1、 Low voltage panels1、Participants in FAT12. Location13、Date14、Item standard15、Purpose16、Inspection Contents16.1 Documents16.2. Equipment Inspection Items36.2.1 Visual inspection36.2.2. Routine Inspection Items56.2.3 Problem List67. FAT Record78. Attachments81、Participants in FATl Supervisor:l Genera

2、l contractor:l Manufacturer:.2. Location 3、Date 4、Item standardl Related product standards and specificationsl Factory Acceptance Test Outline5、PurposeFactory Acceptance Test can operate safely and dimensions of the equipment meet the requirements in the contract and related standards.6、Inspection C

3、ontents 6.1 Documents No.NameContentsQualified or Not(,X)Remarks1Qualification certificateQuality, environment, occupational health, and other management systemQualification of manufacturers2Factory inspection report Performance and function test reports of main parts3Main component1.Product quality

4、 certificate and related certificate documents 2.Product Certificate from supplier and incoming inspection report 3.Purchasing acceptance record and parts in-out records Inspector : Date: 6.2. Equipment Inspection Items 6.2.1 Visual inspection No.Test itemsInspection standardResultsQualified orNot(、

5、X)Remarks1Nameplate and markWhether the installation is reliable, label content is correct.2SprayThe panel color should be RAL7032,and the spraying element should be no flow marks, loss, and damage.3Mechanical operation components, interlocking, lock action reliabilityHuman subjects components, oper

6、ation is flexible and reliable4Wire and cable arrangementLayout is correct5Element selection and installationThe choice for element type should be correct, the element installation position should be correct, and element should be in order.6Parts of fixed connection reliabilityWhether or not the con

7、nection good contacts7The correctness of electrical circuitElectricity for five times, each time 1 s, instrument is normal, switch action is reliable8The reliability of the mechanism operationThe installation within the device switch electrical and all components of the manual operation for 5 times,

8、 whether the agency action is reliable, normal9Cabinet sizeRequirements for Height × width ×depth should be 2200mm × 800mm ×1000mmInspector: Date:6.2.2. Routine Inspection ItemsNO.Inspection itemsInspection standardResultsQualified orNot(、X)Remarks1Test the effectiveness of the p

9、rotective circuitInstrument door-to-ground 100mCradle-to-ground 100mMain switch base ground 100mBus clip bracket to ground 100mBreaker switch base ground 100m2Dielectric properties testBetween live parts and insulated operating handle3.75KV/1SBetween live parts and exposed conductive parts2.5 KV/1SB

10、etween each pole and connected to the exposed conductive parts of other poles 2.5 KV/1SBetween the main and auxiliary circuits not directly connected with the main circuit2 KV/1S3Insulation resistancerelative insulation resistance should be voltage1K/V1K/V 4ClearanceBetween the main circuit bare con

11、ductors of different polarity 5.5 mmBetween the main circuit of bare conductors with the housing 5.5mmCreepage distanceBetween the main circuit bare conductors of different polarity 10 mmBetween the main circuit of bare conductors with the housing 10 mmInspector: Date:6.2.3 Problem List NO.Descripti

12、onModification RecordRecorded by: Date: 7. FAT Record FAT Record of Low Voltage panels for Mombasa-Nairobi Standard Gauge Railway ProjectDate: Location:NO.Function CategoryTest ltem and StandardsTest resultConclusion1Visual inspectionRefer to section 6.2.1Refer to section 6.2.1PassFailure2Routine In

13、spection ItemsRefer to section 6.2.2Refer to section 6.2.2PassFailure3Problem ListRefer to section 6.2.3Refer to section 6.2.3PassFailureConclusion:ManufacturerSign:General contractorSign:SupervisorSign:SupervisorSign:8. Attachments Attachment 1:Technical SpecificationAttachment 2:Product certification certificateAttachment 3:Signature List of Factor Acceptance Test MembersAttac

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论