1、Installation guidePurpose of this guideThis guide contains information regarding the installation and safe handling of solar street lights. All instruction should be read and understood before attempting to install. If there are any questions, please contact our sales department for further explanat

2、ion. The installer should conform to all the safety precautions in the guide when and installing the lamps. Local codes should also be followed in such installation.Before installing the solar street light, the installer should become familiar with the mechanical and electrical requirement for such

3、a system. Keep this guide in a safe placefor future reference (care and maintenance) and in case of sale or disposal of all the solar street lightsGeneralThe solar street lamp installation is different from traditional one especially for solar paneland battery. The installationand constructionproced

4、ureis as below: locationselected,cementbasepouring,preparationin field(batteryplacing,solarpanelandbracketconnection), post assembling (threading, light installation, panels and brackets mounting),pole lifting, battery connection, controller fixed, post location re-checked, and final inspection.1. L

5、ocation selected.Field survey. Make sure no shelter around and enough lifted space (no high-tension cable surrounding).According to street lamp road installation standard and requirement, there are three decoration methods for fixing post. Unilateral, bilateral cross and bilateral symmetry three kin

6、ds. Post height are based on effective road width and decoration method, and separation distance are about the height and light illuminate angle (General is three timesof height)2.cement base pouring:(1). Embedded part dimension.Accordingto factoryprovidinginformationand our actual demand,we suggest

7、postheight and embedded items dimension as below:dimensionEmbedded partsScrewNo.Height ( m )( L*W*H ) mmdiagonal dimensionSignNotes( mm )Model14400400800220M182465005001000280M203686006001400360M2448128008001500400M285(2).Digging hole.According to embedded parts dimension to ensure hole size, especi

8、ally reserve enough place for battery. Details as below:(3). Cement base pouring.Use C20 standardconcreteto pour , andtamp cementbase heavily with bobbingmachine. When pouring,do not make concrete splash whereon screw rod to slow downinstallation. When threading PVC pipe, take as the drawing require

9、ments to make sure noconcrete inside. Noticethere is250mm gap between downpipe terminal to flat surface.Finally make sure the surface ishorizontal witha tester toensure four feet in the samelevel.Preparation :As the installation requirements, prepare all the necessary tools and list themTransport an

10、d carry all the components listed, and check the quantity and models one by one.Installation :1. Battery installation.Before operation, make sure battery models are the same as configuration listed (if a group, make sure connection method first. If in parallel, should not be over 4 pcs). Connect eac

11、h terminal firmly and place them in battery cabinet. Seal the cabinet well with screws to avoid water seepage. Next put the cabinet in the hole and cover or bury it. What doing it, choose a fine day. After burying finish, check the voltage whether normal or not.2. Mounting solar panel.Fix the panel

12、into the bracket firmly with screws and connect as the requirement(inseries or parallel).Afterconnection,make a test for the output voltage whether meet theinstallation. In general, the tested voltage should not lower than 18V in 12V system. If 24Vsystem, the voltage not lower than 36V.3. Post assem

13、blingCheck the installation position and direction. Confirm the length of wires stripping required. Each terminal should be peeled out 150mm in general. And then install lamp and check the position and levelness based on post. After wire connection, notice the positiveandnegativepolesand inspectterm

14、inalswhetherfixedhard.All thesedone shouldaccording to the drawing picture.After finish lamp installation, use a multimeter to test the resistance and check there in no ground connection with the pole body. And then connect the battery to do light test.4. Lifting.Before lifting, prepare all the nece

15、ssary tools, such as spray paint, Rohan pull, hammer, allen, screws and etc and clean the cement base. When lift the pole up to 1m high, .adjust direction of solar panel and fix it. Do make sure the direction face the south. Meanwhile, spray paint if possible.In the process of lifting, notice the sp

16、eed and direction,meantime, people should helppole up. Slowly drop the pole and give a right order to the hoist man. Keep screws symmetrical when tighten and use the Strength stem when fix M24 and above screws. The stem should not be less than 1.2m. Four feet should stand balance and upright.5. Cont

17、roller installation.Operate as the manual instruction, battery connection first, load (light) second (light on or not, if on, check and change new one), solar panel last (observe light status. if off is normal. Some kinds have delayed function, off delayed for 3-5minutes is normal). When operation all these, do not mis-connect positive and negative terminals so as not to shock or destroy circuit. Close inspection window well.6.Post location re-checked.Finish above operations,re-check the post balance and stand level. Meantime, doantiseptic treatment

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论