1、Quality Improvement Road Map For HTT质量改善路线图-针对欧洲HTT2008.08.18EKC.QA By Jiang BoCustomer Expectation客户要求:Quality performance improving to meet PPM request from customer. 提高量产品质量,满足客户PPM要求Following the updated QCI9310-190(M), prevent CIV complaints. 满足客户新的QCI9310-190(M)标准要求,防止CIV投诉.Perfect controls on
2、 APQP-PPAP, to keep quality performance be steady in mass production. 加强APQP-PPAP的管控,确保量产后的质量稳定性现状:Status:2008年上半年的PPM为289 PPM of the first half year of 2008 is 2892008年上半年已出现了2次CIV投诉2 CIVs in the first half year新产品的PPM很高Poor PPM performance of new parts.质量改善计划Quality Improvement Plan1、提升计划Expected
3、PPM improve plan2008年PPM达到200Goal of 2008, less than 2002009年PPM达到100Goal of 2009, less than 1002010年PPM达到50Goal of 2010, less than 502011年PPM达到20Goal of 2011, less than 202012年PPM达到9Goal of 2011, less than 202、到2008年底新工场筹建工作完成New shop floor will be done by end of 2008已筹建完成:2个铸造车间,2个加工车间,1个中子造型车间,1个
4、完成品仓库 Finished: 2-cast foundry,2-machining plant; 1-core molding plant,1-finished part warehouse.正在筹建中:实验室,资材仓库,组装车间,办公大楼In implement: Laboratory, material warehouse, assembly plant, office building.人员 :新工场总人数达到600人,所有管理部门全部编制到位,其中质量管理人员占6%左右Human resource: 600 people in new site, all management dep
5、t. have been set up, Quality takes 6%.3、针对量大的机种实施单元化作业-08年底完成Unitization operation for mass produced PN by end of 2008D单元C单元B单元A单元到08年底筹建完成8个生产单元,产量可达到12万左右/年8 operation units will be finished by end of 2008, capacity will be of 120,000 per year.4、对新的QCI9310-190(M)和APQP-PPAP标准进行内部培训-08年9月底完成Educatio
6、n & Learn on new QCI9310-190(M) and APQP-PPAP standard, by end of Sep-2008.将客户新的要求在EKC内部落实推进Transfer new customer request into internal instruction of Enkei.优化APQP,PPAP的过程质量管控,提高送样合格率,确保量产后过程质量稳定Optimize process control on APQP, PPAP, improve percent passing of sample, to keep be steady in mass prod
7、uction.5、安排专职人员进行SPC管控,提高KCC/ CIC尺寸的过程能力- 08年10月底完成Improve SPC, with dedicated people on each shift, instead of operators on line, to control KCC CIC dimensions capacity现状:在线操作员管控,效果不理想Status: Operator collect data to sum up.改善:每班追加专职人员进行SPC管控Improve: Add dedicated people do this work per shift.6、采取
8、分层审核,确保现场各工序标准化作业-实施中Audit class by class, to keep every work procedure following standard.7、加强现场设备、夹具的点检/保养-实施中Improve device, fixture maintenance, in implement.跟踪并揭示所有夹具的状态Fixture status tracking sheet专人负责对设备进行点检Maintenance record by dedicated people.7、加强刀具的寿命管理-实施中Improve control on cutting tools
9、 useful lives.8、加强量具和测量设备的定期校验/MSA-实施中Improve periodical calibration on measurement/MSA, in implement.9、通过定期的技能培训和考核,提高现场操作员的技能,减少人为造成的质量问题发生Education on operation system, by periodical training on operation skill, and examination on trainings.10、加强可视化管理,确保最终检查达到标准化检查,防止不良品流出Improve visual operation, to keep the operator known the latest quality information, and detail inspection standard.11、开展CSL1管控,防止客户投诉后同样的不良品再次流出-实施中Improve CSL1 controls before warehousing, prevent the re-occurrence of defection customer complaint12、每周开展品质会议,回顾每周
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 校园数据共享合作合同(2篇)
- 2025全面协议借款合同
- 2025艺人经纪公司合同范本下载
- 2025综合高级顾问聘请合同范本
- 金融与新质生产力
- 2025咖啡买卖合同范本标准版
- 2025年国家电网招聘之电网计算机自我检测试卷B卷附答案
- 2025建筑拆除工程合同协议书范本
- 初中历史明朝的统治+课件+2024-2025学年统编版七年级历史下册
- 2025年初级经济师之初级经济师人力资源管理能力测试试卷A卷附答案
- GB/T 45235-2025电子电气产品中双酚A的测定高效液相色谱法
- 《孕期并发症:妊娠剧吐》课件介绍
- 特种电线电缆的绿色生产与科技创新
- 消防管线施工方案
- 2025年度祠堂宗教用品销售承包合同3篇
- 2024旅行社与境外旅游机构入境合作框架协议范本3篇
- 《人文地理学》宗教地理与宗教景观
- 2025年中考语文二轮专题复习:现代文阅读高频考点及答题技巧 讲义
- 开工安全交底
- 【MOOC】量子信息原理与应用-南京大学 中国大学慕课MOOC答案
- 村上承包土地合同
评论
0/150
提交评论