




版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、 On the project management and construction management of the construction progress of quality management Abstract The main factors affect the progress of the project and construction quality management is analyzed in detail, for reference. Paper Keywords: project management, construction schedule m
2、anagement, construction quality control for factors that affect the progress of the project, usually including human factors, technical factors, material and equipment factors, mechanical factors, foundation factors, financial factors, climatic factors, environmental factors, etc. common main factor
3、s are the following: Building construction impacts 1.1 engineering resources availability in order to complete a construction project need to configure the associated bulk construction materials, devices and equipment, and human resources. First, the allocation of human capital if insufficient or un
4、balanced, will certainly affect the progress of the construction work issues. Again, if the supply of raw materials can not meet the demand for wood-based construction-related projects, such that raw materials can not be successful turnaround, resulting in the construction process had been forced to
5、 simultaneously segmented construction, waste of time, affecting the progress of the project Finally, if the configuration excessive construction tools, not only a waste of resources, but also to the construction site blocked, seriously affecting the work. 1.2 Technical factors for each project tech
6、nical requirements are not identical, so before beginning a construction project, to conduct a comprehensive assessment of the projects technical aspects, in order to appear to be made in advance of the technical problems measures to ensure the normal construction schedule. However, in a specific pr
7、oject, the general construction companies will not spend human and financial resources for technical assessment of the difficulty, because they thought it was unnecessary expense. However, when the real construction, the construction side often because of technical problems which led to the construc
8、tion of some items can not be normal, the loss of personnel costs resulting downtime sometimes far greater than the required pre-construction costs to assess the technical difficulty. 2 specific measures to strengthen the management of project construction progress management of pre-construction 2.1
9、 Construction Schedule Management (1) set up the project management team and improve the management level of progress before the start of construction, since the formation to have a higher management level and technical level project management team. Team project manager for the core of leadership,
10、step by step the progress targets duties, their duties, so that each part of the project, progress management of each stage are specifically responsible. And through strict scientific assessment mechanism and incentive mechanism, and fully mobilize the enthusiasm of the project management team membe
11、rs work to ensure the smooth implementation schedule, the project objectives are achieved. Construction Engineering Paper (2) strict examination blueprint to strengthen contract management First, rigorous examination of design drawings, design drawings to ensure the rationality, feasibility, accurac
12、y and clarity. On this basis, to organize construction workers familiar with the design drawings, so that the characteristics of engineering, design intent, technical requirements, and other processes generally pretty good idea to ensure that the specific construction meet the design requirements, r
13、educing rework due to design changes or misunderstanding caused by drawing . Second, to ensure the authority, fairness, clarity, rationality and feasibility of the contract. Avoid disputes after the start, resulting in the temporary suspension, delay the construction period. 3 Project Management Con
14、struction Quality Management Project Management Construction Quality Control should be a comprehensive control process of the whole process, factors affecting project management construction quality there are many, can be artificial, machinery, materials, methods, and the environment various aspects
15、 of construction quality control. The project department should take effective measures for effective control of these projects, to ensure construction quality. Construction managers and operations personnel, the Ministry of construction projects should be ideological and professional qualities, phy
16、sical fitness and other aspects into account, overall construction quality control in order to achieve their goals. During the construction process should also be appropriate choice of machinery and equipment, the establishment of various machinery and equipment management system. Construction Proje
17、ct Department should do the inspection and acceptance of the control to ensure correct and reasonable use of these items. Project Department should adopt guidance, supervision, inspection, to establish a good technical environment, management of the environment and the working environment for the re
18、alization of quality objectives provide good conditions for strengthening the construction quality management to contribute. 4 Conclusion In summary, project management is the management of a complex of factors, the impact of the lot. Therefore, we need to actively deal with the construction process, emerging issues, and strictly control the construction progress, improve construction quality, reduce construction costs and e
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 许昌学院《食品包装工艺学》2023-2024学年第二学期期末试卷
- 重庆资源与环境保护职业学院《企业价值评估》2023-2024学年第二学期期末试卷
- 广东碧桂园职业学院《对比语言学》2023-2024学年第二学期期末试卷
- 天津理工大学《商务礼仪实训》2023-2024学年第二学期期末试卷
- 天津医科大学临床医学院《无机非金属材料生产设备》2023-2024学年第二学期期末试卷
- 湖南网络工程职业学院《建筑工程计量学》2023-2024学年第二学期期末试卷
- 上海农林职业技术学院《商务沟通方法与技能》2023-2024学年第二学期期末试卷
- 滨州学院《投资理财》2023-2024学年第二学期期末试卷
- 怀化师范高等专科学校《中学生物教育技术》2023-2024学年第二学期期末试卷
- 建设终止合同范本
- 糖尿病膳食指南2024
- 健康证用工合同
- 产品试用免责声明
- 2024年10月自考05760营养学一押题及答案
- 【美术】第一单元第1课《情感的抒发与理念的表达》课件 2023-2024学年人教版初中美术八年级下册
- 体育与健康(水平二)《花样跳绳一级动作(18课时)》大单元教学计划
- 2024年济南工程职业技术学院高职单招(英语/数学/语文)笔试历年参考题库含答案解析
- 癔症护理查房
- 中国民航大学开题报告模板
- 人民币银行结算账户管理系统培训课件
- 钢结构施工安全培训
评论
0/150
提交评论