付费下载
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、补全短文Passage 1 Functions of power transmissionCEADBThe function of (1) is to send power from power plants to load center or to exchange。A. step-down substations and connected transmission equipmentB. power network operationC. power transmissionD. transmission at high voltageE. power networksPassage 2
2、 Substation misoperation and its preventing Themisopemtion that can lead to (1) mainly are isolating switch;A. preventing the misoperation in substationB. the closing of grounding switch with power onC. accidents in the electrical operation of the substationD. the persons from illegal entering the l
3、ived bayE. the grounding wire (closing the grounding switch) with power onPassage 3 A brief introduction on the development of supercritical boilers and their mainadvantages BDEACIn (1) such as,Japan and European countries,the supercriticalA. good homogenization of distributionB. some advanced count
4、riesC. whole process management is strengthenedD. great advantages oil economy and environmental protectionE. subcritical once-through boilerPassage 4 Steam generation and use BEADCSteam is one of mans dependable servants More and more in the background,。A. first generating steamB. an electrically h
5、eated homeC. use of steam for electric power generationD. the new generating capacity being installedE. the fuel is uranium and the heat is suppliedPassage 5 Circuit breakerBDAECCircuit breakers are automatically operated high voltage (or high current) switches.。Ato perform any switchi ng operati on
6、 after long periodsB. to control electrical power networksC. of the circuit breakerD. to switch the current which can be from a few amperesE. of the highest importance for high reliabilityPassage 6 The ratio of distance to height of pumped-storage power plant BDACEFor pumped-storage power plant, gen
7、erally the ratio of distance to height(l),。A. is most economicCEABD: on-load switching ofB. is used to evaluate topographic condition of power plantC. is not desirableD. is the ratio of horizontal distance between upper and low reservoirE. is the bestPassage 7 Fuel cells BAECDFuel cells are devices
8、that when a fuel such as hydrogen or hydrogen-rich compounds andoxygen are supplied to。A . further development is under wayB. there is no storage capacity in a fuel cellC. many cells are operated in series to obtain voltagesD. supply alternating current from fuel cellsE. as they are being developed
9、there have been some applications Passage 8 Substationspace into the Digital Age CAEBDSubstations constitute the main part of power transmission and distribution in a power grid.。A. substation automation technology has reached a certain levelB. simulation training technology for substation operation
10、C. composed of a large number of primary and secondary equipmentsD. a full-digital automation systemE. all of which has become an indisputable factPassage 9 Overcoming the Problem of Waste CADEBMany large cities are anything but beautiful Streets are littered with trash.In this trash, however, (1)。A
11、. there is no time to be lostB. building beautiful cities out of garbage is only a dreamC. there is still something that can be usefulD. it can be put to use againE. more and more machines are designed for this purposePassage 10 Hibernation EBDACThe weather in winter. Call be very cold. Some animals
12、 sleep during winter,。A.So they dont need to worry about bad weather and other dangerous animalsB. We call this kind of sleep in wintertime“hibernationC. As it gets warmer and warmer in spring,the sleeping animals begin to wakeup and look around for foodD.Hibernating animals dont need to eat much be
13、cause they dont moveE. They can sleep for a long timePassage 11 Satellites BDACEThe body that is neatest to the Earth is the moon. (1). This satellite isA. The bigger and heavier a body is, the greater is its force of gravityB. It circles the Earth and is therefore know as a satellite of the EarthC.
14、 To get out into space we have to overcome the Earths gravitational pulltheD. A satellite stays in orbit because the planet gravitational force keeps pulling it into a circleE. Artificial satellite can be used for various purposesPassage 12 Secondary equipment in power system BDEACThe secondary equi
15、pments in power system are (1), measuring,regulating,。A. 5A rated current of the current transformer secondary windingB. the equipments that provide protecting,monitoringC. 50V rated voltage of PT secondary sideD. the equipments that send the command signalsE. current values in secondary systemPassa
16、ge 13 Switching overvoltage EABCDA sudden change in the configuration of transmission network caused (1) or by the appearanceof a fault can。A. determine the insulation requirements of transmission linesB. the cost of transmission and 1ine failure rateC. at both opening and closing of circuit breaker
17、sD. by means of circuit breaker closing resistor in 500kV systemE. by the operation of a circuit breakerPassage 14 Transmission line and distribution line ADBCEThe high voltage power line through which power is (1) is called power transmission line.。A. transmitted from power plants step-up substatio
18、n to step-down substationB. the overhead transmission lineC. lightning frequently happening and heavy rainingD. the power line that transmits the power from step-down substationE. 1arge spanning line sectionPassage 15 Transformer insulation CEABDThe insulation of a transformer can be categorized int
19、o internal insulation and externalinsulation.。A. The main insulation materials inside transformer are transformer oilB. The degradation of insulating properties of insulation materials under long period ofinfluenceC. The internal insulation refers to the insulation of various parts inside the oil ta
20、nkD.If the winding temperature is within the scope of 80140CE. The main insulation refers to the insulation between windings and grounding parts and theinsulation between windingsPassage 16 The electricity marketBDAECThe aim of introducing market mechanism is to bring various parties more。A. to agre
21、e on the price and quantity to be tradedB. a wholesale marketC. to register as a market customerD. a retail marketE. to choose electricity suppliersPassage 17 Electric power CBDAEElectric power is a most convenient,clean,safe,and useful form of energywhich supplies。A. its growth rateB. its unavailab
22、ilityC. the lack of electricity (a blackout)D. social disorder, and even national tragedyE. high electric power consumption per capita Passage 18 Copyright piracyBDAECThere are numerous examples of what has become known as copyright piracy.A. new chemicalsB. the research and developmentC. physical propertyD. the fake and real itemsE. the intellectual propertyPassage 19 Electrical energyDEBACElectrical energy is the presence and flow of an electric charge.A. Al
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 猩红热 疑难病例教学查房|多维度诊疗护理深度研讨
- 2026年二级消防设施检测案例专项刷题卷含答案及解析
- 2026年毕节地区毕节市事业编单位人员招聘笔试备考题库及答案详解
- 2026年洛阳市涧西区中小学编制教师招聘笔试模拟试题及答案详解
- 2026年大庆市萨尔图区中小学编制教师招聘考试参考题库及答案详解
- 2026年邯郸市邯山区中小学编制教师招聘笔试模拟试题及答案详解
- 2026年南阳市宛城区中小学编制教师招聘考试备考题库及答案详解
- 2026年天津市红桥区中小学编制教师招聘考试备考题库及答案详解
- 2026年四川省自贡市中小学编制教师招聘考试备考试题及答案详解
- 2026年山东省青岛市中小学编制教师招聘考试备考试题及答案详解
- DL∕T 2584-2022 增量配电网接入电力系统技术规定
- HJ 636-2012 水质 总氮的测定 碱性过硫酸钾消解紫外分光光度法
- JBT 7248-2024 阀门用低温钢铸件技术规范(正式版)
- DB32-T 2977-2016孔压静力触探技术规程
- (高清版)DZT 0285-2015 矿山帷幕注浆规范
- 不同温度下饱和蒸汽压力及水含量对照表
- QCC点焊良率改善提案
- 固定资产管理台账折旧、盘点登记表
- 贵州通誉磷石膏有限公司年生产能力30万吨磷石膏水泥缓凝剂加工项目环评报告
- 2023北京朝阳区初一期末(下)历史试卷及答案
- 二年级下学期语文无纸化测试题例
评论
0/150
提交评论