1、fundamentals of protection practicethe purpose of an electrical power system is to generate and supply electrical energy to consumers. the system should be designed and managed to deliver this energy to the utilization points with both reliability and economy. as these two requirements are largely o
2、pposed, it is instructive to look at the reliability of a system and its cost and value to the consumer. one hand ,the diagram mast make sure the reliability in system design,. on the other hand, high reliability should not be pursued as an end in itself, regardless of cost, but should rather be bal
3、anced against economy,taking. security of supply can be bettered by improving plant design, increasing the spare capacity margin and arranging alternative circuits to supply loads. sub-division of the system into zones. each controlled by switchgear in association with protective gear. provides flex
4、ibility during normal operation and ensures a minimum of dislocation following a breakdown. the greatest threat to the security of a supply system is the short circuit,which imposes a sudden and sometimes violent change on system operation. the large current which then flows, accompanied by the loca
5、lized release of a considerable quantity of energy, can cause fire at the fault location, and mechanical damage throughout the system, particularly to machine and transformer windings. rapid isolation of the fault by the nearest switchgear will minimize the damage and disruption caused to the system
6、. a power system represents a very large capital investment. to maximize the return on this outlay. the system must be loaded as much as possible. for this reason it is necessary not only to provide a supply of energy which is attractive to prospective users by operating the system ,but also to keep
7、 the system in full operation as far as possible continuously, so that it may give the best service to the consumer, and earn the most revenue for the supply authority. absolute freedom from failure of the plant and system network cannot be guaran- teed. the risk of a fault occurring, however slight
8、 for each item, is multiplied by the number of such items which are closely associated in an extensive system, as any fault produces repercussions throughout the network. when the system is large, the chance of a fault occurring and the disturbance that a fault would bring are both so great that wit
9、hout equipment to remove faults the system will become, in practical terms, inoperable. the object of the system will be defeated if adequate provision for fault clearance is not made. nor is the installation of switchgear alone sufficient; discriminative protective gear, designed according to the c
10、haracteristics and requirements of the power system. must be provided to control the switchgear. a system is not properly designed and managed if it is not adequately protected. protective gearthis is a collective term which covers all the equipment used for detecting,locating and initiating the rem
11、oval of a fault from the power system. relays are extensively used for major protective functions, but the term also covers direct-acting a.c.trips and fuses. in addition to relays the term includes all accessories such as current and voltage transformers, shunts, d.c.and a.c. wiring and any other d
12、evices relating to the protective relays. in general, the main switchgear, although fundamentally protective in its function, is excluded from the term protective gear, as are also common services, such as the station battery and any other equipment required to secure opera- tion of the circuit brea
13、ker. reliablitythe performance of the protection applied to large power systems is frequently assessed numerically. for this purpose each system fault is classed as an incident and those which are cleared by the tripping of the correct circuit breakers and only those, are classed as 'correct'
14、;. the percentage of correct clearances can then be determined. this principle of assessment gives an accurate evaluation of the protection of the system as a whole, but it is severe in its judgement of relay performance, in that many relays are called into operation for each system fault, and all m
15、ust behave correctly for a correct clearance to be recorded. on this basis, a performance of 94% is obtainable by standard techniques. complete reliability is unlikely ever to be achieved by further improvements in construction. a very big step, however, can be taken by providing duplication of equi
16、pment or 'redundancy'. two complete sets of equipment are provided, and arranged so that either by itself can carry out the required function. if the risk of an equipment failing is x/unit. the resultant risk, allowing for redundancy, is x2. where x is small the resultant risk (x2) may be ne
17、gligible. it has long been the practice to apply duplicate protective systems to busbars, both being required to operate to complete a tripping operation, that is, a 'two-out-of-two' arrangement. in other cases, important circuits have been provided with duplicate main protection schemes, ei
18、ther being able to trip independently, that is, a 'one-out-of- two' arrangement. the former arrangement guards against unwanted operation, the latter against failure to operate. these two features can be obtained together by adopting a 'two-out-of-three' arrangement in which three ba
19、sic systems are used and are interconnected so that the operation of any two will complete the tripping function. such schemes have already been used to a limited extent and application of the principle will undoubtedly increase. probability theory suggests that if a power network were protected thr
20、oughout on this basis, a protection performance of 99.98% should be attainable. this performance figure requires that the separate protection systems be completely independent; any common factors, such as common current transformers or tripping batteries, will reduce the overall performance.selectiv
21、ity protection is arranged in zones, which should cover the power system completely, leaving no part unprotected. when a fault occurs the protection is required to select and trip only the neareat circuit breakers. this property of selective tripping is also called 'discrimination' and is ac
22、hieved by two general methods: a time graded systemsprotective systems in successive zones are arranged to operate in times which are graded through the sequence of equipments so that upon the occurrence of a fault, although a number of protective equipments respond, only those relevant t
23、o the faulty zone complete the tripping functiopn. the others make incomplete operations and then reset. b unit systemsit is possible to design protective systems which respond only to fault conditions lying within a clearly defined zone. this 'unit protection' or 'restricted
24、protection' can be applied throughout a power system and, since it does not involve time grading, can be relatively fast in operation. unit protection is usually achieved by means of a comparison of quantities at the boundaries of the zone. certain protective systems derive their 'restricted
25、' property from the configuration of the power system and may also be classed as unit protection. whichever method is used, it must be kept in mind that selectivity is not merely a matter of relay design. it also depends on the correct co-ordination of current transformers and relays with a suit
26、able choice of relay settings, taking into account the possible range of such variables as fault currents. maximum load current, system impedances and other related factors, where appropriate. stability this term, applied to protection as distinct from power networks, refers to the ability of the sy
27、stem to remain inert to all load conditions and faults external to the relevant zone. it is essentially a term which is applicable to unit systems; the term 'discrimination' is the equivalent expression applicable to non-unit systems. speed the function of automatic protection is to isolate
28、faults from the power system in a very much shorter time than could be achieved manually, even with a great deal of personal supervision. the object is to safeguard continuity of supply by removing each disturbance before it leads to widespread loss of synchronism, which would necessitate the shutti
29、ng down of plant. loading the system produces phase displacements between the voltages at different points and therefore increases the probability that synchronism will be lost when the system is disturbed by a fault. the shorter the time a fault is allowed to remain in the system, the greater can b
30、e the loading of the system. figure 1.5 shows typical relations between system loading and fault clearance times for various types of fault. it will be noted that phase faults have a more marked effect on the stability of the system than does a simple earth fault and therefore require faster clearan
31、ce.sensitivity sensitivity is a term frequently used when referring to the minimum operating current of a complete protective system. a protective system is said to be sensitive if the primary operating current is low. when the term is applied to an individual relay, it does not reter to a current o
32、r voltage setting but to the volt-ampere consumption at the minimum operating current. a given type of relay element can usually be wound for a wide range of setting currents; the coil will have an impedance which is inversely proportional to the square of the setting current value, so that the volt
33、-ampere product at any setting is constant. this is the true measure of the input requirements of the relay, and so also of the sensitivity. relay power factor has some significance in the matter of transient performance .for d.c. relays the va input also represents power consumption, and the burden
34、 is therefore frequently quoted in watts. primary and back-up protection the reliability of a power system has been discussed in earlier sections. many factors may cause protection failure and there is always some possibility of a circuit breaker failure. for this reason, it is usual to supplement p
35、rimary protection with other systems to 'back-up' the operation of the main system and to minimize the possibility of failure to clear a fault from the system. back-up protection may be obtained automatically as an inherent feature of the main protection scheme, or separately by means of add
36、itional equipment. time graded schemes such as overcurrent or distance protection schemes are examples of those providing inherent back-up protection; the faulty section is normally isolated discriminatively by the time grading, but if the appropriate relay fails or the circuit breaker fails to trip
37、, the next relay in the grading sequence will complete its operation and trip the associated circuit breaker, thereby interrupting the fault circuit one section further back. in this way complete back- up cover is obtained; one more section is isolated than is desirable but this is inevitable in the
38、 event of the failure of circuit breaker. where the system interconnection is more complex, the above operation will be repeated so that all parallel infeeds are tripped. if the power system is protected mainly by unit schemes, automatic back-up protection is not obtained, and it is then normal to s
39、upplement the main protection with time graded overcurrent protection, which will provide local back-up cover if the main protective relays have failed, and will trip further back in the event of circuit breaker failure. such back-up protection is inherently slower than the main protection and, depe
40、nding on the power system con- figuration, may be less discriminative. for the most important circuits the performance may not be good enouugh, even as a back-up protection, or, in some cases, not even possible, owing to the effect of multiple infeeds. in these cases duplicate high speed protective
41、systems may be installed. these provide excellent mutual back-up cover against failure of the protective equipment, but either no remote back-up protection against circuit breaker failure or, at best, time delayed cover. breaker fail protection can be obtained by checkina that fault current ceases w
42、ithin a brief time interval from the operation of the main protection. if this does not occur, all other connections to the busbar section are interrupted, the condition being necessarily treated as a busdar fault. this provides the required back-up protection with the minimum of time delay, and con
43、fines the tripping operation to the one station, as compared with the alternative of tripping the remote ends of all the relevant circults. the extent and type of back-up protection which is applied will naturally be related to the failure risks and relative economic importance of the system. for di
44、stribution systems where fault clearance times are not critical, time delayed remote back-up protection is adequate but for ehv systems, where system stability is at risk unless a fault is cleared quickly, local back-up, as described above, should be chosen. ideal back-up protection would be complet
45、ely indepen_ dent of the main protection. current transformers, voltage transformers, auxiliary tripping relays, trip coils and d.c. supplies would be duplicated. this ideal is rarely attained in practice. the following compromises are typical:a. separate current transformers
46、(cores and secondary windings only) are used for each protective system, as this involves little extra cost or accommodation compared with the use of common current transformers which would have to be larger because of the combined burden. b. common voltage transformers are us
47、ed because duplication would involve a considerable increase in cost, because of the voltage transformers themselves, and also because of the increased accommodation which would have to be provided. since security of the vt output is vital, it is desirable that the supply to each protection should b
48、e separately fused and also continuously supervised by a relay which wil1 give an alarm on failure of the supply and, where appropriate, prevent an unwanted operation of the protection. c. trip supplies to the two protections should be separately fused. duplication of tripping
49、 batteries and of tripplng coils on circuit breakers is sometimes provided. trip circuits should be continuously supervised. d. it is desirable that the main and back-up protections (or duplicate main protections) should operate on different princlples, so that unusual events
50、that may cause failure of the one will be less likely to affect the other.继电保护原理发电并将电力供应给用户这就是电力系统的作用。系统要通过设计、组织,以使电力能够可靠、经济地送到用户2端。由于可靠和经济是两个相互对立的要求,因此系统的可靠性和其所花费用要综合考虑, 一方面,系统设计时必须保证可靠性。而另一方面,不应该不计费用的盲目追求高可靠性,应该结合各方面因素综合考虑。 改进设备设计可以更好地提高供电可靠性,比如增加备用容量裕度和安排多回路供电。将系统分段,有带保护装置的开关控制,
51、这样可以在正常运行时有多种运行方式可供选择,而在故障时可将损失减少到最低程度。 对供电系统最大的威胁就是短路,它往往使系统运行发生突然巨大的变化,巨大能量的局部释放产生的大电流,可导致故障点起火和贯穿系统的机械损伤,特别是对于电机和变压器线圈绕组。迅速断开离故障点最近的开关可减少损失并防止系统瓦解。 一个电力系统就意味着非常巨大的投资。为最大限度地收回成本,系统应尽可能多带负荷。因此不仅要使系统在ab范围内(图1.1运行以吸引潜在的用户,还要尽可能保证系统持续地满负荷运行,只有这样才能给用户带来最好的服务,供电方才能获得最大收益。不能保证设备
52、和电网绝对不发生故障。虽然故障的危害对于单一元件是轻微的,但经过大电网中密切相关的众多元件,故障的危害就扩大了,这就是说任何一个故障有可能影响到整个电网。对于一个大电网,故障发生的几率和故障带来的扰动是相当大的,如果没有切除故障的设施,电网是不允许运行的。没有相应的故障切除装置,就算安装了很多开关,电网的作用也不能实现,还必须根据电力系统的特性和要求配备不同的保护装置来控制开关。一个电力系统如果没有相应的保护,它就不能算是合理的设计和组织。保护装置 保护装置是一个集合术语,它包括了所有用来检测、定位和触发切除电力系统故障的设备。继电器作为主要的保护功能元件而广泛使用。
53、但保护装置还包括直接动作的交流脱扣器和熔丝。 除了继电器,保护装置包括所有附件,诸如电流互感器、电压互感器、分流器、直流线圈、交流线圈以及其它与继电器有关的设备。 一般来说,虽然开关设备也能起到基本保护的作用,但它不算是保护装置。公用设备,如电站蓄电池和其它用来保证开关动作的设备,也不属于保护装置。 为了满足许多不同配置、运行方式和建设性能的电力系统以最佳速度辨别保护的要求,必须开发多种类型的继电器以反映电力系统量。比如,在某些情况下,仅仅测量故障电流量就可以了,但在某些情况下,就有可能要测量功率和阻抗。继电器通常要
54、测量许多复杂的系统量,这些量只有通过数学或图表方式才能方便地表达出来。 可靠性 为使大型电力系统的继电保护装置动作能以数字来评价,每一个系统故障定义为一次事故,故障由且仅由正确的断路器来切除的,称为正确动作,由此可得到正确动作率。 评价的原则对于系统的整套保护给出了一个精确的公式,但它取决于继电器的动作,每一个系统故障需要许多继电器动作来切除,只有所有的继电器都正确动作才能算做一次正确动作。有基于此,标准的技术设备能达到94%的正确动作率。 即使在施工时做了进一步改进,要达到百分之百的可靠性也是不可能的。双重化配置可
55、大大提高可靠性,两套装置中的任何一套均可达到所要求的功能。若一套装置的故障风险为x/套,采用双重化配置后,风险为x2,由于x很小,x2可忽略不计。 实际上母线保护早就采用了双重化配置。两套装置均动作以完成跳闸操作,这就是“2取2”配置。在另一些情况下,重要回路的主保护采用双重化配置,每一套装置能独立完成跳闸操作,这就是“2取1”配置。前一种配置是为了避免误动,后一种配置是为了避免拒动。 以上两个功能可以相互结合,生成“3取2”配置,也就是联合使用三套同样的装置,任何两套装置动作均可实现跳闸功能。这种设计方案已在一小范围内使用,而该原理的应用将
56、日渐广泛。如果一个电网采取这种设计方案,用概率论可以得出这样一个结论,即保护正确动作率可达99.8%。这种正确动作率指标要求单独的保护装置完全独立,任何公用因素,如公用的电流互感器、跳闸用蓄电池,将降低正确动作率。选择性 保护是分区域布置的,这样整个电力系统都得到了保护,而不存在保护死区。当故障发生时,保护应有选择地动作,跳开距离故障点最近的开关。选择性跳闸也称为“鉴别”,一般可通过以下两种方法实现: a 分时限保护 按序分区的保护装置被设计成分时限动作,这样当故障发生时,虽然
57、有多套装置响应,但只有那些与故障区域有关的装置实现跳闸功能,另一些不完全动作然后复归。 b 单元保护 可以将保护装置设计成只响应某一特定区域的故障,这种“单元保护”或“限制保护”可在整个电力系统内使用。由于它不带延时,相对来说可快速响应动作。单元保护通常以比较区域边界量来实现。某些保护装置由于电力系统的布置而具有“限制”特性的,也可称为单元保护。 无论采取何种方法,必须注意选择性不仅仅依靠继电器设计,它还同时依靠适当整定的继电器与电流互感器的正确配合。要考虑到以下变量的变化范围:如故障电流、最大负荷电流、系统阻抗和其它相应的因素。 稳定性 保护装置的稳定性与电网的稳定性概念不同。它是指所有负荷状态和区外故障都不会使装置动作。它实际上是相对单元保护而言的,而对非单元保护则以“识别率”来表示。 速度 自动保护的作用就是在非常短的时间内切除电力系统故障,而该时间若使用人工
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 美容师皮肤健康知识普及试题及答案
- 电梯安全管理人员职称评定考卷及答案
- 化学工艺反应原理练习题库及答案解析
- 有关学期教学计划音乐汇编(33篇)
- 二年级下册道德与法治教学设计-第16课 我们的希望和骄傲 未来版
- Unit1SectionA1a-Pronunciation教学设计2024-2025学年人教版英语七年级下册
- 一年级品德与生活下册 播种春天 2教学设计 辽海版
- Module 10 Unit 1 We have a big family dinner(教学设计)-2023-2024学年外研版(三起)英语四年级上册
- 容器育苗技术在林业育苗中的科学应用与发展探究
- 2024美容师考试如何提升自我效能感试题及答案
- 华北电力大学丁肇豪:多主体数据中心算力-电力跨域协同优化
- 科技公司费用报销制度及流程比较
- 2024年绍兴诸暨市水务集团有限公司招聘考试真题
- DL-T-1878-2018燃煤电厂储煤场盘点导则
- 《扣件式钢管脚手架安全技术规范》JGJ130-2023
- 供应商产品及过程变更控制程序
- 《2022年上海市初中语文课程终结性评价指南》中规定的150个文言实词
- 《铁道概论铁路车站》PPT课件
- TI-BQ40Z50-软件(课堂PPT)
- 建设项目3000万元以下估算投资额分档收费标准
- 《礼仪培训》PPT课件
评论
0/150
提交评论