下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、Boston Big Dig-BackgroundThe problemsBoston, Massachusetts had a world-class traffic problem, an elevated six-lane highway called the Central Artery that ran through the center of downtown. When it opened in 1959, the Central Artery comfortably carried about 75,000 vehicles a day. It has carried upw
2、ards of 200,000, quite uncomfortably, making it one of the most congested highways in the United States.And traffic wasnt the only problem the old Central Artery caused in Boston. The elevated highway (which displaced 20,000 residents when it was built) also cut off Bostons North End and Waterfront
3、neighborhoods from the downtown, limiting these areas ability to participate in the citys economic life. 1Boston Big Dig - SolutionsThe projects two major components: Replacing the six-lane elevated highway with an eight-to-ten-lane underground expressway directly beneath the existing road, culminat
4、ing at its northern limit in a 14-lane, two-bridge-crossing of the Charles River. After the underground highway opened to traffic, the crumbling elevated wasdemolished and in its placewill beopen space and modest development. The extension of I-90 (the Massachusetts Turnpike) from its former terminu
5、s south of downtown Boston through a tunnel beneath South Boston and Boston Harbor to Logan Airport. The first link in this new connection- the four-lane Ted Williams Tunnel under the harbor- was finished in December 1995. The new bridge replaced a deteriorating six lane double-deck bridge that was
6、demolished in spring 2004. 2The .75-mile underwater part of the 1.6 mile tunnel was built using a dozen steel tube sections, each longer than a football field, that were sunk into a trench on the Boston Harbor floor and connected togetherThe underwater portion of the tunnel is actually made up of tw
7、elve binocular shaped steel tubes.Now that connections to the Massachusetts Turnpike (I-90) and Route 1A are in place, use of the tunnel is open to all vehicles. Unlimited use of the tunnel for all began in mid-January 2003 upon the opening of the Mass Pike extension, which connects to the Ted Willi
8、ams Tunnel. Solutions - Ted Williams Tunnel3Boston Big Dig - Open SpacesNashua Street ParkThe Central Artery/Tunnel Project is creating about 40 acres of park and recreational space along the Charles River Basin. This aerial view shows the 2.5 acre Nashua Street Park, set to open in September. Open spa
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 大班玩球的班本课程设计
- 《全自动生产线质量监测故障诊断系统研究》
- 《新生代员工加班行为对员工满意度的影响研究》
- 播音配音课程设计思路
- 《基于ADDIE模型的单元教学设计实验研究》
- 校园汽车租赁合同协议
- 第一届董事会任期工作总结与合规审查
- 园林绿化工程资料管理内容与流程
- 产品销售和服务合同
- 电商平台运营服务合作协议
- 化工生产仿真综合实训报告
- 关于民宿管家培训
- 维保措施及方案设计流程
- 桥架及电缆敷设施工方案及流程
- 人工智能革命AI对全球劳动力市场的影响
- 第三单元名著阅读《经典常谈》-2023-2024学年八年级语文下册同步教学课件
- 人体解剖学与组织胚胎学说课讲解
- 预防艾滋梅毒乙肝培训课件
- 伯努利原理及其应用
- 建筑施工安全风险辨识风级管控(台账)清单
- 学前教育教研指导责任区制度
评论
0/150
提交评论