版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、Steam Generator and Gum SeparationProject Name: Production of Drying Oil and Acetic Acid from Castor OilCompany Name: Team 32Presented by: Qian Yixi (U094350J)Team 32 - Strive for Engineering Excellence 1Objectives/RequirementsRecover heat from the process streams Remove gum solid from the process s
2、treamProvide proper feed stream condition in to ACO separatorDesign a pump for ACO recycle stream2Options1. How to recover the heatSteam generator (for reboilers-LPS, MPS, HPS)Preheater (ACO reactor and AA-AAN separator)2. Order of the equipmentSteam generator Preheaters Gum Separator Pressure regul
3、ating device3Recommended process 4Steam Generator - TypeAccording to Serth (2007), “a dirty or corrosive heating medium together with a moderately fouling process stream favours a horizontal thermosyphon reboiler.”5Heat transfer coefficient6Equipment SpecificationsPERFORMANCE OF ONE UNITSize: 0.3874
4、/1.5m (0.3302/6.1) Type: CEU Hor Heat transfer Area: 26.1 m2 (25.6) No of shells: 1Fluid allocationShell SideTube SideFluid nameBFWFluidFluid quantity, Totalkg/h777 (991)8186Vapor (In/Out)kg/s00.216 (0.28)00Liquidkg/s0.216 (0.28)02.2742.274Temperature (In/Out)C115.2195(196)288.9210Pressure (abs)kPa1
5、500 (1435)1399(1432)12201190 (1996)Pressure drop, allow./calc.kPa300.221(3.1)356539.75(23.7)Fouling resist. (min)m2*K/W0.000120.000530.00063Ao basedHeat exchanged498 kW (540)MTD corrected52.48 C (43)Transfer rate, Service250 W/(m2*K) (494)CONSTRUCTION OF ONE SHELLNumber passes per shell1 (shell side
6、)6 (Tube side)Tube typePlainMaterialSS 316ShellCarbon SteelShell ID387.4 mm(337)Tube pattern 90No of tubes54(26)Tube Length6.1 m(6.1)Tube OD25.4mmBaffle-crossingCarbon SteelType Single SegmentalCut(%d)35(39)Pitch0.0318 m7Gum Separator-Solid-liquid separation From Tarleton (2007), following types of
7、separation unit can be used for this process: Settling tank or lagoon thickener, Clarifiers, Sedimenting centrifuges, Lamella separator, Hydrocyclones, Disc stack, Scroll decanter, Rotary (vacuum) drum, etc. Only Gravity thickeners /clarifiers and Strainer Strainer is not able to recover solid. The
8、obvious advantage of gravity settling is its low cost Wakeman (2005). 8Preliminary DesignResidence Time =947s A = 27.4 m2Assume ideal settling involving the following elements:Discrete and unhindered settling is assumedEven distribution of flow entering the basinParticles that enter the sludge zone stay in the sludge.9Pressure Regulating Device10Valve Design11Cost Estimation12Equipment Specifications13AlternativesFilter instead of sedimentation tank Recover more l
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025年大学大一(思想政治教育)教育学原理阶段测试试题及答案
- 2025-2026年小学三年级语文(篇章理解)上学期期中测试卷
- 2025年大学养老服务管理(管理研究实务)试题及答案
- 中职第二学年(物流服务与管理)货运代理实务2026年综合测试题及答案
- 2025年大学视觉传达设计(平面设计)试题及答案
- 2025门诊个人年终总结报告
- 深度解析(2026)《GBT 17980.85-2004农药 田间药效试验准则(二) 第85部分杀菌剂防治花生叶斑病》
- 深度解析(2026)《GBT 17503-2009海上平台场址工程地质勘察规范》(2026年)深度解析
- 福建农业职业技术学院《临床免疫学及检验》2025-2026学年第一学期期末试卷
- 齐齐哈尔大学《中国传统城市设计理论与方法》2025-2026学年第一学期期末试卷
- 2026年包头钢铁职业技术学院单招职业适应性测试题库及答案详解1套
- 2025年西安市工会系统工会社会工作者招聘备考题库(61人)含答案详解(培优)
- 2025贵州省人才培训中心有限公司招聘2人笔试考试参考题库及答案解析
- 2025北京交响乐团第二次招聘3人笔试备考题库附答案解析(夺冠)
- 2025中原农业保险股份有限公司招聘67人笔试考试备考试题及答案解析
- 2025年保险从业资格考试保险基础知识试卷及答案
- 护理方法:青少年精神分裂症表现解读及护理指导
- 2026中国人民银行直属事业单位招聘60人备考题库及答案详解(历年真题)
- 压疮预防护理:压疮垫的科学使用指南
- (新教材)2025年人教版七年级上册历史期末复习常考知识点梳理复习提纲(教师版)
- 北京市通州区2024-2025学年九年级上学期期末考试数学试题
评论
0/150
提交评论