1、Boston Big Dig-BackgroundThe problemsBoston, Massachusetts had a world-class traffic problem, an elevated six-lane highway called the Central Artery that ran through the center of downtown. When it opened in 1959, the Central Artery comfortably carried about 75,000 vehicles a day. It has carried upw
2、ards of 200,000, quite uncomfortably, making it one of the most congested highways in the United States.And traffic wasnt the only problem the old Central Artery caused in Boston. The elevated highway (which displaced 20,000 residents when it was built) also cut off Bostons North End and Waterfront
3、neighborhoods from the downtown, limiting these areas ability to participate in the citys economic life. 1Boston Big Dig - SolutionsThe projects two major components: Replacing the six-lane elevated highway with an eight-to-ten-lane underground expressway directly beneath the existing road, culminat
4、ing at its northern limit in a 14-lane, two-bridge-crossing of the Charles River. After the underground highway opened to traffic, the crumbling elevated wasdemolished and in its placewill beopen space and modest development. The extension of I-90 (the Massachusetts Turnpike) from its former terminu
5、s south of downtown Boston through a tunnel beneath South Boston and Boston Harbor to Logan Airport. The first link in this new connection- the four-lane Ted Williams Tunnel under the harbor- was finished in December 1995. The new bridge replaced a deteriorating six lane double-deck bridge that was
6、demolished in spring 2004. 2The .75-mile underwater part of the 1.6 mile tunnel was built using a dozen steel tube sections, each longer than a football field, that were sunk into a trench on the Boston Harbor floor and connected togetherThe underwater portion of the tunnel is actually made up of tw
7、elve binocular shaped steel tubes.Now that connections to the Massachusetts Turnpike (I-90) and Route 1A are in place, use of the tunnel is open to all vehicles. Unlimited use of the tunnel for all began in mid-January 2003 upon the opening of the Mass Pike extension, which connects to the Ted Willi
8、ams Tunnel. Solutions - Ted Williams Tunnel3Boston Big Dig - Open SpacesNashua Street ParkThe Central Artery/Tunnel Project is creating about 40 acres of park and recreational space along the Charles River Basin. This aerial view shows the 2.5 acre Nashua Street Park, set to open in September. Open spa
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2024昌吉职业技术学院辅导员招聘笔试真题
- 2025年衢州龙游县机关事业单位招聘考试试题【答案】
- 2025年血液灌流吸附器合作协议书
- 2025年河北石家庄学院选聘事业单位工作人员考试试题【答案】
- 2025年梧州岑溪市选聘市区学校专任教师考试试题【答案】
- 2025年内江市隆昌市教育和体育局选拔教师考试笔试试题【答案】
- 工商联会员代表大会工作报告
- 2025年DH(DHP)离心压缩机项目合作计划书
- 2025年高纯超细石英粉项目建议书
- 2025年应用软件设计服务项目合作计划书
- GB/T 17619-1998机动车电子电器组件的电磁辐射抗扰性限值和测量方法
- GB/T 10560-2017矿用焊接圆环链用钢
- FZ/T 52025-2012再生有色涤纶短纤维
- 2023年山东铁路投资控股集团有限公司校园招聘笔试题库及答案解析
- 音标版中考必考英语1600单词
- 小学科学教育科学三年级上册水三上14《冰融化了》
- 机械制造企业隐患排查清单(公司级、车间级、岗位级)
- 夏季高温施工安全生产培训
- 纯净水及矿泉水厂可行性研究报告
- 援绝神丹_集成良方三百种_方剂加减变化汇总
- 中药饮片GMP认证检查指导原则
评论
0/150
提交评论