1、technical agreement on packaging in gis exportw60000294party a: shanghai siyuan high voltage switchgearco., lid.party b: shanghai xintonglian packaging co., ltd.signature and stampsignature and stampfrom september 2013 to september 2015technical agreement on packaging in gis exportthis agreement is

2、signed and entered by shanghai sieyuan high voltage switchgear co., l(d (buyer) and shanghai xintonglian packaging co., ltd. (supplier) for packaging of 145/252gis export via friendly consultations 1. scope1 1 this technical agreement specifies the scope and requirements for packaging the exported i

3、tems of shanghai sieyuan high voltage switchgear co., l(d1.2 this technical agreement provides the range of services required from shanghai xintonglian packaging co.,ltd. for exported 145/252 gis.1.3 this technical agreement applies only to the acceptance of packaging solutions and inspection of woo

4、denframe cases for 145/252 gis exported by shanghai sieyuan high voltage switchgear co., l【d.2. normative referencesgb/t !91pictorial signs for packaging and transportgb/t 4879 rust-proof packaginggb/t 7284 wooden frame casesgb/t 735() waterproof packaginggb/t 9846.4 plywood- general technical condi

5、tions for plywoodgb/t 13384 technical conditions for packaging electronic productsgb/t 13385 packaging design requirementsq/sj 1405 technical specifications for internal packaging export goods3.3.2.4 technical requirements3.3.3.4 general requirements3.3.4.4 all export items are transported in wooden

6、 packaging frame cases, which shall comply with the relevant requirements of gb/t 7284;3.3.4.4 the wooden frame cases should be suitable for transport by rail, road and sea;3.3.4.4 according to section 3.1in gb/t 13384, under normal storage, handling conditions, it should be ensured that the product

7、s shall be protected from rust, mold, accuracy compromise, damage or loss for inappropriate packaging conditions within at least 2 years from the delivery date;3.3.4.4 the main force bearing component of wooden frame case shall be made with larch, pine, fir, spruce, maple, or woods of the same or gr

8、eater strength;3.3.4.4 spacing packages, lcp cabinets, pt, la boxes should be banned from stacking suitable gaps should be set within the box; other frame box for parts should meet the requirements for at least two layers stacking;3.3.4.4 taking into account the weight, packing size, the component o

9、f packing boxes should take appropriate reinforcement measures; large packages should be provided with protective iron for lifting;3.3.4.4 packing cases shall be equipped with ventilation openings according to the actual needs;3.3.4.4 the strength of wooden pieces for fixing inside the boxes shall m

10、eet the transport requirements;3.3.4.4 the boxes should adopt i to ii class plywood; at the joints of plywood, there should be no gap, and the gap width not more than 3mm.3.3.4.4 packaging protection: according to the modes of transport, the protection methods shall be determined;when you need vacuu

11、m packaging, the built-in sealing bags shall be made with composite film of aluminum foil and vacuumed before sealing the specific production requirements shall be in accordance with the article in 6 q/s j1405.the packaging requirements for various modes of transport are shown in table 1:table 1 pro

12、tection me什lods for packaging boxestransport modeprotection methodsmode 1: roadrust-proof packaging, shockproof packagingmode 2: road and railrust-proof packaging, shockproof packagingmode 3: highway and shipping (transport time within 2 months )vacuum packaging, shockproof packagingmode 4: highway

13、and shipping (two months or more )vacuum packaging, shockproof packaging, waterproof packagingnote: due to the transport and storage time, waterproof packaging can be used in mode 4; and the waterproof packing shall comply with the requirements for packing for class b level 1 and the relevant requir

14、ements of gb/t 7350 standard.3.2 packaging and transportaccording to the requirements of the transport of export items, party b should be able to provide frame wooden packing and packing service according to table 2:table 2 transport and packing requirementstransportpackaging requirementsinterval tr

15、ansport units1 interval/box or 2 intervals/boxtransport of tube3 tubes/ box or 1 tube/box, single layer packinglcp split cabinet1 cabinet/boxbusbar transportation unitsingle or two layers, the quantity determined in accordance with the packing listarrester transportation unitsingle layer package, th

16、e quantity determined in accordance with the packing listvoltage transformer transportation unitsingle layer package, the quantity determined in accordance with the packing listspare parts, instrument and equipmentdetermined in accordance with the packing listparts transportation unitdetermined in a

17、ccordance with the packing listsf6 gassingle layer package, the quantity determined in accordance with the packing list33 packing requirementsa) intervals331 .ithe bottom frames of intervals shall be fixed with box bottom of package (bolt holes shall be provided on the h steel or channel steel of in

18、tervals), while a wooden stopper shall be provided at the front, rear, left and right of bottom frame3.5.1 components above the bottom frame of interval shall be prohibited to be fixed with battens. 3.3.1.3 before sealing, a sealing bag should be used for protection of the interval, while according

19、to the actual needs, placing the appropriate number of desiccant in the relevant locations.b) voltage transformers, surge arresters transportation4.3.2 they must be delivered in upright position;6.4.4 on the bottom bracket, mounting holes shall be provided, and the bottom bracket shall be fixed with

20、 the bottom of packing boxes with screws;6.4.5 battens shall be used on the cover of package of voltage transformers, surge arresters, or when battens can not be fixed above, complementary reinforcement shall be given at bottombefore sealing boxes, sealing bags shall be used for protection, while ac

21、cording to the actual needs, placing the appropriate number of desiccant in the relevant locationsc) ceramic bushing transportationceramic section of bushings can not be used as a limit or stress points, which should be on the outer surface of the upper and lower flanges;the limit position should be

22、 on both ends of the upper and lower flanges or patch panels of flanges;3.3.33 at all of the limit position, foam sponge shall be provided to prevent direct contact with the wooden items; 3334 sealing bags shall be adopted to protect bushings before sealing the case, while according to the actual ne

23、eds, placing the appropriate number of desiccant in the relevant locations.d) busbar transportation unit:the busbars shall be placed horizontally in the box;triangular wooden blocks or wooden stoppers can be used to limit position, with battens used to fix and prevent the goods from getting up and d

24、own during transport;at the locations on the surface in contact with the busbars, foam sponge should be added in order to prevent direct contact with the wooden items;before sealing boxes, sealing bags shall be adopted for the busbars for protection inside, but according to the actual needs, placing

25、 the appropriate number of desiccant in the relevant locations3.3.5 parts:packing parts shall be strictly in accordance with the contents of packing list;before the items are placed in the box, first put the sealing in the box; after completion of the packing, seal the sealing bags and place the app

26、ropriate number of desiccant, and the sealing bags in the packing process must not be damaged;335.3 in case the sizes of spare parts are too small, and the items on the packing list can not fill box to a certain extent, the party a shall promptly adjust items, and the packing list be revised and imp

27、roved;when packing, party a shall be responsible for checking the inventory items, and party b shall be responsible for packing;packing should follow the following principles:before packing, party a confirms: documents, drawings having separate waterproof packages; wearing parts in spare parts, such

28、 as insulation pot, density relay, closing coil, etc., in the packaging needs to be checked for waterproof measures;secondaiy components, sealing rings, paints, density meter, adsorbents, measuring instruments should be placed in separate areas in the spare part boxes to avoid contact with steel par

29、ts (such as: standard parts, support, etc.), that is, mutual isolation in between shall be done for protection against bump;the items needing layering in the box should be isolated with protective plywood, whose performance parameters should be consistent with the relevant provisions of gb/t 9846.4;

30、the gaps between of parts in the box should be filled with foam sponges to cushion articles against bump;to prevent goods from getting up and down during transport, battens should be used prior to sealing to prevent goods from moving around the battens shall be able to be fixed by nails with the sid

31、e of the column.technical documentsparty a shall provide accurate, detailed packing list and parts dimensions, weight, center of gravity to party b; except for parts, the soft copy of drawings of dimensions of the rest transport units should also be provided to party b;party b shall design drawings

32、based on the packing list and dimensions provided by party;party b shall provide the confirmation drawing of boxes containing the following:packing box drawing should contain: general assembly drawings, bottom packing diagram, side plate packing diagram, end plate packing diagram, cover packing diag

33、ram;parts list shall be given in general assembly drawings and split drawings;a description of fixing method in drawings inside the box should be given;in the general assembly schedule, there should have accessories such as: beams, battens, foam sponge, partitions, nails, iron guard, ventilation ope

34、ning, sealing bags, desiccant, and other details of items.party b should send the packing drawings to party a for confirmation at the agreed time;package design drawing should meet the related requirements in gb/t 13385packaging signspackaging signs contain signs for packaging and transport, shippin

35、g mark, company logo and other signs, among which the shipping mark shall be made and printed by the party a in accordance with the project requirements with plastic rainproof processing;packaging logo color: color of signs shall be black, with company logo nsieyuanh blue, which must be clear, eye-c

36、atching, without fading special requirements shall be given according to actual requirements;packaging and storing signs, company logo is sprayed, and shipping mark is attached using nails;packaging and storing signs: signs should be selected based on product characteristics of the product according

37、 to gb/t 191, generally including:"up", "protected from rain ", " fragile ”,"no roll " and " stacking limits" or "prohibit stacking " for packages requiring one-piece lifting and gravity center deviating significantly from the center, they shoul

38、d be marked with ”lifting at this pointu and center of gravity0 signs and frame size can be adjusted according to the box dimensions;packaging and storing signs, company logo logo under normal circumstances should be sprayed on the side of the box (in longitudinal direction), transport signs (marks)

39、 and packing list attached to the end plate; specific locations of packaging signs shall be determined based on the actual packaging boxes3.3.2.5 packaging services scope3.3.3.5 for items in first cooperation or some special packaging not clearly stated in 3.3, party b in the course of packaging sha

40、ll provide technical guidance;3.3.3.5 for each item, party b should send at least one highly experienced personnel responsible for specific packaging of each item;3.3.3.5 boxing business division:4.3party a is responsible for placing the finished product to be packed in the designated packing area;p

41、arty a is responsible for lifting finished products in packaging and provide some special appliances;party a is responsible for checking that the appearance of packaged goods are in good condition;party a is responsible for pasting movement indicator before packaging;party a is responsible for fixin

42、g the packing list on the outer surface of box and plastic processing;party b is responsible for fixing the packaging, protection, packing;437 party b is responsible for spraying and fixing the transportation signs, shipping marks sieyuan logo signs, and responsible for spraying shipping marks neede

43、d3.3.2.6 rights and responsibilities3.3.3.6 party b shall ensure that the package provided shall damage during lifting, transport and packaging and willnot have impact on the product;3.3.3.6 party b when providing packaging services to party a, should be strictly in accordance with established packa

44、ging fixing solutions during protection and packing; when the bottom provided by party a does not meet the requirements of fixing to the box bottom row, party b has the right to refuse to carry out the packaging;3.3.3.6 party b shall provide packing and packaging services at agreed time, and provide

45、 proof of fumigation crates. the valid period of fumigation is 21 days. if the uncertainty in shipment cause fumigation failure and lead to further re- fumigation unpacking, the expenses incurred shall be borne by party a;3.3.3.6 the failure in packaging or rework caused by mismatching size of the b

46、ox shall be the responsibility of the responsible party;3.3.3.6 party b during packaging services shall be responsible for the security of party a,s personnel.3.3.2.7 acceptance3.3.3.7 during delivery of packaging boxes, party a shall inspect the appearance and dimensions in accordance with the draw

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论