1、监理手册陵县永安工程建设监理有限公司1目录一开工前的准备工作二地基基础工程施工2.1土方开挖··········································
2、183;······················ 012.2基土钎探·························
3、3;······································· 012.3验槽·········
4、183;·················································
5、183;········· 022.4地基处理······································
6、3;·························· 022.5垫层······················
7、183;·············································· 032.6钢筋工程·
8、3;·················································
9、3;············· 042.7模板工程···································
10、·······························072.8混凝土基础· ················&
11、#183;··············································082.9砖基础··
12、;··················································
13、;················112.10 防潮层································&
14、#183;··································112.11 回填土·············
15、83;·················································
16、83;···12三主体工程3.1 砌砖工程············································
17、····················· 133.2 混凝土多孔砖工程· ·························
18、183;·······························133.3 钢筋工程················
19、3;················································ 143.4 模板工
20、程··················································
21、;··············· 143.5 砼工程·································&
22、#183;································· 153.6 预置空心楼板工程· ············
23、83;··········································· 16四装饰装修4.1 抹灰工程····
24、;··················································
25、;··········· 184.2 地暖工程·····································
26、···························· 194.3 外墙保温工程· ··················
27、3;········································· 204.4 室内防水工程· ·····
28、183;·················································
29、183;·····224.5 铝塑门窗安装· ·········································&
30、#183;···················234.6 面砖镶贴····························
31、83;·····································244.7 内、外墙涂料粉刷工程··········
32、;··········································· 25五屋面工程安装篇一 基础电气工程· ··
33、83;·················································
34、83;······· 27二 基础给排水工程· ·······································
35、183;·················· 27三 主体电气工程· ····························
36、183;······························· 27四 主体给排水工程· ···············&
37、#183;·········································· 28五 装修电气工程· ····&
38、#183;·················································&
39、#183;····· 28六 装修给排水工程· ·········································
40、················· 29其它 ································
41、········································ 32 建筑工程材料检验取样标准 ·······&
42、#183;············································ 33 建筑工程施工质量验收统一标准 ··
43、·············································· 372规范标准基本用词说明 ·
44、83;·················································
45、83;···· 41 建筑工程资料管理基本要求 ··········································
46、3;········· 42一、开工前的准备工作一、开工前的准备工作:1. 编制监理规划、监理细则、旁站方案、安全监理规划、安全监理细则、安全旁站方案。2. 审查施工单位施工组织设计、技术交底、工程管理人员上岗证。3. 应搜集的资料 : 施工许可证;规划许可证;施工单位资质、安全生产许可证、现场管理人员名单。4. 熟悉高程控制点及轴线控制桩。5. 熟悉图纸及现场情况 .6. 主持召开第一次监理会议, 需明确内容: 监理人员职责及分工; 监理管理工作的一些要求和规定;例会召开的时间、地点、主要参加人员。二、
47、地基基础工程施工1.土方开挖1.一般规定1.1 土方开挖时,应防止附近已有建筑物或构筑物、道路、管线等发生下沉和变形。应与设计单位或者建设单位协商采取保护措施,并在施工中进行沉降和位移观测。当土方工程挖方较深时,应采取措施,防止基坑底部土的隆起并避免危害周边环境。1.2 土方不应堆积在基坑边缘。材料堆放应距坑沿1 米以上的距离,堆土高度不超过1.5 米。2.监理要点2.1 基槽开挖前,楼体放线必须经规划部门验收合格。2.2 严禁超挖, 如果超挖, 超深部分的处理应由设计单位确定方案,施工单位不得擅自填埋。2.3 冬季开挖后,如基础垫层不能紧跟施工,应将基坑(槽)覆盖,防止基土冻结。2.4当开挖
48、深度超过3 米或虽开挖深度没超过3 米但地质条件和周边环境复杂的,应采取基坑支护措施。2.5采用机械施工时,只能挖至设计高程以上30cm,以下用人工挖至设计高程。2.基土钎探1.一般规定1.1 为探明地基在一定深度内是否存在坟坑、古井、古河道、人防工程等异常和土质分部不均情况,对地基进行钎探。1.2 钎眼距离当设计没有规定,且满堂开挖时,其距离不大于1.5 米,呈梅花型布置,钎探深度不得小于1.8 米。31.3 钎眼布置应和钎眼布置图相符。钎探数据应真实有效,填写清晰,钎眼标识应清晰,便于查找。钎点位置用白灰方格线控制,探孔离槽边0.2 米左右。2.监理要点2.1 检查钎眼深度。用2 米长钢筋
49、,检查实际钎探深度。2.2 灌砂。验完槽后,应及时用细砂灌钎眼。3.验槽验槽由建设单位组织,设计、勘察、施工、监理、质检站参加。验槽意见以勘察和设计为主。验槽意见必须形成书面文件,并有各责任主体签字。没有书面验槽文件,不得对地基进行处理。4.地基处理1. 灰土地基 .1.1 一般规定:1.1.1灰土应拌合均匀, 颜色一致, 并保持一定的湿度, 加水量宜为拌合料总重量的16 。1.1.2灰土分段施工时, 上下两层灰土的接槎距离不得小于500mm。当灰土垫层标高不同时,应作成阶梯形。接槎时应垂直切齐。接缝不要留在荷载较大的部位。1.1.3灰土最上一层完成后,应拉线或用靠尺检查标高和平整度,超高处用
50、铁锹铲平;低洼处应及时补打灰土。1.1.4宜优先选用黏土、粉质黏土或粉土,不得含有有机杂物,使用前应先过筛,其粒径不大于 15mm。1.1.5石灰应用块灰, 使用前应充分熟化过筛, 不得含有粒径大于 5mm的生石灰块, 也不得含有过多的水分。1.1.6当灰土厚度小于等于 20cm时,可采用小型机械搅拌(30 或 50 拖拉机);当灰土厚度大于 20cm小于等于 30cm时,需用大型灰土拌和机搅拌, 也可用小型机械分两层搅拌。当厚度超过 30cm时,应分层搅拌。1.2 监理要点 :1.2.1控制白灰用量。 根据铺设厚度计算出用灰量,然后和施工单位的实际进灰量进行比较。3:7 灰土每立方白灰含量
51、0.21 立方(0.245T),2:8 灰土每立方白灰含量 0.14立方。1.2.2灰土拌合后,应保持一定灰土的湿度,应以手握成团,两指轻捏即碎为宜。1.2.3灰土应连续进行,尽快完成,施工中应有防雨排水措施,刚打完或尚未夯实的灰土,如遭受雨淋浸泡,应将积水及松软灰土除去,并补填夯实;受浸湿的灰土,应晾干后再夯打密实。1.2.4灰土垫层不宜冬期施工,当施工时必须采取措施,并不得在基土受冻的状态下铺设灰土,土料不得含有冻块,应覆盖保温,当日拌合的灰土,应当日铺完夯完,夯完的灰4土表面应用塑料薄膜和草袋覆盖保温。2.砂和砂石地基2.1 一般规定 :铺筑砂(或砂石)的厚度,一般为150-200mm
52、,不宜超过300mm,分层厚度可用样桩控制。视不同条件,可选用夯实或压实的方法。夯实可采用平板振动器,压实可采用6 10 吨的压路机。砂和砂石宜铺设在同一标高的基土上,如深度不同时,基土底面应挖成踏步或斜坡形,接槎处应注意压(夯)实。施工应按先深后浅的顺序进行。分段施工时,接槎处应作成斜坡,每层接槎处的水平距离应错开0.5 1.cm,并充分压(夯)实。铺筑级配砂在夯实碾压前,应根据其干湿程度和气候条件,适当洒水湿润,以保持砂的最佳含水量,一般为8 12 。2.1.5采用砂石处理时,应按配比在搅拌机里搅拌,不得在现场随用随调。2.1.6施工时应分层找平,夯压密实,最后一层压(夯)完成后,表面应拉
53、线找平,并且要符合设计规定的标高。2.2监理要点:2.2.1垫层的铺设,应待其下一层检验合格后方可施工上一层。砂石配比应均匀,不得出现石子或砂子集中现象。振捣必须密实,不得有漏振现象。砂和砂石不得含有草根等有机杂质;砂应采用中砂;石子最大粒径不得大于垫层厚度的 23。砂石施工应连续进行,尽快完成,施工中应有防雨排水措施,刚铺筑完尚未夯实的砂石,如遭受雨淋浸泡,应将积水排走,晾干后再夯打密实。不得在基土受冻的状态下铺设砂石,砂中不得含有冻块,夯完的砂石表面应用塑料薄膜或草袋覆盖保温。砂石垫层冬期不宜施工。3. 其他。3.1地基处理完成以后,必须经过监理验收,才能进行下一道工序,有必要时可请设计人
54、员参加验收。3.2桩基、符合地基必须有有资质的检测部门出具的检测文件。5.垫层1. 一般规定1.1垫层施工前,主要材料应有试验室出具的检测报告。水泥应有3d 或 7d 的报告。1.2施工单位的计量器具应配备齐全,且准确有效。搅拌机旁应设置配合比标牌。试验室配合比应根据实际砂、石的含水率调整成施工配合比。砂石料场必须硬化。1.3槽底标高应符合设计要求,用水准仪进行测量。51.4垫层表面应平整,无露石现象.。2. 监理要点 :2.1检查槽底标高是否符合设计要求。2.2见证施工单位随机抽取标养试块和同养试块。标准养护试块:标养,就是按照实验标准来养护,以检测混凝土强度是否达到设计要求。因为虽然按照设
55、计的要求来拌和混凝土,但是由于各种原因,例如,天气、湿度、水泥批次等,仍然会造成质量波动,因此必须检验成品是否达到设计要求。标养条件是湿度90% 以上,温度20±3。 同条件养护试块, 是指依现场结构实体的养护条件进行对试块进行养护,这种条件的试块抗压强度数值反映结构实体的混凝土强度。2.3检查垫层的浇注质量:密实度、厚度、平整度。2.4验线。内容:割方、开间尺寸。允许偏差:长度 L、宽度 B ( m)允许偏差( mm )L(B)30±530 L( B) 60±1060 L( B) 90±15L (B) 90±20注:轴线的对角线尺寸的允许偏差
56、应为边长偏差的20.5 倍;外廓轴线夹角的允许偏差应为±16. 钢筋工程1. 一般规定:1.1钢筋应复试合格,并应该有出厂合格证,使用复印件的应说明原件存放处,并加盖销售单位的红章。1.2当钢筋的品种、级别或规格需作变更时,应办理设计变更文件。1.3钢筋在加工过程中,如发现脆断、焊接性能不良或力学性能显著不正常等现象,应重新进行复试。1.4直径 18mm的钢筋可采用焊接或机械连接,直径18mm的钢筋可采用绑扎。焊接方法有搭接焊、闪光对焊、电渣压力焊。搭接焊:单面焊,焊口长度10d, ,双面焊5d ;焊接前钢筋端部应预弯,保证焊接后两根钢筋在同一轴线上。一级钢、二级钢使用E4303焊条
57、,三级钢采用E5003焊条。适用直径10 40mm 。闪光对焊:适用直径6 40mm 的钢筋,可用于受压也可用于受拉。电渣压力焊:焊包应突出钢筋4mm ,轴线位移不大于2mm ,只用于受压钢筋。61.5钢筋的接头宜设置在受力较小处。同一纵向受力钢筋不宜设置两个或两个以上接头。接头末端至钢筋弯起点的距离不应小于钢筋直径的10 倍。当受力钢筋采用机械连接接头或焊接接头时,设置在同一构件内的接头宜相互开。纵向受力钢筋机械连接接头及焊接接头连接区段的长度为35 倍 d( d 为纵向受力钢筋的较大直径)且不小于500mm ,凡接头中点位于该连接区段长度内的接头均属于同一连接区段。同一连接区段内, 纵向受
58、力钢筋机械连接及焊接的接头面积在分率为该区段内有接头的纵向受力钢筋截面面积与全部纵向受力钢筋截面面积的比值。同一连接区段内,纵向受力钢筋的接头面积百分率应符合设计要求;当设计无具体要求时,应符合下列规定:1 在受拉区不宜大于50% ;2 接头不宜设置在有抗震设防要求的框架梁端、柱端的箍筋加密区;当无法避开时,对等强度高质量机械连接接头,不应大于50% ;3 直接承受动力荷载的结构构件中,不宜采用焊接接头;当采用机械连接接头时,不应大于 50% 。1.6同一构件中相邻纵向受力钢筋的绑扎搭接接头宜相互错开。绑扎搭接接头中钢筋的横向净距不应小于钢筋直径,且不应小于25mm 。 钢筋绑扎搭接接头连接区
59、段的长度为1.3L ( L 为搭接长度),凡搭接接头中点位于该连接区段长度内的搭接接头均属于同一连接区段。同一连接区段内,纵向钢筋搭接接头面积百分率为该区段内有搭接接头的纵向受力钢筋截面面积与全部纵向受力钢筋截面面积的比值。同一连接区段内,纵向受拉钢筋搭接接头面积百分率应符合设计要求;当设计无具体要求时,应符合下列规定:1 对梁类、板类及墙类构件,不宜大于25% ;2对柱类构件,不宜大于50% ;3当工程中确有必要增大接头面积百分率时,对梁类构件,不应大于50% ;对其他构件,可根据实际情况放宽。1.7钢筋搭接区域内,最少应绑扎三道扎丝,中间一道,两端各一道。1.8最外侧靠近基础模板边的钢筋和
60、模板的距离为5cm 。1.9一般情况先铺短向钢筋,再铺长向钢筋。绑扎时靠近外围两行的相交点每点都绑扎,中间部分的交点可相隔交错绑扎,双向受力的钢筋必须将交叉点全部绑扎。如采用一面顺扣应交错变换方向,也可采用八字扣,但必须保证钢筋不位移。凡基础底板筋交叉部位,都应是双向受力部位。1.10垫块距离 1 米左右,呈梅花形摆放。双层钢筋的应使用钢筋马镫,间距1 米左右,呈梅花形摆放。1.11如果柱子主筋采用光圆钢筋搭接时,角部弯钩应与模扳成45°,中间钢筋的弯钩应与模板成 90°角。箍筋与主筋要垂直,箍筋转角处与主筋交点均要绑扎,主筋与箍筋非7转角部分相交点成梅花交错绑扎。柱筋在基
61、础梁高范围内,应不少于3 个箍筋,柱脚钢筋无设计要求时,平直段不应少于25cm.。箍筋的弯钩叠合处应沿柱子竖筋交错布置,并绑扎牢固。有抗震要求的地区,柱箍筋端头应弯成135 °,平直部分长度不小于10d(d为箍筋直径)。柱基、柱顶、梁柱交接处箍筋间距应按设计要求加密。柱上下两端箍筋应加密,加密区长度及加密区内箍筋间距应符合设计图纸要求。1.12梁端第一个箍筋应设置在距离柱节点边缘50mm 处。梁端与柱交接处箍筋应加密。1.13 钢筋安装允许偏差项目项次项目允许偏差1绑扎钢筋网的长与宽± 102绑扎钢筋网网眼尺寸± 203绑扎钢筋骨架宽度、高度± 54绑扎
62、钢筋骨架长度± 105受力筋间距± 106受力筋排距± 57钢筋弯起点位移208绑扎箍筋、横向钢筋间距± 20平高差+39焊接预埋件中心线位移5基础± 1010受力筋保护层梁柱± 5墙板± 32 监理要点2.1检查复试报告是否合格。2.2检查焊接质量、绑扎长度、接头位置是否符合规范要求。当焊口质量不符合要求时,可采取补救措施,在焊口处加一根加强筋,直径同焊接钢筋直径,长度为焊口每侧一个搭接长度。2.3检查负筋的位置是否能保证。检查柱钢筋的定位措施, 必要时要求加设固定钢筋(图)。挑梁的箍筋开口处应朝下。82.4检查箍筋的平直
63、段长度、受力主筋的锚固长度,检查柱、梁、板钢筋及其骨架的位置是否正确,数量及直径是否符合图纸要求。2.4 十字、丁字交叉处底板钢筋的处理:底板横向受力钢筋仅沿一个主要受力方向通常布置,另一方向的横向受力钢筋可布置到主要受力方向底板宽度 1/4 处。90 度交叉处底板钢筋的处理:底板横向受力钢筋应沿两个方向布置。2.5钢筋保护层是指主筋的保护层厚度,即从主筋外表面至构件表面的距离。基础梁箍筋外包尺寸高度的计算:设计截面高度-上部保护层厚度(一般设计为5cm ) -下部保护层厚度 -基础梁下底板筋直径。图:2.6第一次基础验筋,现场检验合格后,建设单位应该通知质检站验收。97. 模板工程1.0一般
64、规定:1.1模板及其支架应具有足够的承载能力、刚度和稳定性, 能可靠的承受浇注混凝土的重量。1.2基础梁高出条形基础部分,应支吊模,保证基础梁混凝土一次浇注。1.3基础圈梁的模板必须顺直,有可靠的加固措施。浇注混凝土时,操作平台严禁压在圈梁模板上。1.4模板与混凝土的接触面应涂隔离剂。严禁隔离剂沾污钢筋和混凝土接槎处。1.5支模前要把构造柱底部及马牙槎处砖块上面的浮灰和垃圾清除干净,并用水进行冲洗,再立模板进行浇捣混凝土。2.0监理要点:2.1拉线或用经纬仪检查模板的顺直度。2.2检查模板的尺寸、牢固程度。2.3基础梁上翻部分必须支吊模。2.4严禁混凝土操作平台直接压在模板上。8. 混凝土基础
65、1. 一般规定:1.1混凝土浇注前主要材料的合格证、出厂报告、复试报告必须齐全。混凝土中掺外加剂的必须到试验室做专门的配合比。1.2搅拌混凝土前,宜将搅拌筒充分润滑。搅拌第一盘时,宜按配合比减少粗骨料用量。 在全部混凝土卸出之前不得再投入拌合料,更不得采取边出料边进料的方法进行搅拌。1.3混凝土必须做开盘鉴定。混凝土搅拌中必须严格控制水灰比和坍落度,不准任意调整用水量。施工单位的计量器具应配备齐全,且准确有效。搅拌机旁应设置配合比标牌。掺外加剂时,应安排专人和专用工具。原材料每盘称量的允许偏差材料名称允许偏差水泥、掺合料±2%粗、细骨料±3%水、外加剂±2%1.4
66、混凝土浇筑时钢筋工、木工都应安排专人盯护。1.5使用插入式振捣棒应快插慢拔,插点要均匀,逐点一动,顺序进行,不得遗漏,做到均匀振实。 移动间距不大于振捣作用半径的1.5 倍 ( 一般为 30-40cm) 。振捣上一层10时应插入下层5cm,以消除两层间的接缝。表面振捣器的移动间距,应保证振动器的平板覆盖已振实部分的边缘。振捣至砼表面出现浮浆和砼不再下沉为止。1.6留施工缝时应提前确定留槎位置,用模板支护好,施工缝处必须振捣密实。再进行施工时,应对施工缝处凿毛,然后刷灰浆,其配合比与混凝土内的砂浆成分相同.1.7混凝土浇筑完毕后,应按施工技术方案及时采取有效的养护措施,并应符合下列规定:a. 应
67、在浇筑完毕后的12h 以内对混凝土加以覆盖并保湿养护;b. 混凝土浇水养护的时间:对采用硅酸盐水泥、普通硅酸盐水泥或矿渣硅酸盐水泥拌制的混凝土 ,不得少于7d;对掺用缓凝型外加剂或有抗渗要求的混凝土,不得少于14d;c. 浇水次数应能保持混凝土处于湿润状态;混凝土养护用水应与拌制用水相同;d .采用塑料布覆盖养护的混凝土,其敞露的全部表面应覆盖严密,并应保持塑料布内有凝结水 ;5 混凝土强度达到1.2N/mm2 前 ,不得在其上踩踏或安装模板及支架。注 :1、当日平均气温低于5时 ,不得浇水 ;1.8拆模后如有质量缺陷,施工单位不得擅自处理,必须报经监理后才可处理。现浇结构外观质量缺陷名称现象
68、严重缺陷 一般缺陷构件内钢纵向受力筋未被混其他钢筋露筋钢筋有露凝土包裹筋有少量露而外露筋混凝土表面缺少水构件主要 其他部位蜂窝 泥砂浆而受力部位 有少量蜂形成石子有蜂窝窝外露混凝土中孔穴深度构件主要其他部位孔洞 和长度均受力部位有少量孔超过保护有孔洞洞层厚度混凝土中夹有杂物构件主要 其他部位夹渣 且深度超受力部位 有少量夹过保护层有夹渣渣厚度11混凝土中构件主要其他部位疏松 局部不密受力部位有少量疏实有疏松松构件主要 其他部位缝隙从混受力部位 有少量不凝土表面有影响结 影响结构裂缝延伸至混构性能或 性能或使凝土内部使用功能 用功能的的裂缝裂缝构件连接连接部位处混凝土连接部位连接有基本不缺陷及连
69、有影响结部位影响结构接钢筋、构传力性缺陷传力性能连接件松能的缺陷的缺陷动缺棱掉清水混凝其他混凝角、棱土构件有土构件有外形 角不直、影响使用不影响使缺陷 翘曲不功能或装用功能的平、飞边饰效果的外形缺陷凸肋等外形缺陷构件表面具有重要其他混凝装饰效果麻面、掉土构件有外表的清水混皮、起不影响使缺陷凝土构件砂、沾污有外表缺用功能的等外表缺陷陷1.9冬期施工:室外日平均气温连续5天稳定低于5 即进入冬期施工;当室外日平均气温连续5 天稳定高于 5 时解除冬期施工。1.10冬期施工宜采用综合蓄热法。a. 对原材料和水进行加热,热水加热不得超过80 。b. 投料顺序:先投粗细骨料,骨料和热水搅拌后,在投入水泥
70、。c. 出灌温度不低于10,入模温度不低于5 .d. 浇筑后应随即进行覆盖,宜先盖一层塑料薄膜,然后再盖棉毡一层。2. 监理要点:122.1检查施工单位人员落实情况。2.2每天对施工单位的配比情况检查不少于3 次,严格控制混凝土的塌落度,以在料斗中能“立住”为宜。2.3在养护期内应保持混凝土表面湿润。2.4对混凝土基础进行验收。验收内容:顶面放线、截面尺寸、标高、浇筑质量。如发现严重质量问题应请设计部门处理。2.5冬季施工时检查冬季施工措施是否到位,用温度计检查混凝土出灌、入模温度。9. 砖基础1. 一般规定:1.1砖在砌筑时应提前1-2 天浇水湿润。一般以水侵入砖四边1.5cm 为宜,含水率
71、为10%-15%,常温施工不得与干砖上墙,雨季不得使用含水率达饱和状态的砖砌墙,冬期浇水有困难时,必须适当增大砂浆稠度。1.2严格按施工配合比配制砂浆。不宜使用砂浆王等外加剂来提高砂浆的和易性。1.3砌砖:砌砖宜采用挤浆法,或采用三一砌砖法。三一砌砖法的操作要点是一铲灰、一块砖、一挤揉,并随手将挤出的砂浆刮去,操作时砖块要放平,跟线。严禁出现板凳灰。1.4挂线: 240 墙宜双面挂线,370 墙双面挂线。墙体转角处设置皮数杆。1.5砖墙水平灰缝和竖向灰缝宽度一般为10 毫米,但不应小于8 毫米,也不大于12 毫米。水平灰缝的砂浆饱满度应不低于80%。水泥标砖砂浆饱满度不低于90%1.6240m
72、m 厚承重墙的每层承重墙上最上一皮砖,应是整砖丁砌。在梁或者梁垫的下面及挑檐、腰线等处,也应是整砖丁砌。1.7砌体组砌方法应正确,上下错缝(上下皮砖搭接应不小于25mm),内外搭砌;灰缝应横平竖直,厚薄均匀;柱、垛无包心砌法、无暗通缝。不得出现瞎缝、透缝现象。1.8砌筑砂浆必须搅拌均匀,随拌随用,盛入灰槽(盆)内的砂浆如有泌水现象时,应在砌筑前重新拌和。水泥砂浆和水泥混合砂浆应分别在拌成后3h和 4h 内用完,施工期间最高气温超过 30,必须分别在2-3 小时内用完。2. 监理要点2.1检查砖的含水率,是否有干砖上墙。2.2 检查粘灰率。检查方法:用百格网或目测检查砖底面与砂浆的粘结痕迹面积,
73、连揭3块砖,取其平均值。2.3检查砖砌体标高是否符合设计要求。2.4检查构造柱的截面尺寸。2.5找平厚度超过30mm的,应使用细石混凝土。10. 防潮层131. 一般规定:1.1防潮剂或防潮粉应有出厂合格证及检测报告。1.2基层应清理干净,防潮层施工前应浇水湿润并甩浆。1.3防潮层厚度应付合设计要求。2. 监理要点:2.1防潮层应和基层接触严密,不得有空鼓、起砂现象。2.2防潮层表面应平整光滑,不得有砂眼现象。2.3防潮层应到柱的保护层边缘为止,不得渗入柱的截面内。2.4防潮层的边缘应和基层宽度保持一致,不得有突出或飞刺现象。11. 基础回填1.1基槽应清理干净,无积水、杂物,架眼填堵密实。1
74、.2基础验收合格后,方可进行回填。1.3回填时应该基础两侧同时回填,分层夯实。2. 监理要点2.1回填时不能破坏 混凝土结构。2.2回填土不得含有有机物及其他杂质,含水率不宜过高。2.3选用的回填土回填之前,必须做击实试验,回填后做干容重试验。14三、主体工程1.砌砖工程1. 一般规定:1.1 主体验收前开关箱、接线盒、 穿线管应安装完成,开关箱、 接线盒进线管必须安装索母,不得切割箱体。开凿宽度需与管径相匹配,需加钉钢丝网。1.2预留管三根(总直径50mm)采用素混凝土柱,砌体高度30cm一道拉结筋。1.3预留洞口大于30cm的必须设置钢筋混凝土过梁,有引下线的采用带凹槽的过梁板。1.4楼层
75、放线必须经监理验收。1.5 砖墙的转角处和交接处应同时砌筑,如临时间断处留槎确有困难时,除转角外,也可留直槎,但必须做成阳槎,并加设直径 6mm 拉结筋,间距沿墙不得超过 500mm,深入墙体不少于 500mm 。1.6 构造柱拉结筋的形状应符合设计要求,设计无要求时,应使用端部有弯折的,弯折长度不小于 150mm, 端部设弯钩,弯钩长度不低于50mm,弯折处深入构造柱截面内不小于50mm。1.7马牙槎应先退后进。1.8安装砼过梁,底部必须座浆。砼过梁每边支座不得小于250mm 。1.9太阳能预留孔砌块上下搭接尺寸不小于120mm ,每隔两块高度放置一道拉结筋。1.10 半砖不得集中使用,二分
76、头不得上墙。1.11 临 时 施 工 洞 口 的 留 置 距 纵 横 墙 交 接 处 的 距 离 应 500mm, 洞 口 尺 寸 不 得 大 于1000mm*1500mm 。1.12 其他规定见基础砌体部分。2. 监理要点 :2.1检查拉结筋的放置数量,超过500mm 高度,必须放置一道拉结筋。2.2检查窗台下部抗裂筋的放置。2.3检查柱、垛是否有暗通缝现象。2.4检查砼过梁的强度及配筋,检查太阳能预留空砌块的强度,推荐使用构造柱内预留直径110mmPUC 管的施工方法。2.5检查卫生间防水墙的强度。2.混凝土多孔砖工程1. 一般规定:1.1 施工时所使用的砼多孔砖的产品龄期不应小于 28d
77、。推广证书、节能证书、合格证齐全有效。1.2 砖块堆码的场地要平整并保持干燥。堆放的场地要易于排水,周边应设排水沟,避免底部砖块浸水,下雨时要采取覆盖措施,避免砖块被雨淋湿。1.3 砖块必须干砌,被雨淋湿和含水率高的砖块绝对不能上墙;在高温干燥天气时施工,如果砖块过于干燥时,可适当喷水湿润后再砌筑,不得浇水湿润。1.4 表面粘着泥及杂物等不清洁的砖块要清理干净才能用于砌筑;其它材料制作的砖块(如15粘土砖等) 不能与混凝土多孔砖混砌,因不同材质的砖块收缩率是不同的,砌体易产生裂缝。1.5灰缝厚度。 砌体的水平灰缝厚度和垂直灰缝宽度应控制在8-12mm 之间,并且要求横平、竖直。灰缝饱满度不低于
78、90%。为保证砂浆饱满度,要勾缝。勾缝要随砌随勾。最好用稍粗的建筑用圆钢钢筋弯成一个弯头,把灰缝中挤出来的砂浆往里轻推,形成凹形的灰缝沟并凹进墙面 2 ,既美观,又可以提高砂浆的密实度和砂浆与砖块结合的紧密度,同时还可以提高抹灰层与砌体基层的粘结牢固度。1.6新砌好的砌体在 7 天内要妥善保护,避免碰撞,防止砂浆与砖块松动。在砌筑时发现砌体歪斜或砌筑不够平整时,只能拆除重砌,不能用敲击砌体的方法进行砌体校正。1.7夏季高温时,在砌筑的第二天,应对砌体进行养护。可用喷雾器喷水养护。这样可以减慢砌体的干燥,提高砂浆的强度和与砖块的粘结牢度。1.8每日砌筑的高度不应超过1.4m。1.9最下面三皮砼多孔砖应孔朝上使用。随砌随用砂浆把孔填实。2. 监理要点:2.1严禁对砼多孔砖进行浇水。2.2检查勾缝后灰缝的密实度。2.3夏季高温时,应要求施工单位安排专人对墙体进行养护。养护期不低于7 天。3.钢筋工程1. 一般规定:1.1 绑扎时,单向板可间隔绑扎,但外围两排必须全数绑扎。双向板必须全数绑扎。长宽比小于 3 的现浇板为双向板。2. 监理
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 幼儿园课件安全管理制度
- 幼儿园食材市场管理制度
- 广饶大福源超市管理制度
- 异地分公司干部管理制度
- 征地指挥部财务管理制度
- 微量血糖仪使用管理制度
- 房产公司财务部管理制度
- 抚州餐厨废弃物管理制度
- 护理站设施设备管理制度
- 拆分学校后档案管理制度
- 食品标准操作规程
- 青海大学《普通化学》2022-2023学年第一学期期末试卷
- 浙江省杭州市2023-2024学年高一下学期期末教学质量检测政治试题
- 电网工程劳务分包投标方案(技术方案)
- 国开(山东)2024年《小学生心理健康教育》形考1-3终考答案
- 《积极心理学(第3版)》 课件 第10章 感恩
- 人工智能营销(第2版)课件全套 阳翼 第1-8章 迈入人工智能领域-人工智能营销的伦理与法律问题
- 人音版四下第5课 陕北绿了百姓笑了
- 2024年重庆市两江新区数学五下期末复习检测试题含解析
- 大学生心理健康教育智慧树知到期末考试答案章节答案2024年湖南中医药大学
- 江苏省南通市2022-2023学年五年级下学期数学期末试卷(含答案)2
评论
0/150
提交评论