1、Salt Water Spray Test ChamberOperating manualI. Structure synopsis1. In test chamberA Spraying of water towerThe internal form experimental nozzle puts on nozzle in, atomizesafter treads the tube the guidance, again passes through the cone-shape diffuserto disperse to the test chamber in.B Atomizati
2、on adjusting deviceThe adjustment atomization quantity size, moves high when atomizesthe quantity to increase, lowers time reducesC Salt water preparation troughIs located the spraying of water the tower base, the salt water isafter the salt water supplemented the barrel pours into the preheating tr
3、ough, thepreheating trough has the switch, may the automatic control water level, in thetrough the base have the clean to use draining water exportation, by plug controls.D Collects the cupAbout nearby two respectively has, uses for to collect the blowout the mist, theprocess leads the pipe flow to
4、in the test chamber outside graduated cylinder.E Humidity cupThe L model humidity cup is with the humidity fashionable clothingwater vessel.F Puts the thing the rackThe focus point is important do not have to surpass 2KG, if the disperser layingaside may put in 10KG about, both sides the rack has tw
5、o rows of V shape hole, isuses for to lay aside the glass rod and vertical direction the minute 30, 45 angles uses.G Heat installationTest chamber control temperature installment.H Filtrating equipmentUses for to filter in the salt water the impurity.I Isolates the water troughThe isolation temperat
6、ure prevented the smog divulgesJ Heats up the water troughIn the test chamber base, installs the water to heat up causes the test chambertemperature balance, the function is heats up with the heat preservation.2 Test chamber exteriorK Dry bulb temperature ideaTests in the laboratory the temperatureL
7、 Wet-bulb thermometerTests in the laboratory the humidityM Counts graduated cylinderThe collection each time experiments atomization quantity.N Saturated spatial air drumLays aside in the control box the base, the function lies in to the air adds thetemperature and the humidity, then delivers in the
8、 test chamber the nozzle.O Salt water supplement barrelIn automatic supplement salt water preheating trough salt waterP Experimental coverThe drift angle 100 angles, use in to cover in the test chamber place above.Q Air ventOutside the caliber pipeline by 11/2 , discharges the mist the pipe to recei
9、ve,causes the mist to discharge.R Draining water exportationOutside the caliber pipeline by 1/2 , discharges the water receives the drain,causes the waste water to discharge from here.S Water entranceThe caliber pipeline by 1/2 , the connection adds the water pipeto the preheating water trough and t
10、he saturated spatial air drumT Supplements the salt water the barrel water level measuring appliance U The airreduced pressure filter, the machine works above for 24 hours, underneath the filterhas draining water the exportation, gently upwardly presses the draining waterexportation, or always barom
11、etric pressure closure.3. Control system(1) test chamber temperature controller pneumatic control test chamber temperature,according to standard temperature hypothesis, saltwater testing method 35C , anti-corrosive testing method 50C .(2) testchamber water level insufficient - like test chamber wate
12、r levelinsufficient, the indicating lamp is bright, also the electromagnetism valve circuit,automatically enters the water until the full water level namely to extinguish.(3) normal like test chamber and saturation tank water levelinsufficient, the indicating lamp is bright, expression normal state.
13、(4) saturation tank water level insufficient like saturated spatial airdrum water level insufficient, the indicating lamp is bright, alsothe electromagnetism valve circuit, automatically enters the water until the fullwater level namely to extinguish.(5) saturated spatial air drum temperature contro
14、ller control saturated spatial air drumtemperature general temperature hypothesis, salt water testing method 47C ,anti-corrosive testing method 63C .(6) pressure gauge this table demonstrated the pressure which thepressure is the air heats up after the saturated spatial air drum, transmits whenspray
15、 nozzle achieved.(7) the timer may wilfully establish the laboratory to need the time,after had finished auto-stop.(8) pressure-regulating valve this valve is the air pressure whenoutdoes lowly, borrows presses the table to demonstrate adjusts. (Test condition1kg)(9) accumulates when straight reads
16、type 0 to be possible to instructaccumulation the experimental time.(10) the power switch controls the entire machine total power source.(11) the console switch controls the test chamber to heat up the troughand the saturation tank spatial air drum electricity heat pipe power source.(12) atomizes th
17、e switch control compressed air to enter the test chamber to causethe spray nozzle atomization.(13) timer switch control timer power source.(14) the defogging switch uses to control the test chamber to remove the mist.IIInstalls the notice and the matters needing attention:1. The power source is: AC
18、 1 巾 220V 20A 50Hz2.The machine lays aside in behind to wall approximately 40cm, about two sidesmust reserve the service space.3. Outside the machine pessimistic electric wire is the total power line, the power lineplease again installs a non- melt silk switch or the knife switch. 6 meter fast airco
19、mpression pipe joint to is spatial (U).4. The water entrance may use PVC 1/2 hard tube or the soft pipe joint running watersource.Draining water place mayuse PVC1/2 hard tube or the hose discharges, must payattention to the water pipe to be supposed downward, also cannot be higher thanthe exhaust pi
20、pe.The air vent must with PVC 11/2 hose, extend to outside discharges, must payattention to the exhaust pipe the installment, may parallel be upward by themachine or be parallel to under. (Upward when must not affect (when transparentexperimental cover opens) above installs the PVChard tube, margin
21、place does nothave residual to model Rubber dust, otherwise electromagnetism valve is easy toblock, creates not good phenomenon).5. The machine installment position, please avoid the sunlight direct radiation, inorder to avoid condition of the influence test.6. The machine installment position, shou
22、ld not approach other electric applianceequipment as far as possible or be flammable, in order to avoid danger.7. This machine is the PVC revertex makes, please do not make an effortto collide, in order to avoid cracks. The application temperature please do notsurpass the experimental standard scope
23、, in order to avoid because of hot hasdistorted or the breakdown.8. Hypothesis experiment time 0.9. Presses down the atomization to press a keyA. the valve which lets in air the air compressor front to openB. to transfer to the air compressor pressure relief valve pressure of2the 23kg/cm (clockwise
24、increase, anti-clockwise reduction).2C. transfers to the pressure-regulating valve pressure of the 1kg/ cm, its pressuremay know by the pressure gauge. (Clockwise increase, anti-clockwisereduction).10. Presses down the time pressed key, then may depend on the hypothesis time, thetime finished the au
25、tomatic power failure.11. The experiment finished, according to order each switch closure.12. In the experiment like has exceptionally, please refers to the functionexceptionally to judge table processing.III. The operation explained1. Mixes the experimental solutionTo mix the method: The 9.5L pure
26、distilled water, joins 500gNaCl, performs to stir,causes its full dissolution. (this time salt water density is 5%)2. Pours into the salt water fluid note entrance the liquid medicines, causes themedicine current of water to the salt water preheating trough.3. The cup watering, the wet-bulb thermome
27、ter will cover the gauze, the gauzeterminal is setting in the cup.4. The laying aside previews or the test specimen in sets at the thingon * ornaments angle to depend on needs the standing operating procedure todecorate5. The hypothesis experiment temperature* depends on must experiment the standing
28、 operating procedure to decorateA The salt water testi ng method: Test chamber temperature 35csaturated spatial air drums temperatures 47cB Corrosion testing method: The test chamber temperature 50csaturated spatial air drums temperatures 63c6. Press down the power source, operates the pressed key,
29、first pre- warm, uses for toarrive the hypothesis temperature.* The attention will have to experiment the lid to cover. (For examplewater level is in sufficie nt in dicat ing lamp is bright, the n will beable automatic control supplement water level, will shine until normal in dicat inglamp, will be
30、 allowed to operate).7. The hypothesis experime nt time8. Presses down the time, the air compressor two pressed keys carries on theexperime nt.* Presses down the atomization pressed key if does not have the gas toleave, looks up behi nd the air compressor the switch admissi on valve and theadjusti n
31、g valve whether do ope n.* In the test chamber like must regarding as, press down removes the mist switchoutside, causes the mist rapidly to discharge.9. The experime nt fini shed, accord ing to order each switch closure.* Like will experiment the time-gap to the next time long, will ask YuCici to e
32、xperiment finished, cleans the test chamber interior to maintain the machine to be clea nVI. Judgme nt and address whe n fun cti on out of fun cti on:Situati onReasonAddressThe temperature of the labcan t reach the sett ingThe temperature set by the labthermometer is too lowThe safe and protect ion
33、switch ofthe lab is too lowHeati ng system out of workFeb-Mag netic con tact out ofwork Control machine out of workLet the thermometer set what it needsLet the safe and protecti on switchset what it n eedsYou can call the warranty personnelfor help by the wire map or call usfor addressThe temperatur
34、e of thesaturati onbarrelscan treachthesett ingThe temperature set by thesaturati onbarrelsthermometer is too lowThe safe and protect ion switch ofthe saturation barrels is too lowHeati ng system out of workFeb-Mag neticcon tact outof workControl machine out of workLet the thermometer set what it ne
35、edsLet the safe and protecti on switchset what it n eedsYou can call the warranty personnelfor help by the wire map or call usfor addressSpray(fog.)volume isno enoughThe spray (fog.) regulator putstoo lowThe glass filter which in thepre-heat box is plugSetting pressure is too lowRise thespray(fog.)r
36、egulatorClear the glass filterAdjust the press-valves to21kg/cmor adjustthedecompress-valves to 2 3 kg/cm2Con diti onReasonProcess ingWhen is unable thethe air compressor hasturnsontheairatomizati onnot revolvedcompressor pressedkeythepressureisadjuststhein sufficie ntpressure-regulat ing2valve gate
37、 1kg/cmthethesole noidvalvepressurebreakdow nin forms this compa ny tothe pressure measuri ngprocess in formsthisapplia nee breakdow n themagn etic con tactorcompa ny to processbreakdow nin forms this compa ny tothe spray nozzle blocksprocessdisma ntles theno zzleclea nsIn the experime ntthe total power s
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 劳务分包合同在建筑行业的应用
- 初中体育 健美操提高班第2次课教案
- 2024年二年级品生下册《机智勇敢保安全》教案 山东版
- 2024年学年八年级语文上册 第四单元 地球我们的家园 第15课《大树和我们的生活》教案2 沪教版五四制
- 2023三年级数学上册 七 庆元旦-时、分、秒的认识 信息窗2 有关时间的计算第1课时教案 青岛版六三制
- 2024-2025学年八年级语文下册 第六单元 22《礼记》二则教案 新人教版
- 2024-2025学年高中数学 第三章 函数的概念与性质 3.2.2 奇偶性教案 新人教A版必修第一册
- 最高额保证合同(2篇)
- 租船合同模版(2篇)
- 运输项目合同(2篇)
- 架构师转正述职报告
- 2023年广东省普通高中学业水平合格性考试数学真题试卷含详解
- 管道支架安装图集
- 收费站安全知识培训
- 保护眼睛-家长进课堂课件
- 肛门疾病知识讲座
- 代谢性疾病知识讲座
- 冬季施工防冻、防滑管理措施
- 山东重点行业环境准入指南汇总
- 新概念第二册语法知识点汇总(完美版)
- 《城市污水源热泵》课件
评论
0/150
提交评论