




版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、The Warehouse Design and Control ProblemBased on Rouwenhorst et. al.,EJOR, Vol. 122, pgs 515-533, 2000Yoon, C. S. and Sharp, G., IIE Trans., Vol. 28, pgs 379-389, 19961Topics already coveredThe roles of the Warehouse in contemporary distribution networksBufferConsolidationValue Adding ProcessingWare
2、house classification based on Customer typesFactory WarehouseRetail Distribution WarehouseCatalog RetailerSupport to Manufacturing operations2Topics already covered (cont.) Warehouses processes and the associated material flowReceivingShippingReserve StorageandPallet PickingCasePickingBrokenCasePick
3、ingAccumulation, Sortation & PackingCross-dockingDirectputawayto reserveDirectputawayto primaryReplenishmentReplenishment3Topics already covered (cont.)Major warehouse equipment, its functionality, and justificationContainers & Unitizing EquipmentStorage and Retrieval EquipmentUnit LoadSmall LoadCon
4、veyorsWarehouse docks and dock-related equipmentAutomatic Identification and Communication Equipment4Major decisions underlying the Warehouse deployment and operationsConfiguration issuesOrganization of the material flowUnit LoadsEstablishment of a forward areaitems to be included in the forward are
5、asizing of the forward areaZoning, Time Windows and Pick WavesEquipment selection and its sizingstorage modesorder picking and material handling equipmentWarehouse management system and automatic identification and communication equipmentLayout: Allocation of Storage CapacityPersonnel skills and siz
6、ing5Major decisions underlying the Warehouse deployment and operationsPoliciesReceiving policiesAssigning trucks to docksStorage policiesAssigning received material to storage locationsReplenishment policiesOrder processing policiesorder batching policieszoning policiespicker routingSortation and co
7、nsolidation policiesShipping policies6Decision / Performance CriteriaResponsivenessQualityCostInvestment +OperationalSpace/Equipment/LaborProduct qualityOrder accuracyOrder flow timethroughputfill ratevolume flexibility/storage capacitymix flexibility= Multi-criteria Optimization Problem!7Warehouse
8、types/missions and Competitive StrategiesFactory warehouse: Interfaces production with wholesalerssmall number of large orders dailyadvance info about order composition= focus on cost and order accuracy(responsiveness depends heavily on production schedules)Retail Distribution warehouse: Serves a nu
9、mber of captive retail unitsadvance info about order compositioncarton and item picking from a forward areamore orders per shift than consolidation/shipping lanes= focus on cost, accuracy and fill rate(responsiveness depends heavily on truck routing schedules)Remark: If the retail units are not capt
10、ive, then responsiveness becomes a crucial issue!8Warehouse types/missions and Competitive StrategiesCatalog Retailer: A warehouse filling orders from catalog salesa large number of small (frequently single-line) ordersitem and, sometimes, carton pickingdaily composition of orders usually unknownonl
11、y statistical information available= focus on cost and response timeSupport of Manufacturing operations: A stock room providing raw material and/or work-in-process to manufacturing operationsmany small ordersonly statistical information available about order compositionstringent time requirements (e
12、.g., response in 30 min)= focus on response time but also accuracy and cost9Yoon & Sharps design procedureMANAGERIAL CONSIDERATIONSPRODUCT DATAORDER DATADATA ANALYSISDATA ANALYSISSPECIFICATION OF ORDERPICK SYSTEM STRUCTURESPECIFICATION OF EQUIPMENTSPECIFICATIONOP. STRATEGIESMATERIALFLOWINFORMATIONFL
13、OWSUBSYSTEMISUBSYSTEMIISUBSYSTEMNSUBSYSTEM RECONCILIATIONEVALUATION & SELECTIONOVERALL PERFORMANCE ANALYSISINPUTSTAGESELECTIONSTAGEEVALUATIONSTAGE10Defining Department and Subsystem structureDepartment ADepartment BSubsystem A1Subsystem A2Subsystem AnSubsystem B1Subsystem B2Subsystem BnTransport Equ
14、ipment 1Transport Equipment 2Transport Equipment kStorage structure (e.g., Gravity Flow Rack)TransferDeviceStorageEquipmentRetrievalEquipment(e.g., pick to light)Transfer DeviceTransportEquipment(e.g., forklift)TransportEquipment(e.g., BeltConveyor)11Determining the basic system structureProduct dat
15、a:Activity levelrequested quantitiesproduct propertiesvendor typesOrder data:number of line itemsnumber of itemscubic volumeshipping prioritiesproduct correlationManagerial requirements /company strategy Definition of major functional areas / departments Definition of departmental sub-systems Storag
16、e and material handling modes Operational policies storage policies replenishment policies order picking policies batching sorting zoning routing receiving & shipping policies12Warehouse Activity Profiling(c.f. Bartholdi & Hackman, Chpt. 10)The careful measurement and statistical analysis of the war
17、ehouse activity.The process of understanding the customer orders that drive the systemSifting through historical data for opportunities and insights that might confer advantage.WAPSKU dataOrder dataLocationdataSummary statisticsDistributions “Structural” Characterizations, e.g., prevailing patterns/
18、trends relations dominant elements13Addressing the problem complexity:Hierarchical DecompositionStrategic-level decisions: they have the longer-lasting impact on the operation of the warehouse, and involve major investmentprocess flow designequipment selectionTactical-level decisions: medium-term de
19、cisions which might still involve significant investmentsizing of the facility areas and its equipmentStorage layoutresolution of organizational issues like the storage and replenishment schemes, and batch sizingOperational-level decisions: Decisions and policies related to the real-time operation o
20、f the facilityassignment and control problems of people and equipment14Strategic-Level Concerns (Rouwenhorst et.al.)ReceivingStoringOrderpickingShippingResourcesProcessesOrganizationSeparatereserve area?Batching?Differenttypes ofstorage?Types ofstorageStorageunitTypes ofsorting eq.15ReceivingStoring
21、OrderpickingShippingResourcesProcessesOrganizationTactical-level concerns(Rouwenhorst et. al.)Forward andreserve areaStorageconceptPick zonesBatch sizeNumberof docksTech. zonesNumberof docksLayoutStoring and Picking eq. capacityPeripheral eq. and workforce capacity16Operational-level concerns(Rouwen
22、horst et. al.)ReceivingStoringOrderpickingShippingResourcesProcessesOrganizationDockAssignmentReplenish-ment PolicyStorageplanDockAssignmentBatchformationPicking taskAssignmentRoutingDwell pointChute AssignmentWorkforce Assignment17General RemarksThe decomposition is ad-hoc: no theoretical justifica
23、tionTop-down approach: Higher-level decisions constitute constraints for lower-level decision making: However, they must be revised if the lower-level problems become infeasibleMost existing quantitative analysis addresses tactical and operational issuesStrategic level issues hard to formally model and analyze due tounderlying problem complexityelusive / intangible nature of some of the c
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 公家车库出售合同标准文本
- 买叉车合同标准文本
- 农业借款合同样本
- 代储代销合同标准文本
- 00后创业项目合同标准文本
- 公司租土方车合同标准文本
- 停车合同标准文本
- 个人戒指转让合同样本
- 个体法人转让合同范例
- 保险合同样本
- 2025年二级建造师建筑实务真题及答案
- 2025年山西地质集团招聘笔试参考题库含答案解析
- 提高发票额度的合同6篇
- 《美国基本概况》课件
- 2025届浙江省温州市九校高三第二次调研数学试卷含解析
- 中建防台风、防汛、防洪应急预案
- 体检报告电子版
- 2024新修订《医疗器械监督管理条例》培训课件全
- 反诈知识竞赛题库及答案(共286题)
- 旅游安全法律法规培训
- 【读后续写】2020年1月浙江高考英语读后续写课件-陶江英
评论
0/150
提交评论