1、Page 19E燃机极好的学习资料燃机极好的学习资料Page 2Index 目录目录1. Gas Turbine Principle & General Introduction 燃机原理及概况燃机原理及概况2. Gas Turbine Structure 燃机本体结构燃机本体结构3. Gas Turbine Accessory Systems 燃机附属系统燃机附属系统4. Gas Turbine Control System 燃机控制系统燃机控制系统5. Gas Turbine Shipment Weight & Dimension 燃机运输重量及尺寸燃机运输重量及尺寸6.
2、Gas Turbine Erection Procedure 燃机安装步骤燃机安装步骤7. Gas Turbine Commissioning Procedure 燃机调试规程燃机调试规程 8. Gas Turbine Performance Procedure 燃机性能试验规程燃机性能试验规程Page 3Physics Principle of Conservation of Mass:mass in = mass out (Open System) Principle of Conservation of Energy:energy in = energy outenergy may be
3、 transformed from one form to another (Power Plant converts Chemical to Thermal to Mechanical to Electrical Energy)Page 4First Law of ThermodynamicsQ = 727 MWW= 281 MWExample: 9FB Energy BalanceDH4-1 = 446 MW Where:DH = total enthalpy change fluid entering systemQ = net thermal energy flowing into s
4、ystem during processW = net work done by the system General Energy Equationenergy in = energy out, or Q = W + DHPage 5Second Law of Thermodynamics - Amount of energy which is unavailable to do work- A measure of disorderEntropy:100 xTTTHCHeCarnotCyclBasic Principle: Heat moves from hot to coldPage 6
5、Note: s denotes entropy1434311212TTPPTTPPIdeal Brayton Cycle Gas Turbine Application)T(T)T(T)T(T Heat Content (Fuel)Work Output (MW)231243Cycle-=Page 7Real Brayton Cycle Compression and Turbine Expansion Inefficiencies Typical Values for GE TurbinesCompressor Efficiency 0.86-0.89Turbine Efficiency 0
6、.90-0.93ActualIdealcompressorTTTT)()(1212ActualIdealcompressorWorkWork11212PPTTIdealEntropyTemperaturePeak Cycle PressureMinimum Cycle PressureCompressionTurbine ExpansionConstant PressureHeat AdditionConstant PressureHeat RejectionIdeal CycleWith c& tLEGEND1234Page 8Real Brayton Cycle Pressure
7、Losses - Inlet, Combustor, ExhaustEntropyTemperatureCompressor Discharge PressureAmbientPressureCompressionExpansionHeat AdditionHeat RejectionCombustor DPExhaust DPInlet DPIdeal CycleWith c& tWith DPsLEGENDEntropyTemperatureCompressor Discharge PressureAmbientPressureCompressionExpansionHeat Ad
8、ditionHeat RejectionCombustor DPExhaust DPInlet DPIdeal CycleWith c& tWith DPsLEGENDIdeal CycleWith c& tWith DPsLEGEND Typical Values for TurbineInlet Pressure Loss 3” H2OExhaust Back Pressure (SC) 5.5” H2OExhaust Back Pressure (CC) 15” H2ODLN Combustor 6-7% DP/PInletExhaustCombustor2314Page
9、 9Real Brayton Cycle Parasitic Flows for Turbine CoolingEntropyTemperatureCompressor Discharge PressureAmbient PressureCompressionExpansionHeat AdditionHeat RejectionCombustor DPExhaust DPInlet DPStg 1 CoolingStg 2 CoolingStg 3 CoolingIdeal CycleWith c & tWith DPsWith Cooling FlowsLEGENDExit Con
10、ditions:Texh 1150FPexh 14.7psiExit Conditions:Texh 1150FPexh 14.7psiCDCompressor BleedBearingBlower air(7FA+e shown)13t hst g. C om p. bl eed9t hst g. C om p. bl eedExit Conditions:Texh 1150FPexh 14.7psiExit Conditions:Texh 1150FPexh 1000CFiring T 1250CPage 13Evolution of MHI Gas TurbinesPage 14Line
11、-Up of MHI Gas TurbinePage 15The Efficiency and Power Output of MHI Gas TurbinePage 16MHI 701F / 701G Gas Turbine featuresPage 17Siemens Gas TurbinesPage 18Siemens SGT5-4000F (V94.3A)Page 19Alstom GT26 Gas Turbine FeaturesPage 20Alstom Gas Turbine Combined Cycle (50 Hz&60 Hz)Page 21典型F级机组和E级机组的性
12、能及参数表表 1:F级简单循环燃气轮机的参考性能(级简单循环燃气轮机的参考性能(ISO标准参考条件)标准参考条件) 生产厂商GESIEMENSMHI型号PG9351FAV94.3AM701F功率(MW)255.6267270热效率()3738.738.2空气流量(kg/s)632.7645651排气流量(kg/s)659压缩比15.416.917.0压气机级数181517透 平 转 子 进 口 温 度(TRIT)()132713101400*透平级数344透平排气温度()609576586NOx排放量(天然气燃料)(ppm)252525机组重量(t)240330340机组近似尺寸22.65.0
13、5.412.56.17.517.35.85.8注*:这是透平参考进口温度,即透平第一级喷嘴前的温度。 Page 22表表2:由:由F级燃气轮机组成的联合循环机组的参考性能(级燃气轮机组成的联合循环机组的参考性能(ISO标准参考条件)标准参考条件)生产厂商GESIEMENSMHI型号S109FAS209FA1S.V94.3A2S.V94.3AMPCP1(M701F)MPCP2(M701F)CC功率(MW)390.8786.9392784397.7799.6GT功率PGT (MW)254.1508.2513.0266.1532.2ST功率PST (MW)141.8289.2281.5131.626
14、7.4PGT/PST1.7921.7571.8222.0221.990热效率()56.757.157.457.357.057.3燃机、汽机配置1+1单轴2+11+1单轴2+11+1单轴2+1余热锅炉配置三压再热三压再热三压再热三压再热三压再热三压再热Page 23表表 3:E 级简单循环燃气轮机的参考性能(级简单循环燃气轮机的参考性能(ISO标准参考条件)标准参考条件)生产厂商GESIEMENSMHI型号PG9171EV94.2/V94.2AM701D功率(MW)123.4157/192144热效率()33.7934.4/35.834.8空气流量(kg/s)403.7510/522441排气流
15、量(kg/s)519/532压缩比12.311.1/14.014.0压气机级数171719透 平 转 子 进 口 温 度(TRIT)()11241105/12901250*透平级数344透平排气温度()538540/572542NOx排放量(天然气燃料)(ppm)2525/2525机组重量(t)190295/320200机组近似尺寸(m)204.64.81412.58.412.016.07.4112.55.25.28Page 24表表4: 由由E级燃气轮机组成的联合循环机组的参考性能(级燃气轮机组成的联合循环机组的参考性能(ISO标准参考条件)标准参考条件) 生产厂商GESIEMENSMHI型
16、号S109ES209E1.V94.22.V94.21.V94.2A2.V94.2AMPCP1(M701D)MPCP2(M701D)CC功率(MW)189.2383.7233467.5293.5588212.5426.6G T 功 率 PG T (MW)121.6243.2152.0304.0367.0142.1284.2S T 功 率 PS T (MW)70.4146.185.5173.0230.070.4142.4PGT/PST1.7271.6651.7781.7571.5962.0181.996热效率()52.052.751.751.855.155.051.451.6燃机、汽机配置1+12
17、+11+12+11+12+11+12+1余热锅炉配置双压无再热双压无再热双压无再热双压无再热双压无再热双压无再热双压无再热双压无再热Page 25GE Gas Turbines9FA at Horizontal AssemblyPage 26CompressorCombustionTurbineKEY:= Static= RotatingMajor Gas Turbine ComponentsAir InletGas ExhaustCold EndHot EndFuelPage 27GE Gas Turbines Family:Evolutions and PerformancesPage 2
18、819867F1260 Tfire19919F1260 Tfire19927FA1288 Tfire19946FA1288 TfireScaleFactor = 0.6919967FA+1316 Tfire19977FA+e1327 Tfire19979FA+e1327 Tfire20016FA+e1327 TfireScaleFactor = 1.220007FB1370+ Tfire88891990919293949596979899200020011986200220038720029FB1396 TfireSIZE (Scaling Factor )(Technology, Mater
19、ials)Firing Temperature,Evolution of Class F Gas Turbines5230 RPMGeared Machines for 50 or 60Hz19929FA1288 Tfire 3000 RPM 50Hz Machines 3600 RPM 60Hz Machines Page 29CompressorMulti-stages, Axial compressorThrough Bolted Disc AssyCast Compressor CasingsIGV for flow control (1 stage IGV for E/F class
20、)Air discharged to CombustorsPage 30Combustion SystemCan Annular Reverse Flow Chambers Dual Fuel Capability (Gas - Liquid)Dry Low NOx , Standard , or Low BTU Combustion Systems,Water /Steam injection for emission abatement Page 31 3 Stage Turbine Air cooled Blades and NozzlesTip shrouded BladesTurbi
21、ne ( Air cooled GT ) Rotor Assembly = Bolted Discs & SpacersPage 32Page 33Siemens SGT6-5000FPage 34Firing Temperature GE Defined at N1 Trailing EdgeN1N2N3B1B2B3TurbineExit FlowNozzle/Wheelspace Cooling Air(Chargeable)Firing PlaneCombustorCombustor & N1 Cooling Air(Non-Chargeable)Bucket/Wheel
22、space Cooling Air(Chargeable)Page 35Combined Cycle T-S Diagram5/Combined Brayton and Rankin CycleTSHeat SourceHeat SinkCOMPRESSIONEXPANSIONHRSGGAS TURBINETOPPING CYCLEBOTTOMING CYCLESTACKTEMPERATUREENTROPYCOMBUSTIONCONDENSEREXPANSIONPage 36Gas Turbine Cycle ConfigurationsSingle-Shaft Combined CycleS
23、ingle Unit Control System Single Generator & ElectricalsLower Initial Cost vs. Separate STGSmaller Footprint than multi-shaftGT-ST-GenShort Cycle InstallationSmall FootprintPeak Power ApplicationsFast Start CapabilitiesGT-GenSimple CycleMulti-Shaft Combined CycleMulti-GT-Gen & ST-Gen Lower C
24、enterline Height / Building Shorter Construction Time Higher Base Load Efficiency 2x1, 3x1, 4x1 Page 37Power Train Center Line Equipment VariationsGenAcceInletStackGenerator on the hot (Turbine) side of GTUsed prior to 1990sShaft driven accessoriesComplex packagingGenerator on the cold (Compressor)
25、side of GTModern F-class arrangementElectric motor driven accessory skidsModular packagingHot End Drive (prior to 1990s)Applied to Frames 51P, 6B,7EA,9ECold End DriveApplied to Frames 6FA, 7FA/FB, 9FA/FB,7H,9H GenStackSkidSkidInletComplex Single-Shaft Power TrainPage 38Examples of Combine Cycle Plan
26、t ArrangementsMulti-shaft CC2 gas turbines + 1 steam turbineSingle-shaft CCPage 39Energy Utilization/Loss in Combined Cycle Power PlantST POWER (20.9%)CONDENSER (32.9%)ST LOSSES (1%)STACK LOSSES (7.1%)HRSG LOSSES (0.5%)STEAM (54.8%) GT LOSSES (1.8%)EXHAUST HEAT (62.4%) to HRSGGT POWER (35.8%)FUEL (1
27、00%) to Gas TurbinePage 409FA Gas Turbine Power Plant General LayoutPower Island HRSGCooling TowerElectrical & ControlsGas Fuel & Water Treatment YardLiquid Fuel YardAdministrationDemin. PlantPage 419FA Gas Turbine Power Plant General LayoutCooling TowerWater TreatmentGT/ST/Gen Building Elec
28、tric & Control Building Admin. Building Liquid Fuel YardHRSGWaste WaterExhaust StackWarehouseAux BoilerGT InletGas MeteringMain Transformer Feedwater Pump BuildingFuel HeaterCondensate Storage Tank Water Pretreatment Chemical AreaPage 429E Gas Turbine General LayoutAdobe Acrobat DocumentMark* VI
29、e Control System - HardwareGE Gas Turbine ControlsPage 44100MB EthernetUnit Data Highway (EGD, NTP)Plant Data Highway (TCP/IP, OPC, GSM, Modbus, PI Server, DNP 3.0)Controller(s)Operator &MaintenanceStations(HMI)EthernetEthernetSystem 1ConditionMonitoringHistorianOSI PITurbineI/ODriven-LoadI/ORem
30、oteI/ORotating Machinery ControlProcessI/OProcessI/ORemoteI/OProcess ControlController(s)PTP IEEE1588100MB EthernetPTP IEEE1588MK VIe ArchitectureTCP PanelPage 45Turbine Control19917FA Gas TurbineIndustrial Steam9H Combined CycleTurbine / Plant Control1997Governor / Plant Control2003Networked I/O, 1
31、00MB Ethernet / FiberGovernors,Hydro, WindVME Backplane, Ethernet, WIndowsProprietary DesignMark VMark VIMark VI eEvolution of Control SystemPage 46MK VIe EnhancementSimplexProcessorsDualTripleSimplexSwitches &I/O NetDualTripleDualTripleI/O PacksSimplex1 PackRedundancy Dual (Process Runs if Cont
32、roller Fails) Triple (Process Runs if Controller has Partial or Complete Failure)Distributed / Remote I/O Less Installation & Maintenance Cost More Flexible ApplicationOn-line Repair / I/O Packs Hot Swap in Redundant Systems Improved MTTR / AvailabilityFlexible RedundancyPage 47MK VIe TMR Featur
33、esTMR configuration Controller redundancy I/O pack redundancy Terminal board redundancy local transimitters/transducers 2-oo-3 voting for digital inputs Analog inputs votingPage 48MK VIe HardwareControllersPower SuppliesIONet Switches Field Wiring Vertical Channels Top & Bottom Cabinet Access Ba
34、rrier Blocks Pluggable (2) 3.0mm2 (#12AWG) wires/ptTCP Outline Page 49MK VIe HardwareTCP Controller RackMain Processor Board Compact PCI QNX Operating System Unit Data Highway, Ethernet IONet 100MB EthernetOptional Second ProcessorPower SupplylProcessor650MHz 1.66GHzlCache256k bytes 1M bytelRam128M
35、bytes 256M byteslFlash128M bytes 128M byteslCommunication Dual 10/100 Full Duplex EthernetlPower18 to 32VdcPage 50MK VIe Hardware I/O Packs Plug into Mk VI Termination Boards Barrier & Box Type TBslProcessor32 Bit RISC CPU 266MHzlCache32k byteslRam32M byteslFlash16M byteslCommunication Dual 10/1
36、00 Full Duplex EthernetlPower28VdcTCP I/O PacksPage 51MK VIe SoftwareTooloboxST is the software tool for I/O definition, EGD configuration, and control strategy programming.EGD ConfigurationControl Logic SheetToolboxSTconfiguration softwarePage 52Cimplicity is the tool used for HMI (human-man interf
37、ace) display and editorOperation MenuPushbuttonLive DataStatus FeedbackSetpointAlarm WindowCimplicityHMI Display EditorMK VIe SoftwarePage 539FA Gas Turbine Weight & DimensionItemLength(m)Width(m)Height(m)Weight(kg)Accessory module9.43.54.236,290Turbine10.54.75.0288,000Generator10.95.34.2275,108
38、9FA Component Weights and Dimensionsa. Heaviest piece to be handled during erection: kg: 285,000b. Heaviest piece to be handled during maintenance: kg 77,500 c. Shipping weight of heaviest piece: kg 288,000 Turbine Page 549E Gas Turbine Weight & Dimensiona. Heaviest piece to be handled during er
39、ection: kg: 207,000b. Heaviest piece to be handled during maintenance: kg 49,611 GT rotor c. Shipping weight of heaviest piece: kg 208,000 Turbine 9E Component Weights and Dimensions Item Length(m)Width(m)Height(m)Weight(kg)Gas Turbine12.655.034.98208,000 Page 55Gas Turbine Erection Procedure安装过程包含了
40、通用电气MS 9001FA燃气轮机所有设备、模块、管路、电缆 在现场的运输 吊装、就位、固定和安装的操作。1 基础准备基础准备包括燃气轮机、发电机和辅助模块的基础,迸气系统和排气系统的基础与附属模块的基础三部分。2 燃机主设备的安装(1)安装燃气轮机和发电机的理想方法是配 备一台起重机,或者方法就是利用滑动装置,从卡车上滚动到基础上然后就位。(2)燃气轮机的就位先在基础上放好燃机底部各类键销的固定架,再将燃气轮机吊装就位并搁置在底板和薄垫片上,调整薄垫片直至正确的中心线高度。Page 56Gas Turbine Erection Procedure2 燃机主设备的安装(3)安装负荷联轴节(入口
41、端)建议采用干冰冷套的方法。安装时螺栓的紧固要求是测量螺栓的伸长量。(4)发电机的就位安装取下发电机上的锁定装置,提高约25.4mm的距离(往换向器一端的方向)。在发电机的底板放置球面垫圈和垫片层,调整薄垫片直至正确的中心线高度。(5) 盘车装置的安装安装人员应该对所有的螺栓进行装配和扭矩加载测试。(6) 燃气轮机排气扩压段安装先布置好排气扩压段两侧的弹簧支架,用吊车将排气扩压段吊装到弹簧支架上,穿入与排 缸连接的垂直面的螺栓,待调整好开口间隙后再紧固此部分螺栓,以减少对燃气轮机本体的附加应力。安装排气扩压段和外壳之间的绝缘材料。Page 57Gas Turbine Erection Proc
42、edure2 燃机主设备的安装(7)最终的定位操作首先应该将发电机与燃气轮机、盘车装置与发电机之间的位置确定好,然后根据要求进行设备的找正找中心工作。注意事项:在进行最终的定位操作之前,排气扩压段应该装配在燃气轮机上。3 安装辅助模块(1)安装辅助模块在基础底板上安装辅助模块。此模块包含润滑油箱、润滑油过滤器、润滑油泵和马达、润滑油冷却器、液压控制油泵和马达、液压蓄电池、密封油泵、提升油泵、润滑油蒸汽去雾器和过滤器、气体燃料设备。并按照厂商的说明书来定位油泵和马达。注意事项:辅助模块的基础上没有地脚螺栓。此模块被设计安装在底板上,它包括一个定位销和一个导向销,可以向一端滑动,以补偿热膨胀。模块
43、上的中心定位销靠近燃气轮机端。Page 58Gas Turbine Erection Procedure3 安装辅助模块(2)安装燃料和雾化空气的模块及电气控制室(PEECC)。注意事项:液体燃料和雾化空气模块安装在6个支撑腿上。PEECC 模块安装在8个支撑腿上。(3)安装注水模块、消防模块、水冷却模块、液体燃料前置模块、空气处理器模块、水洗模块等六个模块。(4)安装冷却风扇模块。(5)安装LCI和励磁机、绝缘触发变压器、总线辅助室。(6)安装和装配封闭母线Page 59Gas Turbine Erection Procedure4 罩壳和平台的安装(1)基础划线,并布置与安装罩壳底部和第一
44、层框架。(2)安装发电机和燃气轮机罩壳:依次安装上部框架和面板。注意此处有封闭母线出线排的管道与其他的管道,应和罩壳一起安装。 (3)安装排气风扇和阻尼器,安装通道、平台和楼梯。同时在燃气轮机和发电机的护栏底部安装一个防止老鼠啃咬的装置。5 安装空气进气系统(1)安装空气进气室的强制通风系统(2)安装空气进气风道系统注意事项:安装人员应该确保风道之间的所有接合面都是防水的或者密封的。(3)安装空气进气过滤室注意事项: 安装精细过滤筒一般在机组第一次运行前30天进行。Page 60Gas Turbine Erection Procedure6 排气烟道的安装(1)布置好排气烟道的底部钢结构。(2
45、)装配和焊接排气烟道的四个部分,上面两部分和下面两部分应该在水平连接处通过螺栓连接法兰盘来进行定位。(3)在排气烟道的外表安装保温材料。(4)安装排气扩散段和排气烟道之间的膨胀节。膨胀节是由两个拼装而成的不锈钢环搭接组成的。注意事项:排气烟道和锅炉进口烟道之间的膨胀节应该由锅炉制造商提供并安装。Page 61Gas Turbine Erection Procedure7 基础上的管道安装在安装燃气轮机发电机时, 一般由通用电气公司提供各种on-base部分的管道(包括支撑架、调节装置和各种仪器)。注意事项:如果部分管道在出厂之前已经装配到燃气轮机上了,那么剩下的管道和管件一般是装在集装箱中运抵
46、现场。此部分的部件号码在集装箱内的管件储放柜上有明显标示,每根管道上也有标记牌,便于安装前清点。8 基础外的管道安装Off-base的管道一般是指外部设备(非GE供货)与GE模块或燃气轮机、发电机之间的管道,以及部分GE模块与主设备之间的管路。管路系统设计由业主委托设计院完成,施工单位进行施工。安装水和二氧化碳管道和液体燃料管道,空气进气加热管道,排放管,水洗管道,消防管道和放空管共七种。警告:在对任何管道和部件进行焊接之前,应该确保所有的设备都已经正确接地了,这样可避免出现过大的电流。在对设备进行焊接操作时,应尽量使接地点靠近工作位置。Page 62Gas Turbine Erection
47、Procedure9 装配电气部分安装各个电气控制元件包括所有导线、管道、仪表、控制装置、接线盒和电气材料的安装,这些材料用在燃气轮机、发电机、电气控制室(PEECC)、辅助模块和液体燃料雾化空气模块上。注意:只有在被允许的前提下才能安装与连接从发电机至主变的封闭母线。10 基础外的模块上的电气安装根据GE的安装图纸来安装所有的控制设备和仪表(压力和温度开关、测仪表、振动开关、液位指示、低位开关报警器)。11 安装业主购买的电气设备由业主提供的十种电气设备:天然气测量管 和测量孔,低量程压差计,高量程压差计,压力变送器,天然气测量热电偶,天然气监测系统,进气传感器和排气传感器, 湿度传感器性能
48、监视器和发电机出线等。Page 63Gas Turbine Erection Procedure12 其它设备的电气安装和6.6kV的VAC电源(BOP)13 电力供应:安装人员负责提供动力电缆, 连接GE公司提供的设备和业主提供的设备14 辅助动力装置(66kV4125 VAC):安装辅助动力电缆和互连导线15 辅助总线 / LCI室:安装互连导线。Page 64Gas Turbine Commissioning Procedure 9FAPage 65Gas Turbine Commissioning ProcedurePage 66Gas Turbine Commissioning Pr
49、ocedurePage 67Gas Turbine Commissioning ProcedurePage 68Gas Turbine Commissioning ProcedurePage 69Gas Turbine Commissioning ProcedurePage 70Gas Turbine Commissioning ProcedurePage 71Gas Turbine Performance Test Procedure1.The Purpose: to measure the performance of the gas turbine-generator units in
50、accordance with the purchase contract.2.The evaluation procedure: To utilize correction factors to translate the measured performance at the test conditions to the rated conditions3. The performance test international standard: Simple Cycle: ASME PTC 22 Combined Cycle: ASME PTC 464. The performance
51、specifications: Power Output xxx,xxx kW Heat Rate, LHV xxx,xxx kJ/kWh Gas Turbine Exhaust Temperature xxx.x C Gas Turbine Exhaust Available Energy xxx.x GJ/hrPage 72Gas Turbine Performance Test Procedure5. Rated ConditionsAmbient air temperature xx oC Ambient air relative humidity xx %Barometric pre
52、ssure x.xxx bar (xx.xx psi)Gas Turbine Shaft Speed xxxx rpmGenerator power factor x.xx (lagging)Gas turbine conditions New and Clean, xxx Fired HoursInlet system pressure drop ( contract rated conditions) xx.x mm H2O (x inH2O)Exhaust system pressure drop (contract rated conditions) xxx.x mmFuel Natu
53、ral GasFuel supply temperature xxx oC (xxx.x oF)Fuel composition % volume Nitrogen (N2) xx.xx Methane (CH4) xx.xx Ethane (C2H6) xx.xx Propane (C3H8) xx.xxFuel lower heating value xx,xxxPage 73Gas Turbine Performance Test Procedure6. Division of Test ResponsibilitiesTest Activity Conducting Party Wit
54、nessing Party Prepare the thermal performance test procedure Provide special instrumentation as specified herein Provide suitable containers for the collection of fuel samples Perform required station instrumentation calibration checks Witness / Assist station instrumentation calibration checks Inst
55、all special test instrumentation Direct the installation of special test instrumentation Obtain calibration records and/or flow section dimensions for the fuel flow section Execute of test program Witness execution of test program Provide copies of pertinent measured data to involved parties Arrange
56、 for third party analysis of fuel samples Remove special test instrumentation Calculate corrected performance results and provide preliminary results Issue the final test reportPage 74Gas Turbine Performance Test Procedure7. Measurement and InstrumentationPerformance test data are of two classes:Pri
57、mary Data used for performance test calculationsSecondary Data not used for performance test calculations, but required for reference or diagnostic purposes8. Pre-Test PreparationAn off-line water wash of the gas turbine compressorThe calibration and proper operation of the control systempertinent s
58、tation instrumentation and measurement devices, and recording systems will be verified9. Conducting the TestFor each unit, a minimum of three (3) test runs per rated case listed will be conducted.Page 75Gas Turbine Performance Test ProcedureIn accordance with paragraph 3.3.4 of ASME PTC 22-1997: Eac
59、h test run will be conducted over a thirty (30) minute time period. Manual data will be recorded at least five (5) minute intervals Electronic control system and data acquisition data will be recorded at least one (1) minute intervals As a minimum, a set of two (2) fuel samples will be taken at the
60、beginning and end of each test run All data files, electronic and/or copies of the manual data hard copy sheets relevant for performance testing and evaluation purposes will be given to the witnessing party immediately after the test. Deviations from the procedure in any aspect of the test program should be discussed by the Conducting Party and the Witnessing Party.10.Evaluatio
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025年度教育机构临时工招聘合同规范4篇
- 二零二五版智能车棚安装与维护服务合作协议3篇
- 美容院化妆品批发与零售代理合同4篇
- 二零二五版“房地产”项目股权代持法律关系合同2篇
- 2025年度茶山茶树种植技术租赁合同范本4篇
- 2025年度新能源储能系统设计、施工与运营合同4篇
- 二零二五年高品质打印纸与多功能复印机销售协议3篇
- 二零二五年度销售代理合同标的为产品销售2篇
- 二零二五年度玻璃瓶品牌授权与分销合作协议3篇
- 2025年度新能源汽车充电桩互联互通平台建设合同(二零二五版)4篇
- 北师大版小学三年级上册数学第五单元《周长》测试卷(含答案)
- 国家安全责任制落实情况报告3篇
- DB45T 1950-2019 对叶百部生产技术规程
- 2024年度顺丰快递冷链物流服务合同3篇
- 六年级下册【默写表】(牛津上海版、深圳版)(汉译英)
- 合同签订培训
- 新修订《保密法》知识考试题及答案
- 电工基础知识培训课程
- 铁路基础知识题库单选题100道及答案解析
- 金融AI:颠覆与重塑-深化理解AI在金融行业的实践与挑战
- 住宅楼安全性检测鉴定方案
评论
0/150
提交评论