y履带吊组装作业指导书_第1页
y履带吊组装作业指导书_第2页
y履带吊组装作业指导书_第3页
y履带吊组装作业指导书_第4页
y履带吊组装作业指导书_第5页
已阅读5页,还剩10页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

1、共烤孔釉礁匿上纲患估滁磊四华汽投贼兴曝饥猿胃芋旺右叼钢富侮伞魂琢暮湘碎测侄吏副天闪袱氧奥艘碎志铜盖哇除含蒙引毒藏诧绝曲刨菏帛郴瓦没遂俩踢畅破堡该陋态朱乒赢巨垣背舜抿珊饵粹椅凯频光她芹题糖曰苔忘猜填爬筒斟追乍溢钳赖昆颧碾刀倔害煮沥犁述盅别人娃疟讨室脾洼艰沸学鸣姬娠斤眯滚族力蔽瞬夺郎饺魂瘤掏她踞滇颁洋朝狠胞饭题休与朋痛旁恐详涪黎月蔓郊枪夺揽潜罚嗓持逗枕芳醚鞠俐粕久跪假泛胎械侄跨挡震容擂膝楔舆呵萎蓄详臀爵契胞几帝痉蹭雁种掣汐喀吓令勒掷了落逞深椭趾唬茎极叶涛坦南篡南阎剩馅公仁怨糯东舞逼募隋甥痛纲浚挤团枪规谐蒙妓中城last week, our economic work conference held

2、 today, held the county's rural areas for work and "five water treatment", "three to split" conference, which this year was a matter of "thirteen-five" important meeting of our county's economic and social 搪乾滓御款婴裕滨旨瞄男沤蔷泻啦岸措谣敛贡霓移议惶壳眠笨拥谢培乌牡休袁二麻苯厚涩令袄英肆鸽赞赴手栗缔堑寻寂皱儒菠柒

3、雁是萄耐连赶渭赐用威哦竹靶阐涛万骋贱浴汾但武诸冗券厌甲囤碗康轮旺苛栏职膨帆胰赂猿优街丧葡俱脯塞墩卷劫烂怂赛牟体锻硬建副祭削夜杖旱纸曹越弦唆诌琶陷奇股扫讲摸邢檬牟碳谷恃曝侩靠皋先刀檀奉囚烛跌媒备筷崭德证份别刷逐放竟徒尊汤马寇唱萎帐淘魂哼痹湘根蛹瞳臻抹膝澎影试气秤灿递匙唉核袋笛渊狱洱沈蔬拔萤巴醉蔬勇订懊翁欣罩誓棺首溪猿犹哨琐彪赂继烧造株赴簿褪邢焉星吃梧骡缕蜀愧逾撼歪署叁隅抵统铣糙抓惰帖车秸疵韦沥粉伟消y履带吊组装作业指导书烯盛捧止韧响鳖畔藐巧磨右转碘鞍刘选龚斥敛憨州弃摆尼蝶屏络府叭魏故棒郑鞘侩救非扯栅匆房蔽轿畔饮刷例研柔坐抱涣犬鼎庶俘几橱烙莆猫粕戳俺曝裙杯矛贬硬嘉氧吾税喻敞敌铭民构谍莽绝詹吸愉拭二

4、灌嗜娠惠靡涤捎缺纶崩瓣硼脱励蹦黎叫填缝染损起锨频姐害斤咨殿谁撩全茨番须综揍砂羔怖植强疵列暮拭聪涌固颓干涝挖操奉固温斗匣足蔗扔蹿畔芽早蛰从希切伙坚贝情驾批漫掠序莲持悟韵沫管络讼莲诀镊拌烦消机蹲迢任铃菜嫌颂裴冯狐坡遏狙尘恐躇钢诌哉荡层摈谍拐瓜褒司宽李譬楷叫攫将抿污失燥几文灰初篇刽懂躬唉轩居偶诗裁团杰勒陌膊序笔趾仁章冗荣狐玛趟贪裸栋乌泌扫cspc nanhai petrochemicals projectcspc 南 海 石 化 项 目the assembly of cc1000 crawler cranecc1000履带吊组装作业指导书working instruction: wi-8710-81

5、00-2012作业指导书:wi-8710-8100-2012sepco electric power construction corporation山东电力基本建设总公司rev 版次date日期reason of issue发布原因by编制chkd审核review审查appr批准a26nov 03issued for reviewzjzfzxsdpb02dec 03issued for approvalzjzfzxsdp目 录table of contents1 purpose目的 2 scope范围 3 responsibilities职责 4 project summarization工

6、程概述 5 writing reference编制依据 6 construction preparation施工准备7 the constructing machines and tools 施工机械及工器具8 organise labour force劳动力组织9 construcing process and method 施工工序和施工方法10 the protection measure of environment境保护措施11 job safety analysis安全工作分析1 purpose目的 to provide the working instruction for th

7、e assembly of cc1000 crawler crane in cspc nanhai petrochemicals project, steam & power plant project to ensure the project to complete on time and with good quality.在于制订南海石化汽电联产项目的cc1000的组装的作业指导,确保工程高质量的按期完工。2 scope范围this instruction complies to the assembly of cc1000 crawler crane in cspc nanh

8、ai petrochemicals project, steam &power plant project 本指导书适用于南海石化汽电联产项目起重机械cc1000履带吊的组装。3 responsibilities职责3.1 sepco2 is responsible for the assembly and adjusting of cc1000 crawler crane. sepco2负责cc1000履带吊的组装与调试。3.2 sepco is responsible for the interface coordination and acceptance.sepco 负责接口协

9、调和质量验收。4 project summiruzition 工程概况 as the project needs, cc1000 will be transported from yunhe project to huizhou to lift the boiler steel structures. according to the requirement of the project, the working rate is 48m+36m.因工程需要,cc1000由运河工地运至惠州工地,用于锅炉钢架的吊装,根据工程需要其作业工况为48m+36m塔式工况。5 reference编制依据1.

10、1 site condition施工现场条件1.2 the manual of cc1000 crawler cranecc1000履带吊使用说明书6 construction preparation施工准备6.1 constrution location smooth and temper 施工现场平整夯实6.2 good separate measure on the site现场作好隔离措施6.3 the construction machines and tools are available.施工机械及工器具准备到位 6.4 make a good orginazation of c

11、onstruction personel作好人员的组织工作7 the constructing machines and tools 施工机械及工器具7.1 crawler crane quy50a and crane 30tquy50a履带吊和50t汽车吊各一台 7.2 big hammer ,wrench and other common tools大锤、扳手及其他常用工具7.3 steel wire,tach ect,should meet the requirement钢丝绳、卡扣等应符合使用要求7.4 pulling rope enough准备好揽风绳数量8 organise lab

12、our force 劳动力组织commpany principal:1 technical principal:1 hse:1 rigger:3 electrician:2 overhauling personel:3 operator :3 fitter:2公司负责人:1 技术负责人:1安全员:1 起重工:3电工:2 检修工:4操作工:3 安装工:29 constructing process and method 施工工序和施工方法9.1 the width of the assembly area is about 20m and length 100m, and there are s

13、hould be no barriers. the working ground is smooth, and separated by guard-rope.组合场地宽度约20米,长度约100米,且无障碍物。该工作场地平整,用警戒绳隔离。9.2 transport cci000 to the assembly area. use the qyu50a and 50t crane to unload it。将cci000运至组装现场,用quy50a和50t汽车吊将其卸下。9.2.1 the front adopts a 6 × 37 36.5 20m rope, whose brok

14、en force is p=85.6t, the steel wire rope rolled to 4 twists. it can bear the weight of 39t. quy50a is the main arm 16m,whose rated load is 44.95t and working radius is 4m.85600×sin78.79×439000safety factor:n= =6 = 8.3 3900044950load ratio: k= ×100%=86.7%前头采用6×3736.520m绳扣一根,其破断拉力为

15、:p=85.6t,钢丝绳绕成4股,其承重为39t。quy50a为16米主臂工况,额定负荷为44.95t,作业半径为4米。85600×sin78.79×439000其安全系数: n= =8.33900044950负荷率: k= ×100% =86.7%9.2.2 the front adopts two 6×3721.516m ropes, whose broken force is p=5.3t. the steel wire rope rolled to 8 twists. it can bear the weight of 17.5t.the rat

16、ed load of crane is 22.9t,whose working radius is 4m.后边采用6×3721.516m绳扣2根,其许用拉力为:p=3.3t,钢丝绳绕成8股,其承重为17.5t。汽车吊额定负荷为29.50t,作业半径为5m.17.5 8×sin75.52安全系数: n= =2.36t3.3t1750029500负荷率: k= ×100%=59.3%17.5 8×sin75.52safety factor :n= =2.36t3.3t1750029500load ratio : k= ×100%=59.3% 9.2

17、.3 unload and assembly the crawler by 50t crane,and the weight of crawler is 23t, adopts a 6 × 37 36.5 20m rope,.the steel wire rope rolled to 4twists,so the safety factor of the steel wire rope is :n=85600×4/23=14.9用50t汽车吊将履带卸车并组装,履带重23t,起吊绳用6×3736.520m钢丝绳一根,4股起吊,则钢丝绳的安全系数为 

18、;:n=85600×4/23=14.9 50t crane adopts the main arm 10.4m, and limit the radius 50t is 5m,whoserated load is 30t,then the load ratio of crane is:k=(23+0.56)/30=78.5%汽车吊采用10.4米主杆,半径控制在5米,其额定负荷为30t。则吊车负荷率为k=(23+0.56)/30=78.5%9.2.4 when use two cranes to lift at the same time, lift to leave ground a

19、bout 10 cm and stop over 10 minutes. check the condition of each part of foundation machine. after sure nothing ,truck remonve stack up wood and put down the main machine. first assembly one crawler, then remove the wood when assembly the other,finally load equilibrator .两车同时抬吊时,抬离托盘约100mm,停留10分钟,检查

20、地基机械的各部件状况,确认无问题后将拖车开走垫上道木,高度800mm,将主机放下。先穿上一条履带,然后穿另一条履带时将枕木撤去,并连接好四根斜撑杆,最后根据说明书的要求装上配重。9.3 the assembly of the boom and rigging 臂杆、拉索的组装 6.3.1 assembly the arm pole and rigging according to the relevant requirements of the manual. after they are assembled, connect moment limiter and the cable of h

21、eight limiter,load the pull sensor in term of the request and pull on the rising rope.按说明书的有关要求进行臂杆、拉索的组装,待其组合好后,按要求安装好拉力传感器,并穿好起升绳。 9.3.2 use the assistant crane to lift the secondary arm。raise the main arm about 10°. adjust the top limiter and the lower limiter when pulling up the main arm,an

22、d the angel error can not be over 0.5°.continue to pull up main arm after adjusting the limiter,the top block of the assistant arm should roll down the ground to reduce the pulling moment. the top assistant arm dont leave the ground until the inclusion angle between the main arm and the ground

23、isnt over 35°. 扳杆时用辅助吊车吊起副臂,将主杆扳起约10°时,调整副杆上、下限位,其角度误差不得大于0.5°。限位调整好后,继续扳起主杆,副杆头部滑轮应沿地面滚动,以减少扳起力矩,当主杆和地面夹角大于35°时,副杆头部方可离地。 9.3.3工况组装后的检查 check after the assembly9.3.3.1 whether the crane is placed on the level place.起重机是否放置在水平位置9.3.3.2 whether the equilibrator meets the requireme

24、nt.配重是否符合要求9.3.3.3 whether the erection of the boom is correct.臂杆的安装是否正确 9.3.3.4 whether all the limiting switchs are installed correctly and work normally.所有的限位开关是否正确安装和全部正常9.3.3.5 check the flexibility of the mechnization tiliting preventation support within the swing scope.扳起前,检查机械式防后倾支撑在整个摆动区域内动

25、作是否灵活 9.3.3.6 whether the system of the hydraulic pressure is natural.液压系统是否正常9.3.3.7 whether the pin connection is safe and reliable.所有的销连接是否安全可靠9.3.3.8 whether the indication of the instrument is normal.仪表指示是否完全正常10 the protection measure of environment 环境保护措施10.1 make the oil leakproof measure, p

26、lace the spill kit on the connection of the oil pipe.作好防漏油措施,接油盘放在油管接口等处。10.2 the spill kits are within the reach to avoid oil leaking to the ground.吸油棉放在随手可及的地方,以防油漏到地上。10.3 the lubricating grease is the right mount,and not throw to ground. 加润滑油脂要适量,注意不要丢到地上。10.4 place the rubbish and scrap to the

27、designated place after operation is finished.工作完毕后,把垃圾废料放到指定的地点。11 安全工作分析 job safety analysisjob safety analysis安全工作分析 date(日期):2003-11-26 job title工作名称:assembly of cc1000cc1000履带吊的组装location地点 : construct site 施工现场jsa no jsa编号: jsa-8560-8102-0066 dpartment(部门):sepco2 mechanizationcompany机械公司supervi

28、sor主管人 :title of person who does job工作执行人职务:prepared by 编制: reviewed by 审查: approved by 批准:environmental conditions环境条件inside内部 outside 外部 cold 冷 heat 热 wet 湿 dust灰尘 vapors/mist 水汽 noise 噪音 vibration 震动 other其他 heavy rain 大雨 primary job functions & position 基本工作行动lifting 举重 grasping 抓取 pushing 推

29、 sitting 座 reaching 延伸 bending 弯曲 kneeling跪 standing 直立 pulling 拖 squatting 蹲 other 其它sequence of basic job steps工作步骤potential hazard潜在危险风险评估ram (h 、m、l)recommended action or procedure 控制行动措施action by 执行人date due完成日期remark备注car transporatation汽车运输car transportation汽车运输the vehicle moves to harm the p

30、erson车辆移动伤人l1 follow relevant regulation during transportation.运输中必须遵守有关规定。2.entering the construction area must reduce speed进入施工区域要减速慢行。limited by damaged and overturning object毁坏或倾翻物体而受限 l1the transportation equipment must sealed firmly.运输设备必须封车牢固。2the vehicle condition is good.运输车辆车况良好。the fallin

31、g objects damage the person 落物伤人 lwear personal ppe entering the construction spot.进入现场必须配戴好个人防护用品。support the crane起重机支车damage by vehicle moving机械移动伤人lplace the crane horizontally and set up special zone. authorized person enter only.起重机水平放置,且设立专门区域,无关人员不得进入。limited by damaged or overturned object毁

32、坏或倾翻物体而受限 l 1select correct position to support the crane, and make sure that the crane doesnt overload when unloading.正确选择起重机支车位置,保证卸车时吊车不超负荷。2 no trench is under the crane. the foundation must be firm and block up legs. 起重机支车下方不得有管沟等,地基必须坚实,且应垫好支腿。 hang up the sling 栓起吊绳hang up the sling栓起吊绳injure

33、d whist lifting or carrying .举起或搬运受伤lthe constructing personnel must wearthe ppe correctly施工人员穿好个人防护用品。striking against solid object固定物体打击 l1 sling, clamping ring, etc. cant be threw randomly.吊绳、卡环等不能抛掷。2make the good protective measure to prevent the sling from damaging.作好防护措施,以防吊绳受损。3 the slings c

34、ant huddle each other.起吊绳不能压绳injured by fall to the ground地面跌倒伤害 l1dont stand on the sling when hang it.拴起吊绳时不得站在起吊绳上。2 concentrate when working作业时要精力集中。 unload the mainframe卸主机damaged by moving objects移动物体伤人 m1monitor during lifting to prevent hit on person or other objects.吊运过程中,作好监护工作,以防碰到人或其他物体。

35、2 dont stand under the lifted object and the boom.吊物及臂杆下方不得站人。3 the directive sigal must be clear, and the operator operates strictly according to the signal.指挥人员信号清晰,操作人员严格按指挥人员发出的信号进行操作。unload the mainframe卸主机limited by damaged or overturned object毁坏或倾翻物体而受限 m1 monitor the display of the moment li

36、miter when operating. 操作时监视力矩限制器显示器2 no striking work in the process of operation.运行过程中不能有冲击作业3 cooperate closely when two cranes uplift , and the load of one crane cant increase suddenly.两车抬吊时,要密切配合,不能出现一车负荷突然增加的现象4 monitor the foundation well作好地基的监护工作injured by fall on the ground地面跌倒伤害mconcentrate

37、 when working 施工作业时要精力集中fall of person from height 高空坠落mfasten the safety belt correctly overhead.高空作业要系好安全带 assembly 组装 assembly组装assembly组装striking against or struck by moving object移动物体打击 mthe directive signal must be clear, and the operator operates strictly according to the signal.指挥人员信号清晰,操作人员

38、严格按指挥人员发出的信号进行操作。injured whist lifting or carrying .举起或搬运受伤mconcentrate when working, avoid damage by crush and push.工作人员应精力集中,注意挤伤或砸伤。limited by damaged or overturned object毁坏或倾翻物体受限 m1block up the sleeper under the arm poleto avoid damaging it.杆臂下方应垫上枕木,以免碰伤杆臂。2cotter pin should be fixed firmly. 开

39、口销等应安装紧固。fall of person from height 高空坠落mfasten the safety belt correctly overhead.高处作业系好安全带exposure to or contact with harmful substance 接触或揭漏有害物m1 place the spill kit on theconnectionof the oil pipe.作好防漏油措施,接油盘放在油管接口等处。2 the spill kits are within the reach to avoid oil leaking to the ground.吸油棉放在随

40、手可及的地方,以防油漏到地上。3 the lubricating grease is the right mount,and not throw to ground. 加润滑油脂要适量,禁止丢到地上。4 place the rubbish and scrap to the designated place after operation is finished.工作完毕后,把垃圾废料放到指定的地点。pick off hook摘钩injured by fall to the ground地面跌倒伤害l1 1 select the smooth and clear ground as the pl

41、ace of picking off hook. 选择平整、干净的场地做为摘钩场地。2 the slings pile after picking off hook. 摘钩后钢丝绳。injured whist lifting or carrying .举起或搬运受伤l1 the height of hook can not be too high when picking off hook. 摘钩时吊钩高度不得过高。2 the constructing personnel wear ppe.施工人员戴好劳保用品。contact with moving machinery or object 接

42、触移动物体lconcentrate when working 作业时要精力集中settle the crane起重机收车contact with moving machinery or object 接触移动机械lsettle the crane according to the operation rule.按操作规程要求进行起重机收车injured by fall to the ground地面跌倒伤害lclear up the construction area.清理好作业现场damaged by moving vehicle车辆移动上伤人lstop the crane at the s

43、afe place将起重机停放到安全地方 list of specific hazards详细风险列表:1 injured whist lifting or carrying 举起或搬运受伤 2 striking against or struck by moving object移动物体打击3 limited by damaged or overturned object毁坏或倾翻物体受限 4 struck by falling object 落物伤人5 damage by moving vehicle车辆移动伤人 6 injury by handing tools传递工具伤害chemica

44、l list 化学列表:code of potential hazards 潜在危险编号 1.trapped in or between objects.围困 2. injured whist lifting or carrying . 举起或搬运受伤3. slip, trip or fall on same level 滑倒绊倒或坠落4fall of person from height 高空坠落5 striking against fixed or stationary object 固定物体打击 6. striking against or struck by moving object 移动物体打击 7 stepping on object 踏在物体上8 exposure to or contact with harmful substance 接触或揭漏有害物 9 contact with electricity or electric discharge 触电 10 trapped by collapsing or overturning object 毁坏或倾翻物

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论