1、地面砖、花岗岩铺贴施工方案Construction Scheme of Floor tile and Granite tile InstallationPreparations弹水平线,确定室内地砖完成面0.00The horizontal line, make sure indoor floor tile finish surface elevation of+ /-0.00.水电管线已安装完毕。Water and electricity line already deployed.二、预备材料 Preparation of materials1. 425425 cement and med
2、ium sand and white cement.2. 800*800*25,600*600*25600*600*12800 * 800 * 25 granite, 600 * 600 * 25 granite, 600 * 600 * 12 floor tile.construction procedure1、工艺流程 construction process材料预备弹楼地面面层标高把握线基层处理弹线找中找方铺贴基准把握标筋铺贴面层铺贴踢脚板养护与成品保护Prepare materialsBomb the ground floor surface elevation control lin
3、eBase treatmentBomb line Lay up the benchmark control standardscreedlay up surface courseLay up the baseboardMaintenance andprotection for the final product2Tile installation order、大面积施工时,应用分段挨次铺贴。Large area construction, segmented order paving。 For the entire building, first tile separate rooms, th
4、en passgeways or corridors.、对于一般房间承受退步法先由房间中部向两侧铺贴。对于有独立柱的大厅,要先铺贴柱间局部,然后再向两边开放。For General rooms, use regression method by laying up from the central to both sides. For the great hall with independent column, firsttile column section, then expand to both sides.、全部房间先铺贴整块板材,非整块板材最终铺贴。地面铺贴完后再铺贴踢脚板。All
5、 the rooms firstly paved with block plate ,or tile at last. Skirtingboard tiled after the ground .3、铺贴方法:Tile installation method1好后可单边挂线。Baseed on marking screed made before, the first row plate hang line onboth sides , after the first raw is tiled , it can be hang line on one side.、结合层与板材面层应分段同时铺砌
6、。先进展试铺,将干 平铺到干硬性水泥砂浆上(干硬程度以手捏成团,落地即散为宜),用橡皮锤用力敲击板面,使摊铺的干硬性水泥砂浆结合层密2-5mm。Combined course and plate surface course should be tiled at the sametime. First trial laying, flat the rigid cement mortar to the paving part, andits thickness should be appropriated. Thentile the plank to dry, rigidcement morta
7、 (Advisable degree of dry is can be kneaded together, and scattered when dropped on land ). Use a rubber mallet hard strike theboard to make the pavingdry rigid cement mortar layer combination is close-grained, and make the surface 2-5 mm below the ground elevation control sheet.、试铺适宜后,将板材揭起,在密实的干硬性
8、水泥砂浆结粘结,然后将板材再原位置再次安放。After appropriate trial paving,lift up the plate.Spread a layer of dry cement to the dry, rigid close-grained cement mortar,and wet it once by the watering can, or water a layer of cement paste for mudbonding, then put the plate back at the position.线吻合便完成一块板材铺贴,再依次铺贴下一块。When p
9、laced again, four corners of the plank should be dropped at the same time. After layed down steadily ,use a rubber hammer to strike it to make it flat and bonded firmlywith the combined course .The plank paving is done when the plank surface is coincided with the elevation ofthe ground control, then
10、 pave the next one .铺贴时要随时找平找直,做到四角平坦,纵横缝隙对齐。When paving ,be sure that it is flat and straight. Make sure the fourcorners flat, and vertical and horizontal crack aligned.Quality requirements1Marble, granite主控工程Dominant item面层与下一层应结合结实无空鼓。Surface course should be combined firmly with the next one ,wi
11、thout any gaps.四角平坦,纵横缝隙对齐、无色差。Four corners flat, vertical and horizontal crack aligned, colorlessdifference.一般工程 General item大理石,花岗石面层的外表应干净,平坦,无磨痕,且应图案清楚,色泽全都,接缝均匀,周边顺直,镶嵌正确,板块无裂、掉角、缺棱等缺陷。The surface of Marble and granite should be clean,flat, no grinding mark, and clear pattern , consistent color
12、, juncture uniform, straight surrounding,right Mosaic, plates without broken corners, no crack defects such as lackof edges.踢脚线外表干净,高度全都,结合结实,出墙厚度全都。The surface of the baseboard should be clean, and consistent inheight, firmly combined, and with consistent wall thickness.楼梯踏步和台阶板块的缝隙宽度应全都,齿角整齐,楼层10m
13、m。The stair tread and step plate should be consistent in gap width, andtidy tooth angles. The floor stage should be adjacent to the tread , ang the height difference should be no more than 10 mm.大理石和花岗石面层的允许偏差应符合:The deviation of marble and granite surface layer should beallowed to meet:、外表平坦度:1.2mm
14、 、缝格平直:1.2mm。接缝凹凸差:0.8mm。踢脚线上口平直:1.2mm。板块间隙宽度:1.2mm。 Surface evenness:1.2mm Seam case straight:1.2mm Junctureheight differenceSkirtingline flatside :1.2mm Plategap width:1.2mm2、地面砖 Floor tile主控工程:Dominant item面层与下一层的结合粘结应结实,无空鼓。Surface course should be combined firmly with the next one ,without any
15、gaps.四角平坦,纵横缝隙对齐,无色差。Four corners flat, vertical and horizontal crack aligned, colorlessdifference.一般工程:General item砖面层的外表应干净,图案清楚,色泽全都,接缝平坦,深浅全都,周边顺直,板块无裂纹,掉角和缺损等缺陷。The surface ofbrick layer should be clean,flat, no grinding mark, and clear pattern , consistent color, juncture uniform, straight sur
16、rounding, right Mosaic, plates without broken corners, no crack defects such as lackof edges.面层邻接处的镶边用料及尺寸应符合设计要求,边角整齐,光滑。The edge materials anddimensions of surface course adjacent sideshould meet the design requirement, with tidy corners and smooth.地板砖间隙宽度:1.2Floor brick gap width:less than 1.2 mm
17、.踢脚线外表应干净,高度全都,结合结实,离墙厚度全都。The surface of the baseboard should be clean, and consistent inheight, firmly combined, and with consistent wall thickness.面层外表的坡度应符合设计要求,不倒流水,无积水,与地漏,管道结合处应严密结实无渗漏。Theslope of surface course should meet the design requirement, on inverse flow, no no stagnant water.The jun
18、ction with floor drain,and pipeshould be closely solid with no leakage.五、成品保护Maintenance and protection for the final product1.1.3The paved ground can be landed 3 days later.2. 铺的房间应临时进展封闭,操作人员和检查人员进入房间踩踏时,要轻踏在一块木板上。The new paved room should be closed temporarily,when operators andinspectors enter rooms, please step on a piece of wood lightly.3. 地面
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 环境污染纠纷公证调解
- 纺织品退货流程管理办法
- 教育研究合同履行准则
- 供应链优化采购策略
- 销售内勤月度工作总结5篇
- 话务员年终工作总结开头怎么写(3篇)
- 历史教师教学工作总结范文5篇
- 2024至2030年中国旋转电位器数据监测研究报告
- 班主任在毕业典礼上的致辞发言稿5篇
- 2024至2030年鲜牛肉末项目投资价值分析报告
- 正余弦定理知识点权威总结18页
- 国企纪检监察嵌入式监督的探索与实践
- 浅议小升初数学教学衔接
- 设备安装应急救援预案
- 深基坑工程降水技术及现阶段发展
- 暂堵压裂技术服务方案
- 《孔乙己》公开课一等奖PPT优秀课件
- 美的中央空调故障代码H系列家庭中央空调(第一部分多联机)
- 业主委员会成立流程图
- (完整版)全usedtodo,beusedtodoing,beusedtodo辨析练习(带答案)
- 广联达办公大厦工程施工组织设计
评论
0/150
提交评论