版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、14.1立式管壳式冷凝器安装计量单位:台定额编号1-12861-12871-1288项目单位单价设备冷却面积(m2以内)5075100数量合计数量合计数量合计综合单价元2488.113144.153358.02其中人工费元1348.281588.781655.38材料费元243.13256.83270.11机械费元182.11456.49555.18管理费元525.83619.62645.60利润元188.76222.43231.75二类工工日74.0018.221348.2821.471588.7822.371655.38材料03590404平垫铁 Q235 3#kg5.008.00840.
2、048.00840.048.00840.0403590203斜垫铁 Q235 3#kg6.005.71634.305.71634.305.71634.3001290109钢板 1.61.9 Q235kg4.161.405.821.807.492.309.5703570217镀锌铁丝 8#12#kg6.001.337.981.509.002.0012.0003510701铁钉kg4.200.040.170.040.170.040.1703410207电焊条 J422 4kg4.350.210.910.210.910.210.9105030700木板材m31800.000.0118.000.013
3、23.400.01527.0034020901木枕m31250.000.04151.250.04151.250.04151.2512010103汽油kg10.640.515.430.7147.600.8168.6812010903煤油kg5.001.507.501.507.501.507.5012050311机油kg9.000.3032.730.4043.640.5054.5512070105黄油(钙基脂)kg8.000.1311.050.1621.300.2021.6211112522白油漆kg12.000.080.960.080.960.080.9602010506石棉橡胶板 低压0.86
4、kg6.501.8011.702.1013.652.4015.6004010611水泥 32.5级kg0.3121.946.8021.946.8021.946.8004030102黄砂m3124.000.044.960.044.960.044.9604050201碎石m3102.000.044.080.044.080.044.0831110301棉纱头kg6.500.603.900.603.900.603.9002270131破布kg7.000.956.650.956.650.956.6502330104草袋m21.500.500.750.500.750.500.7503270104铁砂布 2
5、#张1.003.003.003.003.003.003.0002090302塑料布kg9.001.6815.121.6815.121.6815.1231150101水m34.700.653.060.653.060.653.06其它材料费元6.977.307.64机械99070909载货汽车 装载质量8t台班567.930.1796.550.1796.5599090906叉式起重机 提升质量5t台班503.120.34171.0699090507汽车式起重机 提升质量16t台班1006.370.17171.080.255256.6299091925电动卷扬机(单筒慢速) 牵引力50kN台班154
6、.651.114172.281.199185.4399250303交流弧焊机 容量21kVA台班65.000.1711.050.25516.580.25516.58计量单位:台定额编号1-12891-12901-1291项目单位单价设备冷却面积(m2以内)125150200数量合计数量合计数量合计综合单价元4179.464466.815049.57其中人工费元2059.422155.622399.82材料费元322.28334.84360.99机械费元706.27833.871016.86管理费元803.17840.69935.93利润元288.32301.79335.97二类工工日74.00
7、27.832059.4229.132155.6232.432399.82材料03590404平垫铁 Q235 3#kg5.008.00840.048.00840.048.00840.0403590203斜垫铁 Q235 3#kg6.005.71634.305.71634.305.71634.3001290109钢板 1.61.9 Q235kg4.162.5010.403.0012.483.0012.4803570217镀锌铁丝 8#12#kg6.002.4014.402.6716.022.6716.0203510701铁钉kg4.200.060.250.060.2503410207电焊条 J4
8、22 4kg4.350.311.350.311.350.311.3505030700木板材m31800.000.01730.600.02137.800.02545.0034020901木枕m31250.000.06277.500.06277.500.06277.5012010103汽油kg10.640.9189.771.0210.851.22413.0212010903煤油kg5.001.507.501.507.501.507.5012050311机油kg9.000.8087.270.8087.270.8087.2712070105黄油(钙基脂)kg8.000.2421.940.2732.18
9、0.2732.1811112522白油漆kg12.000.080.960.080.960.101.2002010506石棉橡胶板 低压0.86kg6.502.4015.602.4015.603.2020.8004010611水泥 32.5级kg0.3133.69810.4533.69810.4533.69810.4504030102黄砂m3124.000.0546.700.0546.700.0546.7004050201碎石m3102.000.0686.940.0686.940.0686.9431110301棉纱头kg6.500.684.420.684.420.805.2002270131破布
10、kg7.001.268.821.268.821.268.8202330104草袋m21.501.001.501.001.501.001.5003270104铁砂布 2#张1.003.003.003.003.003.003.0002090302塑料布kg9.001.6815.121.6815.122.7925.1131150101水m34.701.004.701.004.701.004.70其它材料费元8.759.099.91机械99070909载货汽车 装载质量8t台班567.930.255144.820.255144.820.255144.8299090507汽车式起重机 提升质量16t台班
11、1006.370.34342.170.425427.710.595598.7999091925电动卷扬机(单筒慢速) 牵引力50kN台班154.651.275197.181.547239.241.624251.1599250303交流弧焊机 容量21kVA台班65.000.3422.100.3422.100.3422.10计量单位:台定额编号1-12921-12931-1294项目单位单价设备冷却面积(m2以内)250350450数量合计数量合计数量合计综合单价元6099.686805.828263.17其中人工费元3073.223372.183989.34材料费元407.13436.4649
12、9.07机械费元990.521209.921660.41管理费元1198.561315.151555.84利润元430.25472.11558.51二类工工日74.0041.533073.2245.573372.1853.913989.34材料03590404平垫铁 Q235 3#kg5.008.00840.048.00840.049.20946.0503590203斜垫铁 Q235 3#kg6.005.71634.305.71634.306.57339.4401290109钢板 1.61.9 Q235kg4.164.0016.644.0016.644.6019.1403570217镀锌铁丝
13、8#12#kg6.004.0024.004.0024.004.6027.6003510701铁钉kg4.200.080.340.080.340.100.4203410207电焊条 J422 4kg4.350.421.830.421.830.522.2605030700木板材m31800.000.03155.800.03664.800.04581.0034020901木枕m31250.000.07188.750.07188.750.07796.2512010103汽油kg10.641.32614.111.5316.281.83619.5412010903煤油kg5.001.507.501.507
14、.501.507.5012050311机油kg9.000.8087.270.8087.271.019.0912070105黄油(钙基脂)kg8.000.3332.660.3332.660.4043.2311112522白油漆kg12.000.101.200.101.200.101.2002010506石棉橡胶板 低压0.86kg6.503.2020.803.6023.404.0026.0004010611水泥 32.5级kg0.3140.61512.5940.61512.5940.61512.5904030102黄砂m3124.000.0688.430.0688.430.08610.66040
15、50201碎石m3102.000.088.160.088.160.1010.2031110301棉纱头kg6.500.885.720.885.721.006.5002270131破布kg7.001.5811.061.5811.062.1014.7002330104草袋m21.501.001.501.001.501.502.2503270104铁砂布 2#张1.003.003.003.003.003.003.0002090302塑料布kg9.002.7925.114.4139.694.4139.6931150101水m34.701.125.261.125.261.517.10其它材料费元11.0
16、612.0413.66机械99070909载货汽车 装载质量8t台班567.930.34193.100.34193.100.425241.3799090509汽车式起重机 提升质量25t台班1174.120.425499.000.595698.6099090511汽车式起重机 提升质量32t台班1259.290.851070.4099091925电动卷扬机(单筒慢速) 牵引力50kN台班154.651.751270.791.879290.592.04315.4999250303交流弧焊机 容量21kVA台班65.000.42527.630.42527.630.5133.1514.2卧式管壳式冷
17、凝器及卧式蒸发器安装计量单位:台定额编号1-12951-12961-1297项目单位单价设备冷却面积(m2以内)203060数量合计数量合计数量合计综合单价元1482.731720.872196.52其中人工费元756.28872.461125.54材料费元229.04246.66292.33机械费元96.58139.35182.11管理费元294.95340.26438.96利润元105.88122.14157.58二类工工日74.0010.22756.2811.79872.4615.211125.54材料03590404平垫铁 Q235 3#kg5.008.00840.048.00840.
18、048.00840.0403590203斜垫铁 Q235 3#kg6.005.71634.305.71634.305.71634.3001290109钢板 1.61.9 Q235kg4.160.803.331.004.161.405.8203570217镀锌铁丝 8#12#kg6.000.804.801.207.201.207.2003510701铁钉kg4.200.030.130.030.130.030.1303410207电焊条 J422 4kg4.350.210.910.210.910.210.9105030700木板材m31800.000.0011.800.00610.800.0081
19、4.4034020901木枕m31250.000.02733.750.0337.500.04151.2512010103汽油kg10.640.515.430.6126.510.6126.5112010903煤油kg5.002.5012.502.5012.502.5012.5012050311机油kg9.000.2021.820.2021.820.3032.7312070105黄油(钙基脂)kg8.000.0880.700.1010.810.1010.8111112524厚漆kg10.000.343.400.343.400.606.0011112522白油漆kg12.000.161.920.16
20、1.920.161.9202010506石棉橡胶板 低压0.86kg6.501.207.801.207.801.509.7502010705耐酸橡胶板 3kg65.000.3019.500.3019.500.6039.0004010611水泥 32.5级kg0.3116.044.9716.044.9716.044.9704030102黄砂m3124.000.033.720.033.720.033.7204050201碎石m3102.000.033.060.033.060.033.0631110301棉纱头kg6.500.855.530.855.530.905.8502270131破布kg7.0
21、00.533.710.533.710.634.4102330104草袋m21.500.500.750.500.750.500.7503270104铁砂布 2#张1.006.006.006.006.006.006.0002090302塑料布kg9.002.2820.522.2820.522.2820.5231150101水m34.700.502.350.502.350.502.35其它材料费元6.306.757.43机械99090906叉式起重机 提升质量5t台班503.120.1785.530.255128.300.34171.0699250303交流弧焊机 容量21kVA台班65.000.1
22、711.050.1711.050.1711.05计量单位:台定额编号1-12981-12991-1300项目单位单价设备冷却面积(m2以内)80100120数量合计数量合计数量合计综合单价元2778.023317.203795.66其中人工费元1405.261679.061903.28材料费元320.10354.83395.14机械费元307.87393.41488.50管理费元548.05654.83742.28利润元196.74235.07266.46二类工工日74.0018.991405.2622.691679.0625.721903.28材料03590404平垫铁 Q235 3#kg5
23、.008.00840.048.00840.048.00840.0403590203斜垫铁 Q235 3#kg6.005.71634.305.71634.305.71634.3001290109钢板 1.61.9 Q235kg4.161.807.492.309.572.309.5703570217镀锌铁丝 8#12#kg6.001.207.201.609.601.609.6003510701铁钉kg4.200.030.130.030.130.030.1303410207电焊条 J422 4kg4.350.421.830.421.830.421.8305030700木板材m31800.000.01
24、119.800.01425.200.01832.4034020901木枕m31250.000.04151.250.04151.250.06277.5012010103汽油kg10.640.7147.600.8168.680.8168.6812010903煤油kg5.003.0015.003.0015.003.0015.0012050311机油kg9.000.4043.640.5054.550.5054.5512070105黄油(钙基脂)kg8.000.1010.810.1210.970.1210.9711112524厚漆kg10.000.707.000.808.000.909.00111125
25、22白油漆kg12.000.161.920.182.160.182.1602010506石棉橡胶板 低压0.86kg6.501.8011.701.8011.702.1013.6502010705耐酸橡胶板 3kg65.000.6039.000.7548.750.7548.7504010611水泥 32.5级kg0.3116.044.9716.044.9718.735.8104030102黄砂m3124.000.033.720.033.720.033.7204050201碎石m3102.000.033.060.033.060.044.0831110301棉纱头kg6.501.056.831.08
26、7.021.107.1502270131破布kg7.000.745.180.845.880.956.6502330104草袋m21.500.500.750.500.750.500.7503270104铁砂布 2#张1.006.006.006.006.006.006.0002090302塑料布kg9.003.3630.244.4740.234.4740.2331150101水m34.700.502.350.502.350.552.59其它材料费元8.299.1210.03机械99070909载货汽车 装载质量8t台班567.930.1796.550.1796.550.1796.559909050
27、7汽车式起重机 提升质量16t台班1006.370.17171.080.255256.620.34342.1799091925电动卷扬机(单筒慢速) 牵引力50kN台班154.650.15323.660.15323.660.17927.6899250303交流弧焊机 容量21kVA台班65.000.25516.580.25516.580.3422.10计量单位:台定额编号1-13011-13021-1303项目单位单价设备冷却面积(m2以内)140180200数量合计数量合计数量合计综合单价元4537.564999.875898.07其中人工费元2224.442458.282947.42材料费
28、元417.19430.93513.78机械费元716.98807.77874.74管理费元867.53958.731149.49利润元311.42344.16412.64二类工工日74.0030.062224.4433.222458.2839.832947.42材料03590404平垫铁 Q235 3#kg5.008.00840.048.00840.048.00840.0403590203斜垫铁 Q235 3#kg6.005.71634.305.71634.305.71634.3001290109钢板 1.61.9 Q235kg4.163.0012.483.0012.484.0016.6403
29、570217镀锌铁丝 8#12#kg6.001.609.601.609.601.609.6003510701铁钉kg4.200.030.130.030.130.060.2503410207电焊条 J422 4kg4.350.421.830.421.830.421.8305030700木板材m31800.000.02341.400.02341.400.03359.4034020901木枕m31250.000.06277.500.06277.500.07796.2512010103汽油kg10.640.8168.680.8168.681.0210.8512010903煤油kg5.003.0015.
30、003.0015.003.0015.0012050311机油kg9.000.5054.550.5054.550.5054.5512070105黄油(钙基脂)kg8.000.1210.970.1210.970.1210.9711112524厚漆kg10.000.909.001.0010.001.0010.0011112522白油漆kg12.000.182.160.182.160.182.1602010506石棉橡胶板 低压0.86kg6.502.1013.652.4015.602.4015.6002010705耐酸橡胶板 3kg65.000.9058.501.0568.251.0568.2504
31、010611水泥 32.5级kg0.3118.735.8118.735.8132.6310.1204030102黄砂m3124.000.033.720.033.720.056.2004050201碎石m3102.000.044.080.044.080.077.1431110301棉纱头kg6.501.107.151.137.351.137.3502270131破布kg7.000.956.651.057.351.057.3502330104草袋m21.500.500.750.500.751.001.5003270104铁砂布 2#张1.006.006.006.006.006.006.000209
32、0302塑料布kg9.004.4740.234.4740.237.2064.8031150101水m34.700.552.590.552.591.004.70其它材料费元10.4210.5612.93机械99070909载货汽车 装载质量8t台班567.930.255144.820.255144.820.34193.1099090507汽车式起重机 提升质量16t台班1006.370.51513.250.595598.7999090509汽车式起重机 提升质量25t台班1174.120.51598.8099091925电动卷扬机(单筒慢速) 牵引力50kN台班154.650.23836.810
33、.27242.060.35755.2199250303交流弧焊机 容量21kVA台班65.000.3422.100.3422.100.42527.6314.3淋水式冷凝器安装计量单位:台定额编号1-13041-13051-1306项目单位单价设备冷却面积(m2以内)304560数量合计数量合计数量合计综合单价元1880.782167.162658.63其中人工费元987.901143.301385.28材料费元218.89267.51340.46机械费元150.40150.40198.69管理费元385.28445.89540.26利润元138.31160.06193.94二类工工日74.00
34、13.35987.9015.451143.3018.721385.28材料03590403平垫铁 Q235 2#kg5.005.80829.048.71243.5611.61658.0803590202斜垫铁 Q235 2#kg6.005.56233.378.34450.0611.12466.7403570217镀锌铁丝 8#12#kg6.002.0012.002.0012.002.0012.0003510701铁钉kg4.200.060.250.090.380.130.5503410207电焊条 J422 4kg4.350.421.830.421.830.632.7405030700木板材m
35、31800.000.0047.200.0047.200.00610.8034020901木枕m31250.000.0337.500.0337.500.04151.2512010103汽油kg10.640.515.430.6126.510.7147.6012010903煤油kg5.002.5012.502.5012.502.5012.5012050311机油kg9.000.3032.730.3032.730.5054.5512070105黄油(钙基脂)kg8.000.2021.620.2021.620.2021.6211112522白油漆kg12.000.161.920.161.920.161.
36、9202010506石棉橡胶板 低压0.86kg6.500.301.950.402.600.603.9004010611水泥 32.5级kg0.3133.1310.2749.1715.2465.6620.3504030102黄砂m3124.000.0546.700.08110.040.1214.8804050201碎石m3102.000.0686.940.0959.690.1212.2431110301棉纱头kg6.500.885.720.885.720.936.0502270131破布kg7.000.533.710.533.710.745.1802330104草袋m21.501.001.50
37、1.502.251.502.2503270104铁砂布 2#张1.005.005.005.005.005.005.0002090302塑料布kg9.002.2820.522.2820.522.2820.5231150101水m34.701.004.701.446.772.009.40其它材料费元6.498.1610.34机械99090906叉式起重机 提升质量5t台班503.120.255128.300.255128.300.34171.0699250303交流弧焊机 容量21kVA台班65.000.3422.100.3422.100.42527.63计量单位:台定额编号1-13071-130
38、8项目单位单价设备冷却面积(m2以内)7590数量合计数量合计综合单价元2981.193444.72其中人工费元1587.301777.48材料费元353.93429.91机械费元198.69295.26管理费元619.05693.22利润元222.22248.85二类工工日74.0021.451587.3024.021777.48材料03590403平垫铁 Q235 2#kg5.0011.61658.0814.5272.6003590202斜垫铁 Q235 2#kg6.0011.12466.7416.38698.3203570217镀锌铁丝 8#12#kg6.002.0012.002.001
39、2.0003510701铁钉kg4.200.130.550.160.6703410207电焊条 J422 4kg4.350.632.740.632.7405030700木板材m31800.000.00610.800.00814.4034020901木枕m31250.000.04151.250.04151.2512010103汽油kg10.640.7147.600.828.7212010903煤油kg5.002.5012.502.5012.5012050311机油kg9.000.5054.550.5054.5512070105黄油(钙基脂)kg8.000.2021.620.2021.621111
40、2522白油漆kg12.000.182.160.182.1602010506石棉橡胶板 低压0.86kg6.500.905.851.509.7504010611水泥 32.5级kg0.3165.6620.3583.7525.9604030102黄砂m3124.000.1214.880.1518.6004050201碎石m3102.000.1212.240.1616.3231110301棉纱头kg6.501.056.831.107.1502270131破布kg7.000.745.180.956.6502330104草袋m21.501.502.252.003.0003270104铁砂布 2#张1.005.005.005.005.0002090302塑料布kg9.003.3930.513.3930.5131150101水m34.702.009.402.5011.75其它材料费元10.8513.69机械99070909载货汽车 装载质量8t台班567.930.1796.5599090906叉式起重机 提升质量5t台班503.120.34171
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 提升学习兴趣推动个人成长与发展考核试卷
- 2024材料供应合同范文,材料供应合同
- 危害辨识风险评价及风险控制考核试卷
- 苏州科技大学天平学院《混凝土与砌体结构设计》2021-2022学年第一学期期末试卷
- 荧光免疫技术(免疫学检验课件)
- 苏州科技大学天平学院《高层建筑给排水与消防》2023-2024学年第一学期期末试卷
- 人事行政培训员工关系管理考核试卷
- 喷枪在石材加工的应用考核试卷
- 服饰配饰设计与发展考核试卷
- S-Grepafloxacin-S-OPC-17116-生命科学试剂-MCE
- 成都达州商会筹备方案
- 工程材料-构配件设备-报审表+数量清单
- 教师教育教学质量提升措施
- 肺结核归口管理培训课件
- 医药经理的资源整合能力
- 噪声的基本知识和光电探测器简介
- 《神秘的楼兰古国》课件
- 航空主题酒店策划方案
- 《销售10大军规》课件
- 燃气安全预警与应急处理
- 煤焦酚-安全技术说明书MSDS
评论
0/150
提交评论