1、Functional Test 功能性测试Project 项目: SH147 LEED CxFT- _Air Source Heat Pump 空气源热泵And Chiller System Including:以及冷机系统包括 CHW Pumps 冷冻水泵 _Related Tests 相关的测试: 1.Participants 参加Party 参加方Participation 参与者Party filling out this form and witnessing testing 填表并方Dates of test 测试日期2.Test Prerequisites 测试前提要求a.The

2、 following have been started up and startup reports* and prefunctional checklist approved ready for functional testing:bmitted and下面已经列出的是启动和预调试,其已经提交和获批,为功能性测试准备就绪ASHP: Prefuctionals,风冷热泵 预调试 Startup report启动Chilled wat冷冻水泵 Chilled watumps: Prefuctionals,预调试 Startup report启动iand valves: Prefuctiona

3、ls预调试冷冻水管和阀门Air handler units 空气处理机: Prefuctionals 预调试, Startup report 启动*The written ASHP startup report must contain a full listing of all adjustableernal program settings.的风冷水热泵启动必须包括一份所有完整的可调的的程序设定列表b. Pisystem flushing complete and required report approved.管路系统的完成和要求的c.Water treatment system co

4、mplete and operational.水处理系统完成和可操作d. Vibration control report approved (if required).控制的(要求)e. Test and balance (TAB) complete and approved for the hydronic system.对于水系统的测试和平衡(TAB)的完成和 These functional test procedures reviewed and approved by installing contractor.安装承包商对这些功能性测试流程复核和 Safeties and ope

5、rating ranges reviewed.安全和运行范围已复核f.g.h. Test requirements and sequen测试要求和操作流程附上 Schedules and setpos attached.明细表和设定值附上of operation attached.i.j. Sufficient clearance around equipment for servicing.足够的间隙对于设备之间的维修 Control Program Review. Review the software control program(s) for this equipment. Para

6、meters,k.setpos and logic sequenappear to follow the specified written sequen.控制程序。该设备的控制程序,参数设定值和逻辑顺序符合指定的顺序m. Record made of All Values for Current Setpos (SPt), Control Parameters, Limits, Delays, Lockouts,Schedules, Etc. Changed tomodate Testing.下所有当前的设定值(SPt),控制参数,限值,延迟,锁定,明细表等。然后改变以适应测试。3. Tes

7、ting Procedures and Record测试流程和Proced. No. 项目Test Procedure(including spel conditions)Expected and Actual Response Write ACTUAL response in brackets or circle预期和实际响应(在括号或者圆圈内写实际响应)Pass Y/N通过是/否Note #注释Proced. No. 项目Test Procedure(including spel conditions)Expected and Actual Response Write ACTUAL re

8、sponse in brackets or circle预期和实际响应(在括号或者圆圈内写实际响应)Pass Y/N通过是/否Note #注释1.Startup SequenceCHW pumps ON by BAS启动顺序通过 BAS 启动冷冻水泵Observehe BASt the proof of flow has been made. Once there is proof of flow, observet the HP starts.在 BAS 观察,证实开始,一旦开始了,观察热泵的启动。2.Minimum On-TimeWiSHP on and running for less

9、n 10 minutes ,d all cooling coil valvesclosed.Return CCVs to normal after procedure.最短运行时间空气源热泵开启和运行少于 10 分钟要求所有的冷却盘管阀门关闭在此流程后 CCVs 返回至正常Observet the ASHP and pump does NOT stop until the 10 min. min ON-time is expired.观察空气源热泵和泵直到 10 分钟后才停机,满足最短运行时间。时间设置依据实际情况而定3.Minimum Off-TimeTurn the ASHP off, a

10、nd then restart the ASHP after lessn 20 minutes.最小关断时间关闭空气源热泵,并在 20 分钟内重启Observet the ASHP and pump does NOT startup until the 20 min. min Off-time is expired.观察空气源热泵和水泵直到 20 分钟后才启动,超过最短关闭时间。时间设置依据实际情况而定4.General Chilled Water Temperature Control.Have the chiller and pumps start running. Have all PA

11、Us/AHUs/FCUs coils valve are open.一般冷冻水的温度控制将冷冻机组和泵启动运行。将所有的PAUs/AHUs/FCUs 的盘管阀门开启Record the CHWRT and CHWRT setpo 12.Record the CHWST and CHWST setpo 7.冷冻水回水温度,设定值为 12冷冻水送水温度,设定值为 75.ASHP OperationTurn on only one ASHP and CHWP Two-way motorized control valves are open by BAS空气源热泵的运行只开启一台空气源热泵和冷冻水泵

12、通过 BAS 打开两通控制阀Turn all of ASHP and CHWP on Two-way motorized control valves of20% PAUs/AHUs/FCUs are closed by BAS.开启所有的空气源热泵和冷冻水泵通过 BAS 关闭 20%的 PAUs/AHUs/FCUs 的两通控制阀Observe by BASt:The CHW flow from CHWR pipe to CHWS pipe.One ASHP and CHre on.通过 BAS 观察冷冻水流从冷冻水回水管流向冷冻水供水管一台空气源热泵和冷冻水泵运行Observe by BAS

13、t:The CHW flow from CHWS pipe to CHWR pipe.One ASHP and CHre off.通过 BAS 观察冷冻水流从冷冻水供水管流向冷冻水回水管一台空气源热泵和冷冻水泵关闭NOTES 附注*Abbreviations: CWP = chilled wat system.ump, Pt = setpo , CHWS = chilled water supply, BAS = building automation缩写语 CWP=冷冻水泵,Pt=设定值,CHWS=冷冻水供水,BAS=建筑自动控制系统Record any permanently change

14、d parameter values and submit changes to Owner.任何改变的参数值并将变化提交给业主。A SUMMARY OF DEFICIENCIES IDENTIFIED DURING TESTING IS ATTACHEDProced. No. 项目Test Procedure(including spel conditions)Expected and Actual Response Write ACTUAL response in brackets or circle预期和实际响应(在括号或者圆圈内写实际响应)Pass Y/N通过是/否Note #注释6.

15、减机运行末端空调机组全部开启;同时开启三台一次大泵,一台一次小泵;并开启 1 台二次泵观察到平衡管中正向流量示数达到 110%的一次 泵流量,一台一次泵卸载7.加机运行末端空调开启;开启一台一次大泵,并开启一台二次泵;观察到平衡管中逆向流量示数达到 20%的二次泵流量,启动一台一次泵8.Secondary CHWP Operation Reset dp of the farthest circuit冷冻水二次泵的运行重置最远回路的压差Observe by BASt:Vrive speed/freq vary.通过 BAS 观察VFD 驱动速度/频率的不同9.Chiller Staging OFF.With the ASHPs and pumps in auto, d the CCVs onAHUs/PAUs/FCUs to less n 10% open.冷冻机组分步关闭空气源热泵和泵设置自动,控制少于 10% AHUs/PAUs/FCUs 的 CCVs 开启。Observe t the ASHPs remains ON until a 5 minute timer expires and the ASHP shuts OFF . The pump remains ON for another 2 minutes; t

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论