1、Supplier Performance Development ProcessTask 15 PPAP.Task DescriptionProduction Part Approval Process (PPAP)Production parts are manufactured at the production site using production tooling, gaging, equipment, operators, etcParts from production run are analyzedTest results and records from APQP are

2、 submitted with Part Submission WarrantPPAP.PurposeFor the supplier to demonstrateall design records and specification requirements are properly understoodthe process has the capability to produce product that meets requirements.SomethingChanged Application AIAG PPAP manual defines when PPAP submiss

3、ion is required New partCorrection to discrepancy in previous submissionDesign or process changeChange in source of subcontracted materials or servicestransfer or rearrangement of tooling & equipment.MethodologyBuyer enters PPAP submission date on purchase orderApprover determines submission levelde

4、fault level 3default level 4 for raw materialSupplier submits PPAPPPAPALL.xls electronic submission recommendedApprover evaluates PPAP packageLevel 5 at supplier site Approver determine part submission status Notify supplier and manufacturing of status.DFMEAControl PlanEarly Production Containment P

5、lan (Pre-Launch Control Plan)Process capability studiesGage Measurement System AnalysisLab Accreditation & scopeRestricted & Reportable Materials formInterim Worksheet, if requiredSupplier Data ReceivedWarrantAppearance Approval Report (AAR), as requiredSample PartsPrint/Design RecordEngineering Cha

6、nge DocumentsCheck fixtures/aidsProcess Flow DiagramPFMEA.PPAP Review ChecklistDelphi checklist to assist with evaluation of PPAP packageAction plan created with use of checklist.Flow ChartLinkage of Product Characteristics from DFMEA to Operational StepsOperation numbers consistent with PFMEA, Cont

7、rol Plan, Operator InstructionsEnsure identification of inspection and reworkUse A-6 Process Flow Chart checklist in APQP manual to evaluate.PFMEALinkage with DFMEA, Process Flow, Control Plan, Operator Instructions, etcDegree to which high RPNs are addressed with preventive strategiesAction Plans a

8、ssigned, implemented, effectiveness assessed and RPN recalculatedUse A-7 Process FMEA checklist in APQP manualRPN = 504.DFMEAAssess feasibility, risk, design intent issuesConfirm manufacturing process capability consideredFocus on Critical CharacteristicsLessons Learned incorporatedUse A-1 Design FM

9、EA checklist in APQP manual to evaluate.Control PlanEnsure Control Plan is aligned to, and correlates with, DFMEA, Process Flow, PFMEAControl Methods appropriate to variation type(s)Incorporates Lessons Learned, Statistical DataUse A-8 Control Plan checklist in APQP manual to evaluate.Pre-Launch Con

10、trol PlanEarly Production Containment requirementsAdditional controls included for proper duration or quantityPFMEA and statistical data used to determine what additional controls necessaryshort term capabilitylong term capability on similar process.Process Capability Studies.MSA StudiesMeasurement

11、uncertainty determinedGage R&R, Bias, Stability, and LinearityGage R & R acceptance guidelines30% unacceptable, measuring system needs improvementVerify study performed correctly.Part Submission StatusFull Production ApprovalInterim ApprovalAuthorize shipment to Delphi without Full Production Approv

12、alCorrective Action Plan is requiredRejectedCorrected submission required before production quantities may be shipped.Interim Part ClassA parts from production tooling and meet specs, not all PPAP requirements have been metB parts from production tooling and require rework to meet specsC parts not f

13、rom production tooling, parts meet specsD parts do not meet specsE parts do not meet specs and vehicles with class E parts require retrofit to make them saleable.SummaryAIAG PPAP manual defines requirementsAPQP Product and Process ValidationSupplier submits PPAP to proper levelPPAP package evaluated and status determinedSupplier and Delphi manufacturing sit

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论