版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、天津工程职业技术学院国际钻井作业英语水平测试试题第一部分 情景会话单项选择(共20小题,每小题1分,满分20分)1. - I II fill in this Spudding Inspection Report in practice.- . We are full of con fide nces.A. Take it easyB. Don t worryC. You are welcomeD. Don t ention it2. - Where s thdaily drilli ng report ?A. i n the dow nholeB. from the rig man agerC
2、. in the drawer of the toolpusherD. ovdesthere on the dog house3. - Shall we bring Blowout Emerge ncy Program for you to check now?-. I ll check them later.A. No, no need.B. No, tha nksC. No, get it right now D. No, don t worry4. - Have the SCR house, MCC house and the wellhead bee n checked?-Yeah .
3、A. Everythi ng is fineB. All are no problemC. All are in no rmal con diti on D. They are all good now5. - Good spuddi ng mea ns an ome n of success.A. Yes, good luck B. I hope soC. You re excellenD. It s Ok6. - Perform deviational survey ahead of time prior to pulling out.A. Good idea B. GreatC. Wel
4、l done D. It s acceptable7. - What s the loss speed and how much foam mud has lost?3-Loss speed,. 10 m mud has lostA. 15 rpm B. 15 spm C. 15 m3 /hD. 15 Kpa8. - Can you set up circulatio n ?-Circulation? A. Yes, it isB. No problemC. No, we re notD. Yes, we can do its producer?9. - How about the weigh
5、t , grade and types of threads? Which country- , K55 casing, 99 ppf and BTC thread.A. I n Chi na B. From AmericaC. Japa nD. Korea n10. - Have the guide shoe and float-collar bee n conn ected -Yeah. .A. They are the drill floorB. They are in the holeC. They will be checkedD. They are laid dow n on th
6、e catwalk11. - Shall we cut the guide pipe nowA. Yes, no problem B. Ok, make itC. Take actionD. Yeah, it s upto you12. - The pressure test pump is not worki ng. We have to borrow one. -From whom ?A. Rig 16B. From the drillersC. From the locationD. Drilling crew13. - No drop means pressure test OK. ?
7、A. You know?B. Got itC. Un dersta ndD. Are you clear14. -Go and tell him the Supervisor wants to talk to him.A. I will goB. Let sgoC. All rightD. OK15. - Oh, sorry, I almost forgot.- ?A. That s all right B. No problemC. You are so kind D. Forgot what16. - How of the zone ?-Over 200 meters.A. deepB.
8、largeC. thickD. wide17. - The mud density is 65-70 pcf, higher than requirement, whyA. To bala nee the formatio n pressure B. The Drilli ng Program shows itC. Because of the pump problem D. For faster drilli ng speed18. - How about the hole stability ?- . Still a little loss in the hole.A. Very bad
9、B. Not quite stableC. Terrible D. Not perfect19. - In the cylinder, the cement block is probably the reason of worn liner.A. Why did this happenB. What ca n it doC. How is it possible D. Which reason is it20. - After finishing drilling, what s the next step ?- , POOH, then carry out wire line log.A.
10、 Complete the well B. Run cas ingC. Drill ano ther wellD. Circulate a cycle第二部分 英语知识运用单项选择(共20小题,每小题1分,满分20分)21. George, you d better the Drilling supervisor for instruction.A. to ask B. ask ingC. ask D. asked22. It s difficult to say whether the footage needs .A. to be deepe nedB. to deepe nC. bein
11、g deepe nedD. deepe ned23. Si nee in the Gas Zone, the Rig Man ager had always appeared on thefloor.A. drilli ngB. drilled C. was drilli ng D. was drilled24. The Drilling Supervisor a meeting to discuss the completing operationalprocedures.A. hold B. is held C. was holdi ngD. has holdi ng25. The per
12、sonnel who attended the safety meeting the Rig Manager,Toolpusher, Driller and the Head of Completion Crew.A. was B. were C. is D. has bee n26. Check well control precautions are in place.A. what B. that C. whether D. where27. It was gett ing dark, the Toolpusher and rough necks were still busy in t
13、he rig-site.C. a few D. a lotA. much B. a little28. the operators were very professi on al, the wireli ne operati on was not easy.A. Although B. eve n if C. eve n though D. Because29. At midnight, the Rig Manager was woken up from dream, his watch, itwas 4 a.m.A. to look at B. looki ng at C. looki n
14、g on D. to look30. On the rig floor, George asked was operating the brake bar.A. that B. about C. who D. what31. , he went to the circulati on & solid con trol system.A. Finished the floor inspectionB. To finish the floor inspectionC. Finished the floor inspectionD. The floor inspection finishing32.
15、 Xiao Wang switched the power on, the equipment started to runat on ce.A. As much as B. As far as C. As long as D. As soon as33. Laden, went down the hill to buy the goat.A. the local labor we hiredB. we hired the local laborC. the local labor who we hiri ngD. we are hiri ng the local labor34. Last
16、night, the Drilling Supervisor came to his office to discuss the DrillingProgram by Company with him.A. issu ingB. is issued C. issued D. was issued35. George, the design depth is 3,380m, same depth the last well.A. toB. withC. than D. as36. On the solid control system, there ll be a guy to keep his
17、 thyeshangeof pit level.A. atB. forC. on D. upon37. He found the drilling torque .A. in creasesB. in creased C. to in crease D. are in creas ing4 of page 838. When climbing up the floor, he saw the Toolpusher the brake handle.A. holdB. heldC. holdi ngD. is holdi ng39. One hour and half later, the bi
18、t on the floor.A. was han dledB. was laid C. was held D. was lifted40. The Toolpusher clea ned the clay on the bit with his hand so that every one could see it .A. clearly B. clearlier C. more clearly D. most clearly第三部分综合知识运用完形填空(共20空,每空1分,满分20分)Spudding in means to41 drilling operations. The 42, c
19、onsisting of adrill bit, 43, drill pipe, and kelly, is assembled and lowered into the con ductorpipe. Drilli ng fluid, better known as 44, is circulated through the 45 andthe drill string by means of pipes and flexible hose 46 the drilling fluid or 47 and a swivel device attached to the upper end of
20、 the kelly. The swivel device en ables drilli ng mud to48 while the kelly and drill string 49. The mudpump draws fluid from 50 or pits located nearby. The drilling mud _51 through the kelly, drill pipe, drill collars, and 52. It is returned to the _53by means of the well bore and the con ductor pipe
21、 where it is directed to a device called a 54. The shale shaker separatesthe 55 and solids from thedrilling mud, which is56 to the mud tanks to be circulated again. As the drillstring is rotated in the57 , the drill bit cuts into the 58 . The drilling mudlubricates and 59 the drill bit and drill str
22、ing and 60 the drill cuttings to the surface .41. A. carry outB. con ductC. performD.beg in42.A. drill stemB. drill li nerC. drill stri ngD.drill bit43. A. drill collarsB. threadsC.joi ntsD. couples44. A. slurryB. drilli ng mudC. drilli ng liquidD.mud water45.A. kellyB. sta nd pipeC. hoseD. top driv
23、e46.A. i nstalli ngB. con struct ingC. connectingD.pass ing47. A. mud tanksB. mud pumpsC, mud pitD.mud den sity48. A. be circulatedB. circulateC. circulat ingD.to circulate49. A. is rotatedB. are rotatedC. being rotatedD.rotated50. A. mud tanksB. flow linesC. sta nd pipeD.swivel51.A. goesB. runsC. p
24、assesD.flows52. A. drill toolB. drill bitC. no zzleD.drill pipe53. A. surfaceB. dow n holeC. la ndD.wellhead54. A. mud pitB. desanderC. desilterD.shale shaker55.A. mudB. drill cutt ingsC. sandD rocks56. A. returnedB. removed57. A. underground B. conductor58. A. rockB. earth59. A. heatsB. warms60. A.
25、 holdsB. carriesC. replaced C. cat hole C. grayC. coldsC. takesD. recovered D. well bore D. well wall D. coolsD. brings第四部分 阅读理解 (共 10 小题,每小题 2 分,满分 20分)If the well is to be plugged and abandoned (放弃 )as a dry hole, a cementing company is called to the drill site. The well bore is filled with drilli
26、ng fluid, which contains additives (添加剂)which give it special properties that prevent itsmovement from the well bore into the surrounding rock. Cement plugs are required within the well bore at intervals where porosity (孔隙度)has been detected to isolate these porosity zones and prevent the movement o
27、f formation fluids from one formation to another. The cement is pumped into the well bore through the drill string. The cement is mixed at the surface in special trucks which are equipped with high-volume pumps. The pumps are connected to the drill string which has been inserted into the wellbore to
28、 a predetermined (预定)depth. A quantity of cement is pumped into the well bore through the drill string and displaced out of the bottom of the drill string with drilling fluid. The drill string is then pulled up to the next interval that is to be cemented. This process is repeated until all the requi
29、red plugs have been set. A cement plug is also set at the base of the surface casing, which remains in the hole, and another plug is set at the surface. In cultivated (耕种) areas the surface casing is cut off below plow (犁) depth. A steel plate is welded at the top of the surface casing. All drilling
30、 equipment and materials are removed from the drill site. The pits are allowed to dry up and are backfilled (回填) and the site is restored as nearly as possible to its original condition.If a decision is made to attempt to complete the well as a producer, casing is delivered to the site and a cementi
31、ng company is called. The wellbore is filled with drilling fluid that contains additives to prevent corrosion (腐蚀) of the casing and to prevent the movement of the fluid from the wellbore into the surrounding rock. The casing is threaded together and inserted into the well bore much in the same mann
32、er as the drill string. Casing may be inserted to a total depth of the hole or a cement plug may have been set at a specific depth and the casing set on top of it. Cement is mixed at the surface just as if the well were to be plugged. The cement is then pumped down the casing and displaced out of th
33、e bottom with drilling fluid or water. The cement then flows up and around the casing, filling the space between the casing and the wellbore to a predeterm ined height. Special tools are sometimes used with the cas ing which allow the setting of cement between the outside of the casing and the well
34、bore at specific intervals (特定层段).This is done to protect the casing and to prevent the moveme nt of formatio n fluids from one formatio n to ano ther .61. If the well is to be plugged and aba ndoned as a dry hole,A. The well bore is filled with some chemicalsB. The well bore is full of drilling flu
35、ids, which contains some oilC. The well bore is full of drilling fluids containing additivesD. The well bore is filled with some additives containing drilling fluids62. During ceme nting operati on,A. The cement is injected by pump into the well bore through the drill string.B. The ceme nt is pumped
36、 into the well bore through the drill bit.C. The ceme nt is pressured into the cas ing through the drill stri ng.D. The ceme nt is squeezed in to the bottom of well bore through the drill stri ng.63. The pumps are conn ected to the drill stringA. which inserts into the wellbore to a predetermined de
37、pth.B. and the drill stri ng in sert ing into the wellbore to a predeterm ined depth.C. already in serted into the wellbore to a predeterm ined depth.D. The pumps are connected to the drill string and inserted into the wellbore to a predeterm ined depth.64. If a decision is made to attempt to comple
38、te the well as a producer, casing isdelivered to the site. The word un derl ined meansA. producti onB. produc ing wellC. productivityD. oil producti on65. A ceme nt plug may have bee n set at a specific depth andA. the cas ing set on top of the ceme nt plug.B. the cas ing set on top of the same dept
39、h.C. the ano ther plug set on top of the cas ing.D. the ano ther plug set on top it.66. Whe n the ceme nt is pumped dow n the casingA. the casing is displaced out of the bottom with drilling fluid or water.B. the cement is removed out of the bottom with drilling fluid or oil.C. the cement is displac
40、ed out of the bottom with drilling fluid or water.D. the cas ing is removed out of the bottom with gas or oil.67. A ceme nt plug is also set at the base of the surface casingA. which ceme nted in the hole.B. remai ning in the hole .C. sett ing in the holeD. which remai n in the hole68. What to do af
41、ter A steel plate is welded at the top of the surface cas ing?A. to in stall the well head.B. to test the wellC. The drilling crew is leaving the drill site.D. All drilling equipment and materials are removed from the drill site.69. The drill stri ng is the n pulled up to the n ext in terval that is to be ceme nted.The un derl ined st
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2024版二手车买卖及二手车交易监管与服务保障协议2篇
- 2024年标准建筑安装工程承包合同版B版
- 2024版塔吊租赁与施工安装一体化服务合同3篇
- 2024年度工厂物流服务合同2篇
- 2024年度不间断电源租赁及电力安全保障合作协议3篇
- 2024年杭州市技师学院合同标的保险责任划分
- 2024版工业废水处理设施委托运营合同3篇
- 2024年度房屋买卖合同风险评估及保险协议3篇
- 2024年度绿色生态住宅项目股权转让协议示范文本3篇
- 2024年度医疗卫生项目招标投标廉洁诚信保障书3篇
- PPT2023版中国近现代史纲要课件第十一专题决定当代中国命运的关键一招PPT
- 义务教育化学课程标准(2022年版)
- 2023年朱文峰《中医诊断学》视频讲稿
- 少儿美术教案课件-《美丽的枫叶》
- 中国传统文化剪纸PPT模板
- 健康生活方式与慢性病
- 系列压路机xmr30s40s操作保养手册
- 广州教科版六年级英语上册M1-6复习练习题(含答案)
- GB/T 37136-2018电力用户供配电设施运行维护规范
- GB/T 20388-2006纺织品邻苯二甲酸酯的测定
- GB/T 19066.1-2003柔性石墨金属波齿复合垫片分类
评论
0/150
提交评论