建筑工程英文自我评价_第1页
建筑工程英文自我评价_第2页
建筑工程英文自我评价_第3页
建筑工程英文自我评价_第4页
建筑工程英文自我评价_第5页
已阅读5页,还剩2页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

1、自我鉴定示范文本 | Excellent Model Text 资料编码:CYKJ-FW-246编号:_建筑工程英文自我评价编辑:_日期:_单位:_建筑工程英文自我评价用户指南:该自我鉴定资料适用于把阶段时间里取得的成绩、存在的问题及得到的经验和教训进行一次全面系统的总结,明确下一步的工作方向,少走弯路,少犯错误,提高工作效益作用。可通过修改使用,也可以直接沿用本模板进行快速编辑。Review of my work in the 20XX years, although some results, but there are some shortcomings, is my work in t

2、he 20XX years from the following aspects to do a brief summary:1, to strengthen the safety of the new approach to staff education: the workers did not enter the labor service security personnel before the request, the staff in time after the entry into the staff of the roster and ID card copy of the

3、 project department, I and labor team safety After the staff members have agreed on the time for safety education, they will be responsible for the preservation of the education materials and image materials of the staff members after the safety and fire safety examinations of the staff and workers

4、are conducted in the conference room of the project department.2, do a good job in sub-sub-item security technology to disclose the information: in the sub-sub-construction of the project before the combination of the relevant regulatory requirements and the construction site environment and operati

5、onal safety precautions for targeted security to the end, after review by the Chief Engineer Issued to the labor team. Safety at the end of the main against the labor team security officer, in the security at the end of the labor team must be marked again to each team, and then in the construction w

6、ork supervision team operators can work in accordance with the Ministry of the Ministry of security.3, safety information: in accordance with the construction site in Hebei Province safety data management procedures and relevant regulatory requirements for safety data collection and collation, a tot

7、al of 12 safety information, in accordance with safety information requirements of the regular sub-items for security checks, and labor units In accordance with the safety inspection problems rectification period, and within the specified time for the rectification of labor service units review.4, c

8、onstruction site safety and on-site civilized construction situation: in the field of safety inspections to strengthen the monitoring of major hazard sources, and to develop a list of major construction site safety hazard, such as foundation support, scaffolding, crane, etc. Monitoring, on-site Linb

9、ian protection, reserved hole, elevator shaft protection, stairs protection, on-site temporary electricity to check every day before work.Tangshan area because of the wind is usually relatively large in the wind when the time to inform the labor team security personnel to prohibit high-altitude oper

10、ations and temporary operations and tower crane drivers to prevent large winds in the operation and lifting of large material accidents occurred in the summer pay attention to staff temperature Operations and winter fire conditions. In the routine inspection found that there are security risks to in

11、form the labor team to rectify and notify the team issued a security risk notice, and asked the team within the specified time rectification is completed, if not completed the rectification of the labor team will be economic Punishment, to strengthen the implementation of the rectification of the la

12、bor unit to track the situation, efforts to eliminate the hidden dangers of accidents in the bud, but at various times when the labor team is not in accordance with the requirements of the project department issued a notice of stoppage, in the daily work of the manager I have made substantial progre

13、ss in my work with the help and support.5, staff quarters and living areas of health: the dormitory management difficult, the labor units in the dormitory management is relatively weak, dormitory and living area health environment is poor, the phenomenon of private wire pull chaos is serious, worker

14、s use rice cookers, rice cookersCooking and winter use of electric heating and electric mattress phenomenon is more serious.In order to staff quarters and living area health management, in the project department under the leadership of the strong support and decision-making, increased the staff quarters and living area management. Requiring the labor unit on a monthly basis to arrange for the daily life of public areas

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论