下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、Boston Big Dig-BackgroundThe problemsBoston, Massachusetts had a world-class traffic problem, an elevated six-lane highway called the Central Artery that ran through the center of downtown. When it opened in 1959, the Central Artery comfortably carried about 75,000 vehicles a day. It has carried upw
2、ards of 200,000, quite uncomfortably, making it one of the most congested highways in the United States.And traffic wasnt the only problem the old Central Artery caused in Boston. The elevated highway (which displaced 20,000 residents when it was built) also cut off Bostons North End and Waterfront
3、neighborhoods from the downtown, limiting these areas ability to participate in the citys economic life. 1Boston Big Dig - SolutionsThe projects two major components: Replacing the six-lane elevated highway with an eight-to-ten-lane underground expressway directly beneath the existing road, culminat
4、ing at its northern limit in a 14-lane, two-bridge-crossing of the Charles River. After the underground highway opened to traffic, the crumbling elevated wasdemolished and in its placewill beopen space and modest development. The extension of I-90 (the Massachusetts Turnpike) from its former terminu
5、s south of downtown Boston through a tunnel beneath South Boston and Boston Harbor to Logan Airport. The first link in this new connection- the four-lane Ted Williams Tunnel under the harbor- was finished in December 1995. The new bridge replaced a deteriorating six lane double-deck bridge that was
6、demolished in spring 2004. 2The .75-mile underwater part of the 1.6 mile tunnel was built using a dozen steel tube sections, each longer than a football field, that were sunk into a trench on the Boston Harbor floor and connected togetherThe underwater portion of the tunnel is actually made up of tw
7、elve binocular shaped steel tubes.Now that connections to the Massachusetts Turnpike (I-90) and Route 1A are in place, use of the tunnel is open to all vehicles. Unlimited use of the tunnel for all began in mid-January 2003 upon the opening of the Mass Pike extension, which connects to the Ted Willi
8、ams Tunnel. Solutions - Ted Williams Tunnel3Boston Big Dig - Open SpacesNashua Street ParkThe Central Artery/Tunnel Project is creating about 40 acres of park and recreational space along the Charles River Basin. This aerial view shows the 2.5 acre Nashua Street Park, set to open in September. Open spa
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2026天津市河西医院招聘1人备考题库及答案详解(全优)
- 2026SKAO国际组织职员招聘 (第2批)备考题库附答案详解(黄金题型)
- 2026湖北教师招聘统考钟祥市招聘15人备考题库及答案详解(名校卷)
- 海信全球营销中心2027届实习生招聘备考题库及答案详解(名师系列)
- 潍坊市公开招聘2026届山东省公费师范毕业生备考题库(82人)含答案详解(巩固)
- 2025年福建南平武夷云无人机有限公司人员招聘1人笔试备考题库及答案解析
- 2025年河北衡水市卫生健康委选聘工作人员14人考试模拟试题及答案解析
- 立足文化理解锻造思维品质-九年级英语下册Unit 2 Integrated skills Study skills深度教案
- 2026河北正定二五六医院行政职能后勤部门实习生招募农业考试备考题库及答案解析
- 2026年湖北省孝感市孝南区农村义务教育学校教师公开招聘10人农业笔试模拟试题及答案解析
- 心房颤动单病种质控查检表
- 食用菌育种教材 第2章 蕈菌的性及交配系统(4学时)
- SMT PCBA周转、存储作业指导书V1.0
- GB/T 4209-2022工业硅酸钠
- GB/T 32238-2015低温承压通用铸钢件
- GB/T 12719-2021矿区水文地质工程地质勘查规范
- 2022-2023学年八年级科学第二学期期末教学质量监测试卷+答案+答题卷
- rm928x产品规格书-中文版rm9284d
- 附件1:岗位分等级聘用考核量化表(竞岗竞聘积分表)
- 《内部控制与风险管理(第二版)》第九章财务风险管理
- 巡察工作流程图1
评论
0/150
提交评论