1、合同编号:工程名称:Con tract of Con struct ion P rojectCon tract Number:P roject Name:发包方(甲方):工程设计顾问(北京)Empio yer (P arty A): Intern ati onal Con suit ing Engin eers ( Beiji ng) Limited承包方(乙方):中寰艺高建筑装饰工程有限公司Con tractor (P arty B): Zhong Huany igao Buildi ng Decorati on Engin eeri ng Co. , Ltd根据中华人民共和国合同法和建筑安
2、装工程承包合同条例及有关规定,为明确双方在施工 过程中的权利、义务和经济责任,经双方协商同意签订本合同。In order to make defi nite of the rights, obligati ons and econo mic respon sibilities of both p arties duri ng the con struct ion, the p arties, in accorda nee with The PRC Con tract Law and Con struct! on Engin eeri ng Con tract Regulati ons and
3、releva nt p rovisi ons, agree to sig n this con tract.第0条程工贝目 Article 1, Project item1. 工程地点: P roject site:2. 程氾困: Scope of p roject3. 工程造价:人民币元整(该造价为包工包料价)第二条施工准备Project cost: PMB Yuan only (Cost of this con tract is the con tract price for labor and materials)Article 2, Prep arati on for con stru
4、ct ion1 .甲方协助乙方办理临时水电及垂直运输,提供建筑图纸及有关隐蔽障碍物的资料。Party A shall assists party B to deal with the pro cedures of temporary hydro po wer and vertical transp ortati on and p rovide architectural draw ings and docume nts of releva nt con cealed obstacles .2 .乙方:.Party B:负责施工区域的临时设施、水电管线的铺设、管理、使用和维修工作;Be resp
5、on sible for the works of lay ing, man ageme nt, use and maintenance of the temporary facilities, water and electricity pip eli ne in the con struct ion area.组织施工管理人员和材料、施工机械进场;Orga nize con struct ion man ageme nt staff and con structi on materials, con struct ion mach inery en ter the Site.负责在装修期间
6、保持公共地方清洁及每天负责将装物料弃置于由管理处指定的垃圾收集处。Be respon sible for kee ping p ublic p laces clea n duri ng con struct ion and p ack ing con struct ion material and leavi ng in the garbage collecti on p lace desig nated by man ageme nt office each day.第二条一匚程期限 Article 3 P eriod of Con structio n1 .根据工期和使用需要,商定工程总施
7、工期为天(日历天),自年 月 日开工至年 月 日完工Accord ing to the p eriod of con structi on and the use n eed,the total con struct ion p eriodagreed shall bedays (Cale ndar days), start from the date ofand compi ete on thedate of .2 如遇下列情况,经甲方现场代表签证后,工期相应顺延:Con struct ion p eriod shall be proIon ged upon Party A site rep
8、 rese ntative* s con firmati on whe n the matters occur as follows. 按施工准备规定,甲方未协助乙方办理临时水电及垂直运输,影响进场施工;Accord ing to the requireme nts of con structi on prep arati on. Party A fail tot assist Party B to apply for temporary water and electricity and vertical transp ortati on and have an impact on P ar
9、ty B con struct ion; 因甲方提出增减项目而造成重大设计变更,因而影响进度; , .The material modificatio n or cha nge of desig n due to the p arty As requireme nt of additi onor deleti on of p roject have the effect of hindrance on the p rogress of works.未按合同规定拨付预付款、工程款而影响施工;P arty A fail to pay the adva nee p ayme nt and con s
10、truct ion cost to party B and impact the con struct ion p rogress;人力不可抗拒的因素而延误工期。The delay of schedule of con struct ion due to Force Majeure.第四条一程J贡熏 Article 4 The quality of project一.本工程质量经双方研究要求达到双方约定之验收标准。The quality of p roject should achieve the requireme nts of acce ptance agreed by both p ar
11、ties.二乙方必须严格按照施工图纸、说明文件和国家颁发的建筑工程规范、规程和标准进行施工,并接受甲方的监督。P arty B should carry on the con struct ion in strict accorda nee with draw ing, sp ecificati on file and regulati ons and sp ecificati ons authorized by the comp ete nt authorities and be un der the sup ervisi on of Party A.三.乙方在施工过程中必须遵守下列规定:P
12、arty B should, duri ng the con structi on.第五条工程价款的支付与结算合同总价X50鼠即元The total con tract price50%, which isYua n.中期款The payment of medium-term工程进度过半三日内Within 3 (three) days after the p rogress more than half.合同总价X40 %,即The total con tract price40%, which isYua n.尾款Final Payment竣工验收结算后七日内With in 7 (seve
13、n) days after the compi eti on acce ptanceandcomply with the p rovisi ons as follows:1 .由乙方提供给甲方的所有材料必须经甲方同意方可使用,未按要求购买严禁使用;All materials p rovided by P arty B should be subject to the app roval of Party A p rior to use, And none of the same being bought without con formity with Party A requireme nt
14、s can be used.2 隐蔽工程必须经甲乙双方检查,方可进行下一一道工序;The con cealed works should be checked by both p arties before the next p rogress;3 .工程竣工后,乙方按规定对工程实行保修,保修时间自通过竣工验收之日算起,保修期一年。P arty B shall take the liability of maintenance follow ing the compi ete of works. The p eriod of maintenance shall be one year from
15、 the day of acce ptance of compi ete.Article 5 P ayme nt and settleme nt of the con tract pricesettleme nt.合同总价X10览即兀 The total con tract price10%, which isYua n.第六条施工与设计变更Article6 The Modificati on of Con struct ion and Desig n乙方交付的设计图纸、说明和有关技术资料,作为施工的有效依据,开工前由甲方组织签字认同,作为施工的补充依据,甲、乙双方均不得擅自修改。Desig
16、n draw in g, illustratio n and releva nt tech ni cal data con sig ned by party B are thebasis for con structi on and shall be con firmed by party As sig nature, cwemiedsasthe suppl eme ntary basis and shall be modified by any p arty without authorizati on.二施工中如发现因甲方要求而发生的设计错误或严重不合理的地方,乙方应及时以书面形式通知甲方
17、,由甲方及时会同乙方等有关单位研究确定修改意见或变更设计文件,乙方按修改或变更的设计文件进行施工。若发生增加费用(包括返工损失、停工、窝工、人员和机构 设备调迁、材料构配件积压的实际损失)由甲方负责,并调整合同造价。If and whe n any error or material un reas on able p roblem of desig n due to party A requireme nt, P arty B shall no tify P arty A promp tly in writi ng and decide the ame ndme nt or modifica
18、ti on of the desig n docume ntati on by the con sultati on and n egotiati on betwee n p arties and un its concern ed. Party B shall carry out con struct ion accord ing to the desig n docume nts modified or cha nged. If p roject cost in crease (in cludi ng the actual loss of rework loss, stopp age or
19、 slowdow n, personnel and machi ne equipment relocated, material structures, fixtures backlog), shall be respon sibility by Party A, and be adjusted the con tract p rice together with Party B.三.乙方在保证工程质量和不降低设计标准的前提下,提出修改设计、修改工艺的合理化建议,经甲方、设计单位或有关技术部门同意后采取实施。Any reas on able suggest! on on the modific
20、ati ons of desig n and craft propo sed by Party B, subject to the quality and without reduci ng sta ndards of desig n, could be carried out upon the app roval of Party A, desig n unit or concerned tech ni cal dep artme nt.四.甲方如需设计变更,必须作出正式修改通知书和修改图纸,乙方才予实施。重大修改和增加造价时,必须另行协商,乙方才予实施。P arty A should, i
21、f any n ecessary desig n cha nge, make the formal ame ndme nt and modify draw ings for Party B s impi eme ntati on. . Material cha nges and cost in creased must be n egotiated by both p arties before P arty B impi eme nt the same.第七条工程验收Article 7 Acceptance of project甲方须及一.工程施工中地下工程、结构工程必须具有隐蔽验收签证、试
22、水、抗渗等验收合格记录。 时办理验收签订手续。The un dergro und engin eeri ng, structural engin eeri ng in the con struct ion of p roject should be checked and with issue of certificate and the record of acce ptance of water test, an ti-p ermeability and so on. P arty A should deal with the acce ptance sig ned formalities
23、 timely.二.工程竣工验收后,甲方才可使用 Party A can use the p roject after compi etion acce ptance 在规定的保修期内,凡因施工造成的质量缺陷应由乙方无偿保修。其保修条件、范围和期限按城乡建设环境保护部(84)城建字第79号通知印发的建筑工程保修办法(试行)执行。 In the p rovisi on warra nty p eriod, any con struct ion quality defects, Party B should make maintenance free of the quality defect d
24、ue to con struct ion, the scope and dur at i on carry out accord ing to the issua nee of Cheng Jia n No. 79 no tificati on “ Con structi on engin eeri ng guara ntee measures (Trial) “by Urba n and Rural Con structi on and Environmen tai P rotecti on Dep artme nt (84).第八条 违约责任 Article 8 Liability for
25、 breach of con tract 乙方的责任:Res pon sibility of Party B:1 .工程质量不符合合同规定的,负责无偿修理和返工。Take charge of gratis rep air and rework if p roject quality does n t meet con tact's sti pu lati on2 .工程不能按合同规定的工期交付使用的,按合同中关于建设工期提交或拖后的奖罚规定偿付逾期罚款。If fail to deliver the con structi on accord ing to the con tract o
26、n time, The overdue fines accord ing to puni shme nt or award of the p rovisi on concerning the delivery or delay.甲方的责任:The res pon sibility of Party A:一 未能按照合同的规定履行自己应负的责任,造成的实际损失。除竣工日期得以顺延外,还应赔偿乙方由此Failed to fulfill their respon sibilities in accorda nee with the p rovisi ons of the con tract, in
27、additi on to the compi eti on date to be postponed should be compen sati on for the actual loss of Party B .二工程中途停建、缓建或由于设计变更以及设计错误造成的返工,应采取措施弥补或减少损失。同时,赔偿乙方由此造成的停工、窝工、返工、倒运、人员和机械设备调迁、材料和构件积压 的实际损失。The ongoing p roject is stopp ed, postponed or due to desig n cha nges and rework caused by desig n errors, should take measures to remedy or reduce losses. At the same
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2024济宁高新区职业中等专业学校工作人员招聘考试及答案
- 2024河南省平舆县中等职业学校工作人员招聘考试及答案
- 2024沧源佤族自治县职业技术学校工作人员招聘考试及答案
- 疼痛腰痛康复规范
- 幼儿园冬季卫生保健小知识
- 教育机构二人合资托管合同书
- 心理知识习题(含参考答案)
- 电子商务行业分析报告
- 植物题库含答案
- 企业与员工离职合同样本
- 造价咨询公司组织机构及人员岗位职责
- 中国文化科举制度的等级
- GB/T 700-2006碳素结构钢
- 多发性骨髓瘤NCCN患者指南中文版2022
- GB/T 13441.4-2012机械振动与冲击人体暴露于全身振动的评价第4部分:振动和旋转运动对固定导轨运输系统中的乘客及乘务员舒适影响的评价指南
- 教科版科学五年级下册全册全套课件【最新版】
- 中绿的制度课
- 机械原理课程设计-抽油机机械系统设计说明书
- 医疗护理品管圈QCC成果汇报之提高住院病人健康宣教的知晓率(问题解决型)
- DBJ41T 074-2013 高压细水雾灭火系统设计、施工及验收规范
- Q∕SY 05262-2019 机械清管器技术条件
评论
0/150
提交评论