1、for upto 4 units in parallel , this is exactly like say 2 or 3 units in paralle1. say for 4 x 480 kva configurations 一 you will need:dp3480e - 4 unitsparallel card for dp3480e - 4 units (1 sitting inside each unit) mccb box - 4 units (1 for each ups)service bypass for 4 x dp3480e - 1 unit (specify r
2、edundant n+1 or full power i. c. whether load is 480 x 3 kva or 480 x 4 kva) electronic static switch - built in every unit (no need to add deperately)the diagram wi 11 be exactly same as for 2 or 3 x dp3480e or 4 x dp3480e.for more than 4 units, we shall need an external static switch - so the thin
3、gs will change to:say for 6 x 480 kvadp3480e - 6 unitsparallel card for dp3480e - 6 units (1 sitting inside each unit) mccb box - 6 units (1 for each ups)service bypass for 6 x dp3480e - 1 unit (specify redundant n+1 or full power i. c. whether load is 5 x 480 kva only or 6 x 480 kva - in example be
4、low it is 5 x 480 kva)electronic static switch 一 external to be capable of handling full power of load (say 6 x 480 kva for full power or 5 x 480 kva for redundancy 一 in example below it is 5 x 480)this diagram will look something like:in this option, the load is 5 x 480kva = 2,400 kva, which can be
5、 handled by 5 ups modules. the 6th module is parallel operating and sharing the load in redundant operation.normally on full load operation, each of the 6 ups active modules is running at 5/6lh i.e. about 85% load only.an external static switch is used to handle any overloads outside the rating of o
6、nline operation or failure of more than 1 module the static switch is rated for 5 x 480 kva load.a single line drawing is attached below to give an impression of the arrangement.parallel operation of dp300esambhaji wagh apc, singaporein dp300e systems parallel operation works as followswe can connec
7、t upto nine units of same capacity in parallel to achieve redundancy or increased load capacity in ups system. the configuration will look as followswe have supplied this kind of solution to ibm uk where they have two banks of six units of dp300e in parallel to support their megacenter.parallel oper
8、ation is used with the above shown configuration and works as followsthese parallel units are connected to service bypass panel to make it easy to combine the ups power and distribute it to the load all units get the input through input switches from sbp (service bypass panel) and output of all unit
9、s will be combined on sbp through individual output switches. this makes it easy to service and maintain the units and increase the reliability of operation.up to four units can be connected in parallel without any additional external static switch. if the configuration demands more than four unit t
10、o be connected in parallel then this configuration uses external static switch for bypass, which is also connected to sbp through switches. for more than four systems the external static switch is used to avoid the imbalance of current on all parallel ups static switches, because of the different le
11、ngths of input and output cables, during the bypass operation of upsin order to work in parallel and share the load all units are installed with parallel operation board inbuilt in a system. this board insures that all units work in synchronization and share the load current equallytherefore 9 units
12、 of dp3480e in parallel can support 4320kva of total load with each unit carrying the equal current.the configuration of connecting all units in parallel has advantages of high power availability, overload capacity, redundancy in case of load less than full load capacity of 8 units and high reliabil
13、ity as no additional equipment required at the output.sbp is a unit which has only power switches and sense contacts and does not include any electronic components and hence very reliable and makes it easy to maintain and repair the units in futurein order to connect all units in parallel, a paralle
14、l cable is connected between all units and this parallel cable also has redundancy (i.e. uses two parallel cables) in order to increase the reliability of parallel operation. parallel board ensures that all units run in synchronization to keep the same output frequency and phase, it also senses the
15、output current for all units and make it equal on all systems. in parallel operation system also continuously checks how many units are cuitently active and sharing the load and display it on front panel fr. ex. 3/3 (i.e. 3 of 3, all three of parallel systems are on) or 2/3 (i.e. two of three parall
16、el systems are working and one is off). by measuring the total load and checking the number of active system it display on front panel whether the system is operating in parallel or parallel redundant mode.all parallel board signals are electrically isolated from ups control circuit and hence there will not be possibility of causing any failure in other units if one of unit fails. many other manufacturers use parallel board where there is no isolat
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025年旅游公司浮动抵押合同
- 个人住宅租借押金及季度租金合同样本(2024版)一
- 二零二五年度专业印刷品设计、印刷与打印服务合同3篇
- 事业单位基本建设粉刷工程分包合同2024版B版
- 2025年度烘焙连锁面包砖供应链合作协议4篇
- 二零二五年度干股虚拟股分红激励方案合同范本
- 2025年度玩具货物运输委托服务协议
- 二零二五年度物业小区个人承包社区物业服务综合解决方案协议
- 2025年度家用空调拆装安全操作规范及应急处理合同
- 二零二五年度家政服务公司保姆雇佣协议
- 海外资管机构赴上海投资指南(2024版)
- 山东省青岛市2023-2024学年七年级上学期期末考试数学试题(含答案)
- 墓地销售计划及方案设计书
- 从偏差行为到卓越一生3.0版
- 优佳学案七年级上册历史
- 铝箔行业海外分析
- 纪委办案安全培训课件
- 超市连锁行业招商策划
- 城市道路智慧路灯项目 投标方案(技术标)
- 【公司利润质量研究国内外文献综述3400字】
- 工行全国地区码
评论
0/150
提交评论