文稿教案讲稿1_第1页
文稿教案讲稿1_第2页
免费预览已结束,剩余1页可下载查看

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

1、S Drafted Checked ReviewedApprovedBEFORSTAGECHENGGANG NUCLEARPHASE I(21000MW)文件编码 DOC.S Drafted Checked ReviewedApprovedBEFORSTAGECHENGGANG NUCLEARPHASE I(21000MW)文件编码 DOC. 厂房通风系统手System Manual-第 6 章 控制 Chapter 6第6.1 章 控制基准Chapter 6.1 Control Project文件类Sub-ItemEngineeringSBA:B:C:国家甲级工咨甲中广核工程设 Certif

2、icationNO:NationalAgradeengineeringCertificationNO:编ernal CP0905-X-NT-0000-is the property of CNPDC It must not be used、reproduced、transmitted or disclosed without the prior written permis of CNPDC 本文件之 属于中广核工程设计 。未获本公司 ,任何人不得擅自使用、 、传递或 该文件。SystemManual-DVK Chapter6-6.1ControlRev 版版日状编Drafted 校Check

3、ed 审Reviewed 批Approved 修改说明Modification-A竹SystemManual-DVK Chapter6-6.1ControlRev 版版日状编Drafted 校Checked 审Reviewed 批Approved 修改说明Modification-A竹Manual-DVK Chapter6-6.1ControlBCHENGGANG PHASE核厂房通风系统手册DVK- Fuel Building Ventilation System 6Chapter Manual-DVK Chapter6-6.1ControlBCHENGGANG PHASE核厂房通风系统手册

4、DVK- Fuel Building Ventilation System 6Chapter 6.1Chapter 6.1 Control CHINAAPR.,SystemManual-DVK Chapter6-6.1ControlRev 文件修SystemManual-DVK Chapter6-6.1ControlRev 文件修版日章页修改范围及依据ABEFOREFORSystemManual-DVK Chapter6-6.1ControlSystemManual-DVK Chapter6-6.1ControlRev 6 6.1CONTROL Chapter6-6 The DVK syste

5、m is operated and monitored from Chapter6-6 The DVK system is operated and monitored from KIC. The low flow exhaust may be initiated by alocal latching emergency push-Fans 001, 002, 003, 004 ZV and electrical tracing 005 RS iodine adsorber casing are d. They d by trainFan005 ZVandelectrical heater00

6、3RSareFan006ZVandelectrical heater002RS ared bytraind bytrainAirtight air operated d ers 071, 072, 073, 075, 077, 093, 095, 097, 099 VAI d by train A; 076, 078, 079, 094, 096, 098,100,101 VAI ared by train B. Their itions are automatically controlled in case of fuel building contamination and/or LOCA. They can be operated from the main control room by KIC.Airtight airoperated ers013VAI and014VAI drespectively bytrain andtrain B. Closing is performed automatically and opening is performed Ai

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论