1、促进国内先进技术产业发展的机遇促进国内先进技术产业发展的机遇 INNER MONGOLIA 50MW SOLAR THERMAL PARABOLIC TROUGH POWER DEMONSTRATION PROJECTThe opportunity of promoting the development of domestic advanced technology industry 内蒙古施德普太阳能开发有限公司内蒙古施德普太阳能开发有限公司INNER MONGOLIA STP DEVELOPMENT CO.LTD.v 2006年年5月月,第四次中德高技术论坛签署合作建设本项目的备忘录。

2、May 2006, memorandum of the cooperation for constructing this project during the fourth Sino-German High-Tech Forum was signedv 2006年年10月月,中国内蒙古绿能新能源有限责任公司和德国Solar Millennium AG公司,正式签署组建合资公司的协议书。 Oct. 2006, China Inner Mongolia Lenon New Energy Co., Ltd and Germany Solar Millennium AG signed an agre

3、ement for establishment of a Sino-German joint venture companyv 2007年年,合作经营的内蒙古施德普太阳能开发有限公司成立,旨在完成本项目的可行性研究报告编制工作及有关项目前期工作。 In 2007, Inner Mongolia STP Development Co., Ltd was founded with its purpose of finishing the feasibility study and preliminary work of Inner Mongolia 50MW solar thermal parab

4、olic trough power plant project1、资源评价、资源评价Solar resource evaluation 通过对三个备选站点通过对三个备选站点12个月的实际太阳直射光测量,个月的实际太阳直射光测量,选定厂址累计太阳光直接辐射的总量为选定厂址累计太阳光直接辐射的总量为1919kWh/m2/年。年。 By measurement of on site solar DNI for a period of 12 months in 3 sites, the site which accumulated solar sum DNI 1919kWh/year was sele

5、cted as the final project site.2、厂址选择、厂址选择Project site selection 中国巴拉贡,东经中国巴拉贡,东经107.09,北纬,北纬40.25,海拔,海拔1161m。位于内蒙古鄂尔多斯市杭锦旗内。位于内蒙古鄂尔多斯市杭锦旗内。 Ba Lagong is situated in Hang Jinqi Erdos China with E107.09, N40.25, height 1161m.3、建设规模、建设规模Construction Scale 185MW槽式太阳能热发电空冷机组,汽轮机的排气采用直接空冷冷却系统。太阳能集热面积约51万

6、余平方米。 185MW solar thermal power dry cooling generator, direct dry cooling system of steam turbine, heat collection area is 510,000 square meter.4、接入系统、接入系统Synchronization to power grid 电站内建设一座电站内建设一座110KV升压站,升压站以单回升压站,升压站以单回110KV线路至距离约线路至距离约0.7的库布其的库布其220KV变变110KV侧。侧。 A 110KV substation will be buil

7、t with single loop to Ku Buqi 220KV substation which is about 0.7km far away.5、燃料供应、燃料供应Fuel Supply 启动锅炉、导热油防凝加热装置燃用的天然气,由启动锅炉、导热油防凝加热装置燃用的天然气,由长(庆)长(庆)乌(审)乌(审)临(河)输气管道距电站临(河)输气管道距电站10的的磴口分输站供给,采用天然气罐车运输。磴口分输站供给,采用天然气罐车运输。 Natural gas used for boiler start up and heat transfer fluid heater will be s

8、upplied by Dengkou gas branch station which is the gas branch station of Chang(qing)Wu(shen)Lin(he) gas line about 10km from the project by natural gas tank vehicle.6、水源、水源Water resource 工业用水及生活用水耗水量为工业用水及生活用水耗水量为15万立方米万立方米/年,自杭年,自杭锦旗巴拉贡创业园区自来水管道引接。锦旗巴拉贡创业园区自来水管道引接。 The total water consumption is 15

9、0 thousand m/year supplied by water pipe of Chuangye Industry Zone, Ba Lagong Hang Jinqi.7、年发电量、年发电量Annual generation 预计总发电量预计总发电量1.2亿亿KWh/a,净发电量,净发电量1亿亿KWh/a。 Planned total annual generation is 120 million KWh/a, the net generation is 100 million KWh/a8、总投资、总投资Total investment 工程动态投资工程动态投资18亿余元,动态单

10、位千瓦造价亿余元,动态单位千瓦造价2.2万余元,万余元,度电成本约度电成本约19.7元。设备年利用小时数元。设备年利用小时数1415h。 The dynamic investment of the project is more than 18 billion RMB and unit dynamic investment is 22 thousands Yuan/KW, unit cost is about 19.7Yuan/kWh. Annual equipment utilization is 1415h.1、完成了可行性研究报告并已上报国家能源局。、完成了可行性研究报告并已上报国家能源

11、局。 Finished the feasibility study and submitted it to NEA2、获得的支持性文件。、获得的支持性文件。 Attained supporting documents国家发改委关于同意开展项目前期工作的函(发改办能源国家发改委关于同意开展项目前期工作的函(发改办能源2007164号)号) Letter on permission of development preliminary work of the project by NDRC (NDRC 2007No. 264)环境评价报告审查意见(内环审表环境评价报告审查意见(内环审表200828

12、4号)号) Review advice of environment evaluation report (IM 2008 No. 284)内蒙古电力公司关于项目同意并入电网的函(内电发展内蒙古电力公司关于项目同意并入电网的函(内电发展20099号)号) Letter on permission of connection to power grid by Inner Mongolia Power Company (2009No.9)内蒙古国土厅关于压覆重要矿产资源的函(内国土资函内蒙古国土厅关于压覆重要矿产资源的函(内国土资函2008261号)号) Letter on project on

13、important mine by Inner Mongolia Land Office ( IM LO 2008 No.261)内蒙古军区关于不涉及影响军事设施的函内蒙古军区关于不涉及影响军事设施的函 Letter on no influence military on establishment by Inner Mongolia Military Area获得的支持性文件获得的支持性文件Attained supporting documents内蒙古民航机场关于机场净空保护的函(内机场函内蒙古民航机场关于机场净空保护的函(内机场函200879号)号) Letter on headroom

14、 protection by Inner Mongolia civil aviation airport (IM 2008 No.79)内蒙古西部天然气公司关于承诺供气的函内蒙古西部天然气公司关于承诺供气的函 Commitment of supply natural gas by Inner Mongolia West Natural Gas Company中国建行银行贷款承诺书(意承编号中国建行银行贷款承诺书(意承编号2008年年第第47号)号) Commitment of loan by China Construction Bank (CCB 2008 No.47)地质灾害危险性评价报告

15、审查意见地质灾害危险性评价报告审查意见 Commitment of loan by China Construction Bank (CCB 2008 No.47)杭锦旗政府关于四通一平承诺函(杭政函杭锦旗政府关于四通一平承诺函(杭政函200876号)号) Commitment on four connection and one smooth by Hang Jinqi government ( Hang 2008No.76)获得的支持性文件获得的支持性文件Attained supporting documents杭锦旗国土局关于项目征地收费标准的函(杭国土资发杭锦旗国土局关于项目征地收费标

16、准的函(杭国土资发200880号)号) Letter on charge standard of ground levy by Hang Jinqi Land Bureau (Hang 2008No.80)内蒙古水利厅关于水资源论证的批复(内水资内蒙古水利厅关于水资源论证的批复(内水资200937号)号) Approval on water resource prove by Inner Mongolia Water Resource Department (IMW2009No.37)内蒙古水利厅关于水土保持报告书的批复(内水保内蒙古水利厅关于水土保持报告书的批复(内水保200932号)号)

17、Approval on water and soil conservation report by Inner Mongolia Water Resource Department (IMW2009No.32)内蒙古国土厅关于用地的初审意见(内国土资字内蒙古国土厅关于用地的初审意见(内国土资字2009365号)号) Approval of first trial advice on land by Inner Mongolia Land Office (IMLO2009No.365)获得的支持性文件获得的支持性文件Attained supporting documents1、目前造价高的问题、

18、目前造价高的问题Why the construction cost is high at this moment? 制约太阳能槽式热发电技术大规模化发展的主要矛盾是成本问制约太阳能槽式热发电技术大规模化发展的主要矛盾是成本问题,而聚光镜和真空集热管是槽式太阳能热发电系统中最为核心的题,而聚光镜和真空集热管是槽式太阳能热发电系统中最为核心的部件,本项目采用进口部件占总投资的部件,本项目采用进口部件占总投资的40%左右。左右。 At present the main issue restricting the large-scale development of solar thermal pow

19、er technology is the high costs. The solar collection mirror and heat collecting pipes are the two core components of solar thermal parabolic trough power system. The imported components of our project are about 40% of the total investment.序号序号目前可以在国内生产目前可以在国内生产目前须依赖进口目前须依赖进口今后可以在国内生产今后可以在国内生产1土木工程抛

20、物镜面(Mirror)2金属结构,管路,阀门集热管(HCE)3绝热保温控制系统4蒸汽循环和补水系统工程和监理等5汽轮发电机组电站系统设计6冷却系统7热交换器8电气系统及测量与控制9机电系统No. Can be produced in China at present Now imported needed, but later can produced in China 1Civil engineering Mirror 2Steel structure, pipe and valve Heat collecting elements3Heat insulation Control syste

21、m4Steam cycle and water back up system Engineering and supervision 5Steam turbine unitPower plant system design 6Cooling system 7Heat exchanger 8Electricity system, measurement and control 9Electro-Mechanical Systems 2、世界它国项目电价水平不明的问题、世界它国项目电价水平不明的问题 Obscurity of tariff in other countries 参照系不明确,导致政

22、府主管部门难以很快判定、确定国内项目参照系不明确,导致政府主管部门难以很快判定、确定国内项目的电价政策。的电价政策。 Our government cant decide the tariff of such domestic project policy just because of obscurity of such policy system for reference.3、国产化途径及能力、国产化途径及能力Means and ability of localization 槽式太阳热发电如果可以实现规模化本土制造,可以利用本国槽式太阳热发电如果可以实现规模化本土制造,可以利用本国的产

23、业优势,使其大幅降低制造成本,产业化前景很是看好,在首的产业优势,使其大幅降低制造成本,产业化前景很是看好,在首先满足本国市场需要的同时,还可以出口到美国等发达国家。在西先满足本国市场需要的同时,还可以出口到美国等发达国家。在西班牙、美国、北非、中东等地的槽式太阳热发电电站项目都可以在班牙、美国、北非、中东等地的槽式太阳热发电电站项目都可以在中国采购,诸如:电站辅机设备、金属支架等等。中国采购,诸如:电站辅机设备、金属支架等等。 If the related localization of solar thermal parabolic trough industry realized, we

24、 can use the advantage to greatly reduced manufacturing costs, and it will have a bright future. So it can not only satisfy the domestic demand, but it also can export to America. The solar thermal parabolic trough power plant project in Spain, America, North Africa and Middle East can purchase some

25、 components from China, such as equipment and steel structure. 中国国内供货份额中国国内供货份额场地和基础设施机械与设备土建与安装一般场地工程无100%道路、仓库、围栏无100%供水基础设施无100% 太阳集热区集热管和反射镜0%100%金属支撑,运动部件95%100%DCS,电子与控制60%100%导热油100%100%备件运输与装载55%100%90%无 Supplied in China Field and basic establishment Machinery and equipmentCivil engineering

26、 and installationCommon field engineeringNo100%Roads, storage and fenceNo100%Basic establishment of water supply No 100% Solar collect fieldHeat collecting pipes and mirrorSteel structure and movement componentDCS, electron and controlHeat transfer fluidSpare partsTransportation and loading0% 95% 60

27、% 100%55%90%100% 100% 100% 100%100% No 中国国内供货份额中国国内供货份额场地和基础设施机械与设备土建与安装 电站辅机设备一般电站辅机设备和冷却水系统100%100%水处理100%100%燃料供给100%100%电气100%100%仪表与控制90%90%其他土建与安装无100%装载与运输50%无工程无75%项目管理无65%监理、调试与启动无45% Supplied in ChinaField and basic establishmentMachinery and equipmentCivil engineering and installationBala

28、nce of PlantCommon BOP and cooling system100%100%Water treatment100%100%Fuel supply100%100%Electrics100%100%Instrumentation and control90%90%Other civil engineering and installationNo100%Transportation and loading 50%NoEngineeringProject managementSupervision, commission and start upNoNoNo75%65%45%

29、中国国内供货份额中国国内供货份额场地和基础设施机械与设备土建与安装 导热油系统导热油加热器蒸汽锅炉0% / 100%100%导热油罐热交换器100%100%泵0%100%装载与运输50%无 发电区汽轮机与发电机0%100%汽水系统100100电气辅助系统100%100%装载与运输50%无 Supplied in ChinaField and basic establishmentMachinery and equipmentCivil engineering and installationHeat transfer fluid (HTF) HTF heater/ steam boilerHT

30、F tank/ heat exchange pumpTransportation and loading0% / 100% 100%/ 0%50%100% 100%/100%NoPower block Steam turbine and generatorSteam and water systemElectrical auxiliary systemTransportation and loading0% 100100%50%100% 100100%No4、以引进促进实现大规模化发展的建议、以引进促进实现大规模化发展的建议 Suggestion on realizing large-scal

31、e development by importing and promoting引进技术与设备的范围和内容引进技术与设备的范围和内容 Scale and content of imported technology and equipment 结合内蒙结合内蒙50MW槽式系统的建设,建议应引进以下技术:槽式系统的建设,建议应引进以下技术: The following technology should be imported in accordance with Inner Mongolia 50MW solar thermal parabolic trough power plant: 系统

32、设计与集成建设技术。系统设计与集成建设技术。 System design and integrated construction technology 槽式聚光镜的生产制造。槽式聚光镜的生产制造。 Manufacturing of mirror 集热管的生产与集成。集热管的生产与集成。 Manufacturing and integration of heat collection element 跟踪与控制系统。跟踪与控制系统。 Tracking and control system 导热油的生产及热能储存技术,包括生产设备和技术。导热油的生产及热能储存技术,包括生产设备和技术。 Manuf

33、acturing and technology of HTF and heat storage, including manufacturing equipment and technology 其他。其他。 Others4、以引进促进实现大规模化发展的建议、以引进促进实现大规模化发展的建议 Suggestion on realizing large-scale development by importing and promoting技术引进、消化、吸收再创新的几点建议技术引进、消化、吸收再创新的几点建议 Some suggestions on technology importation

34、, digesting, absorption and re-innovation 技术引进的重点是聚光镜和集热管的生产与集成。技术引进的重点是聚光镜和集热管的生产与集成。 The important point of technology importation is the manufacture and integration of mirror and heat collecting elements. DSG技术、联合循环发电技术、储热技术等。技术、联合循环发电技术、储热技术等。 DSG, combined cycle power generation technology and heat storage technology 引进消化吸收再创新工作要着眼于两个方面,一是设计技术,二是制造技术。引进消化吸收再创新工作要着眼于两个方面,一是设计技术,二是制造技术。 Pay more attention to t

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论