奉化、宁海收费所大棚修复工程开工报告_第1页
奉化、宁海收费所大棚修复工程开工报告_第2页
奉化、宁海收费所大棚修复工程开工报告_第3页
奉化、宁海收费所大棚修复工程开工报告_第4页
奉化、宁海收费所大棚修复工程开工报告_第5页
已阅读5页,还剩40页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

1、first compliance review of the application of the appraisal committee, only through the compliance review of the application to take part in a detailed review. 8.1 application compliance review: does not meet one of the following conditions, procuratorial agency to submit application through complia

2、nce reviews, be invalidated: (1) application of the formats, contents, meet the requirements of selected files, powers of attorney, declarations by the legal representative and the tender agent application to meet the requirements; (2) licence and a bidding agent qualifications meet the requirements

3、; (3) the similar project tendering agency agent number and provide proof of material compliance; (4) the tendering agency intends to put into this project the number of professionals to meet the requirements; (5) are intended to the agent of the project as a project manager has similar projects the

4、 number of and references to meet the requirements; (6) no fraud case. 8.2 application review in detail the evaluation committee through compliance reviews will be selected for detailed review of the application. 8.2.1 tender agent institutions similar project tender performance requirements (16 poi

5、nts) tender agent institutions similar project tender performance 16 points, by two part composition (1) agent similar project of cumulative bid amount scored calculation rules for: agent water project bid amount (on january 1, 2007 has has bid notice for associate) cumulative each reached 100 milli

6、on yuan have 2 points, water project cumulative bid amount scored up not over 6 points. in addition, completes a bid worth more than 500 million yuan in total 1 minute, but other items score accumulated winning amount up to a maximum of 6 points. (2) calculation rule for the number of agents similar

7、 projects: proxy bid amount (since january 1, 2007 winning notice shall prevail) bidding projects in more than 50 million yuan by 2 points, but the agency projects the number of scores up to 3 minutes. 8.2.2 to be agents of the construction project as a project manager in the same project performanc

8、e (10 points) project manager agent performance scores including agents of the bidding agencies of similar projects, as well as in other similar project tendering agency service agent during performance. total 10 project manager agent performance, made up of two parts (1) acting like the accumulated

9、 winning amount calculation rule: agents for water conservancy project bid amount (since january 1, 2007 winning notice for example) cumulative average reached 100 million yuan 3 but scored no more than 5 minutes. (2) calculation rule for the number of agents similar projects: proxy bid amount (sinc

10、e january 1, 2007 winning notice for example) in the more than 50 million yuan water conservancy project period of 3 minutes, but scores the number of agents similar projects up to a maximum of 5 points. project manager demonstrated to provincial-level and higher people's government or the devel

11、opment and reform commission published the winning bidder on the designated media publicity shall prevail. 8.2.3 staff requirement (25 points) 1, to the construction project serving personnel, 4 years experience in tendering agent, 2 points per person, 2 years experience in tendering agent .pig is n

12、ot a pig. with domestic international market and technology big environment of changes, as china traditional industry of pig production of job way and profit way are requirements related industry for resources integration, to quality security for premise, regulation based farming, and management cos

13、t and the production, and sales cost, go standardization, and scale, and intensive, and market road, fast upgrade whole industry chain of regulation capacity, market competition capacity and anti-risk capacity. first, industry analysis (a) the basic situation in china is a traditional hog production

14、 and consumption country, 2008 46.15 million tons of pork, pig stock 462.64 million head by the end pig slaughter 609.6 million. national pig industry's annual production value at around 650 billion yuan, nearly 50% per cent of annual output value of animal husbandry. sichuan province in 2008 pr

15、oduced 6.52 million tons of pork, with 694,000 tons of chengdu city, live pig sell 10.46 million, first 15 vice-provincial cities in the country. the whole nation advantage regional planning (2008-2015) there are 437 counties (cities), 55, sichuan, chengdu has 7 (including in pengzhou). internationa

16、l pig industry mainly include the european union, the united states, and canada, and brazil and other absolute scale of animal husbandry industry and technology developed countries. market 1, the domestic market from china's meat consumption habits and economic analysis of the development situat

17、ion, the emergence of new trends in the market of domestic pork and its products. docking is a pig production and sales more closely. the yangtze river delta, pearl river delta and the bohai rim economic developed area industrial structure adjustment gathered pace, two or three industries to the cen

18、tral and western bias. second, the rigid domestic consumption growth. for a long period, pork is still the largest variety of meat consumption in china, the absolute consumption continues to grow. especially in the vast rural market growth potential. third, market for pork and higher product quality

19、 requirements. pollution-free pork safety and health has shown a very good market prospects. four is the market changing. currently, cold meat, more and more varieties of meat and pork meat products, which accounted for a large proportion of pork consumption, stores, chain stores, supermarkets and o

20、ther marketing methods is on the rise, and transport has been extended to more than 2000 km in radius. chengdu is an important "river pig" resource market, the city's commercial rate reaches above 60% of live pigs, pork and raw materials primary processing products in the domestic and

21、international reputation is high. western hog trading center in chengdu and provides disease-free areas of construction in order to further accelerate the development of swine industry realizes space and conditions. 2, the international markets at present, annual volume of trade in live pigs in the

22、world year around 18 million, about 6 million tons of pork trade. a large net exporter of pork is mainly the eu and north america,-importing countries mainly in asia, japan, and korea, and singapore, the philippines, hong kong and other countries and regions, as well as russia, about 3 million tonne

23、s were imported. it is predicted that the world meat consumption increase of 80% in asia in the future, our country has obvious geographical advantages, export potential. with the advancement of live pigs superiority industry belt construction, animal disease .奉化、宁海收费所大棚 修 复 工 程开工报告宁波卓泰建设工程有限公司2014年

24、12月6日奉化、宁海收费所大棚修复工程承包单位:宁波卓泰建设工程有限公司 监理单位:浙江公路水运工程咨询监理公司合同号: / 编号: 02 浙路(jb)102项目开工报告申请 年 月 日申请开工日期2014.1128计划完工日期2014.12.27共计划日历天30天合同规定工期2014年11月28日至2014年12月27日历时30天承包人主要施工准备工作情况自检说明主要施工管理人员到位情况(含合同规定人员替换情况)详见附表主要施工机具设备到场情况详见附表主要材料采购意向及进场情况详见附表质量保证(或is09002管理)体系建立情况详见附表安全质量自检机构建立情况详见附表施工驻地及临时工程(含借

25、地)设备情况详见附表工地试验室建立及临时资质报批情况详见附表其他有关情况说明详见附表附件无 负责人: 年 月 日监理审批意见试验监理工程师专业监理工程师驻地(总)监理工程师签名日期注:合同段工程只有当本表内容审核符合合同或有关要求时,才可进行“分项工程”的开工审批施工技术方案报审表合同号: / (编号:2013-001) 项目名称:奉化、宁海收费所大棚修复工程 施工单位:宁波卓泰建设有限公司致(驻地监理工程师) : 现报上工程的奉化、宁海收费所大喷修复工程施工技术方案,方案详细说明和图表见附件,请予以审核和批准。附件:施工技术方案 承包人: 日期:专业监理工程师审查意见:专业监理工程师: 日期

26、:驻地监理工程师审查意见:专业监理工程师: 日期:附注:特殊技术、工艺方案要经总监代表批准,一般由工程技术部批准由承包人呈报三份,审批后施工单位和驻地监理工程师办公室各留一份4.1 application of the chinese language application for proxy bidding agency application system. 4.2 bidding agent applications should be submitted by the agency included in the 5th chapter of the content, and tha

27、n select file asked to provide appropriate documentation. 4.3 proxy application shall affix its official seal coding and page by page in the specified location. agent a copy of the application shall have to number the pages and signed original copy (copy) (including supporting documents), and copy s

28、hould be exactly the same. 4.4 application there shall be no loose pages. 4.5 agent application should be complete with indelible ink (powdered) prints, the agent shall not alter any page of the application. 4.6 bidding agencies offer should be based on the interim measures for the management of ten

29、dering agent's service charges (meter prices 20021980) rules of the nineth, tender agent service charges using the difference progressive billing rate. charges in accordance with the tendering agent's service charges and, in conjunction with the provisions of the specific circumstances of th

30、e project shall not be floating up and down-floating range must not exceed 20%, otherwise the application cannot pass compliance checks, be invalidated. due to bidding agency selection and principal-agent contracts signed during charging base bid amount has not yet been produced, it can only be acco

31、rding to the rates of price, bid and the bid amount determines after the end, controlled response rates calculated shall pay tender fee (tender agency fee accounts for the actual bidding agent item for fares). than the selected person tendering agent's service charge control the upper and lower

32、limits, cap for the state development planning commission of the interim measures for the management of tendering agent's service charges (meter prices 20021980) of tendering agent's service fees under 100%, the lower limit for the state development planning commission of the interim measure

33、s for the management of tendering agent's service charges (meter prices 20021980) of tendering agent's service fees under 80%. tendering agent's service charge base should include the following tenders: construction, supervision and material over the above tenders are expected to be impo

34、rtant, with each tendering agency entrusted with tender bid amount as a base for a separate computation of tendering agent's service fees. tendering agent's service fee payment in accordance with the general office of the state development and reform commission on tendering agent's servi

35、ce charge of notification on the relevant issues (the change price 2003857). sale of prequalification documents and solicitation documents going to choose all, pricing should be based on the principle of profit not files, must not violate the relevant provisions in the price department. 4.7 requirem

36、ents in the form of application proxy application shall be prepared in the 5th chapter of the format. application of various supporting documents should be requested by the selection of files grouped by order. comparison and selection of the bidding agencies must provide supporting documents require

37、d by the file; the file you selected does not have the required supporting documents, bidding agency acknowledged the need to provide, or you can provide. proxy application shall be bound, and page-by-page coded in the order. 5th chapter application format notes: bidding agent . 奉化、宁海收费所大棚修复工程施 工 技

38、术 方 案第一节 :修复工程施工工艺方案一|、灯具工艺流程:(a)灯具安装工艺流程:检查灯具 组装灯具 安装灯具 通电试运行。(b)开关、插座安装工艺流程: 检查开关、插座 安装开关、插座 通电试运行。1.1灯具固定应符合下列规定:灯具重量大于3kg时,固定在螺栓或预埋吊钩上。软线吊灯、灯具重量在0.5kg及以下时,采用软线自身吊装,大于0.5kg的灯具采用吊链,且软电线编叉在吊链内,使电线不受力。花灯吊钩圆钢直径不应小于灯具挂销直径,且不应小于6 mm,大型花灯的固定及悬吊装置,应按灯具重量的2倍做过载试验。当钢管做灯杆时,钢管内径不应小于10 mm,钢管厚度不应小于1.5 mm。1.2灯具

39、安装高度和使用电压等级应符合下列规定:一般敞开式灯具,灯头对地面距离不小于下列数值(采用安全电压时除外)。室外:2.5m(室外墙上安装),厂房:2.5m,室内:2m。1.3当灯具距地面高度小于2.4m时,灯具的可接近裸露导体,必须接地或接零可靠,并应有专用接地螺栓且有标识。1.4引向每灯具导线线芯最小截面积应符合下表:导线线芯最小截面积(mm2)灯具安装的场所及用途线芯最小截面积铜芯软线铜线铝线灯头线民用建筑室内0.50.52.5工业建筑室内0.51.02.5室外1.01.02.51.5装有白炽灯泡的吸顶灯具、灯炮不应紧贴灯罩,当灯炮与绝缘台间距离小于5 mm时灯泡与绝缘台间应采取隔热措施。1

40、.6应急照明灯具安装应符合下列规定: 1、应急照明灯的电源除正常电源外,另有一路电源供电;或者是独立于正常电源的柴油发电机组供电;或由蓄电池柜供电或选用自带电源型应急灯具;应急照明在正常电源断电后,电源转换时间为:疏散照明15s;备用照明15s(金融商店交易所1.5s);安装照明0.5s;疏散照明由安全出口标志灯和疏散标志灯组成。安全出口标志灯距地高度不低于2m,且安装在疏散出口和楼梯口里侧的上方;疏散标志灯安装在安全出口的顶部,楼梯间、疏散走道及其转角处应安装在1 m以下的墙面上。不易安装的部位可安装在上部。疏散通道上的标志灯间距不大于20 m(人防工程不大于10 m);疏散标志灯的设置,不

41、影响正常通行,且不在其周围设置容易混同疏散标志灯的其他标志牌等;应急照明灯具、运行中温度大于60的灯具,当靠近可燃物时,采取隔热、散热等防火措施。当采用白炽灯,卤钨灯等光源时,不直接安装在可燃装修材料或可燃物件上;应急照明线路在每个防火分区有独立的应急照明回路,穿越不同防火分区的线路有防火隔堵措施;疏散照明线路采用耐火电线、电缆,穿管明敷或在非燃烧体内穿刚性导管暗敷,暗敷保护层厚度不小于30 mm。电线采用额定电压不低于750v的铜芯绝缘电线。1.7插座接线应符合下列规定:单相两孔插座,面对插座的右孔或上孔与相线连接,左孔或下孔与零线连接,单相三孔插座面对插座的右孔与相线连接,左孔与零线连接。

42、单相三孔、三相四孔及三相五孔插座的接地或接零线接在上孔,插座的接地端子不与零线端子连接,同一场所的三相插座,接线的相序一致。接地或接零线在插座间不串联连接。潮湿场所采用密封型并带保护地线触头的保护型插座安装高度不低于1.5m。车间与试验室插座安装高度不小于0.3米。1.8照明开关安装应符合下列规定:同一建、构筑物的开关采用同一系列产品,开关的通断位置一致操作灵活,接触可靠。相线开关控制。开关距门框边缘的距离0.150.2 m,高度1.3 m。二、卫生器具安装施工方案安装准备卫生洁具及配件检验卫生洁具安装卫生洁具配件安装卫生洁具与墙、地缝隙处理卫生洁具外观检查盛水、通水试验(1) 卫生器具的安装

43、位置应正确,允许偏差:单独器具10毫米,成排器具5毫米;垂直度不超过3毫米。(2) 卫生器具安装高度应符合设计要求,设计无规定时,应按规范规定确定。允许偏差:单独器具±10毫米;成排器具±5毫米。(3) 卫生器具支、托架的安装须平整、牢固,与器具接触应紧密。(4) 连接卫生器具的排水管管径和最小坡度,如设计无要求时,应符合下表的规定:连接卫生器具的排水管管径和最小坡度 表3.2.3序号卫生器具排水管管径(mm)管道最小坡度1污水盆(池)500.0252洗脸盆(洗手盆)32500.0253大便器(自闭式)1000.0124小便器(自动、手动)40500.020(5) 卫生器具

44、给水配件的安装应符合规范规定。(6) 为保证卫生器具安装位置的精确度、待土建单位在卫生间内部初步粉刷后,再安装卫生器具下部的排水接管。第二节 :室内装修施工工艺方案一、室内贴面砖施工工艺标准施工工艺1工艺流程2操作工艺(1)基体为混凝土墙面时的操作方法 1)基层处理:将凸出墙面的混凝土剔平,对于基体混凝土表面很光滑的要凿毛,或用可掺界面剂胶的水泥细砂浆做小拉毛墙,也可刷界面剂。井浇水湿润基层。2) 10mm厚1:3水泥砂浆打底,应分层分遍抹砂浆,随随刮平抹实,用木抹搓毛。3)待底层灰六七成干时,按图纸要求,釉面砖规格及结实际条件进行排砖。弹线。4)排砖:根据大样图及墙面尺寸进行横竖向排砖,以保

45、面砖缝隙均匀,符合设计图纸要求,注意大墙面。柱子和垛子排整砖,以及在同一墙面上的横竖排列,均不得有小于1八砖非整砖。非整砖行应排在次要部位,如窗间墙或阴角处等。但注意一致和对称。如遇有突出的卡件,应用整砖套割吻合,不用非整砖随意拼凑镶贴。 5)用废釉面砖贴标准点,用做灰饼的混合砂浆贴在墙瓦用以控制贴釉面砖的表面平整度。6)垫底尺。计算准确最下一皮砖下口标高,底尺上皮一比地面低1m左右,以此为依据放好底尺,要水平。安稳。7)选砖。浸泡:面砖镶贴前,应挑选颜色。规格一致的罚浸泡砖时,将面砖清扫干净,放人净水中浸泡2h以上,取出表面晾于或擦干净后方可使用。8)粘贴面砖:粘贴应自下而上进行。抹8mm厚

46、1:01:2水泥石灰膏砂浆结合层,要刮平,随抹随自上而下粘贴面砖,求砂浆饱满,亏灰时,取下重贴,井随时用靠尺检查平整度,时保证缝隙宽度一致。9)贴完经自检无空鼓。不平。不直后,用棉丝擦干净,用缝胶。白水泥或拍干白水泥擦缝,用布将缝的素浆擦匀,砖面净。另外一种做法是,用1:1水泥砂浆加水重20的界面剂或专用瓷砖胶在砖背面抹34mm厚粘贴即可。但此种做法其层灰必须抹得平整,而且砂子必须用窗纱筛后使用。另外也可用胶粉来粘贴面砖,其厚度为23mm,有此种法其基层灰必须更平整。(2)基体为砖墙面时的操作方法:1)基层处理:抹灰前,墙面必须清扫干净,浇水湿润。2) 12mm厚1:3水泥砂浆打底,打底要分层

47、涂抹,每层厚度宜57mm,随即抹平搓毛。二、 涂饰工程本修复工程表面施涂油漆施工工艺标准施工工艺1、工艺流程(1)处理基层:用刮刀或碎玻璃片将表面的灰尘、胶迹、锈斑刮干净,注意不要刮出毛刺。(2)磨砂纸:将基层打磨光滑,顺木纹打磨,先磨线后磨四口平面。(3)润油粉:用棉丝蘸油粉在木材表面反复擦涂,将油粉擦进棕眼,然后用麻布或木丝擦净,线角上的余粉用竹片剔除。待油粉干透后,用1号砂纸顺木纹轻打磨,打到光滑为止。保护棱角。(4)满批油腻子:颜色要浅于样板12成,腻子油性大小适宜。用开刀将腻子刮人钉孔。裂纹等内,刮腻子时要横抹竖起,腻子要刮光,不留散腻子。待腻子干透后,用1号砂纸轻轻顺纹打磨,磨至光

48、滑,潮布擦粉尘。(5)刷油色:涂刷动作要快,顺木纹涂刷,收刷。理油时都要轻快,不可留下接头刷痕,每个刷面要一次刷好,不可留有接头,涂刷后要求颜色一致。不盖木纹,涂刷程序同刷铅油相同。(6)刷第一道清漆:刷法与刷油色相同,但应略加些汽油以便消光和快干,并应使用已磨出口的旧刷子。待漆干透后,用1号旧砂纸彻底打磨一遍,将头遍漆面先基本打磨掉,再用潮布擦干净。(7)复补腻子:使用牛角腻板。带色腻子要收刮干净。平滑。元腻子疤痕,不可损伤漆膜。(8)修色:将表面的黑斑、节疤、腻子疤及材色不一致处拼成一色,并绘出木纹。(9)磨砂纸:使用细砂纸轻轻往返打磨,再用潮布擦净粉未。(10)刷第二、三道清漆:周围环境

49、要整洁,操作同刷第一道清漆,但动作要敏捷,多刷多理,涂刷饱满、不流不坠、光亮均匀。涂刷后一道油漆前应打磨消光。(11)冬期施工:室内油漆工程,应在采暖条件下进行,室温保持均衡,温度不宜低于十10,相对湿度不宜低于60。第三节:地面工程一、砖面层施工工艺标准施工工艺1工艺流程基层处理找标高、弹线抹找平层砂浆弹铺砖控制线铺砖 、勾缝、擦缝养护 踢脚板安装 2操作工艺(1)基层处理:把沾在基层上的浮浆、落地灰等用堑子或钢丝刷清理掉,再用扫帚将浮土清扫干净。(2)找标高:根据水平标准线和设计厚度,在四周墙、柱上弹出面层的上平标高控制线。(3)排砖:将房间依照砖的尺寸留缝大小,排出砖的放置位置,并在基层

50、地面弹出十字控制线和分格线。排砖应符合设计要求,当设计无要求时,宜避免出现板块小于1/4边长的边角料。(4)铺设结合层砂浆:铺设前应将基底湿润,并在基底上刷一道素水泥浆或界面结合剂,随刷随铺设搅拌均匀的干硬性水泥砂浆。(5)铺砖:将砖放置在干拌料上,用橡皮锤找平,之后将砖拿起,在干拌料上浇适量素水泥浆,同时在砖背面涂厚度约1mm的素水泥膏,再将砖放置在找过平的干拌料上,用橡皮锤按标高控制线和方正控制线坐平坐正。(6)铺砖时应先在房间中间按照十字线铺设十字控制砖,之后按照十字控制砖向四周铺设,并随时用2m靠尺和水平尺检查平整度。大面积铺贴时应分段。分部位铺贴。(7)如设计有图案要求时,应按照设计

51、图案弹出准确分格线,并做好标记,防止差错。(8)养护:当砖面层铺贴完24h内应开始浇水养护,养护时间不得小于7d。(9)勾缝:当砖面层的强度达到可上人的时候,进行勾缝,用同种、同强度等级、同色的水泥膏或1:1水泥砂浆,要求缝清晰、顺直、平整、光滑、深浅一致,缝应低于砖面051mm第四节:防水工程屋面防水工程施工方法及技术措施1. 工艺流程:基层处理涂刷基层处理剂涂布2厚聚氨脂防水涂料附加层法施工三元乙丙卷材与基层涂专用胶晾胶卷材铺贴收头粘接卷材接头密封蓄水试验防水层验收做保护层。2. 基层处理找坡施工前,应先事先清理屋面上垃圾,预埋落水口、出水口,完成伸出屋面的所有管道,管边根部用细石砼分两次

52、灌密实,以保证不发生漏水。3. 聚氨脂防水涂料:(1)基层应干燥,含水率以少于9%为宜。(2)涂膜施工工艺施工顺序:基层处理落水口管根增强处涂刷底层涂料涂布第一道涂膜防水层。(3)涂布顺序应先垂直面后水平面,先阴阳角及管根,细部后大面,每层涂布方向应顺直。4. 三元乙丙防水卷材施工方法及技术要点、卷材在大面积铺贴前,排气槽屋面拐角、天沟、落水口、屋脊等易渗漏薄弱环节应加铺一道附加层。防水卷材铺贴方向,卷材应平行于屋脊方向从檐口处往上铺贴,双向流水坡度卷材搭接应顺流水方向。、卷材从流水坡度的下坡开始,接卷材规格弹出基准线铺贴。并使卷材的长向与流水坡向垂直,注意卷材的配置应减少阴阳角处的接头。、铺

53、贴平面与立面相连接的卷材,应由下向上进行,使卷材紧贴阴阳角,铺展时对卷材不可拉的过紧。且不得有皱折、空鼓等现象。、阴角处上翻250,卷材收头采用金属压条钉压,最大钉距不应小于900,然后用密封材料将接缝和压条顶缝嵌填密实。、管道四周防水层收头处,应采用金属箍筋箍紧。并用密封材料嵌填密实。5、排气、压实:、排气:每当铺完一卷卷材后,应立即用干净松软的长把滚刷从卷材的一端开始,朝卷材的横向顺序用力滚压一遍,以排除卷材间粘接层间空气.、压实:排除空气后,平面部位可用外包橡胶的长300重30的铁辊辊压,使卷材与基层粘接牢固,垂直部位用手持压辊辊压。、卷材末端收头及封边嵌固:为了防止卷材末端剥落,造成渗

54、水、卷材末端收头也可采用聚氨脂嵌缝膏或其它密封材料封闭,当密封材料固化后,表面再涂刷一层聚氨脂防水涂料,然后压水泥砂浆压缝封闭。6、卷材的接头粘贴:高分子卷材(三元乙丙)搭接缝用丁基胶粘剂a、b两个组份,按1:1的比例配合搅拌均匀,用油漆刷均匀涂刷在翻开的卷材接头的两个粘接面上,静置干燥20min,即可从一端开始粘合,操作时用手从里向外一边压合,一边排除空气、并用手持小铁压辊压实边缘用聚氨脂嵌缝膏密闭。7、防水层蓄水试验:屋面三元乙丙防水层施工完毕后,经隐蔽工程验收,甲方、监理确认做法符合设计要求,符合施工规范。下来再做24小时蓄水试验,经检查确认不渗漏水,方可进行下道工序防水保护层的施工。8

55、、成品保护:、屋面防水层工程完毕后,应加强管理和保护,严禁在防水层上进行其它作业,造成破坏。、严禁在防水层上凿孔找洞,重物冲击,堆放杂物。出现渗漏部位的施工技术要点及做法屋面防水材料必须严格按设计文件注明的防水材料品种、规格、性能的要求选用防水材料。使用前必须严格经过复试合格后方可使用。严禁使用未经国家检测部门检验的防水材料,选用的防水材料除产品合格证外,其材料的耐久性必须符合设计要求的使用年限。精心设计的同时实施精心管理,精心施工。防水施工操作人员,必须具有防水特殊作业工种的岗位证书,无证人员不许上岗操作,以保证施工质量。屋面防水容易产生渗漏部位,施工技术要点及做法如下:1、 屋面卷材起鼓、

56、开裂、张嘴防治的措施及要点:严格控制基层及保护层的含水率,待基层干燥后,再铺设保温层及防水层。如基层及保温层含水率大于规范要求,必须设排槽、排气孔。在女儿墙与屋面连接处做圆弧,圆弧半径r应不小于150,以保证卷材基层粘接牢固不得漏贴附加层。按规范要求施工,严格控制卷材长、短边搭接长度。2、 出屋面管道周壁渗漏防治措施及施工要点:、出屋面管道补孔工作应在做屋面防水层前完成,包括穿层管补孔。并由专人负责,不得由管道工补孔,以确保修补质量。凿除预留四壁松动浮石,清除垃圾,底模必须支撑牢固,以保证补漏浆,不下坠。、提前洒水湿润后,浇201:2水泥浆接浆,上浇c20加微膨胀剂细石砼,并要求浇筑密实。、隔天在其表面上用防水油膏嵌缝,然后用1:2水泥砂浆与屋面找平,并在管道周边做“馒

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论