1、A1 three layer fireproof gypsum board wallA1 三层防火石膏板隔墙Construction scheme 施工方案Organizer: wang jing 编制人 : 王 静Auditor : 审核人:Date : 2013-08-16 日 期: 2013-08-16Fire preve nti on board partiti on wall con struct ion pla n防火板隔墙施工方案1. scope of application适用范围keelThis chapter is applicable to in dustrial and
2、 civil con struct ionof light steel man-made board partiti on in stallati on project.本章适用于工业与民用建筑中轻钢龙骨人造板隔墙安装工程编制参考标准及规范2. Preparati on of reference sta ndards and specificati ons(1)中华人民共和国国家标准GB50210 -2001中华人民共和国国家标准GB50300 -2001中华人民共和国国家标准GB50325 -2001(4)中华人民共和国国家标准GB50326 -2001建筑装饰装修工程质量验收规范 建筑工程
3、施工质量验收统一标准 民用建筑工程室内环境污染控制规范 建设工程项目管理规范(5)重庆市建筑工程施工安全操作规程DCQ01 62 2002(6)建筑安装分项工程施工工艺规程DCQ01 26 96。3. Terms, symbols 术语、符号(1) Han dover In spectio n交接检验The un dertak ing by the con structi on side and complete exam in ati on by both parties and can con ti nue to make con struct ion activities ide nti
4、fied.由施工的承接方与完成方经双方检查并对可否继续施工做出确认的活动(2) The main con trol program 主控项目On the safety of Construction Engineering、 health 、 Environmental Protection andThe public interest tests play a decisive role in the project建筑工程中的对安全 、 卫生 、 环境保护和公众利益起决定性作用的检验项目。(3) The general project 一般项目In addition to the main
5、 control inspection items outside the project 除主控项目以外的检验项目 。(4) Base layer 基层Directly bear the weight of construction decoration the surface layer. 直接承受装饰装修施工的面层 。4. Construction preparation 施工准备4.1 Technical preparation 技术准备Preparation of light steel gypsum board partition wall engineering construc
6、tion plan,and the workers are written technical clarification and safety.编制轻钢骨架石膏板隔墙工程施工方案 ,并对工人进行书面技术及安全交底 。4.2 Three hours refractory aging gypsum board partition system三小时耐火时效石膏板隔墙系统Double layer three 12mm paper fireproof gypsum board +75 keel +50mm thick, 60kg/m3 density rock wool.双面三层 12mm 纸面防火
7、石膏板 +75 龙骨 +50mm 厚, 60kg/m 3容重岩棉 。4.3 Material requirements. 材料要求(1) Various keel, gypsum board materials and accessories and auxiliary materials shall comply with existing national standards and industry standards. When the decorative .下载可编辑 .material examination, found not to comply with the desig
8、n requirements and the relevant provisions of indoor environmental pollution control norms, prohibited the useof.(1)各类龙骨 、 配件和石膏板材料以及辅材的材质均应符合现行国家标准和行业标准的规 定。 当装饰材料进场检验 ,发现不符合设计要求及室内环保污染控制规范的有关规定时 , 严禁使用 。1) Light steel keel main parts: The keel along the top, along the keel to strengthen the keel,
9、vertical keel, transverse keel should meet the design requirements and the relevant provisions of the standards.轻钢龙骨主件 :沿顶龙骨 、沿地龙骨 、 加强龙骨 、竖向龙骨 、横撑龙骨应符合设计要求 和有关规定的标准 。2) Light steel frame accessories: Support card, Cato, Angle, fittings, such as fixedand layering accessories should comply with the d
10、esign requirements轻钢骨架配件 :支撑卡 、卡托、角托、连接件 、固定件和压条等附件应符合设计要求。3) Fastening material: pull anchors, expansion bolts, galvanized self-tapping screwsand paste caulking material shall meet the design requirements.紧固材料 :拉锚钉 、膨胀螺栓 、镀锌自攻螺丝和粘贴嵌缝材 , 应符合设计要求 。4) Gypsum board surface should be smooth, neat edge,
11、there should be no dirt,cracks, chipping, warping, peeling, color, pattern incomplete defects.石膏板应表面平整 、边缘整齐 、不应有污垢 、裂纹、缺角 、翘曲、起皮、色差、图案 不完整的缺陷 。(2) Fill sound insulation material: Rock wool should meet the design requirements ofselection.填充隔声材料:岩棉应符合设计要求选用。(3) Quality requirements: see table below质量
12、要求:见下表paperbacked gypsum board size allowable deviationunit : mm纸面石膏板规格尺寸允许偏差单位:mmItemLen gthWidthThickness 厚度项目长度宽度9.5> 12尺寸偏差0,- 60,- 5士 0.5士 0.5Annotate : Plate surface should be cut into rectangles, two diagonal length is notmore tha n 5mm.注:板面应切成矩形,两对角线长度差不大于 5mm.fracture load valuesPaperbac
13、ked gypsum board纸面石膏板断裂荷载值Plate thickness(mm )The fracture load , N板材厚度 (mm )断裂荷载,N纵向横向9.536014012.050018015.065022018.080027021.095032025.01100370Paperbacked gypsum board weight per un it area value纸面石膏板单位面积重量值Plate thickness( mm)Weight per un it area kg/m2板材厚度 (mm )单位面积重量kg/m 29.59.512.012.015.015
14、.018.018.021.021.025.025.0Light steel keel to allow the section size deviationunit : mm轻钢龙骨断面规格尺寸允许偏差单位:mmItem 项目Classy article优等品First grade 一等品Qualified products 合格品Length 长度 L+ 30, 10Cladding keelSection sizeSize尺寸AA<30±1.0A>30±1.5覆面龙骨断面尺寸Size尺寸B±0.3±0.4±0.5Other ke
15、elSize尺寸±0.3±0.4±0.5Section sizeA其它龙骨Size尺寸<30±1.0断面尺寸B>30±1.5unit : mm/1000mmLight steel keel sides and straight ness of the gro und轻钢龙骨侧面和地面的平直度单位:mm/1000mmCategory类别Variety品种Detectio n site检测部位Classy article优等品First grade、聲口等口口Qualified products 合格品Wall墙体Tran sverse
16、 keel and vertical keel横龙骨和竖龙骨Side侧面0.50.71.0Bottom 底面1.01.52.0Through keel贯通龙骨Sideandbottom 侧面和底面Con doletop吊顶Beari ng the keel andCladd ing keel承载龙骨和覆面龙骨Sideandbottom侧面和底面An gle of light steel keel allowable deviatio n轻钢龙骨角度允许偏差ForminganglesShortest edge size mm 成形角的最短边尺寸mmClassy article优等品First g
17、rade一等品Qualified products合格品10 18±1°5'±1 °30 '±2 °0 '>18±1°0'±1 °15 '±1 °30 'Light steel keel appearanee、Surface qualityunit : G/m2轻钢龙骨外观、表面质量单位:g/m 2、缺陷腐、蚀种、损'、*坏类黑斑、麻 麻Classy article 优等品First grade_.纶口 等口口Qu
18、alified products合格品Notpermitted不允许No more seriouscorrosion、 Damaged spots 、pitting .Area of not more than 1cm2 of spots per meter within the length of not more than five.无较严重腐蚀、损坏黑斑、麻点。面积不大于1cm 2的黑 斑每米长度内不多于5处。Item项目Classy article 优等品First grade_.纶口 等口口Qualified products合格品Double-sidedgalva ni zed双面
19、镀锌量120100804.3 Mai n machi nes and tools主要机具Every teams and groups with a list of major mach inery and equipme nt每班组主要机具配备一览表No.序号Mach in ery, equipme nt 机械、设备名称Specificati on规格型号Quotapowerorcapacity定额功率或容 量Qty数量Perfor mance性能Type ofwork工种Remarks备注Calculatedin accorda neeElectricGoodcarpe nterwith 8
20、-10people a teams1电锤TE 150.65kw2良好木工and groups按8-10人/班组计算Calculatedin accorda neeHand drillGoodcarpe nterwith 8-10people a teams2手电钻JIZ ZD 10A0.43kw1良好木工and groups按8-10人/班组计算Grin di ngCalculatedin accorda neewheelJIG SDG Goodcarpe nterwith 8-10people a teams3cutt ing3501.25kw1良好木工and groups按8-10人/班组
21、mach ine计算砂轮切割机PullrivetGoodcarpe nterCalculatedin accorda nee4gun2良好木工with 8-10people a teams拉铆枪and groups 按8-10 人 / 班组计算Calculated inaccorda neealumi numGoodcarpe nterwith 8-10 people a teams5screed2m3良好木工and groups 按8-10 人 / 班组铝合金靠尺计算Calculated inaccorda neeHoriz on talGoodcarpe nterwith 8-10 peo
22、ple a teams6ruler600mm4良好木工and groups 按8-10 人 / 班组水平尺计算AdjustableCalculated inaccorda neeWrenchorWrenchGoodcarpe nterwith 8-10 people a teams7扳手Hex wrench8良好木工and groups 按8-10 人 / 班组活动扳手或六计算角扳手GoodCalculated inaccorda neeTape良好carpe nterwith 8-10 people a teams8measure5m8木工and groups 按8-10 人 / 班组卷尺计
23、算Li neGoodcarpe nterCalculated inaccorda nee9hammer0.5kg4良好木工with 8-10 people a teams线锤and groups 按8-10 人 / 班组计算(1) Electric mach inery :Ha nd drill 、 Impact hammer 、 Cutt ing mach ine.电动机具手电钻、冲击电锤、切割机。(2) Hand tools : Pull rivet gun 、 Hand saw 、 Pliers、 hammer 、 screw driver 、 spanner、Line drop 、sc
24、reed、steel rule、Steel horizontal ruler Etc.手动工具:拉铆枪、手锯、钳子、锤、螺丝刀、扳子、线坠、靠尺、钢尺、钢水平 尺等。4.4 Operat ing con ditio ns作业条件(1) Before the con struct ionof light steel frame partiti on ,Should be arran gedoutside,In stall gypsum board should wait for roofi ng、 ceil ing and After completi ng thewall plaster. B
25、aseme nt moisture content meet the requireme nts of decorati on,Should gen erally be less than 8% -12%。And after the releva nt units、 Department's acceptanee 。 The completion of the handover formalities 。 If the design to pillow , After the pillow should meet the design strength can be in stalle
26、d in the above partiti on keel.轻钢骨架隔断工程施工前,应先安排外装,安装石膏板应待屋面、顶棚和墙体抹灰完 成后进行。基底含水率达到装饰要求,一般应小于8% 12 %以下。并经有关单位、部门验收合格。办理完工种交接手续。如设计有地枕时,地枕应达到设计强度后方可 在上面迸行隔墙龙骨安装。(2) Installation of various systems of pipes、 Box elastic line and other preparatorywork already in place.安装各种系统的管 、线盒弹线及其他准备工作己到位 。5. Critica
27、l quality points关键质量要点5.1 Materials Key requirements材料的关键要求(1) Various keel 、 Fitting and Gypsum board material And adhesive auxiliary materials shall comply with existing national standards and industry standards.各类龙骨 、 配件和石膏板材料以及胶粘剂辅材的材质均应符合现行国家标准和行业标 准的规定 。5.2 Key technology requirements 技术关键要求El
28、astic line must be accurate , After a reinsertion will continue after the next process 。 Secure the top and bottom of the keel , After each handover keel , Should remain flat vertical , Securely installed.弹线必须准确 ,经复验后方可进行下道工序 。固定沿顶和沿地龙骨 , 各自交接后的龙 骨 ,应保持平整垂直 ,安装牢固 。5.3 The key requirement of quality质
29、量关键要求(1) Prohibited partition wall connecting member using shooting nail fixed on thebrickwall 。 Should use the embedded parts or expansion bolt connection。 Upper and lowerthreshold must be firmly connected with the main body 。严禁隔断墙上连接件采用射钉固定在砖墙上 。应采用预埋件或膨胀螺栓进行连接 。 上 下槛必须与主体结构连接牢固 。, Surfaces should
30、 be flat(2)Gypsum board should undergo a rigorous selectionand smooth。In stall gypsum board should be strictly checked the verticallyand smooth ness keel 。石膏板应经严格选材,表面应平整光洁。安装石膏板前应严格检查龙骨的垂直度和平 整度。5.4 Occupation health safety critical requireme nts职业健康安全关键要求(1) ) When using power tools , Electricity
31、should follow theconstruction sitetemporary electrical safety technical specifications"JGJ46-88。在使用电动工具时,用电应符合施工现场临时用电安全技术规范JGJ46 88。(2) when work high above the ground , Scaffoldingerection should follow theCho ngqing Muni cipality buildi ng con struct ion safety practices.。在高空作业时,脚手架搭设应符合重庆市建
32、筑工程施工安全操作规程。(3) Preve nt the dust polluti on duri ng the process of con struct ion should take the corresp onding protective measures 。施工过程中防止粉尘污染应采取相应的防护措施。5.5 Environment the key requireme nts环境关键要求(1) During the construction process should be consistent withCivil buildingengin eeri ng en viro nme
33、n tal polluti on con trol no rms"GB50325-2001 。在施工过程中应符合民用建筑工程室内环境污染控制规范GB50325 2001。(2) During the con struct ionprocess should preve nt no ise pollutio n , At thecon struct ionsite boun daryno ise sen sitive areas should choose to use在施工过程中应防止噪声污染 , 在施工场界噪声敏感区域宜选择使用低噪声的设 备 ,也可以采取其他降低噪声的措施 。6.
34、 Construction technology施工工艺6.1 Process flows 工艺流程snap the line Installation heaven and earth keel Install vertical keel Install thesystem pipe, line Installing the card blocked lateral keel Install gypsum board in theoutboard Filled with rock wool Install inner gypsum board弹线 安装天地龙骨 安装竖向龙骨 安装系统管 、线
35、安装横向卡挡龙骨 安装外 侧石膏板 填充岩棉棉 安装内测石膏板6.2 Operation process 操作工艺(1) Snap the line弹线Pop up on the substrate horizontal and vertical lines vertical, Used to control theposition of installation partition keel、 Keel flatness and fixed-point。在基体上弹出水平线和竖向垂直线, 以控制隔断龙骨安装的位置 、 龙骨的平直度和固定点 。(2) The partition keel ins
36、tallation 隔断龙骨的安装1) Fixed position along the elastic line along the top and along the keel, After eachhandover keel , Should remain straight。 Fixed-point spacing should not exceed800m ,The keel to the top portion must be fixed firmly。 Between border keel andmatrix沿弹线位置固定沿顶和沿地龙骨 ,各自交接后的龙骨 , 应保持平直 。 固
37、定点间距应不大于 800m ,龙骨的端部必须固定牢固 。 边框龙骨与基体之间 , 应按设计要求安装密 封条。2) When choosing support card series keel , Support the card should be installed on the vertical keel opening , The card distance is 400 mm,Distance of 20-25mm at both ends of the keel 。选用支撑卡系列龙骨时 ,应先将支撑卡安装在竖向龙骨的开口上 ,卡距为 400mm ,距 龙骨两端的为20 25伽3) w
38、hen Choose penetration keel, Height of less than 3m installation one partitionwall;3-5 m to install two ;5m above installation three。选用通贯系列龙骨时,高度低于3m的隔墙安装一道;3 5m时安装两道;5m以上时安装 三道 。4) The hole is not more than 600 mm on both sides stand vertical keel, respectively , Plus a fixed upper and lower Horizo
39、ntal keel hole , More than 600 mm on both sides stand vertical keel, respectively, Plus a fixed upper and lowerhorizontal keel hole 。门窗或特殊节点处 , 应使用附加龙骨 ,洞口不超 600mm 两边分别立竖龙骨 , 洞口上下 加横龙骨固定 ,超过 600 mm 两边分别立竖龙骨 ,洞口上下加横龙骨和立竖立龙骨固 定 、加强等安装应符合设计要求 。Partition frame allowable deviation龙骨详细布置见下图 :5)Skelet on a
40、llowable deviati on of in stallati onShall conform to table3 3 . 5 2骨架安装的允许偏差,应符合表3 3 5 2规定,Partiti on frame allowable deviati on隔断骨架允许偏差The serial n umber 项次Item项目Allowable deviati on 允许偏差(mm)In specti on methods检验方法1Elevati on of vertical立面垂直3The care with 2m cable board in specti on用2m托线板检查2Surfa
41、ce is flat and level2In 2 m ruler and wedge feeler check用2m表面平整直尺和楔型塞尺检查(3) In stallati on of gypsum board石膏板安装1) Before in stall the gypsum board , Partiti on should be embedded in the pipesand attached to the walls of the device to take measures to stre ngthe n partial。安装石膏板前,应对预埋隔断中的管道和附于墙内的设备采取局
42、部加强措施。2) Gypsum board should be laid vertically , Long side seam should fall on the vertical keel 。石膏板应竖向铺设,长边接缝应落在竖向龙骨上。3) Double-sided gypsum board in stallati on, Should be one side of the in side andoutside two layers of gypsum board and keel staggered joints to arrange joint and should not fall
43、 on the same root keel ;Accord ing to the desig n requireme nts of 3hours fire protect ion ,After a good should be in stalled at the side of the keel gypsum plasterboard ,Carried rock wool padding; Using rock wool 50mm, 60kg/ m3 of rock wool board fire treatment . Then the other side of the enclosed
44、 board 。双面石膏板安装,应与龙骨一侧的内外两层石膏板错缝排列接缝不应落在同一根龙骨上;根据3小时防火失效的设计要求,应在龙骨一侧安装好石膏石膏板后,进行岩棉填充: 采用岩棉50mm,60kg/m 3的岩棉板进行防火处理再封闭另一侧的板。4) Gypsum board should adopt self-tapp ing screws 。 Surrounding the screw spaci ngshould not exceed 200 mm , Middle part of the screw spaci ng should not exceed 30Omm ,Screws fro
45、m the edge of the plate should be 10-16 mm。1,2, 3 layers of下载可编辑.gypsum board, respectively, with 25 mm, 35 mm, 50 mm screw fixed to the keelFirst and sec ond floors screw spaci ng should be enl arged, The third layer of thescrews should be tightly nailed ; Since the outer steel frame block , Can
46、9;t con struct ion , Gypsum board is fixed outside the side of the 300 mm from the top place , Self-tapp ing screws from the in side to the outside of gypsum board fixed keel。石膏板应采用自攻螺钉固定。周边螺钉的间距不应大于200 mm,中间部分螺钉的间距不应大于30Ommn ,螺钉与板边缘的距离应为10 16m。第一、二、三层石膏板分别采用25mm、35mm、50mm的螺钉固定于龙骨上,一、二层螺钉间距应放大,第三 层螺
47、钉应紧密钉固;由于外侧钢架挡住,无法施工,外侧距顶部300mm处石膏板固定 时,自攻螺钉从内侧龙骨向外侧石膏板固定。5) When installing drywall , Should be started from middle part of the plate to plate edges fixed 。 Nail head slightly buried plate , But not damage the paper surface; Nail hole should use gypsum putty screw ing.安装石膏板时,应从板的中部开始向板的四边固定 。钉头略埋人板
48、内,但不得损坏纸 面;钉眼应用石膏腻子抹平。6) )Gypsum board should be based on accurate a grid size cutouts; Should be inplace and tight against a grid , But cannot be forced.石膏板应按框格尺寸裁割准确;就位时应与框格靠紧,但不得强压。7) Gypsum plate and the top wall around the wall or pillar should have a no tch3mm 。 When laying gypsum board , Shou
49、ld first where the rabbet sealing filling paste , Then pla nking and extrusi on seali ng paste the panel closely con tact withadjacent surface.隔墙端部的石膏板与周围的墙或柱应留有 3mm 的槽口 。施铺石膏板时 , 应先在槽口处 加注嵌缝膏 , 然后铺板并挤压嵌缝膏使面板与邻近表层接触紧密 。8) In the Ding type or cross-shaped connecting point , As for the inside corner s
50、hould use putty covered , Paste the seam zone ,As exposed corners should protect horn.在丁字型或十字型相接处 ,如为阴角应用腻子嵌满, 贴上接缝带 ,如为阳角应做护角。9) Gypsum board joints , Should generally be 3-5 mm , Bevel groove must be connected with, On top of the 500mm places with a stick sewed in the gap of gypsum board.石膏板的接缝,一般
51、应3 5mm缝,必须坡口与坡口相接,在顶部500mm处用木棍把贴 缝贴于石膏板的缝隙上 。10) The third layer and the second layer gypsum board plasterboard used adhesive coated between layer and layer.第三层石膏板与第二层石膏板每层之间用粘结剂满涂 。4) The installation order of gypsum board石膏板安装施工顺序1) By A1 from north to south, installation; First install the keel ,
52、 Then install theouter gypsum board , Then filled with rock wool , Finally laying inside of gypsum board.从A1北侧向南侧安装;先安装龙骨,再安装外侧石膏板,然后填充岩棉,最后敷设内 测石膏板 。5) Gypsum board grant putty the outside, Coated paint 。 Interior wall grant puttyinside of ,Coated paint 。 Since the top 500mm steel frame block at a
53、not convenient construction , 500 mm on gypsum board first coated with paint to install again. 石膏板外侧批腻子 , 涂涂料 。 内墙内侧批腻子 ,涂涂料 。 由于顶部 500mm 处有钢架挡住不 便于施工 ,先在石膏板上 500mm 处涂上涂料再安装 。7. Material transport 材料运输7.1 Vertical transport 垂直运输(1) Light steel skeleton and plaster board etc , From the north of A1 us
54、ing thecrane to the third floor of unloading platform轻钢骨架和石膏板材等材料,采用吊车从A1北侧吊至三楼卸货平台处。7.2 Horizontal transportation 水平运输(1) Based on the construction sequence from north to south , The material divide the north根据从北至南的施工顺序 , 将材料划分北部 , 中部 , 南部三处堆放人工搬运 。7.3 施工过程材料搬运(1) The scaffold height as tall building to the unloading platform and the third floor , The gypsum board moved to the scaffold ,Then according to the gypsum board installation orde
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
评论
0/150
提交评论