旋转的容积泵技术条件_第1页
旋转的容积泵技术条件_第2页
旋转的容积泵技术条件_第3页
旋转的容积泵技术条件_第4页
旋转的容积泵技术条件_第5页
免费预览已结束,剩余1页可下载查看

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

1、Issue 12.98LS-Class: BMLINDE AGProcess Engineering and Contracting DivisionTechnical SpecificationPositive Displacement Pumps - Rotary based on API 676 first editionLINDE STANDARD306-76Orig.: TAM/Sm.Checked: T AM/NagelAppr.: T AN/Hent.Total 7 PagesDescriptors: Rotating Equipm., Displacement Pump, Pu

2、mp, API 676CONTENTSPage TOC o 1-5 h z HYPERLINK l bookmark0 o Current Document 0FOREWORD2 HYPERLINK l bookmark2 o Current Document 1GENERAL2 HYPERLINK l bookmark4 o Current Document Scope2 HYPERLINK l bookmark6 o Current Document Alternative Designs2 HYPERLINK l bookmark8 o Current Document Conflict

3、ing Requirements2 HYPERLINK l bookmark10 o Current Document Definition of Terms2 HYPERLINK l bookmark12 o Current Document Referenced Publications2 HYPERLINK l bookmark14 o Current Document BASIC DESIGN2GeneralRatings and SpeedsPressure CasingsCasing ConnectionsRotating ElementsMechanical Seals and

4、Conventional PackingBearingsLubricationMaterialsNameplates and Rotation ArrowsACCESSORIESDrivers TOC o 1-5 h z HYPERLINK l bookmark40 o Current Document Couplings and Guards5 HYPERLINK l bookmark42 o Current Document Baseplates5 HYPERLINK l bookmark44 o Current Document Relief Valves5 HYPERLINK l bo

5、okmark46 o Current Document Auxiliary Piping5 HYPERLINK l bookmark48 o Current Document INSPECTION AND TESTS5 HYPERLINK l bookmark50 o Current Document General5 HYPERLINK l bookmark52 o Current Document Inspection5 HYPERLINK l bookmark54 o Current Document Tests6 HYPERLINK l bookmark56 o Current Doc

6、ument Preparation for Shipment6 HYPERLINK l bookmark58 o Current Document GUARANTEE AND WARRANTY6 HYPERLINK l bookmark60 o Current Document VENDORS DATA6 HYPERLINK l bookmark62 o Current Document Proposal6 HYPERLINK l bookmark64 o Current Document Contract Data70 FOREWORDThis specification contains

7、modifications (Mod) and additions (Add) to API Standard 676, first edition, September 1980, which is a part of this specificationParagraph numbers used below are the API 676 paragraph numbers.Paragraphs not mentioned below shall remain as they are described in API 676Paragraphsmarkedin API with a bu

8、llet shall apply as stated, if not stated otherwisein thisspecification.Paragraph numbersherein which do not appear in API 676 are new paragraphs (Newpara which areinserted in alphabetical and/or numerical order.Paragraphsor partsof it which are substituted are marked with (Subst.Paragraphsor partso

9、f it which are deleted (Delete) shall not apply.The statements of this specification have to be observed, if deviations are not explicitly specified in other documents (purchase order, data sheet, job-referred specification, etc).This specification shall be applied with Pumps - Technical Specificati

10、on - General.GENERALScope(Add): This specification contains minimum requirements for pumps, their spare parts and accessories (if other special specifications are not valid).Alternative Designs(Add): Alternative designs deviating from this specification, but suitable for the operating conditions, ma

11、y be offered in addition. Deviations from this specification shall be specified in the proposal for approval by Purchaser.Conflicting Requirements(Add): The Vendor has to bring discrepancies to Purchasers attention.Definition of Terms(Add): The term Purchaser* as used in this specification shall ref

12、er to LINDE and/or its authorized representatives.The term Vendor as used in this specification shall refer to manufacturer of the equipment including his subcontractors.Referenced Publications(Mod): Instead of the U.S. publications shown in API 676, the equivalent German standards, codes and specif

13、ications, respectively standards, codes and specifications applicable for the plant, are valid.BASIC DESIGNGeneral(Add): All components, including drivers and gears, shall be suitable for a loading based on the maximum rated design pressure.(Add): The maximum allowable sound level and the requiremen

14、ts for noise control are specified separately.(Add): NPSHR shall be at least 1 m (3 ft) lower than NPSHA.(Mod): All electrical components and installations shall be suitable for the area classification and grouping specified on the Pumps - Technical Specification - General* and/or Data Sheet4.(Add):

15、 All equipment covered by this specification shall be suitable for operation outdoors, totally unprotected from the weather.(Newpara): In case the operating and/or plant conditions require cooling or heating, appropriate jackets shall be provided at the pump.Operating and rated design conditions of

16、the utility systems will be specified in Data Sheet* and/or Pumps - Technical Specification - General. The Vendor shall specify the required quantities of the utilities in the Data Sheet4.Ratings and Speeds(Add): Anticipated process variations are specified in Data Sheet.(Add): The maximum allowable

17、 working pressure and temperature are specified in Data Sheet,.Pressure Casings2.3.9 (Mod): Operating and design conditions for the cooling/heating system are specified on Pumps - Technical Specification - General4.Casing Connections(Mod): Inlet and outlet connections shall be flanged and shall have

18、 the same pressure rating. Exceptions will be especially agreed.(Mod): Design and rating of flanges are specified on Pumps - Technical Specification - General* and/or Data Sheet.(Add): Design of casing vent and drain are specified on Pumps - Technical Specification - General* and/or Data Sheet4.(Add

19、): The Vendor shall specify the maximum allowable forces and moments for the pump nozzles.(New para): Flange connections shall be designed for through-bolting. In case the flanges are not according to DIN or ANSI standard, the Vendor shall show all dimensions (thickness, diameter, etc.) on the outli

20、ne drawing.(Newpara): When pressure gauge connections shall be provided, this will be specified separately.Rotating Elements(Add): Rotors and shaft shall be stiff enough for the conditions at rated design pressure and temperature.(Newpara): The major rotating parts shall be dynamically balanced to G

21、rade G2,5 of ISO 1940.(Newpara): The effective vibration velocity (unfiltered) at the bearing housing of the pump shall not exceed 3,0 mm/s in vertical, horizontal and axial direction.Mechanical Seals and Conventional Packing(Mod): If not specified otherwise, mechanical seals shall be used.(Mod): Gl

22、ands shall be bolted for all pumps equipped with mechanical seals.(Add): Mechanical seals shall be of the hydraulically balanced type. Manufacturer of mechanical seals are specified in Data Sheet“ and/or Pumps - Technical Specification - General,.(Add): Type of mechanical seal (single, double or tan

23、dem) and required shaft sealing devices will be specified in Data Sheet14.2.6.4 (Mod): See para. 2.6.1.Bearings(Add): Additional the housing for oil-lubricated bearings shall be equipped with constant level oiler (see also para. 2.8.2).(New para): If water cooling is required water jackets or coolin

24、g coils may be used. Pipe connections inside the bearing housing are prohibited.(Newpara)-. Thrust bearing shall be a part of the pump.Lubrication(Mod): Oil-lubricated bearings in separate housings shall be furnished with constant level oiler.(New para): The requirement of a pressure lubrication sys

25、tem and the supplier will be especially specified.Materials(Add): The Vendor shall offer the most suitable materials for the specified operating conditions. Brass and bronze shall not be used for parts exposed to the ambient air.It is not permitted to use asbestos.3 (Add): All weld repairs of pressu

26、re casings have to be approved by the Purchasers material inspection department prior to repair.2.9.2.5 (New para): For construction weldings special specifications are valid. These shall be requested from the Purchaser, if required.2.9.3 (Mod): At allowable pumping temperature (temperature at rated

27、 design pressure) below minus 10 AD Instructional Pamphlet W 10H shall be used.2.10 Nameplates and Rotation Arrows(Add): At least the following informations are required:Name and address of the manufacturerPump type and sizeItem numberSerial numberRated capacityRated headPump speedPower inputImpelle

28、r diameter (maximum and installed)Casing hydrostatic test pressureRated design pressureRated design temperatureAdditionally, the item number and the casing hydrostatic test pressure shall be stamped on the discharge flange.ACCESSORIESDrivers(Add): The Purchaser will specify and furnish the pump driv

29、er (motor). For pumps with common base plate, the driver will be shipped directly to Vendors work shop for installation of the coupling, mounting and alignment of the whole unit by the Vendor. For pumps with separate base plate the Vendor shall ship the driver coupling half (completely machined!) to

30、 the driver manufacturer, if not specified otherwise.In case the driver is not a standard electrical motor, an outline drawing of the driver will be supplied to the Vendor.The Vendor shall provide all informations to enable the Purchaser to order the driver 3 weeks after pump purchase order.(Add): A

31、nticipated process variations that may affect the sizing of the driver will be especially specified in Data Sheet.(Add): See Pumps - Technical Specification - General and/or Data Sheet.(Add): See Pumps - Technical Specification - General and/or Data Sheet.(Mod): Belt and chain drives are not accepta

32、ble.(Newpara): Gears for positive displacement pumps - rotary shall be pump Vendors standard.Couplings and Guards3.2.2 (Add): Coupling manufacturer and type will be specified on Data Sheet1 and/or Pumps - Technical Specification - General.The coupling hubs shall have cylindrical fits. Use of taper f

33、its will be especially specified.Couplings shall be dynamically balanced.Baseplates(Add): Drain-rim or drain-pan baseplates suitable for grouting shall be furnished.(Mod): The baseplates shall be a fabricated steel unit.(Add): Baseplates with lift lugs shall be provided.(Mod): Anchor bolts shall be

34、supplied by the Vendor.(Add): The baseplate and pedestal support assembly shall be sufficiently rigid to be mounted without grouting. If the baseplate w川 not be grouted, it will be especially specified.(Add): Replaceable shims to compensate the tolerances shall be supplied by Vendor.Relief Valves(Mo

35、d): Relief (safety) valves for pump protection shall be provided by the Vendor, if not specified otherwise.Auxiliary Piping(Add): Non-Soldered Taper Bush Type Pipe Unions shall not be used.(Add): The cooling water piping on pumps shall be supplied by Vendor, terminating with flanges at the edge of t

36、he baseplate on pump side. All cooling points shall be piped in parallel. Each cooling point shall be furnished with a manual regulating valve in the inlet line and a closed sight flow indicator in the outlet line.All parts of auxiliary systems of the mechanical seals shall be supplied with material

37、 resistant to the liquid, but at least of stainless steel.(Mod): Brass and bronze shall not be used. Use of galvanized pipe will be especially specified.INSPECTION AND TESTSGeneral(Add): The tests and inspections required by the Vendor shall be specified in the proposal.Tests and inspections require

38、d by the Purchaser for specific items will be specified in purchase order and/or Data Sheet4.All inspections and tests shall be carried out by the Vendor. The inspections and tests witnessed by the Purchaser will be agreed with the Vendor and noted in purchase order and/or Data Sheet.Inspection(Add)

39、: The Vendor shall send all certificates and test data for the required tests and inspections to the Purchaser.Tests(Add): The following tests shall be performed on all pumps:Certified material test in accordance with Data SheetCertified hydrostatic testCertified performance testOther required tests

40、 will be specified in Data Sheet and/or purchase order.(Mod): The Vendor shall notify the Purchaser not less than ten (10) working days prior to the date of all agreed tests and inspections, so that the Purchaser may be present. After receipt of this notification the Purchaser will decide whether to

41、 be present.(Mod): Minimum test pressure shall be 1,5 times rated design pressure.Minimum test period shall be 30 minutes.(Newpara): For the performance test, the Purchasers driver shall not be used, if not specified especially. A calibrated test shop motor shall be used for performance testing.(Add

42、): If required, NPSH tests are specified on the Data Sheet,.(Add): The test conditions are the rated conditions with the usual speed allowances of the motors. Deviations shall be specified in the proposal for approval by Purchaser.(Add): Certified performance data and curves shall be supplied.4.3.5

43、(Newpara): Material TestsFor pressure containing parts and rotating parts the following certified tests in accordance withEN 10204 are required:Special Requirements(specified on Data Sheet EN 10204/3.1 B)Chemical analysis and tensile strength and impact tests verified by inspection certificates in a

44、ccordance with EN 10204/3.1 BNormal Requirements(specified on Data Sheet EN 10204/2.2)Chemical analysis and tensile strength verified by test report in accordance with EN 10204/2.2If the temperature at maximum allowable working (rated) pressure is below minus 29 , Special Requirements shall be appli

45、ed.4.4 Preparation for Shipment(Add): Outdoor storage for at least one (1) year must be provided for.(Add): Damages by unsuitable closures are in the responsibility of the Vendor.(Add): See 4.4.2.4GUARANTEE AND WARRANTYSee commercial specification.VENDORS DATAProposal(Mod): The Vendors proposal shal

46、l include:All informations and documents as shown in .Documents and Date Requirements in column A.Sheet TUMPS, Price and Weights completed.Special instructions for installation and piping.Contract Data(Add): See Documents and Date Requirements* and/or specification for documentation.(Add): Manufactu

47、ring shall start after the purchasers approval of the drawings.(Add): The specification for documentation shall be considered.(Add): Form and frequency of progress reports will be agreed between Vendor and Purchaser during discussion of the offer.(New para): Installation and operating instructionsTh

48、e manuals shall be delivered in such a form that they can be easily put into a four pin documentation folder.The manuals shall includeThe pump specific part consisting of:Data sheetPerformance test curveCharacteristic curve including NPSH-curveArrangement drawing of complete unit (pump, driver, gear

49、, auxiliaries, baseplate, etc.) = On the arrangement drawing the complete scope of supply has to be shown!Cross sectional drawing of pump and shaft sealing systemsDrawings of interconnecting piping (If not clearly shown in the arrangement drawing!)Parts listThe general part consisting of:General instructionsSpecial instructions for the specific operating conditions. Pr

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

最新文档

评论

0/150

提交评论