1、船舶电气设备安装工艺TECHNOLOGY OF ELECTRICAL EQUIPMENT INSTALLATION FOR STEEL SHIP 第 1 页 共36 页 目录 Contents第一章概述Chapter 1 General1. 主要内容 Main contents2. 适用范围 Application3. 引用标准 Refer standards第二章技术内容Chapter 2 technology1. 设备的配套 Check item before installation 2. 设备安装的基本工艺要求 General requirement for equipment ins
2、tallation3. 各类电气设备安装的具体规定 Detail requirement for followed units3.1 电机 Electric motor3.2 主配电板和应急配电板 MSB & ESB 3.3 控制设备及分配电设备 Control panel & distribution box3.4 蓄电池 Battery3.5 舱室照明灯具 Cabinet lighting fixtures3.6 照明附具 Lighting appurtenance3.7 日用电器 Fan & heater3.8 船内通讯,信号设备 Internal communi
3、cation equipment4. 设备安装前的准备工作 Preparation before installation5. 设备安装的基本形式 Basic form 6. 设备及电缆的接地 Earthing of equipment & cable7. 设备的进线 Cable entrance8. 设备的接线 Wire connection第三章闭杯闪点小于 60 的油船电气设备安装工艺Cheaper 3 Additional technology for equipment installation on oil tanker which the flash point less
4、 than 60 1. 一般要求 general 2. 危险区域或处所的化分及其电气设备的安装 Dangerous area division & equipment installation船舶电气设备安装工艺TECHNOLOGY OF ELECTRICAL EQUIPMENT INSTALLATION FOR STEEL SHIP 第 2 页 共36 页 3. 扩大危险区域或处所的划分及其电气设备的安装 Widen dangerous area division & equipment installation4. 其它处所电气设备及附加要求 Additional requ
5、irement for other space5. 防爆电气设备的基本要求 Basic requirement for ex-proof equipment 6. 防爆电气设备的安装 Installation requirement of ex-proof equipment第一章 概述 Chapter 1 General 1. 主要内容 Main contents 本工艺对入级钢质船舶的:1.电气设备的安装提出了安装工艺、接地、进出线等的具体要求和规定。以确保安装质量。2.闭杯闪点60的油船的电气设备施工工艺也作了规定。This technology ruled followed items
6、 for classed steel vessels:1.detail requirement for equipment installation, earthing, cable entrance and wire connection2.special technology for equipment installation, on oil tanker that the flash point less than 602. 适用范围 Application用于我厂入级钢质船舶(包括闭杯闪点60的油船)的电气施工。其它特种船舶或船东提出的其它特殊工艺要求,应另编专用工艺文件,作为补充规
7、定。For electric construction of classed steel ships (included oil tanker that the flash point more than 60)The special technology will been edited as additional standard, if for other special vessels or for special requirement bring forward by ship owner 3. 引用标准 reference standards1.中国船级社钢质海船入级建造规范(1
8、996)4 分册CCS Rules for Classification of Steel Ships(1996)part 42. 中国长江轮船总公司金陵船厂企业标准Corporation Standard of Jingling Shipyard 3. 中国船舶工业总公司电气专业标准Specialty Standards of China Ship Industry Parent Company船舶电气设备安装工艺TECHNOLOGY OF ELECTRICAL EQUIPMENT INSTALLATION FOR STEEL SHIP 第 3 页 共36 页 4. BV 规范 16 分册B
9、V Rules part16 5. GL 规范 3 分册(1992)GL Rules part 3(1992) 6. DNV 规范 第四篇 第四章DNV Rules part 4 chapter 4 7. LR 规范 6 分册LR Rules part 6第二章技术内容Chapter 2 Technology Content1.设备的配套Package of equipment1.1 按照设备明细表(托盘 D 表)或电装图及电气设备布置图进行领料配套。所有电气设备应有制造厂的产品合格证。重要设备应具有相应的船检检验合格证或船用产品型式认可证或其它必须的证书,并注意其有效期限。Materials
10、 preparation is according to equipment list or material list and arrangement drawing and cable trays drawings. All electric equipment should have quality certificates from maker. Some important equipment should have class type approval certificate, equipment certificate or other necessary certificat
11、e, and pay attention to the effective date. 1.2 核对设备型号、规格同设备明细表(托盘 D 表)及图样是否相符,并检查设备及其零件有无缺损,必要时应测量设备的绝缘电阻。 Check whether equipment specification is accordance with equipment list and whether equipment has some defect. Measure insulation resistance if necessary. 1.3 检查设备填料函的数量及规格是否与图纸要求相符。Check whet
12、her cable gland specification and quantities are in accordance with drawings. 1.4 按照相关图纸,配齐及安装好设备的底脚或支架及接地附件。Supports, foundation, ground accessories and so on to be prepared according to relative drawings. 1.5 按照相关图纸,装好设备的识别铭牌,对具有内部接线的设备,如分电箱、起动器等,应配齐必要的开箱图。 For power distribution panels, starter a
13、nd so on, necessary principle drawing and nameplate to be installed correctly. 船舶电气设备安装工艺TECHNOLOGY OF ELECTRICAL EQUIPMENT INSTALLATION FOR STEEL SHIP 第 4 页 共36 页 1.6 配套好的电气设备,存放在专门储备处,存放场所应保持清洁、干燥。 Electric equipment should be placed in special store. The store should be kept dry and clean.2.设备安装的
14、基本工艺要求Basic technical requirement of equipment installation.2.1 设备安装应尽量考虑安全及便于使用、维修,安装场所应有足够的照明并通风良好。For the equipment installation, the security and convenient for use and maintenance should been considered as far as possible. There should have enough lighting and good ventilation in installation s
15、ite. 2.2 设备安装不应破坏舱壁或甲板原有的防护性能及强度,在水密的舱壁、甲板和甲板室的外围壁上不应钻孔以螺丝紧固电气设备。Equipment installation should not break bulkhead or deck the defend capability and the intensity. It is not allowed that drill and screw for install the equipment on watertight bulkhead or deck.2.3 设备不应直接安装在主甲板以下的船壳板上。Equipment should
16、not direct installed on the shell under the main deck.2.4 在易燃易爆舱室,如蓄电池室、油漆间、煤舱等处,除该处必须的防爆设备外,不应安装其它电气设备。In dangerous space, such as battery room, painting room and so on, prohibit installed non-safety equipment except needed ex-proof equipment.2.5 在油、水侵蚀或蒸汽易于积聚的地方,只能安装相应防护等级的电气设备。Electric equipment
17、with relative IP class can be installed at such space, where water, oil and steam are easy to accumulate.2.6 安装在易受机械损伤场所的设备。其防护型式与安装场所相适应。否则,应加装必要的防护装置。The equipment liable being machine damaged site, the protection degree should be accommodate to installation position. Otherwise, it should be adopt
18、ed essential protection.2.7 舱室的封闭板内一般不应安装电气设备,但线路的分支接线盒可安装 在便于开启的木作板内, 且在板外应配有相应的铭牌。Normally, electric equipment should not be installed inside closed panel of cabin. But junction box of circuit branch can be installed inside decoration panel, which is easy for open, and the relative nameplate shoul
19、d be performed.2.8 电气设备若必须在油舱、油柜或双层底、储油舱等外壁表面安装时,设备与此类舱壁之间至少应有 50mm 的距离,但工作时能产生高温的电气设备(如各类电阻器),禁止在此类舱壁表面安装。船舶电气设备安装工艺TECHNOLOGY OF ELECTRICAL EQUIPMENT INSTALLATION FOR STEEL SHIP 第 5 页 共36 页 If the equipment has to be installed on the bulkhead of bulkhead of oil tank, the distance to the surface sh
20、ould be more than 50mm, and electric equipment (heater etc.) producing high temperature forbid installed on the mentioned place.2.9 安装场所如有剧烈震动,足以影响设备的正常可靠工作时,设备的安装应采取适当的减震措施。Proper absorber should be adopted if shake of installation place can influence normal and reliable working.2.10 当非铝合金设备支架安装在铝质
21、轻围壁上时,中间应有绝缘衬垫(如橡胶布,涂有白漆的帆布等)隔开,以防直接接触引起电解腐蚀。When non-aluminum equipment support to be installed on aluminum bulkhead, insulation pad such as rubber, canvas with white painting should be added between bulkhead and support in order to prevent electroanalysis.2.11 调节电阻、启动电阻、充电电阻、电热器具以及其它工作时能产生高温的电气设备,
22、应尽量远离木质隔板等易燃物体和其它设备安装,必要时中间应用绝热材料隔开,当设备外壳温度超过 80时,应加防护网或在布置上予以安排,以防工作人员偶然触及而灼伤。Electric equipment such as regulation resistance, start resistance, charge resistance, heater etc, if high temperature to be occurred during they working, their installation should be far away from other flammable objects
23、, heat insulation materials to be used between them and flammable equipment if necessary. When equipment out shell temperature is more than 80, proper arrangement or protection net to avoid touching damage.2.12 敞开式电气设备应安装在专用舱室内,否则其带电部分应加防护罩,以防偶然触及。Exposed equipment should be installed in special cab
24、ins, its electric part should had protection net in order to prevent touching by accident.2.13 设备的安装都应该是可拆的,其联接应牢固,并有防止受震动而松脱的装置。Equipment installation should be removable. The connection should be tight and anti-loose.2.14 除电压不超过 24V,且对无线电收讯机不产生干扰的设备及具有双重绝缘的设备外,其它电气设备的金属外壳或开启式设备的金属骨架均应可靠接地。Except t
25、he equipment of voltage less than 24V and no effect for radio equipment, all metal shell of electric equipment should earth reliably.2.15 设备安装应在设备支架焊装、补漆结束后进行,以保证设备本身的油漆及部件不受损坏。同时设备安装后,应用透明塑料布包扎起来。Equipment installation to be done after equipment support welding and painting in order to keep equipme
26、nt painting and part of equipment not been damaged. After equipment installation, it should be covered by plastic.3 各类电气设备安装的具体规定船舶电气设备安装工艺TECHNOLOGY OF ELECTRICAL EQUIPMENT INSTALLATION FOR STEEL SHIP 第 6 页 共36 页 Detail requirement of electric equipment installation 3.1 电机 Motor3.1.1 发电机组的安装,其转轴应与船
27、舶艏艉线平行,其它卧式电机的转轴也尽量与艏艉线平行。立式电机的转轴应与船舶水线平面垂直。Axis of auxiliary engine and horizontal motor should parallel with the centerline of the ship as far as possible. Stood motor axis to be vertical.3.1.2 电机的安装应留有测量转速、观察火花、维护换向器和碳刷架的空间。机组应有共同的底座。Leave space for measure revolution, observe spark, maintenance
28、commutator and carbon-brush. The motor group must have common base.3.2 主配电板及应急配电板Main switchboard and emergency switchboard 3.2.1 配电板面板前通道的宽度应至少为 800mm,后通道的宽度至少为 600mm,如配电板的结构形式为可在前面和侧面进行检修,维护和更换部件时,允许后面不设通道。The passageway front MSB is not less than 800mm, The passageway behind MSB is not less than
29、600mm. If maintenance can be done in the front and the side, it allows no passageway behind ESB.3.2.2 配电板前后应铺有防滑和耐油的绝缘地毯或经绝缘处理的木格栅。The floor in front of and behind switchboard should be provided with insulating covering.3.2.3 配电板的上方不应装有油、水及蒸汽管,如不能避免时,则应采取有效的防护措施,油柜及其它液体容器,不得在上述区域安装。The oil pipe, wat
30、er pipe and steam pipe should not above MSB. If not avoid, it must adopt effective protection. Oil tank and other liquid vessel shouldnt install the mentioned space.3.2.4 安装在单底机舱内的落地式主配电板的底座应为具有水密性能的封闭式底座。即底座本身及与船底壳板之间的焊接、引入电缆的电缆管与底座的焊接,均应具有水密性能,以防油水在底座内积聚。If self-stand main switchboard installed in
31、 single bottom engine room, closed foundation with watertight function to be equipped. Welding between foundation and ship hull, foundation and cable pipe to be watertight in order to prevent oil or water accumulation in foundation.3.3 控制设备及分配电设备Control and distribution panel3.3.1 起动箱及分配箱的安装高度,其上沿距甲
32、板或花钢板一般为 1900mm 左右,同一区域内安装的设备,其箱体的上沿应尽量对齐。The distance from up-edge of starter and distribution box to deck is about 1900mm, the equipment in same area, their up-edges must be same highness.船舶电气设备安装工艺TECHNOLOGY OF ELECTRICAL EQUIPMENT INSTALLATION FOR STEEL SHIP 第 7 页 共36 页 3.3.2 落地安装的电气设备,如控制屏等则尽量安
33、装固定在甲板上的角钢底座上,其底座高度一般为 100200mm。Self-stand equipment (as control panel ) should be mounted on angle iron base fixed on deck as far as possible. The highness of foundation is 100mm200mm.3.3.3 电机的起动箱,(组合起动屏除外)主令控制器或控制按钮盒,应尽量安装在电机附近,以便操作、检修和观察。Motor starter, (except GSP) control column or push button b
34、ox should be mounted near the motor as far as possible.3.3.4 立式安装的主令控制器或操纵台(器),应设经防蚀处理过的钢质底座,底座及底座内的穿甲板层的电缆管与甲板间焊接应具水密性能,并应在设备与底座之间垫以厚度不小于5mm 的橡皮,以保证水密及减振。Self-stand main control column or operation console should be equipped with antiseptic and steel foundation. Welding between cable pipe and deck
35、inside foundation should be watertight. 5mm rubber should be provided between equipment and foundation in order to keep watertight and shock absorption. 3.3.5 主令控制器的安装,应考虑其手柄操作的方便,手柄转轴至操作平台的高度一般为 1m左右。Height from handle of control column to operation plate is about 1m.3.3.6 起动箱及分配箱上方不应装有油、水及蒸气管的法兰接头
36、,如不可避免,必需采取相应的措施。The flange of oil pipe, water pipe and steam pipe should not be above starter and distribution panel. If cannot avoid, suitable protection should be performed.3.4 蓄电池 Battery3.4.1 蓄电池应安装在专用舱室或箱柜内,在机舱内若条件不许可,则可敞开安装在通风良好的地方。放置蓄电池箱、柜及敞开安装的蓄电池场所附近,不应有排气管、蒸汽管等各种热源或产生火花的设备。Battery should
37、be mounted in expert cabinet or box or open mounted in place with good ventilation. And battery cannot be installed near all kinds of heat source.3.4.2 蓄电池的安装应便于检测、维护和更换。保证空气流通,若蓄电池为上下安装,之间应留有不小于 300mm 的空间。若为并排安装的蓄电池,其间的空隙应用不吸潮,耐电解液腐蚀的绝缘材料楔隔、衬垫和固定。蓄电池的底部应以厚度不小于 2mm 的青铅皮或其它耐腐蚀材料制成的托盘加以衬垫。托盘的四周边净高度不小于
38、 45mm,以防电解液漏出腐蚀船体钢材。对于敞开安装的蓄电池,其上部还应设有大于电瓶组尺寸的挡板,以防下落物件或搁置物件损坏电瓶或造成短路。Battery shall be so installed as to ensure accessibility for changing, inspection and maintenance. If battery is multi-layer mounting, its space is not less than 300mm. If it is side by side, its space should be pad by anti-corros
39、ion insulation. Tray should be pad by lead or anti-corrosion materials at least 2mm under battery. Free height around tray should not less than 45mm in case of steel hull 船舶电气设备安装工艺TECHNOLOGY OF ELECTRICAL EQUIPMENT INSTALLATION FOR STEEL SHIP 第 8 页 共36 页 corrosion by leakage of electrolyte. As to o
40、pen mounted battery, baffle to be provided on top of it in case of battery damage or short circuit by falling things.3.4.3 蓄电池(封闭式的除外)不得安放在居住舱室内。Battery should not be installed in accommodation cabin except free maintain type.3.4.4 蓄电池的一般高度为电池液孔塞至甲板不大于 1.4m,否则应设有踏板以便操作。Battery height is not more tha
41、n 1.4m generally, otherwise, provide pedal.3.4.5 蓄电池箱、柜应有独立的通风装置,其出风口设在上方,进风口设在下方,进出通风口一般设在箱、柜的对角线的两端,在结构上,应设有档板式弯头,以防止水、火星或其它进入。Independent ventilation equipment should be equipped for battery box or cabinet. The outlet is above and inlet is below. Normally, wind inlet and outlet should be performe
42、d at both side of diagonal of box or cabinet. Elbowed baffle to be provided in case of water, spark or other things come into box. 3.4.6 酸性蓄电池和碱性蓄电池不准放在同一蓄电池舱室、箱或柜内。 Lead-acid and alkalescent batteries cannot be mounted at same cabinets. 3.4.7 蓄电池接线完毕后,所有接线柱处应用凡士林等油脂涂封,以防腐蚀。After battery connection,
43、 all terminal board should be covered with vaseline in order to prevent corrosion. 3.5 舱室照明灯具Lighting fixtures3.5.1 舱室照明灯具应参照室内器具的具体位置及舱室结构适当布置,首先应保证操作及工作地点有必要的照明,并尽量保证舱室各处的照度。Cabin light shall proper arrange according to cabin structure and cabin apparatus. Necessary lighting for operation and work
44、ing area should be kept. Also cabin lighting level to be kept.3.5.2 具有两个分路供电的舱室照明灯具应交叉或间隔布置。Alternation or cross arrangement should be kept for cabin lighting if two way power supply.3.5.3 安装在货舱外走道露天甲板等其它易受机械损伤的场所的灯具,应有防护罩。应急照明的灯具,其外壳应有红色应急标志,且该标志贴在灯具外壳的位置应统一。Protection covers to be provided if ligh
45、t fixtures to be installed in machinery space such as outside passageway of cargo hold and weather deck. For the emergency lighting, the red mark should be performed at same position.3.5.4 床头灯 Bed lamp 床头灯安装的位置一般为高于床铺板 750mm,离床头(一般以靠近船艏或船舯的一端为床头)300 的侧壁上,或顶头中间。Bed lamp high is 750mm to bedplate, and
46、 300mm to bed head, or on the middle of bed head wall.船舶电气设备安装工艺TECHNOLOGY OF ELECTRICAL EQUIPMENT INSTALLATION FOR STEEL SHIP 第 9 页 共36 页 3.5.5 镜灯及壁灯 Mirror lamps and wall lamps镜灯及壁灯的一般安装高度为:壁灯:距地板 1800mm 镜灯:镜子上方 100mmGeneral height: wall lamps: 1800mm from floor Mirror lamps: 100mm above mirror3.5
47、.6 投光灯,探照灯及航行信号灯Flood light, searching light and navigation & signal light a.投光灯及探照灯的安装应便于操纵,并应保证其可动部分在工作需要的照射范围内转动灵活无阻,光线不受阻碍。 Floodlight and search light installation should be easy for operation and turn their movable parts and without obstacles for their light. b.投光灯及探照灯应设有专用的灯架或灯座,灯架或底座的高度及
48、形式与灯具的工作要求相适应。Floodlight and searching light should have special base, its height and type should be suit for working requirement. c.探照灯安装时,应在其底部或底座间垫以厚度不小于 5mm 的橡皮,以保证水密。对于在室内用连杆控制的探照灯,其连杆的安装亦应保证水密及操纵灵活。5mm rubber should be equipped between bottom of floodlight and its support in order to keep wate
49、rtight. As to indoor searchlight controlled by lever, its levers installation should keep watertight and easy operation. e.气体放电型投光灯的高压触发装置应安装在带有“高压危险”标记的金属箱内,金属箱内应尽量装在人员不易触及的地方。The flood light of gas discharge type, its high voltage touch device should mount in metal box with “DANGOUS: HIGH VOLTAGE”
50、 remarks. This metal box should be put such space where people can not touch it easily. f. 航行信号灯的安装位置、高度及要求,应符合有关信号设备规范的规定。Installation location and height and requirement of navigation & signal light should meet the relative rules requirement.3.6 照明附具 Light accessories3.6.1 暗式照明开关的安装,其扳柄方向应一致,扳
51、柄向上为“接通”,扳柄向下为“断开”。The switch direction of flush mounted switches in cabin should be consistent, upwards it turn-on and downwards is turn-off.3.6.2 潮湿和有爆炸危险的场所,其照明开关应能切断所有绝缘极。船舶电气设备安装工艺TECHNOLOGY OF ELECTRICAL EQUIPMENT INSTALLATION FOR STEEL SHIP 第 10 页 共36 页 The lighting switches in humidity and e
52、xplode site can shut down all poles.3.6.3 防水插座及开关插座的安装,其插口不应朝上,并尽量避免向左,壁式安装的非水密,插座的电源孔应为水平方向,接地孔在电源孔上方。Water-proof and watertight sockets installation, its plug hole should not be upwards and towards left is avoid if possible. Wall mounted non-watertight socket, its power hole should be horizontal a
53、nd earth hole is above power hole.3.6.4 可开启的舷窗下方不得安装非水密电气设备。Under the openable porthole, forbid mounting non-watertight electric equipment.3.6.5 分路接线盒应设有与系统图、布置图代号或名称相一致的明显耐久铭牌,铭牌的材料应为滞燃。Junction box of branch should be provided with enduring and clear nameplate. Nameplate material should be of flam
54、e retardant.3.6.6 机舱所处花钢板以下及封闭的燃油和滑油分油机室内,不应安装插座。Sockets not to be installed under platform of engine room and closed purifier room. 3.6.7 照明附具的安装高度参照下表的规定(高度为地面至设备下沿)Installing high of lighting accessories as follows, (height is deck to below edge of equipment)附具名称 Accessories name安装高度 Height附注 Rem
55、ark室内开关及走道暗式开关Inner switch and flush-mounted switch in corridor距地面 1.4m1.4m from floor靠近开门的一侧安装Near the open the door室内水密开关及走道防水开关Inner watertight switch and corridor watertight switch距地面 1.5m1.5m from floor靠近开门的一侧安装Near the open the door台灯插座Table lamp socket距台面 0.15m0.15m from table face在台面左侧避开窗口Ta
56、ble ports. & avoid openable window 台式电话插座Table telephone socket距台面 0.15m0.15m from table face在台面右侧避开窗口table stb. and avoid openable window台扇插座Table fan socket距台面 0.15m0.15m from table face避开窗口Avoid openable window壁扇插座Wall fan socket距地面 1.8m1.8m from table face室内防水插座,开关插座Inner watertight socket a
57、nd socket with switch距地面 1.3m1.3m from floor落地暗式插座Lower flush-mounted socket距地面 0.3m0.3m from floor避开窗口Avoid openable window高低压插座箱H/L voltage socket距地面 1.3m1.3m from floor3.7 日用电器 fan and heater船舶电气设备安装工艺TECHNOLOGY OF ELECTRICAL EQUIPMENT INSTALLATION FOR STEEL SHIP 第 11 页 共36 页 3.7.1 壁扇和顶扇的安装位置,应保证
58、在转动时,不受阻碍且不致影响人身安全. 壁扇安装高度一般为距地面 1.8m,顶扇的安装高度一般为其转动时的最低点距地面不小于 2.0m。Wall fan and ceiling fan installation should be safety for crew during running. In general, Wall fan is 1.8m from deck. The lowest point of ceiling fan is 2.0m from deck. 3.7.2 电取暖器固定安装,安装场所不应有可燃物体及尘埃积聚,电取暖器如安装在可燃材料附近时,二者应离开适当距离或采取绝
59、垫隔垫的防护措施。Electric warm heater should be fixed in the space where no burnable object or dust gathered. If it nears the burnable material, there is enough distance or adopted insulation between of them.3.8 船内通讯,信号设备Internal communication, signal equipment3.8.1 音响及灯光信号设备Sound and lighting signal equipm
60、ent 音响及灯光信号设备应安装在易于听到和观察之处,并应设有必要的识别标记,电铃(警钟)的安装,不得使铃锤罩朝上,以免水及尘埃积聚。Sound and lighting signal equipment should be installed visible and audible. Necessary label should be equipped. For electric bell installation, the beat hammer cover should be downward in case of water and dust gathered.3.8.2 火警按钮盒 Fire alarm push button 火警按钮盒应安装在较
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- GB/T 28182-2024额定电压52 kV及以下带串联间隙避雷器
- 人教版四年级上册数学第六单元《除数是两位数的除法》测试卷及参考答案【综合题】
- 建筑工程技术咨询合同(3篇)
- 2024年版权使用延期协议2篇
- 解除租赁合同协议书写要点
- 语文课引发的大学教育思考
- 质量保证为梦想助力
- 购车定金支付协议
- 购销合同回款风险防范
- 购销天然气合同范本
- 中华人民共和国保守国家秘密法实施条例培训课件
- 2024年全国统一高考英语试卷(新课标Ⅰ卷)含答案
- 小学英语“教学评一体化”实施
- 电影音乐欣赏智慧树知到期末考试答案章节答案2024年华南农业大学
- 生物信息学概论智慧树知到期末考试答案章节答案2024年中南大学
- MOOC 思辨式英文写作-南开大学 中国大学慕课答案
- 跨国公司的外汇风险管理分析-以TCL科技为例
- 《长相思》完整版课件
- 电大中级财务会计二形考任务1-4答案
- T∕ACSC 01-2022 辅助生殖医学中心建设标准(高清最新版)
- 强制检定工作计量器具备案承诺书.doc
评论
0/150
提交评论