1、 统计 C01-19施工组织设计(方案)报告表项目名称:安仁中央商务区编号:至:市监理公司安仁监理部(监理机构)安仁中央商务区项目桩基工程按施工合同要求及相关技术标准,经我单位上级技术负责人审核批准。请审查它。附:安仁中央商务区桩基工程建设方案(一期工程)专案经理:2011 年月日项目监理机构审核意见:专业/主管工程师:年月日本表由建设单位填写,监理机构签字后交建设单位保存。目录TOC o 1-3 h z u HYPERLINK l _Toc307498722 一、编译依据 PAGEREF _Toc307498722 h 1 HYPERLINK l _Toc307498723 1 .编译依据
2、PAGEREF _Toc307498723 h 1 HYPERLINK l _Toc307498724 2本项目采用的技术标准和规定 PAGEREF _Toc307498724 h 1 HYPERLINK l _Toc307498725 二、项目概况及地质条件 PAGEREF _Toc307498725 h 2 HYPERLINK l _Toc307498726 1 .项目概述 PAGEREF _Toc307498726 h 2 HYPERLINK l _Toc307498727 1)工程简介 PAGEREF _Toc307498727 h 2 HYPERLINK l _Toc30749872
3、8 2)项目规模 PAGEREF _Toc307498728 h 2 HYPERLINK l _Toc307498729 2 、工程场地岩土工程地质条件 PAGEREF _Toc307498729 h 3 HYPERLINK l _Toc307498730 1)场地地形、地质构造与区域稳定性 PAGEREF _Toc307498730 h 3 HYPERLINK l _Toc307498731 2)场地岩土特性、特征及分布规律 PAGEREF _Toc307498731 h 3 HYPERLINK l _Toc307498732 3)不良地质影响 PAGEREF _Toc307498732 h
4、 4 HYPERLINK l _Toc307498733 4)基础岩土层物理力学性能统计指标 PAGEREF _Toc307498733 h 5 HYPERLINK l _Toc307498734 5)场地地下水状况 PAGEREF _Toc307498734 h 6 HYPERLINK l _Toc307498735 3. 工程特点 PAGEREF _Toc307498735 h 9 HYPERLINK l _Toc307498736 四、施工部署 PAGEREF _Toc307498736 h 9 HYPERLINK l _Toc307498737 一、项目管理机构 PAGEREF _To
5、c307498737 h 9 HYPERLINK l _Toc307498738 2 、施工人员 PAGEREF _Toc307498738 h 10 HYPERLINK l _Toc307498739 三、机械设备设备计划消耗量表 PAGEREF _Toc307498739 h 11 HYPERLINK l _Toc307498740 四、液压静力打桩机设备及主要技术参数 PAGEREF _Toc307498740 h 11 HYPERLINK l _Toc307498741 4 . 1技术准备 PAGEREF _Toc307498741 h 12 HYPERLINK l _Toc30749
6、8742 4 . 2材料准备 PAGEREF _Toc307498742 h 13 HYPERLINK l _Toc307498743 4 . 3劳工组织准备 PAGEREF _Toc307498743 h 13 HYPERLINK l _Toc307498744 4 . 4施工现场准备 PAGEREF _Toc307498744 h 13 HYPERLINK l _Toc307498745 五、静压管桩施工方法 PAGEREF _Toc307498745 h 14 HYPERLINK l _Toc307498746 一、施工设备的选择 PAGEREF _Toc307498746 h 14 H
7、YPERLINK l _Toc307498747 2.确定施工顺序 PAGEREF _Toc307498747 h 14 HYPERLINK l _Toc307498748 4 、压桩施工操作步骤详解 PAGEREF _Toc307498748 h 16 HYPERLINK l _Toc307498749 五、桩身垂直度保证措施 PAGEREF _Toc307498749 h 18 HYPERLINK l _Toc307498750 、 PHC桩 PAGEREF _Toc307498750 h 验收18 HYPERLINK l _Toc307498751 七、 PHC桩的验收方法 PAGERE
8、F _Toc307498751 h 18 HYPERLINK l _Toc307498752 八、静压桩质量检验标准 PAGEREF _Toc307498752 h 19 HYPERLINK l _Toc307498753 9 、管桩的堆放及装卸方法 PAGEREF _Toc307498753 h 20 HYPERLINK l _Toc307498754 六、建设计划及工期保障措施 PAGEREF _Toc307498754 h 20 HYPERLINK l _Toc307498755 1 、施工进度总体控制计划 PAGEREF _Toc307498755 h 20 HYPERLINK l _
9、Toc307498756 二、保证项目进度的主要措施 PAGEREF _Toc307498756 h 20 HYPERLINK l _Toc307498757 1 ) 保证工期的组织措施 PAGEREF _Toc307498757 h 20 HYPERLINK l _Toc307498758 2 ) 保证工期的管理措施 PAGEREF _Toc307498758 h 21 HYPERLINK l _Toc307498759 3 )保证工期的技术措施 PAGEREF _Toc307498759 h 22 HYPERLINK l _Toc307498760 七、质量保证措施 PAGEREF _To
10、c307498760 h 22 HYPERLINK l _Toc307498761 一、质量管理与检验标准 PAGEREF _Toc307498761 h 22 HYPERLINK l _Toc307498762 二、质量保证技术措施 PAGEREF _Toc307498762 h 22 HYPERLINK l _Toc307498763 八、安全保障措施 PAGEREF _Toc307498763 h 24 HYPERLINK l _Toc307498764 1.安全系统 PAGEREF _Toc307498764 h 24 HYPERLINK l _Toc307498765 二、安全组织措
11、施 PAGEREF _Toc307498765 h 24 HYPERLINK l _Toc307498766 三、安全技术措施 PAGEREF _Toc307498766 h 25 HYPERLINK l _Toc307498767 九、成品保护: PAGEREF _Toc307498767 h 26一、编译依据一、编译依据项目地质调查报告;项目施工现场的现场勘察;业主组织的问答环节及补充文件;设计文件规定和现行的相关规定和标准;业主提供的工程进度资料;公司承接同类项目的施工经验。2 本项目采用的技术标准和规定计量工程采用技术标准和规定:工程测量规程GB50026-93桩基施工、验收及质量评价
12、主要采用技术标准和规定:建筑基础设计规范GB/T50007-2002建筑工程施工质量验收统一规定GB50300-2001建筑基础施工质量验收规程GB50202-2002建筑地基处理技术规程JGJ79-2002建筑工程桩基检测技术规程JGJ/T106-97建设工程项目管理规定GB/T50326-2001建筑工程监理规程GB50319-2000基础与基础工程施工及验收规范GBJ202-83施工桩基技术规程JGJ94-94高处施工安全技术规程JGJ80-91工程机械使用安全技术规程JGJ33-2001建筑工地临时用电安全技术规程JGJ46-88建设工程施工现场用电安全规程GB50194-93预应力混
13、凝土管桩GB13476-1999预应力混凝土管桩图集 03SG409工程技术资料管理采用的技术标准、法规和要求:建设工程文件备案管理办法GB/T50328-2001参考标准建筑钢结构焊接规程CO2气体保护钢管桩半自动焊接技术规范Q/BGJ004-2002二、项目概况及地质条件一、项目概况工程简介安仁中央商务区8#、9#、10#、11#楼、恒大酒店由安仁黄金地产投资建设,南方建设负责设计,南建顺协工程勘察,安仁市监理公司分公司 负责施工全过程的工程监理,负责中国四冶的施工总承包工作。安仁中央商务区8#(19楼)、9#(19楼)、10#(11楼)、11#楼(11楼)、恒大酒店(21楼、地下1楼)位
14、于安仁中央商务区.一期工程位于安仁县八一路与安仁大道交汇处。场地交通便利,场地已平整。本工程桩基采用预应力离心高强预应力钢筋混凝土管桩基础,工法采用水力静压桩工法。管桩有PHC500-100-AB、PHC500-100-A和PHC400-95-A三种,桩身混凝土强度等级为C80。采用交叉桩尖,以中风化或微风化石灰石为承载层。入土深度为1025m 。设计单桩竖向极限承载力标准值和单桩竖向承载力特征值分别为:8#、9#建筑桩型及规格PHC500-100-A,Q UK =1600KN和R a =3200KN; 10#、11#建筑桩型号规格PHC400-95-A,Q UK =1100KN,Ra = 2
15、200KN;恒大酒店桩型及规格,PHC500-100-AB,Q UK =2000KN,Ra = 4000KN。桩基静压桩终压力值等技术控制指标,在桩基试验时,由设计单位在桩的现场试验后确定。工程规模本工程设计桩点总数为1006个,如下表所示。静压管桩工程量统计项目名称桩型及规格设计桩长(m)桩数(支)管桩总量(m)评论8#PHC500-100-A1020m2529#PHC500-100-A1020m25110#PHC400-95-A1020m31011#PHC400-95-A1020m253恒安大酒店PHC500-100-AB1025m186全部的12522 、工程场地岩土工程地质条件场地地形
16、、地质结构与区域稳定性拟建场地为丘陵地貌,地势已平整,仍有坡度,孔位最大高差为m ,无影响场地稳定性的构造痕迹(岩溶除外)等不良地质影响已经在网站上发现过,网站的区域稳定性比较高。这很好。场地岩土特性、特征及分布规律场地为丘陵地貌,钻探发现深度周围的第四纪土层为填土、坡积土、残留土和石炭系(C)石灰岩。自上而下的叙述如下:第四纪人工填充层(Q ml ) 黏性土填土层:浅灰黄色、棕红色、疏松,以黏性土为主,性质不均匀,压实不足,填筑时间1年左右。该层分布在场区ZK68、ZK84ZK86、ZK90ZK93、ZK98ZK103、ZK105ZK109、ZK241、ZK249、ZK257孔中,层厚0.9
17、03.20 m ,平均层厚2.19 m ,顶面深埋。 0.000.00米。其主要物理力学性能平均值: w = 26.9% , 0 = 1.88g /cm3 , e = 0.823 ,wL = 34.5 %, wp = 21.1 %, Ip = 13.4 , IL = 0.43 , a 1-2 = 0.404 MPa -1 , Es = 4.57 MPa , c = 25.6 kPa, = 18.0 。第四纪冲积层 (Q al ) 图层,该字段中缺少该图层。第四纪残余斜坡沉积物 (Q d l , Q el ) 1层粉质粘土:棕红色,可塑性,主要由粉末和粘土组成,含少量砾石,粘性好,略带光泽,干强
18、度中等,韧性中等,为坡土。该层分布于全场,层厚0.708.50 m ,平均层厚3.39 m,顶面埋深0.003.20 m 。其主要物理力学性能平均值: w = 25.8% , 0 = 1.89g /cm3 , e = 0.803 ,wL = 33.8 %, wp = 20.8 %, Ip = 13.0 , IL = 0.39 , a 1-2 = 0.358 MPa -1 , Es = 5.25 MPa , c = 28.9 kPa, = 18.5 。 2层粉质粘土:棕红色、浅灰黄色、塑性,主要由粉末和粘土颗粒组成,粘性好,略带光泽,干强度中等,韧性中等,为残土。该层分布于全场,层厚5.1025
19、.80 m ,平均层厚14.54 m,层顶埋深1.609.20 m 。其主要物理机械性能的平均值: w = 25.5% , 0 = 1.92g /cm3 , e = 0.765 ,wL = 33.6 %, wp = 20.8 %, Ip = 12.8 , IL = 0.36 , a 1-2 = 0.343 MPa -1 , Es = 5.30 MPa , c = 29.7 kPa, = 19.4 。石炭系石灰岩 (C) 3层风化灰岩:浅灰色、灰色、隐晶结构、层状结构,矿物成分以碳酸盐为主,裂缝较发育,岩心呈块状、短柱状。岩石的硬度为软岩,岩体的完整性比较破碎,岩体的基本质量等级为级。本层曝光领
20、域ZK64、ZK66ZK69、ZK71ZK74、ZK76、ZK77、ZK79ZK82、ZK84、ZK86ZK92、ZK94ZK98、ZK100、ZK101、ZK103、ZK104、ZK109、ZK241、ZK249、ZK333对于孔洞,裸露层厚度为0.20-3.40 m ,平均裸露厚度为1.09 m,顶面埋深为11.00-31.60 m 。 3-1层溶洞:填满,浅灰黄色,软塑流塑粉质粘土。该层出露于孔ZK66ZK68、ZK72、ZK73、ZK82、ZK87ZK91、ZK95、ZK97、ZK100、ZK101、ZK103、ZK104、ZK109、ZK333,洞体垂直高度0.205.50 m ,平
21、均垂直高度1.43 m ,洞顶面埋深11.40-25.30 m 。 4层微风化灰岩:浅灰色、灰色、隐晶结构、层状结构,矿物成分以碳酸盐为主,裂缝较发育,岩心为短柱状,部分破碎。岩石硬度为较硬的岩石,岩体的完整性比较完整,岩体的基本质量等级为级。该层在整个场区裸露,裸露层厚2.00-5.80 m ,平均裸露厚度3.85 m,层顶面埋深11.60-33.00 m 。其岩石的饱和单轴抗压强度为32.343.2 MPa ,平均为38.1 MPa 。地质不好本次详细调查未发现活动断层、构造断裂带等不利地质影响,但洞穴较为发育。 ZK103、ZK104、ZK109、ZK333孔洞的垂直高度为0.205.5
22、0 m ,平均垂直高度为1.43 m ,洞顶面埋深11.4025.30 m 。基础岩土层厚层顶面埋深及岩土性质和特征见附表1。附表1 :基础岩土层厚度、层顶面深度、岩土性质及特征项目编号: 20 11 - 053b原因时代分层序列号岩层名称厚度(米)平均层厚(m)埋深_(男)岩土工程描述曝光次数Q毫升粘度普通填充0.903.202.190.000.00浅灰黄色、棕红色、疏松,主要由粘性土组成,性质不均匀,压实不足,填埋时间约1年。222Qel_ _ 1粉质粘土0.708.503.380.003.20棕红色,塑性,主要由粉末和粘土组成,含少量砾石,粘性好,略带光泽,干强度中等,韧性中等,为坡土。
23、53 2粉质粘土5.1025.8014.541.609.50棕红色,浅灰黄色,有延展性,主要由粉末和粘土组成,粘性好,略带光泽,干强度中等,韧性中等,残土。53 3中风石灰石0.203.401.0911.0031.60浅灰色、灰色、隐晶质结构、层状结构,矿物成分以碳酸盐为主,裂缝较发育,岩心呈块状、短柱状。36 3-1洞穴0.205.501.4311.4025.30完全填充的浅灰黄色软塑料至流动塑料粉质粘土。19 4微风轻拂石灰石2.005.803.8511.6033.00浅灰色,灰色,隐晶结构,层状结构,矿物成分以碳酸盐为主,裂缝较发育,岩心为短柱状,局部破碎岩块。53基础岩土层物理力学性能
24、统计指标基础岩土层物理力学性能统计指标见表2和表3。附表2:基础岩土层物理力学性能分层统计表分层岩层名称统计数据w。ew Lwp _我_伊利_1-2 _埃斯_C统计数据序列号指数(%)(克/厘米3 )(%)(%)(兆帕-1 )(兆帕)(千帕)()数字粘性填充最低限度22.01.810.69829.417.611.80.280.3054.0221.116.713最大值29.81.960.92637.522.914.60.540.4665.6232.119.4平均值26.91.880.82334.521.113.40.430.4044.5725.618.0标准差2.9040.0490.0792.5
25、941.7020.9200.0820.0500.4742.7580.750变异系数0.1080.0260.0960.0750.0810.0690.1920.1230.1040.1080.042修正系数0.9460.979标准值24.317.6 1粉质粘土最低限度20.51.750.62729.017.411.60.250.1774.1820.616.630最大值29.92.020.93238.923.615.30.560.4469.1737.320.6平均值25.81.890.80333.820.813.00.390.3585.2528.918.5标准差2.4000.0600.0782.523
26、1.5561.0050.0660.0661.2254.5650.964变异系数0.0930.0320.0970.0750.0750.0770.1700.1850.2340.1580.052修正系数0.9500.984标准值27.518.2 2粉质粘土最低限度21.81.830.67429.917.811.10.270.2184.0221.917.539最大值30.91.990.90641.626.115.50.540.4447.9736.822.1平均值25.51.920.76533.620.812.80.360.3435.3029.719.4标准差2.1460.0480.0592.4191.
27、4381.0120.0660.0591.0233.7361.110变异系数0.0840.0250.0780.0720.0690.0790.1810.1720.1930.1260.057修正系数0.9650.984标准值28.719.1附表3 基础岩土层标准贯入试验结果分层统计分层序列号频率实测标准穿透测试命中(单位被命中)修正后的命中数(单位被命中)周长平均值标准差变异系数修正系数标准值周长平均值6464.50.8370.1860.8473.83.95.84.4 1二十一12517.14.9630.2890.88915.28.824.315.6 21386 至 2817.65.0860.289
28、0.95816.84.123.614.1场地地下水状况拟建场地地下水类型主要有:一种是孔隙水,存在于土层的潜水中。 ;另一种是裂隙水和溶洞水,主要出现在风化石灰岩的裂隙和溶洞中。根据钻井条件分析,有一定的水量。勘测时需加水钻孔,无法测量地下水初始水位,稳定水位标高为 m (见附表4)。见附表4-1勘查点主要数据一览表序列号钻号钻头类型坐标位置孔深海拔水位稳定第一水位X是深度海拔深度海拔(男)(男)(男)(男)(男)(男)(男)(男)1ZK63总则孔57207.491498541.68623.00104.721.85102.872.15102.572ZK64总则孔57219.904498567.
29、30323.00106.162.25103.912.50103.663ZK65控制孔57219.530498599.30120.00106.222.15104.072.55103.674ZK66总则孔57219.078498637.90125.20106.162.06104.102.35103.815ZK67总则孔57218.804498661.35030.00106.222.17104.052.40103.826ZK68控制孔57218.604498678.44833.50106.602.36104.242.55104.057ZK69总则孔57180.627498517.89023.4010
30、5.491.92103.572.30103.198ZK70总则孔57182.468498541.36215.60105.751.87103.882.15103.609ZK71控制孔57182.144498568.36016.20105.711.75103.962.05103.6610ZK72总则孔57181.820498595.35815.00105.571.73103.842.18103.3911ZK73总则孔57181.495498622.35619.70105.711.89103.822.06103.6512ZK74控制孔57175.875498648.98630.30105.831.9
31、3103.902.28103.5513ZK75总则孔57176.936498675.46227.00105.791.86103.932.45103.3414ZK76总则孔57157.884498514.06515.40104.991.89103.102.40102.5915ZK77控制孔57157.560498541.06316.50105.561.77103.792.45103.1116ZK78总则孔57157.235498568.06115.40105.531.69103.842.40103.1317ZK79总则孔57156.911498595.05916.80105.371.77103.
32、602.55102.8218ZK80控制孔57156.587498622.05723.00105.711.83103.882.40103.3119ZK81总则孔57156.263498649.05521.00103.210.85102.362.00101.2120ZK82总则孔57155.939498676.05325.00103.180.96102.221.85101.33二十一ZK83控制孔57136.118498500.97316.80104.851.17103.682.18102.67二十二ZK84总则孔571320.641498534.18615.00105.851.78104.07
33、2.25103.6023ZK85总则孔57132.147498567.76025.00105.351.82103.532.45102.9024ZK86控制孔57131.823498594.75831.00105.371.95103.422.50102.8725ZK87总则孔57131.499498621.75619.00103.410.97102.442.23101.1826ZK88控制孔57131.175498648.75429.20103.020.90102.122.05100.9727ZK89控制孔57130.851498675.75229.80102.830.85101.982.281
34、00.5528ZK90控制孔57096.760498495.33918.80104.151.45102.701.85102.3029ZK91总则孔57107.797498513.46317.00104.191.66102.532.00102.1930ZK92总则孔57107.473498540.46120.20104.191.53102.662.15102.04附表4-2勘查点主要数据一览表序列号钻号钻头类型坐标位置孔深海拔水位稳定第一水位X是深度海拔深度海拔(男)(男)(男)(男)(男)(男)(男)(男)31ZK93控制孔57107.149498567.46026.60105.881.641
35、04.242.08103.8032ZK94总则孔57106.825498594.45835.00105.471.75103.722.05103.4233ZK95总则孔57106.501498621.45624.50105.101.82103.282.25102.8534ZK96控制孔57106.176498648.45431.00102.671.05101.622.25100.4235ZK97总则孔57105.853498675.45227.60102.700.76101.941.95100.7536ZK98总则孔57082.799498513.16327.80104.011.64102.37
36、2.10101.9137ZK99控制孔57082.475498540.16126.40104.081.70102.382.25101.8338ZK100总则孔57082.151498567.15929.60103.901.11102.792.35101.5539ZK101总则孔57081.827498594.15725.40103.701.21102.492.05101.6540ZK102控制孔57081.503498621.15530.00104.901.65103.252.85102.0541ZK103总则孔57081.178498648.15325.00104.681.77102.912
37、.25102.4342ZK104总则孔57080.854498675.15223.10102.880.90101.981.85101.0343ZK105控制孔57072.518498496.50124.20103.171.12102.051.90101.2744ZK106总则孔57057.477498539.86127.80103.170.95102.221.95101.2245ZK107控制孔57057.153498566.85930.20103.201.05102.152.26100.9446ZK108总则孔57056.829498593.85727.80103.401.11102.292
38、.04101.3647ZK109总则孔57066.806498688.77530.00102.571.00101.572.45100.1248ZK231总则孔57197.950498712.48024.00101.800.89100.911.56100.2449ZK241控制孔57173.950498717.43823.10101.200.80100.401.05100.1550ZK249控制孔57139.458498714.10726.80103.651.20102.451.44102.2151ZK257总则孔57113.338498711.02823.00103.571.05102.521
39、.53102.0452ZK324总则孔57100.322498713.05022.50103.450.85102.601.45102.0053ZK333控制孔57070.346498714.25127.80104.701.66103.041.35103.35根据国家标准岩土工程勘察规程(GB50021-2001)(2009版)判断:地下水环境型,对混凝土有轻微腐蚀性;对钢筋混凝土结构中的钢筋有轻微腐蚀性。根据经验,土壤对混凝土和钢筋混凝土结构中的钢筋有轻微的腐蚀性。三、工程特点1、项目地点在城郊,远离居民区,施工不会对居民造成干扰。场地原本是山间或菜地,没有地下管线。目前已完成“三通一平”。
40、8#、9#楼原为山体,现场土方开挖。整平后场地局部,表层土为粘性黄土,密实度高;回填时,回填深度为 1 2.5m。土壤为粘性黄土,遇水易软化。回填时土方已压实;恒安宾馆地下为停车场,基坑深度4.5m10万,基坑土方已开挖至地下停车场。场地底面与基坑土为粘性黄土,基坑周边临时排水沟完善。2、项目场地的地面耐力可以满足打桩机的施工要求,但需要修建临时施工道路,保证重型桩车可以直接进入桩基作业现场。为不影响施工进度,各单元建设临时施工道路,路面采用砂石铺装,道路两侧开挖300400排水沟与道路相连。周边市政排水系统。3、根据地质调查报告,ZK66ZK68、ZK72、ZK73、ZK82、ZK87ZK9
41、1、ZK95、ZK97、ZK100、ZK101、ZK103、ZK104、ZK109、ZK333孔在埋深11.4011.40处有溶洞25.30m, 溶洞较为发育。平均垂直高度1.43 m,接近这些测孔时,打桩速度不宜过快,以免发生偏桩或断桩。4、项目所在地区无管桩生产企业。供应需要距离安仁县城200公里。管桩供货距离长,需要提前做好管桩进料计划。5、本工程桩型、规格多(400-95-A、500-100-A、500-125-AB)。施工时要注意施工图中使用的桩型,以及不同型号的采购和管桩。桩发挥作用的堆叠位置。四、建设部署一、项目管理机构为高质量、高效率地承接本项目的建设,确保项目质量和工期满足业
42、主要求,并建立相应的管理机构,如下图所示。项目管理组织图项目经理:庄正文技术总工:唐小宏现场总工:高伙铁经营计划部采购供应部工程技术部质量部安全部办公室机电设备部2、施工人员配置根据桩基工程作业特点,每台打桩机每班配备足够多的各类操作工。这些操作人员均经过专业技术培训,从事桩基施工多年。他们具有丰富的施工经验和技术技能,施工技术水平在四级以上。进入工地的工人应当接受三级安全教育,申领各种必要的证件,并持有特殊工种的证件。项目部主要人员如下:邮政人数邮政人数专案经理1起重机2现场总工程师1主机手2首席技术工程师1打桩工4测量员3焊机4保安人员1电工1注:以上打桩机操作员由2个工作组组成。3、机械
43、设备设备计划消耗表序列号机械设备名称规格单元起源数量额定功率1静态打桩机ZYS-700B-B型塔2130KW3CO2保护焊机BX3-300-4塔*423.5KW4镝灯3000W杯子*33KW5碘钨灯1KW杯子*66KW6经纬仪J6塔17经纬仪J2塔18等级DS3塔天津2四、液压静力打桩机设备及主要技术参数根据设计规范要求,单桩最大设计承载力特征值为2000kN。根据以往的施工经验,桩的终压力为特征值的2.0-2.4倍。为保证满足施工要求和施工进度,选用两台静力打桩机。 (ZYS-700B-B型)同时工作并准备足够的配重铁。打桩机主要技术参数如下:额定桩压(KN)7000额定工作油压(MPa)2
44、3.9压桩速度(m/min)高速4.5低速0.7打桩行程(米)0.6排量(米)肖像3.6水平的0.6旋转角度()8升力(米)1.1方桩 (mm)最低限度350最大600最大圆桩(mm)600边桩距离(mm)0.68角桩距离(mm)1.1额定起重量(t)16振幅扭矩 (tfm)60.0功率(千瓦)桩100起重30尺寸(毫米)领班13500工作宽度7300运输高3020总重量(含配重)(t)700施工准备4.1 技术准备1)项目技术部组织人员成立现场测量组,做好工地轴线和标高控制桩的设置,对甲方布设的桩点进行复核。2)收集工程地质资料,绘制桩基施工方案,编制桩基施工方案。3)组织项目管理部管理人员
45、了解图集、图纸、施工规范、技术标准和技术文件。4)总技术工程师参与技术交底,在总技术工程师的带领下,组织研究工程图纸,审核工作,做好图纸的联合审核和交底工作。建设计划。5)根据图纸的联合审查,在开工前完善施工组织设计的调整和准备工作。6)编制科学实用的施工方案、质量保证措施和检验计划。7)做好对团队的技术和安全交底。4.2 材料准备1)各类材料齐备,完成材料采购采购计划,并确保施工期间所有材料(包括证明文件)及时到位。2)预应力管桩的规格和质量必须符合设计要求和施工规范,现场堆放合理。3)预应力管桩在打桩前应达到设计强度的100%,现场应有足够的桩,以满足配桩的需要。4)配备合格的设备和一定数
46、量的消防设备。5) 完成业主或当地有关部门要求的各项证明手续。4.3 劳工组织准备1)建立建设项目领导机构。根据项目的规模、结构特点和复杂程度,确定建设项目牵头机构的人选和名额;遵循合理分工、密切合作的原则,以岗定岗、以岗择人、树立施工经验、开拓进取、工作效率的原则。高建设项目领导(组织结构图见3.1)。2)根据开工日期和用工需求计划,组织工人进场,安排员工生活,进行安全、防火、文明施工教育。3) 配备特殊技术等级证书、职业资格证书和工人和管理人员。4.4 施工现场准备1)本施工方案确定的施工单位各部门人员集中到位,明确施工准备目标,按项目部人员主要职责开展作业,完成桩基操作人员的组织和准备工
47、作。2) 完成业主或有关地方当局要求的各种证明程序。3)完成工程机械(工具)的维护、调试、清洗。进场前确保机械(带)性能和状况良好。4)规划和组织运输力量,检查和实施通行道路和路线。5)临时施工布置:根据现场情况和工程需要,采用集装箱板房作为桩基施工现场办公室、工人宿舍、食堂等,并确定供电、供水点。详见施工方案。6)组织施工机具进场:根据施工机具需求计划,按施工计划要求,组织施工机具进场,存放在指定位置及方法,并进行相应的维护和试运行。7)组织建筑材料进场:根据本项目所需管桩需求计划,组织管桩进场,按打桩机行走路线放置。根据项目现场的特殊性,为保证施工期间阴雨天气正常施工,应将管桩运输至打桩机
48、附近,让打桩机有桩打桩。目前的桩运方案为:根据桩位分布,8#、9#、10#、11#楼北侧建设临时运桩路1条,至恒安各建设1条临时施工路酒店,与场地临时主干道相连。临时施工道路宽5米,铺装砾石300mm厚,碾压压实,在临时施工道路两侧开挖300400明渠排水沟,与市政排水管网连接;个别桩由叉车拖到施工现场。8)做好季节性施工准备:根据施工组织设计要求,认真落实雨季施工技术组织措施,特别是接桩时的焊接,避免雨天施工。排水沟应安排专人定期清沟,维修保养,使现场排水畅通。五、静压管桩施工方法一、施工设备的选择1)打桩机型号的选择:桩基工程位于市区外。桩型设计采用400-95-A、500-100-A、5
49、00-125-AB型桩。工程桩的终压力大于单桩。桩承载力特征值的2倍,桩尖风化或微风化石灰岩为承载层,桩尖进入承载层深度大于3D 。为满足设计和施工技术规程的要求,参照建筑桩基技术规程附件5和静压桩基技术规程,结合现场施工环境,打桩机选用2台行走静力打桩机(最大压力桩力达到6000kN),满足工程施工需要。2)打桩机配重的选择:打桩机配重必须用磅秤校验,并在配重表面标明其质量。液压机的最大打桩力应为打桩机车架重量加上配重之和 0.9。 ZYS-700B-B型打桩机总重量(自重KN+总配重KN) 0.95000KN (单桩最大承载能力特征值2000KN的2倍以上),配重的选用打桩机完全满足设计最
50、大压力桩力。3)给料机的选择:给料机的选择,给料机的最大长度为- 2.9m(相对0.000m控制标高)根据图纸要求,选择长的11m给料机以满足设计和施工要求,并选择a 给料机用钢桩 给料机断面外圆周形状应与静压断面外圆周形状一致。应有足够的强度和刚度,表面应有防止夹紧机构打滑的设施。送桩机长度应满足送桩深度。要求。与工程桩顶面接触的给料机端面应平整,并与给料机中心轴线垂直。2、确定施工顺序打桩时,由于桩对土体的压实作用,第一个打入的桩被水平推造成偏移和位移,或被垂直挤压和拉动造成浮桩;则后打桩很难达到设计标高或土层深度。 ,导致土体隆起和挤压,桩高高。因此,为保证桩组施工的质量和进度,消除各种
51、不利因素造成的不利影响,在打桩前应根据桩的密度、桩的规格、长度和长度,正确选择打桩顺序。桩架的移动方便。桩密时(桩中心距小于等于边长或直径的4倍),应由中部向两侧对称施涂,如图A所示;或从中间向周边,如图B所示。这样打桩时土体由中间向两侧或四周挤压,容易保证施工质量。桩数较多时,也可分段施工。当桩身稀疏时(桩身中心距大于等于边长或直径的4倍),可采用上述两种打桩方式或从一侧向单一方向打桩的方式,如图C所示,即逐行驾驶假设。这样一排一排打桩,桩架单向运动,打桩效率高。但打桩前向一侧不应有建筑物、构筑物、地下管线等防止横向移动和振动,以免土体被压坏损坏。当桩规格、埋深、长度不同时,宜先打大桩,后打
52、小桩,先打深桩,再打浅桩,先打长桩,再打短桩。结合工程实际,本工程施工顺序主要采用逐行法(A),部分采用中向两侧法(C)。两台打桩机根据楼号从A轴开始施工。 1轴施工完成后,开始转向2轴,沿ABC轴前进,按就近原则移动打桩机。为减少挤土效应引起的桩身漂浮效应,5根以上桩的承台施工必须遵循先内后外的原则。三、静压管桩施工工艺:场地平整测量定位探孔吊桩插桩桩机进场安置经纬仪校正与跟踪监控桩机就位压桩经养护达100%设计强度运桩至压桩点并检查桩体质量桩平面位移测量记录送桩至设计标高桩机移到下一桩位静压管桩施工流程图压桩步骤1)场地平整:清除表面杂物,填平场地坑洼,必要时用压路机压实表土。在场地周围挖
53、沟,排至集水坑集中排水。 (本项目建设方负责“三通一平”,目前已完成)2)测量定位:开工前,甲方应提供该区域控制点的信息,明确现场控制点的具体位置,并及时办理双方交接手续。 .根据甲方提供的控制点,放出轴线和桩位,在每个桩点插入短钢筋,制成管桩等径模具,白灰沿模具散落。打桩机到位后重新测试。由专人负责测量、定位、放样和复核工作,定期检查测量仪器,准备好测量、定位、放样的原始数据。得出的定位、放样测量结果数据以书面形式报主管和甲方审核。轴线偏差不小于1cm桩位偏差,2cm确认后方可施工。3)预应力管桩成品检验:检查预应力管桩的出厂合格证和主要质量指标,然后进行外观检验,同时做好检验记录。主管接受
54、并签字批准。管桩两端应清洗干净,焊接面有油漆杂物污染时应清洗干净。不合格的桩及时清理出场。4)设备准备情况检查:将打桩机安装到位,按要求的总重量配置重量,将打桩机平台调平。打桩前仔细检查打桩机设备和起重工具。5)桩基探测:根据测量定位点,用相同直径的钢管,用静力打桩机压穿1层素填层,探测表土的障碍物。防止桩尖挡住石块,以便顺利通过层淤泥。如果场地土层状况良好,为提高工作效率,可直接压桩,无需探桩。6)悬桩和插桩:根据各孔的设计桩长,选择各段的桩长和压桩顺序并编号。用打桩机自带的吊车按序号将桩子吊装到位,然后用夹具夹住桩子,对准测量定位点,将桩子插入孔内。在压桩过程中修正桩的角度是非常困难的,因
55、此在就位时应正确就位。第一段管桩插入地面时,必须保持正确的位置和方向。从轻压开始并仔细检查。如有偏差,应及时纠正。如有必要,拉出重压。桩的垂直度由专人安排,用两台经纬仪监测。经纬仪应设置在不受打桩影响的地方,相互成90左右的方向,并应经常调平,监测导架应保持垂直。机架的转动、滑动和停止均可调节。7)压桩:利用打桩机的重量,通过液压系统抱桩,将管桩垂直压入土中,利用两台经纬仪随时双向控制管桩的垂直度。并观察桩的压力和深度。如果初压时下沉量大,宜采用轻压。随着沉桩的加深,沉桩速度减慢,压力逐渐增大。在整个压桩过程中,压杆、桩帽和桩身应尽量保持在同一轴线上。必要时应根据桩身方向调整桩架导杆方向。注意
56、尽量不要使管桩受到偏压,以免管桩弯曲。当桩身难以下沉时,需要检查桩架导杆是否倾斜偏心,桩身是否垂直。根据设计桩位图绘制桩号编号方案,除压桩记录外,抄送甲方及监理人员一份,供监理人员查阅。选择桩位的浮动观测点并详细记录。8) 给料机:为了将管桩压到设计标高,需要使用给料机,给料机由钢板制成,长度较长11m。作业时先将给料机吊起,给料机下端面紧贴上管桩上端面,对准中心线,保证垂直度符合要求,然后加压至桩被送至设计标高并达到最终压力值。5、桩身垂直度保证措施调整打桩垂直度是保证打桩质量的关键,必须高度重视。总则当桩插入土5080cm时,停桩,然后调整垂直度。桩的垂直度由专人安排,用两台经纬仪监测(也
57、可以用铁锤挂线观察) 。 ,经常调平,监控导架保持垂直,并通过打桩机导架的转动、滑动和停留进行调整。打桩垂直度不得超过0.5%,满足要求方可继续打桩。在打桩过程中,施工人员随时观察打桩进尺的变化。如果地质层有障碍物,桩身发生偏移,应分一两笔逐步调整,不得一次强行改正。6 、PHC桩的验收PHC混凝土管桩进场后,业主、监理、供应商应会同四方对进场的PHC桩进行验收,办理验收手续,并做好检验记录和鉴定工作。 . PHC桩主要检查桩的外形尺寸和管桩的产品合格证。当在施工过程中对PHC桩的强度有任何疑问时,要及时与业主和监理进行沟通。 PHC桩的外观尺寸内容误差按建筑基础工程施工质量验收规程(GB50
58、202-2002)进行验收,并应符合下列要求:序列号项目内容偏差1外部的无蜂窝、露筋、裂纹、色泽均匀、堆顶无气孔2直径5mm3室壁厚度5mm4桩尖中心线2mm5桩顶平整度10mm6桩弯1.0秒表测定2电极质量设计要求检查产品证书3桩压%5检查压力表读数4接桩时上下接头平面偏差连接桩时节点弯曲下垂毫米101/1000L用钢尺测量用钢尺测量,L为两桩的长度5桩顶标高毫米50等级9、管桩堆放及装卸方法桩桩场地应平整坚实,防止不均匀沉降。堆垛时,必须采取可靠的防滚防滑措施。图A0.207L 0.586L 0.207L 图B起重机用于装卸,汽车运输。由于每根管桩的长度小于或等于每根管桩的长度,所以15m
59、采用两端吊钩吊装(如图A所示)。堆垛的底层应放置0.207L枕头,远离两端吊点(如图B),枕头的支撑点应在同一平面上。滚动,防滑。装卸时应轻拿轻放,严禁抛掷、碰撞、翻滚。起吊过程应保持平稳,避免剧烈振动,防止桩身开裂。起桩时,各起吊点应同时起吊,各起吊点受力均匀。六、建设计划及工期保障措施1、施工进度总体控制计划根据现场情况和施工要求,结合以往的施工经验,两台打桩机每天可打桩50根(施工15小时),按理论计算25天即可完成压桩。考虑到不可预见因素和天气影响,40天左右完成静压桩施工需要15天左右。二、保证工程进度的主要措施根据施工期可能影响施工计划的问题及施工进度网络图中的关键路径,为保证施工
60、期的实现,提出以下措施:1)保证工期的组织措施a、建立以项目经理为首的项目组织保障制度,落实项目经理负责制,在项目经理的领导下,加强施工管理,建立严格的责任制。项目部成员配置齐全,职责明确,层层把关。积极配合项目法人和监理工程师,相互协商,确保项目的连续性。b、选拔思想素质高、业务能力强的专业管理人员和施工人员,组成项目管理部和各类专业施工队伍。c、组织施工人员按计划进入现场,完善临时施工设施。d。做好项目前期准备工作,做到“五个落实”:即组织落实、技术落实、资金落实、物资落实、设备落实。e.积极加强施工和生产调度,与施工单位、设计单位、监理单位密切配合,定期召开现场协调会,形成协调会制度。解
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 服务合同期限协议
- 家长会学生心理健康教育
- 感恩父母写作要求
- 完整职场礼仪培训
- 幼教主要业绩工作总结
- 阿克地区温宿二中2025届普通高中招生选考科目考试试题含解析
- 阿图什市2025年四年级数学第二学期期末学业质量监测模拟试题含解析
- 陕西交通职业技术学院《公共安全数据处理技术》2023-2024学年第二学期期末试卷
- 中班冰雪天气交通安全
- 陕西工业职业技术学院《现当代文学专题研究》2023-2024学年第一学期期末试卷
- 小学生主题班会通用版中国少年先锋队入队前教育六知、六会、一做 课件
- 成立龙舟协会管理制度
- 《广告摄影》 教案
- 生物化学-脂类和生物膜
- 110kV升压站构支架组立施工方案
- CONSORT2010流程图(FlowDiagram)【模板】文档
- 【课件】Unit4Using+Language+课件人教版(2019)选择性必修第三册
- 地下管道漏水抢修施工方案范本
- 中国儿童戏剧发展史
- 钣金件通用检验作业指导书
- WMO三年级初级测评专项训练
评论
0/150
提交评论