版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、管理信息系统(第7版)章节练习题及答案chapter extension 17管理信息系统(第7版)章节练习题及答案chapter extension 17 Copyright 2017 Pearson Education, Inc.管理信息系统(第7版)章节练习题及答案chapter extension 17Experiencing MIS, 7e (Kroenke)Chapter Extension 17 Agile Development1) According to the systems development life cycle (SDLC), the linear progre
2、ss from requirements to design to implementation is called the _ method.A) life cycleB) waterfallC) water cycleD) scrumAnswer: BAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss the key issues involved in managing the components of IT infrastructure.Learning Obj: LO 29.1: Why is the
3、 SDLC losing credibility?Classification: Concept2) Why is the systems development life cycle (SDLC) called the waterfall method?A) It does not return to a development phase that has been completed.B) It uses feedback from team members to schedule tasks.C) It delivers a working version of the product
4、 at frequent intervals.D) It can be used only for projects on information systems.Answer: AAACSB: Information TechnologyDifficulty: 2: ModerateCourse LO: Discuss the key issues involved in managing the components of IT infrastructure.Learning Obj: LO 29.1: Why is the SDLC losing credibility?Classifi
5、cation: Concept3) The systems development life cycle (SDLC) gained popularity because it was stipulated that it would be used for all software development contracts by the U.S. Department of _.A) DefenseB) EducationC) AgricultureD) CommerceAnswer: AAACSB: Information TechnologyDifficulty: 1: EasyCou
6、rse LO: Discuss the key issues involved in managing the components of IT infrastructure.Learning Obj: LO 29.1: Why is the SDLC losing credibility?Classification: Concept4) Which of the following statements indicates why the SDLC is falling out of favor?A) The system design is revised frequently.B) I
7、t allows the team members to establish the project schedule.C) It is risky, as no value is generated until the end of the project.D) Systems requirements do not change during a project.Answer: CAACSB: Information TechnologyDifficulty: 2: ModerateCourse LO: Discuss the key issues involved in managing
8、 the components of IT infrastructure.Learning Obj: LO 29.1: Why is the SDLC losing credibility?Classification: Concept5) The nature of the systems development life cycle (SDLC) denies the fact that system requirements are fuzzy and always changing.Answer: TRUEAACSB: Information TechnologyDifficulty:
9、 1: EasyCourse LO: Discuss the key issues involved in managing the components of IT infrastructure.Learning Obj: LO 29.1: Why is the SDLC losing credibility?Classification: Concept6) According to the systems development life cycle (SDLC), the progress from requirements to implementation is nonlinear
10、.Answer: FALSEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss the key issues involved in managing the components of IT infrastructure.Learning Obj: LO 29.1: Why is the SDLC losing credibility?Classification: Concept7) The systems development life cycle (SDLC) gained popularity whe
11、n the U.S. Department of Commerce stipulated that it would be used for all software development contracts.Answer: FALSEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss the key issues involved in managing the components of IT infrastructure.Learning Obj: LO 29.1: Why is the SDLC los
12、ing credibility?Classification: Concept8) In software development, where requirements change periodically, the waterfall model works well.Answer: FALSEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss the key issues involved in managing the components of IT infrastructure.Learning O
13、bj: LO 29.1: Why is the SDLC losing credibility?Classification: Concept9) The waterfall model used by the systems development life cycle (SDLC) is suitable for building physical things, such as a runway.Answer: TRUEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss the key issues inv
14、olved in managing the components of IT infrastructure.Learning Obj: LO 29.1: Why is the SDLC losing credibility?Classification: Concept10) The systems development life cycle (SDLC) is falling out of favor because it is very risky.Answer: TRUEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO:
15、 Discuss the key issues involved in managing the components of IT infrastructure.Learning Obj: LO 29.1: Why is the SDLC losing credibility?Classification: Concept11) Why is the systems development life cycle (SDLC) losing credibility?Answer: The systems development life cycle (SDLC) process is falli
16、ng out of favor in the systems development community, primarily for two reasons. First, the nature of the SDLC denies what every experienced developer knows is true: systems requirements are fuzzy and always changing. They change because they need to be corrected, or more is known, or users, once th
17、ey see a part of the application, change their minds. Other reasons are that business needs change, or technology offers other possibilities. According to the SDLC, however, progress goes in a linear sequence from requirements to design to implementation. Sometimes this is called the waterfall metho
18、d because the assumption is that once a phase is finished, it is not revisited. Requirements are done. Then design is taken up. Design is completed, and is followed by implementation. However, experience has shown that it just doesnt work that way.The second reason that the SDLC is falling out of fa
19、vor is that it is very risky. The people for whom the system is being constructed cannot see what they have until the end. At that point, if something is wrong, all the money and time has already been spent. Furthermore, what if the project runs out of money or time before it is completed? The resul
20、t is a form of management blackmail in which the developers ask for more money or time. If management declines, which it might because the time or money at that point is sunk, they are left not only with the loss but also with the unmet need that caused them to start the process in the first place.A
21、ACSB: Information TechnologyDifficulty: 3: ChallengingCourse LO: Discuss the key issues involved in managing the components of IT infrastructure.Learning Obj: LO 29.1: Why is the SDLC losing credibility?Classification: Concept12) The systems development life cycle (SDLC) generates values _.A) in the
22、 beginningB) after the design phaseC) at frequent intervalsD) at the very endAnswer: DAACSB: Information TechnologyDifficulty: 2: ModerateCourse LO: Discuss the key issues involved in managing the components of IT infrastructure.Learning Obj: LO 29.2: What are the principles of agile development met
23、hodologies?Classification: Concept13) Designing only the portions of the system that are needed to complete the current work being done is known as _ design.A) waterfallB) scrumC) just-in-timeD) frequentAnswer: CAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss the key issues involv
24、ed in managing the components of IT infrastructure.Learning Obj: LO 29.2: What are the principles of agile development methodologies?Classification: Concept14) Which of the following is an advantage of using agile techniques over the SDLC?A) In projects using agile techniques, customers test only th
25、e completed version of the product.B) Changes in systems requirements are incorporated toward the end of the project.C) System design is completed at the beginning of the project.D) A working version of the product is delivered frequently during the project.Answer: DAACSB: Information TechnologyDiff
26、iculty: 2: ModerateCourse LO: Discuss the key issues involved in managing the components of IT infrastructure.Learning Obj: LO 29.2: What are the principles of agile development methodologies?Classification: Concept15) Test as you go is a principle of the SDLC.Answer: FALSEAACSB: Information Technol
27、ogyDifficulty: 1: EasyCourse LO: Discuss the key issues involved in managing the components of IT infrastructure.Learning Obj: LO 29.2: What are the principles of agile development methodologies?Classification: Concept16) Extreme programming is one of the alternatives to the systems development life
28、 cycle (SDLC).Answer: TRUEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss the key issues involved in managing the components of IT infrastructure.Learning Obj: LO 29.2: What are the principles of agile development methodologies?Classification: Concept17) Agile development methodol
29、ogies welcome changes in requirements.Answer: TRUEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss the key issues involved in managing the components of IT infrastructure.Learning Obj: LO 29.2: What are the principles of agile development methodologies?Classification: Concept18) Th
30、e systems development life cycle (SDLC) processes are designed to frequently deliver a working version of a product.Answer: FALSEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss the key issues involved in managing the components of IT infrastructure.Learning Obj: LO 29.2: What are
31、the principles of agile development methodologies?Classification: Concept19) Unlike agile techniques, the systems development life cycle (SDLC) delivers benefits early and often.Answer: FALSEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss the key issues involved in managing the co
32、mponents of IT infrastructure.Learning Obj: LO 29.2: What are the principles of agile development methodologies?Classification: Concept20) Agile development methodologies advocate the design of the complete system at the beginning.Answer: FALSEAACSB: Information TechnologyDifficulty: 1: EasyCourse L
33、O: Discuss the key issues involved in managing the components of IT infrastructure.Learning Obj: LO 29.2: What are the principles of agile development methodologies?Classification: Concept21) Agile development methodologies discourage interaction between developers and customers.Answer: FALSEAACSB:
34、Information TechnologyDifficulty: 1: EasyCourse LO: Discuss the key issues involved in managing the components of IT infrastructure.Learning Obj: LO 29.2: What are the principles of agile development methodologies?Classification: Concept22) Just-in-time design may lead to substantial revision of the
35、 work product produced previously in the project.Answer: TRUEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss the key issues involved in managing the components of IT infrastructure.Learning Obj: LO 29.2: What are the principles of agile development methodologies?Classification: Co
36、ncept23) According to agile development methodologies, testing never involves business customers.Answer: FALSEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss the key issues involved in managing the components of IT infrastructure.Learning Obj: LO 29.2: What are the principles of a
37、gile development methodologies?Classification: Concept24) Agile development techniques assume that the development teams are unaware of their weaknesses.Answer: FALSEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss the key issues involved in managing the components of IT infrastruc
38、ture.Learning Obj: LO 29.2: What are the principles of agile development methodologies?Classification: Concept25) Agile development methodologies are applicable only to team projects on information systems.Answer: FALSEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss the key issues
39、 involved in managing the components of IT infrastructure.Learning Obj: LO 29.2: What are the principles of agile development methodologies?Classification: Concept26) What are the principles of agile development methodologies?Answer: The following are the principles of agile development: Expect, eve
40、n welcome, changes in requirements Frequently deliver working version of the product Work closely with customer for the duration Design as you go Test as you go Team knows best how its doing/how to change Can be used for applications, information systems, and business process development AACSB: Info
41、rmation TechnologyDifficulty: 2: ModerateCourse LO: Discuss the key issues involved in managing the components of IT infrastructure.Learning Obj: LO 29.2: What are the principles of agile development methodologies?Classification: Concept27) Which of the following development methodologies is associa
42、ted with the scrum process?A) agile developmentB) systems development life cycleC) V-ModelD) rapid application developmentAnswer: AAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss the key issues involved in managing the components of IT infrastructure.Learning Obj: LO 29.3: What is
43、 the scrum process?Classification: Concept28) According to scrum essentials, the first step of each work period is to _.A) conduct team meetsB) determine tasks to performC) select requirements to considerD) deliver a working versionAnswer: CAACSB: Information TechnologyDifficulty: 1: EasyCourse LO:
44、Discuss the key issues involved in managing the components of IT infrastructure.Learning Obj: LO 29.3: What is the scrum process?Classification: Concept29) Which of the following is true of paired programming?A) Two team members get together and write two separate programs.B) Two members share the s
45、ame computer and write a program together.C) A team member writes two programs.D) A team member and the customer pair up to write a program.Answer: BAACSB: Information TechnologyDifficulty: 2: ModerateCourse LO: Discuss the key issues involved in managing the components of IT infrastructure.Learning
46、 Obj: LO 29.3: What is the scrum process?Classification: Concept30) Diana and her team are working on developing a software to manage accounting processes for a firm. Her team is following the scrum methodology, and Diana is the only person who has the authority to make changes in the requirements a
47、nd priority of the project. This makes Diana the _ of the team.A) scrum masterB) product ownerC) database designerD) business analystAnswer: BAACSB: Reflective ThinkingDifficulty: 2: ModerateCourse LO: Discuss the key issues involved in managing the components of IT infrastructure.Learning Obj: LO 2
48、9.3: What is the scrum process?Classification: Application31) The function of a scrum master is to _.A) stop the misuse of meeting timeB) change product requirements and their priorityC) test programs on a regular basisD) develop the database designAnswer: AAACSB: Information TechnologyDifficulty: 1
49、: EasyCourse LO: Discuss the key issues involved in managing the components of IT infrastructure.Learning Obj: LO 29.3: What is the scrum process?Classification: Concept32) Scrum essentials encourage minimal documentation.Answer: TRUEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss
50、 the key issues involved in managing the components of IT infrastructure.Learning Obj: LO 29.3: What is the scrum process?Classification: Concept33) In the scrum process, a stand-up is a 15-minute team meeting.Answer: TRUEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss the key iss
51、ues involved in managing the components of IT infrastructure.Learning Obj: LO 29.3: What is the scrum process?Classification: Concept34) In paired programming, two computers are used by the same programmer.Answer: FALSEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss the key issues
52、 involved in managing the components of IT infrastructure.Learning Obj: LO 29.3: What is the scrum process?Classification: Concept35) Briefly outline the scrum essentials.Answer: The following are the scrum essentials: Requirements list drives process Each work period (1 to 48 weeks):Select requirem
53、ents to considerDetermine tasks to performselect requirements to deliverTeam meets daily for 15 min (stand-up) What I did yesterday What Im going to do today Whats blocking meTest frequentlyPaired work possibleMinimal documentationDeliver (something) that worksEvaluate teams work process at end of p
54、eriod (and say thanks) Rinse and repeat until:Customer says were doneOut of timeOut of money Three principal roles:Product Owner (business professional)Scrum MasterTeam Members (7 2 people)AACSB: Information TechnologyDifficulty: 2: ModerateCourse LO: Discuss the key issues involved in managing the
55、components of IT infrastructure.Learning Obj: LO 29.3: What is the scrum process?Classification: Concept36) According to the scrum essentials, when is a project said to be done?Answer: Work continues in a repeating cycle of scrum periods until one of three conditions is met: The customer is satisfie
56、d with the product created and decides to accept the work product, even if some requirements are left unsatisfied. The project runs out of time. The project runs out of money.AACSB: Information TechnologyDifficulty: 2: ModerateCourse LO: Discuss the key issues involved in managing the components of
57、IT infrastructure.Learning Obj: LO 29.3: What is the scrum process?Classification: Concept37) In a scrum, who is a product owner?Answer: The product owner is the business professional who provides the requirements and is available for clarification and testing. The product owner is the only person o
58、n a scrum team who has the authority to add, delete, or change requirements and their priority.AACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss the key issues involved in managing the components of IT infrastructure.Learning Obj: LO 29.3: What is the scrum process?Classification: C
59、oncept38) In a scrum, who is a scrum master? What are his or her responsibilities?Answer: A scrum master is an expert in scrum processes who helps to keep the process organized and operating. The scrum master is not the boss; he or she is more like a coach or even a referee. The scrum master steps i
60、n when meetings go too long, when team members are misusing meeting time, when the product sponsor isnt doing his or her job, and when other situations are not working. The scrum master is also the guardian of team members time. If distractions occur, the scrum master steps in to eliminate them. If
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 幼儿园教育工作的心得体会
- 高考百日倒计时誓师大会演讲稿
- 幂的乘方积的乘方教案6篇
- 社会实践实习报告15篇
- 销售工作心得体会范文800字(34篇)
- 年终总结大会发言稿
- 2022年餐饮行业食品安全员能力考核试卷-含答案
- 第一章绪论及学前教育基本原理
- 高处安装、维护、拆除试题题库及答案
- 项目安全培训试题及参考答案【综合题】
- 法治教育教学教案及反思(3篇模板)
- JBT 7363-2023 滚动轴承 零件碳氮共渗 热处理技术规范 (正式版)
- 饲料加工员试题及答案
- 2024年湖南省长沙市湖南师大附中教育集团中考全真模拟考试(一模)语文试题
- 寓德育教育于化学教学
- CRRT治疗原理、模式选择
- GB 21257-2024烧碱、聚氯乙烯树脂和甲烷氯化物单位产品能源消耗限额
- 人教版九年级化学暑假衔接课程05分子和原子 讲义
- 生产部门年度培训计划
- 在线网课学习知道《学习科学与技术(山东师大)》单元测试考核答案
- 0-3岁婴幼儿亲子关系与互动智慧树知到答案2024年杭州师范大学
评论
0/150
提交评论