r/n/r/n⑤/r/n水车浇灌要使用软管,禁用高压水流浇灌,以保证灌溉效果。/r/n/r/n⑥/r/n使用喷灌时要保证浇透浇到边,并由专人看管。/r/n/r/n⑦/r/n使用中水灌溉时,水质必须符合园林植物灌溉水质要求。/r/n/r/n⑧/r/n在雨季可采纳开沟、埋管、打孔等排水措施及时对绿地和树池排涝,防止植物因涝而死。绿地和树池内积水不得超过24小时,宿根花卉种植地积水不得超过12小时。/r/n1.3修剪/r/n1.3.1/r/n修剪原则应依据绿地景观要求和树木生长特性,制定修剪技术方案。充分考虑树木与生长环境的关系,并依照树龄及生长势强弱进行修剪。/r/n1.3.2/r/n修剪时期/r/n/r/n①/r/n园林树木可在休眠期和生长期进行修剪,但更新修剪必须在休眠期进行。/r/n/r/n②/r/n严峻伤流和易流胶的树种应避开生长季和落叶后伤流严峻期。/r/n/r/n③/r/n抗寒性差、易抽条的树种宜于早春进行。/r/n/r/n④/r/n常绿树修剪应避开生长旺盛期。/r/n1.3.3/r/n乔木修剪(1-2次/年)/r/n/r/n①/r/n常绿乔木应保持其自然树形和主尖直立向上生长,及时疏除过密枝、干枯枝和病虫枝,并通过修剪改造偏冠树。/r/n/r/n②/r/n落叶乔木依照不同树种及立地条件进行修剪,常见树形有中央领导干形、杯状形、自然快乐形等。/r/n/r/n③/r/n行道树修剪,还应注意以下规定:/r/n(1)行道树的树型和分枝点高度应差不多一致,分枝点高度最低标准为/r/n2.8m/r/n。/r/n(2)树木与架空线有矛盾时,应修剪树枝,使其与架空线保持安全距离。/r/n(3)在交通路口/r/n30m/r/n范围内的树冠不能遮挡交通信号灯。/r/n(4)路灯和变压设备附近的树枝应与其保留出足够的安全距离。/r/n1.3.4/r/n灌木修剪(1-2次/年)/r/n/r/n①/r/n保持灌木原有树形,适量疏剪内膛小枝,适当短截强壮枝,完全疏除下垂枝、细弱枝。/r/n/r/n②/r/n生长于树冠外的徒长枝,应及时疏除或早短截,促生二次枝。/r/n/r/n③/r/n花落后形成的残花、残果,若无观赏价值或其他需要的宜尽早剪除。/r/n/r/n④/r/n造型灌木应保持外形轮廓清晰,外缘枝叶紧密。/r/n/r/n⑤/r/n花灌木修剪应特不注意:/r/n(1)春季先花后叶的灌木(如紫荆、贴梗海棠等),应于开花后进行春梢修剪,春梢留芽以3~5个为宜。/r/n/r/n(2)夏秋季开花的灌木(如木槿、紫薇、珍宝梅、月季等)应在早春芽萌动前修剪,保留3~5个芽为宜。一年中数次开花的(如月季、珍宝梅等)花后要复剪,促进再次开花。/r/n(3)具有蔓生、匍匐生长习性的花灌木(如连翘、迎春),以疏剪为主。/r/n1.3.5/r/n绿篱、色块(2-3次/年)/r/n/r/n①/r/n依照绿篱、色块设计方案,使绿篱及色带轮廓清晰,线条整齐,顶面平坦,高度一致。侧面上下垂直或呈梯形。/r/n/r/n②/r/n球型绿篱修剪应保持外轮廓圆滑。/r/n/r/n③/r/n绿篱及色块每年第一次修剪操纵一定高度,以后每次修剪高度较前一次修剪提高/r/n1cm/r/n。/r/n/r/n④/r/n每年整形修剪最少2次以上。/r/n/r/n⑤/r/n修剪后残留绿篱面的枝叶应及时清除洁净。/r/n1.3.6/r/n攀缘植物/r/n/r/n①/r/n吸附类藤木,应在生长季剪去未能吸附墙体而下垂的枝条,未完全覆盖的植物应短截空隙周围枝条,以便发生副梢,填补空缺。/r/n/r/n②/r/n钩刺类藤木,可按灌木修剪方法疏枝;生长到一定程度,树势衰弱时,应进行回缩修剪,强壮树势。/r/n/r/n③/r/n生长于棚架的藤木,落叶后应疏剪过密枝条,清除枯死枝,使枝条均匀分布架面。/r/n/r/n④/r/n成年和老年藤木应常疏枝,并适当进行回缩修剪。/r/n1.3.7/r/n园林树木修剪时应注意:/r/n/r/n①/r/n落叶树一般不留橛,针叶树应留1~/r/n2cm/r/n长的橛。/r/n/r/n②/r/n修剪的剪口必须平滑,不得劈裂,并注意留芽的方位。/r/n/r/n③/r/n直径超过/r/n4cm/r/n以上的剪锯口,应用刀削平,涂抹防腐剂促进伤口愈合。/r/n/r/n④/r/n锯除大树杈时应注意防止劈伤。/r/n1.4病虫害防治(3-5次/年)/r/n1.4.1/r/n贯彻/r/n“/r/n预防为主,综合治理/r/n”/r/n的方针。6-8月份为该地区虫害高发期,要紧虫害有天牛、红蜘蛛、介壳虫等,采纳甲胺磷、氧化乐果、多菌灵等药物按照比例进行防治;6-8月份气温增高同时也是病害高发期,如国槐茎腐病,采取涂白、刷石硫合剂、涂梳理剂等防治和预防。加强病虫检查,做好虫情预报和记录,及时采取防治措施。关于危险性病虫害,一旦发觉疫情应及时上报主管部门,并迅速采取扑灭措施。/r/n1.4.2/r/n科学养护,保持植株生长健壮,增强抗病虫能力。及时清理带病虫的落叶、杂草等,消灭病源、虫源,防止病虫扩散、蔓延。/r/n1.4.3/r/n物理防治。要紧包括饵料诱杀、灯光诱杀、潜所诱杀、热处理、截止上树、人工捕捉、挖蛹或虫、摘除卵块虫包、刷除虫或卵、刺杀蛀干害虫、摘除病叶病梢、刮除病斑、结合修剪剪除病虫枝等。/r/n1.4.4/r/n生物防治。应爱护和利用天敌,制造有利于其生存进展的环境条件。具体方法要紧包括以微生物治虫、以虫治虫、以鸟治虫、以螨治虫、以激素治虫,以菌治病虫等。/r/n1.4.5/r/n化学防治/r/n/r/n①/r/n应选用高效、低毒、无污染、对天敌较安全的药剂。应抓住时机,对症下药、安全用药,不得随意加大浓度。尽量采取兼治,减少喷药次数。/r/n/r/n②/r/n选用新药剂和新方法时,应经试验证明有效和安全时,才能大面积推广应用。/r/n1.4.6/r/n操作人员必须按照《技术操作规程》进行作业。/r/n1.5其他治理/r/n1.5.1/r/n防寒、防风/r/n/r/n①/r/n适时浇灌返青水和冻水,浇足浇透。科学修剪,使树木枝条充分木质化,有效操纵病虫害的发生,提高抗寒能力。/r/n针对出现极端天气,在冬季进行防寒爱护、搭设风障、加固支撑、增加纤绳,并每日专人巡视、做好巡视记录,制定相应的应急预案。/r/n/r/n②/r/n树木防寒应采取以下措施:/r/n(1)树体防寒。对耐寒、耐旱、抗风能力差的边缘树种搭设风障。/r/n(2)主干防寒。对耐寒性差且树皮较薄的树种采取主干包裹防寒物加绕草绳等防寒措施。/r/n(3)树干涂白。用石灰水加石硫合剂对主干涂白,可反射阳光,降低树体昼夜温差,幸免树干冻裂。还可杀死在树皮内越冬的害虫。涂白要均匀,不可漏涂,一条干道上的树木或成片成群树木,涂白高度要一致。/r/n1.5.2/r/n树木更新及伐移/r/n/r/n①/r/n移植苗木采取苗木爱护性移植、灌水、修剪、生根粉、保水剂等措施,并有专人记录,确保其长势。/r/n/r/n②/r/n密植林或枯朽、衰老、严峻倾斜、对人和物体构成危险的树木要及时进行伐移。/r/n/r/n③/r/n伐移树木时,要划定安全范围并围拦,严格执行操作规程,确保安全。/r/n2色带、露地花卉/r/n2.1色带/r/n2.1.1/r/n色带用苗及时分栽,适时浇水、施肥、打尖修剪,清除残花败叶,及时清理死苗,并按原品种、原规格补齐,保持景观效果。年浇水8-10次;/r/n2.2宿根花卉/r/n2.2.1/r/n萌芽前应剪除上年残留枯枝、枯叶,注意返青水和冻水的浇灌时期和灌水量,年10-20次。/r/n2.2.2/r/n及时中耕除草,作业时不能伤根及造成根系裸露,宿根花卉萌芽期应特不注意爱护新生嫩芽,同时及时剪除多余萌蘖。年修建2-4次。/r/n2.2.3/r/n花谢后应及时去除残花、残枝和枯叶,并加强肥水治理。做好病虫害的防治工作,年3-5次。/r/n2.2.4/r/n对不耐寒的宿根花卉应采取覆土、覆膜等不同防寒措施,确保安全越冬。/r/n3草坪及地被植物/r/n3.1土肥治理(3-5次/年)/r/n3.1.1/r/n草坪建植时应施基肥,之后每年应依照草坪草的生长状况进行适当追肥。/r/n3.1.2/r/n施肥时期和施肥量:夏季草坪施化肥硫胺,溶解喷洒。/r/n3.1.3/r/n草坪施肥必须均匀,撒施后及时灌水。/r/n3.1.4/r/n叶面喷肥/r/n3.2水分治理(冷草20-25次/年;暖草10-15次/年)/r/n3.2.1/r/n除土壤封冻期外,人工草坪应适时进行浇灌,每次要浇足浇透,浇水深度不低于/r/n20cm/r/n。雨季应注意排水,上冻前要浇足浇透冻水。/r/n3.2.2/r/n严禁使用撒过融雪剂的积雪补充草坪土壤水分。/r/n3.2.3/r/n在使用中水灌溉时,水质必须符合园林植物灌溉水质要求。/r/n3.3修剪/r/n3.3.1/r/n草坪的修剪应依照不同草种的习性和观赏效果,进行定期修剪,使草的高度一致,边缘整齐。/r/n3.3.2/r/n剪草的高度以草种、季节、环境等因素而定。一次修剪高度原则上不大于草高的1/3。/r/n3.3.3/r/n草坪植物的修剪次数依不同的草种、不同的治理水平和不同的环境条件来确定:a)野牛草:全年修剪木少于5-8次,自5月至9月,最后一次修剪不晚于9月上旬。b)大羊胡子:差不多上能够不修剪,为提高观赏效果一年可修剪2次~3次。c)冷季型草:要定期及时修剪,使草坪高度保持在6厘米至10厘米,年8-10次。/r/n3.3.4/r/n清除杂草及枯草层:/r/n①/r/n草坪杂草随长随除,除早、除小,确保草坪效果。/r/n②/r/n疏松土壤,土壤板结时打孔松土输氧。枯草层厚度在/r/n1.5CM/r/n以上时,易产生病虫害,水不易渗入土壤,因此随时、及时清除枯草,有利草坪生长。/r/n3.3.5/r/n野草每年修剪1-2次。/r/n3.4病虫害防治(2-8次/年)/r/n3.4.1/r/n草坪及地被的病虫害防治,应在加强养护治理的基础上,以防为主,综合防治。/r/n3.4.2/r/n草坪及地被病害以冷季型草最为严峻。化学防治应在5月初开始,此后依照病情适时喷药。病害易发病期不管发病与否都应及时预防,一般需打药三次以上,有病早治,无病早防,将病害操纵在初发期,将危害降低至最低。/r/n3.4.3/r/n草坪及地被害虫要紧有:蛴螬、蚜虫、螨类、粘虫、淡剑袭夜蛾、地老虎、蜗牛、蛞蝓等,依照不同害虫发生规律,建好虫情监测、预报制度。视情况适时防治,不能出现因虫害造成大面积秃坪或死坪。其要紧防治方法参考相关规范。/r/n3.4.4/r/n草坪及地被病虫害防治技术操作必须按照《农药操作规程》进行作业。打药时刻在人少夜间或早晨打,减少对行人的危害,以生物为主的综合防治替代化学防治为主的措施。以虫治虫,以菌治虫,以鸟治虫,寻求安全有效无污染的新防措施。提高厂区道路绿色植物的生态效益,改善环境质量。/r/n3.5其他治理/r/n3.5.1/r/n除草及时清除有碍观瞻和阻碍草坪、地被植物生长的杂草。/r/n3.5.2/r/n防寒加强肥水治理,特不是返青水和冻水应适时浇灌,并浇足浇透。合理安排修剪时期和修剪量,有效操纵病虫害的发生,提高抗寒能力,确保草坪安全越冬。/r/n4水生植物/r/n4.1水生植物按其生活方式和形态差异分为挺水型、浮叶型、漂移型及沉水型。/r/n4.2日常治理/r/n4.2.1/r/n要定期清除水中杂草,池底或池水过于浑浊时,要换水或完全清理。每年应对池塘进行干塘作业,即入冬前排空池水,曝晒一个冬天。/r/n4.2.2/r/n水生植物定植前要在(要紧是挺水植物)种植池(盆)内放入新配营养土,培养土要头年堆制好的混合肥土,按1:1:1比例将廐肥、园土、塘泥调配,堆制1年以上使用,也可使用肥沃塘泥,池底施园林常规用基肥。在生长期内发觉植物叶片瘦弱发黄时,应塘叶面追肥(荷花等叶面有专门结构的植物除外)/r/n4.3病虫害防治及有害生物操纵/r/n4.3.1/r/n要经常检查有无病虫害,以预防为主,发病初期可使用常用杀虫杀菌剂喷杀,作业时应以塑料布围挡覆盖,以免污染水体。/r/n4.3.2/r/n在盛夏季节死水和池塘经常发生池水污染变色现象,这是由蓝藻、裸藻、绿藻及原生单细胞生物生长失去操纵所致,可使用生石灰、绿矾进行化学操纵。/r/n4.3.3/r/n在开放大规模水体中,有些漂移型、沉水型水生植物如凤眼莲、苦草等易生长过于繁盛,造成危害,必须采取人工清除、机械清除及化学清除相结合的方法加以操纵。/r/n5园林绿地治理要求/r/n5.1绿地卫生/r/n5.1.1/r/n每日进行绿地卫生检查,保持绿地内无垃圾杂物,及时清除/r/n“/r/n树挂/r/n”/r/n等白色污染物及绿地和水面的杂物。/r/n5.1.2/r/n清除垃圾杂物后应注意保洁,集中后的垃圾杂物和器具应摆放在隐蔽的地点,严禁焚烧垃圾和枯枝落叶。/r/n5.1.3/r/n应爱护好绿地内的花草树木,保持绿地的完整。/r/n5.2秩序治理/r/n5.2.1/r/n加强监管,严禁绿地内堆放杂物和停放与绿化作业无关的一切车辆;/r/n5.2.2/r/n严禁在绿地植物上贴挂标语、晾晒衣物等。/r/n5.2.3/r/n应保证围栏、护网、绿化供水及观赏、游艺等设施的完整美观,防止绿化用水等被盗用。/r/n二、绿化养护工作流程图/r/n春季(3、4月)/r/n春季(3、4月)/r/n天气回暖,土地逐渐解冻,各种植物先后萌动。进行春季植树。对新植和原有园林绿化植物养护治理要同时进行。其要紧工作内容是:/r/n浇水/r/n施肥/r/n病虫害防治/r/n剥芽去蘖/r/n撤除防寒物/r/n草坪修剪/r/n初夏(5、6月)/r/n气温上升,日照变长。各种植物先后开花,抽生新条,开始旺盛生长。植物需水量大。病虫害加速活动。杂草开始大量滋生。养护治理的要紧工作是/r/n浇水/r/n封堰/r/n锄杂草/r/n防治病虫害/r/n去蘖修剪/r/n花卉加强治理/r/n草坪追施/r/n雨季(7、8、9月)/r/n高温、多雨,树木、花灌木枝叶生长量大。各种树木具有一断长短不同的休眠期,这时期要紧维护治理的内容是:/r/n中耕除草/r/n修剪/r/n防治病虫害/r/n排涝抗旱/r/n叶面喷肥追肥/r/n花卉加强治理/r/n秋季(10、11月)/r/n气温降低树木逐渐停止生长,新梢逐渐木质化,树叶产生离层,逐渐脱落,这时期的要紧工作是:/r/n浇冻水/r/n施肥/r/n防寒/r/n防寒/r/n防治病虫害/r/n行道树树干涂白/r/n清扫树叶/r/n冬季(12、1、2月)/r/n土地封冻,绿地植物停止生长。要紧维护治理的工作内容是:/r/n树木花灌木整形修/r/n剪/r/n防寒/r/n防治病虫害/r/n大雪后结合扫雪给树木打雪、堆雪缓解春旱/r/n第/r/n三/r/n章施工网络打算及实现招标人质量目标的要紧措施/r/n绿地养护质量的检查验收以《/r/n园林绿化养护治理标准/r/n》和有关技术操作规程为要紧标准,对有专门要求的养护项目,则按照项目部拟定的技术措施进行检查验收。绿地养护技术质量的检查验收,采取逐级自检,逐级负责的方法。/r/n具体质量保证体系流程如下图所示。/r/n绿地/r/n绿地/r/n技术负责人对各作业队日常养护质量进行检查(每周许多于两次),并将检查情况填入《质量检查记录》,对月度养护情况最终/r/n检查验收/r/n项目部质检员/r/n对全项目部的养护治理每日进行自检,上述情况要有记录。/r/n对月度养护情况最终检查验收/r/n出现问题及时指出,并限期及时纠正/r/n作业队自行整改/r/n对项目部检查验收不合格项进行整改/r/n存档做为月考核依据/r/n下发整改通知单/r/n技术负责人验收合格/r/n质检员验收合格/r/n养护治理年月历表/r/n月份/r/n工作/r/n1/r/n月/r/n份/r/n2月份/r/n3月份/r/n4月份/r/n5月份/r/n6月份/r/n7月份/r/n8月份/r/n9月份/r/n10月份/r/n11月份/r/n12月份/r/n浇水/r/n修剪/r/n中耕除草/r/n病虫害防治/r/n施肥/r/n种植结构调整/r/n/r/n防寒/r/n防风/r/n绿地保洁/r/n其他/r/n倒伏树木的扶正/r/n打雪、堆雪/r/n巡视及保持绿地完整/r/n防涝/r/n防盐碱/r/n第/r/n四/r/n章施工安全体系目标及措施/r/n一、安全生产操纵措施/r/n、安全机构设置/r/n设一名专(兼)职安全员,负责具体的安全工作。生产作业队要设有安全员(或作业队长兼任),负责作业队的安全治理工作。/r/n、建立安全生产制度/r/n1、建立健全各级领导安全生产责任制。按照/r/n“/r/n安全机构设置/r/n”/r/n情况,完善各级领导安全生产责任制。分不为:主管经理职责、安全员职责、作业队长职责、作业队安全员职责。/r/n2、建立安全生产会议制度。经理部依照季节变化或重点绿化工作每月要召开一次会议,研究安全生产情况,解决安全工作中存在的问题,采取措施,确保安全生产。/r/n作业队每周要要组织一次安全专题会议,学习有关安全生产的文件;传达安全生产的有关会议精神:总结上周安全生产情况,提出安全生产措施和要求。/r/n每日布置生产任务的同时,布置安全工作。/r/n3、建立安全生产培训教育制度。新工人到京唐钢经理部从事绿化工作前,要通过经理部、作业队安全教育,考试合格后才能上岗作业。教育内容要紧是安全制度学习,现场环境与安全主意事项、安全操作规程等。/r/n对全体职工要进行定期安全教育和培训。每年要依照安全生产形势和有关方针政策对职工进行安全教育和培训。不断提高职工安全意识,自觉做好安全工作。/r/n4、建立安全生产检查制度。依照有关安全生产治理制度和领导要求,经理部每月要进行一次安全生产检查,作业队要进行当日安全检查,发觉安全隐患和问题要及时解决和处理。一时不能解决的要采取措施,保证安全。/r/n5、建立特种作业审批制度。从事电气焊操作必须办理动火手续,要经安全专业治理人员签批。从事有限空间作业也要办理相关审批手续。/r/n6、严格执行业主相关的安全生产治理制度。/r/n(三)、建立安全生产责任制度/r/n1、建立各级领导安全生产责任制。作业队长、专(兼)职安全员、经理部领导都要建立安全生产责任制,明确各自的安全责任,各负其责,确保安全生产。/r/n2、完善岗位安全操作规程。依照绿地养护操作人员配置情况,完善岗位安全操作规程,达到一岗一规程,人人有规程,达到熟知会用。/r/n3、建立机械设备安全操作规程。依照机械配备种类型号,建立安全操作规程,按规程操作使用机械,杜绝设备事故的发生。/r/n(四)、建立消防制度完善消防设施/r/n消防安全是生产安全的重要组成部分,京唐钢经理部要建立消防制度,配备消防设施和器材,保证消防安全。/r/n(五)、建立安全生产突发事故应急救援预案/r/n制定安全生产人身损害事故、设备事故、火灾事故等突发事故应急救援预案,把事故损失操纵在最小范围。/r/n二、安全保证体系流程图/r/n安全机构设置/r/n安全机构设置/r/n安全制度编制/r/n安全制度编制/r/n下发执行/r/n下发执行/r/n修改补充完善/r/n否/r/n修改补充完善/r/n贯彻执行/r/n贯彻执行/r/n检查执行情况/r/n检查执行情况/r/n第/r/n五/r/n章文明生产及环境爱护体系治理措施/r/n一、治理措施/r/n/r/n/r/n1/r/n、养护作业/r/n现场/r/n进出/r/n的车辆应有防遗漏物的遮盖措施,设专人/r/n清扫、洒水湿润工作,保持场内外的清洁。/r/n/r/n2.尽可能的人、机、材有序的安排/r/n,/r/n现场内整理洁净/r/n。/r/n3、/r/n运输车辆出/r/n作业/r/n地,应冲洗车轮,不得将泥土带出,污染/r/n厂区/r/n道路/r/n。/r/n4、绿化养护作业人员/r/n必须配戴统一/r/n劳动爱护用品及/r/n身份标识/r/n。/r/n5、绿化养护作业/r/n不得侵/r/n厂区/r/n内道路、堵塞排水沟渠、防碍安全/r/n防护设施和遮档安全标志。/r/n6、现场投入/r/n使用的机械设备、垂直运输设备、临时施工设施和安全防护设施,/r/n必须/r/n通过验收/r/n合格后/r/n方可投入/r/n使用。/r/n7、基地/r/n办公室,做到清洁卫生,文件资料存放有序,墙上的图表、文字张贴(悬挂)整齐牢固,文明办公。
/r/n8、/r/n施工现场必须指定专人供应卫生饮水;盛饮水的容器应有盖加锁,装有水龙头放水,冬季应保暖,夏季供清凉茶;盛饮水的容器每日清洗一次,不饮隔夜水;茶杯应有消毒溶液浸泡;
/r/n9、/r/n施工现场应建立环境爱护制度,采取措施操纵各种/r/n扬/r/n尘、废水、废弃物及噪声、振动对环境的污染和危害。
/r/n/r/n1/r/n0、/r/n施工和生活垃圾不得乱堆、乱倒,应指定地点堆入,/r/n并及时/r/n清运出场。
/r/n/r/n1/r/n1、作业现场/r/n不准焚烧垃圾/r/n及残枝落叶/r/n。
/r/n12、养护区域/r/n应制定“防火安全治理方法”,落实/r/n项目经理部/r/n、作业队、个人三级防火责任制,明确划分防火区、重点防火部位和防火安全责任,并落实到个人;规定动用明火申报程序和审批权限。
/r/n13、/r/n针对作业点可能发生火灾的性质配置足够数量的灭火器材并要教会作业人员/r/n熟练使用/r/n。
/r/n14、/r/n制定/r/n经理部/r/n的治安、保卫制度,积极与当地派出所和/r/n首钢京唐公司/r/n保卫/r/n部门/r/n联系,及时办理暂住证、务工证。经常进行打算生育治理检查,配合搞好治安治理。
/r/n15、/r/n制订作业队治安治理责任制,对各作业队成员进行法制教育,约束其不法行为,从而杜绝打架、盗窃等行为的发生。/r/n16、土方施工/r/n现场经常洒水,以减少/r/n扬/r/n尘污染。装卸有/r/n扬/r/n尘的材料时,要洒水湿润。/r/n17、/r/n合理安排夜间施工项目,有效操纵施工噪声,施工人员不得大声喧哗和撞击其它物件,减少人为的噪声扰民现象。/r/n18、建立定期噪音监测制度,发觉噪音超标,立即查找缘故及时整改。
19、制定环保文明施工条例,加强环保文明施工教育,提高全体施工人员的环保文明施工意识。/r/n
/r/n二、文明生产及环境爱护体系流程图/r/n制定规章制度/r/n制定规章制度/r/n教育落实/r/n教育落实/r/n班前布置/r/n班前布置/r/n定期检查与抽查相结合/r/n是/r/n定期检查与抽查相结合/r/n是否执行/r/n考核及处罚/r/n否/r/n考核及处罚/r/n/r/n第/r/n六/r/n章/r/n施工大型及要紧机具分时期配置表/r/n及材料需用打算/r/n一、投入要紧施工设备及机具表/r/n序号/r/n名称/r/n型号/r/n单位/r/n数量/r/n1/r/n洒水车/r/n东风6吨/r/n台/r/n1/r/n2/r/n运输汽车/r/n欧玛可2吨/r/n台/r/n3/r/n3/r/n打药车/r/n2吨/r/n台/r/n1/r/n4/r/n手推车/r/n台/r/n10/r/n5/r/n三轮车/r/n台/r/n20/r/n6/r/n剪草机/r/n日本/r/n台/r/n20/r/n7/r/n背式割灌机/r/n日本/r/n台/r/n40/r/n8/r/n油锯/r/n日本/r/n台/r/n2/r/n9/r/n高枝剪/r/n国产/r/n把/r/n40/r/n10/r/n绿篱剪/r/n国产/r/n把/r/n20/r/n11/r/n剪枝剪/r/n国产/r/n把/r/n100/r/n12/r/n铁锹/r/n把/r/n300/r/n15/r/n手锯/r/n把/r/n100/r/n16/r/n梯子/r/n个/r/n10/r/n二、/r/n材料需用打算/r/n鸡粪600吨、硫铵50吨、喷头500个、水管/r/n3000米/r/n、无纺布100卷、支撑杆3000根、8#铅丝/r/n200公斤/r/n、/r/n三、/r/n养护临建设施/r/n本项目现场总平面布置严格按照北京市建筑工地关于安全防护、文明施工以及对临时设施的要求来布置。考虑安全警示标志、必要的现场围挡、五板一图、场容场貌、材料堆放、现场防火以及垃圾清运等多方面问题,现场的邻舍和临时用电严格执行有关规定。/r/n现场设置的临时设施要便于装拆、移动,以便在阻碍施工时采取措施。/r/n依照现场实际情况,方便现场施工,并按紧凑、合理、有用、符合安全防火、便于治理,并满足该工程有关规定及文明施工要求的原则进行布置。合理利用场地,方便现场施工,并按节约、适用、装拆方便的原则进行设计。其结构形式按本地的气候、材料和工程的工期长短而定。/r/n设计和修建临时房屋时,遵守业主有关规定。材料堆放地、机械停放地、生活和办公区相互之间分开布置,尽量减少相互阻碍因素。/r/n临时供水、供电均以满足需要量、方便使用、安全为布置原则。临时供水管网布置遵循在保证不间断供水的情况下,管道铺设越短越好的原则。动力线路与照明线路分开布设。电源位置考虑在设备集中、负荷最大而输电距离又最短的地点。配电箱设置在便于操作的地点,并设有防雨、防晒设施。/r/n第/r/n七/r/n章/r/n应急预案/r/n一/r/n、/r/n应急预案/r/n1、首先应先成立应急抢险工作领导小组/r/n组长/r/n:/r/n技术负责人/r/n负责应急抢险工作的总指挥;/r/n/r/n副组长/r/n:/r/n项目负责人/r/n负责应急抢险工作的具体组织安排;/r/n/r/n后勤负责人/r/n负责应急抢险工作后勤物资的预备和调配;/r/n成员/r/n:/r/n突击任务组成员负责落实应急抢险工作的具体措施和现场指导、监督、跟踪/r/n;/r/n下设两个突击队具体负责现场抢险工作。/r/n2、应急抢险物资的预备/r/n在抢险工作开始之前/r/n必须充分预备所需物品。如应急灯、安全带、通信工具、安全帽和灭火器、应急标志、反光衣、雨衣、雨鞋、防腐剂、沙袋、烟雾弹等消防器材及应急药品。/r/n3、要紧抢险措施/r/n/r/n1/r/n/r/n加强对防洪、防风、抢险的工作宣传、培训/r/n/r/n使职员学会和掌握差不多的防范知识和处理技能/r/n/r/n一旦出现问题/r/n/r/n可随时有条不紊地参与工作。/r/n/r/n2/r/n/r/n经常检查管养绿地范围内、各职员宿舍等有无事故隐患。如乱拉电线、违章存放易燃、易爆物品等/r/n/r/n应及时采取积极、有效的措施予以整改。/r/n/r/n3/r/n/r/n完善必要的抢险工具/r/n/r/n保证抢险救灾物资的充足供应/r/n/r/n配备各种防火、/r/n防/r/n风、防洪器材及设备。/r/n/r/n4/r/n落实抢险责任人/r/n划分抢险/r/n地段,一旦遇有火灾、大/r/n风、洪水等突发/r/n事件,做到/r/n“/r/n早抢救、快出击/r/n”/r/n快速、有效地参加抢险工作。/r/n/r/n5/r/n
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 烟台理工学院《展示设计》2022-2023学年第一学期期末试卷
- 制定仓库相关法规遵循的计划
- 急救知识在学校教育中的推广计划
- 许昌学院《社会心理学》2021-2022学年第一学期期末试卷
- 三年级数学计算题专项练习汇编及答案
- 加强与高校合作的人才引进计划
- 班级行为规范的建立与实施计划
- 科技辅助教学应用指导计划
- 销售业绩提升的行动计划
- 美术课堂教学方法探究计划
- 慢性阻塞性肺疾病的早期筛查与干预
- 2024年企业招聘渠道优化方案
- 糖尿病人冬天养生知识讲座
- 成本计算与管理 第5版 课程思政教学材料 项目五 中国新能源汽车强势崛起
- 2024年内蒙古包头包钢集团招聘笔试参考题库含答案解析
- 2023年SQE供应商质量工程师年度总结及下年规划
- 2024年中国林业集团招聘笔试参考题库含答案解析
- 二 《微写作•抒发情感》(教学课件)-【中职专用】高二语文精讲课堂(高教版2023·职业模块)
- 2023劳动合同劳动合同法全文正规版
- “信息化”设备管理使用制度
- 【人才发展】新上岗干部的90天转身计划
评论
0/150
提交评论