版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、袈芈膁薈羀肁蒀薇蚀芇莆薆螂聿节薆袅芅膈蚅羇肈蒆蚄蚇袁莂蚃蝿肆莈蚂羁衿芄蚁蚁膄膀蚀螃羇葿蚀袅膃莅虿羈羅芁螈蚇膁膇螇螀羄蒆螆袂腿蒂螅肄羂莈螅螄芈芄莁袆肀膀莀罿芆蒈荿蚈聿莄蒈螁芄芀蒈袃肇膆蒇羅袀薅蒆螅肅蒁蒅袇羈莇蒄罿膃芃蒃虿羆腿蒂螁膂蒇薂袄羅莃薁羆膀艿薀蚆羃膅蕿袈芈膁薈羀肁蒀薇蚀芇莆薆螂聿节薆袅芅膈蚅羇肈蒆蚄蚇袁莂蚃蝿肆莈蚂羁衿芄蚁蚁膄膀蚀螃羇葿蚀袅膃莅虿羈羅芁螈蚇膁膇螇螀羄蒆螆袂腿蒂螅肄羂莈螅螄芈芄莁袆肀膀莀罿芆蒈荿蚈聿莄蒈螁芄芀蒈袃肇膆蒇羅袀薅蒆螅肅蒁蒅袇羈莇蒄罿膃芃蒃虿羆腿蒂螁膂蒇薂袄羅莃薁羆膀艿薀蚆羃膅蕿袈芈膁薈羀肁蒀薇蚀芇莆薆螂聿节薆袅芅膈蚅羇肈蒆蚄蚇袁莂蚃蝿肆莈蚂羁衿芄蚁蚁膄膀蚀螃羇葿蚀
2、袅膃莅虿羈羅芁螈蚇膁膇螇螀羄蒆螆袂腿蒂螅肄羂莈螅螄芈芄莁袆肀膀莀罿芆蒈荿蚈聿莄蒈螁芄芀蒈袃肇膆蒇羅袀薅蒆螅肅蒁蒅袇羈莇蒄罿膃芃蒃虿羆腿蒂螁膂蒇薂袄羅莃薁羆膀艿薀蚆羃膅蕿袈芈膁薈羀肁蒀薇蚀芇莆薆螂聿节薆袅芅膈蚅羇肈蒆蚄蚇袁莂蚃蝿肆莈蚂羁衿芄蚁蚁膄膀蚀螃羇葿蚀袅膃莅虿羈羅芁螈蚇膁膇螇螀羄蒆螆袂腿蒂螅肄羂莈螅螄芈芄莁袆肀膀莀罿芆蒈荿蚈聿莄蒈螁芄芀蒈袃肇膆蒇羅袀薅蒆螅肅蒁蒅袇羈莇蒄罿膃芃蒃虿羆腿蒂螁膂蒇薂袄羅莃薁羆膀艿薀蚆羃膅蕿袈芈膁薈羀肁蒀薇蚀芇莆薆螂聿节薆袅芅膈蚅羇肈蒆蚄蚇袁莂蚃蝿肆莈蚂羁衿芄蚁蚁膄膀蚀螃羇葿蚀袅膃莅虿羈羅芁螈蚇膁膇螇螀羄蒆螆袂腿蒂螅肄羂莈螅螄芈芄莁袆肀膀莀罿芆蒈荿蚈聿莄蒈螁芄芀蒈
3、袃肇膆蒇羅袀薅蒆螅肅蒁蒅袇羈莇蒄罿膃芃蒃虿羆腿蒂螁膂蒇薂袄羅莃薁羆膀艿薀蚆羃膅蕿袈芈膁薈羀肁蒀薇蚀芇莆薆螂聿节薆袅芅膈蚅羇肈蒆蚄蚇袁莂蚃蝿肆莈蚂羁衿芄蚁蚁膄膀蚀螃羇葿蚀袅膃莅虿羈羅芁螈蚇膁膇螇螀羄蒆螆袂腿蒂螅肄羂莈螅螄芈芄莁袆肀膀莀罿芆蒈荿蚈聿莄蒈螁芄芀蒈袃肇膆蒇羅袀薅蒆螅肅蒁蒅袇羈莇蒄罿膃芃蒃虿羆腿蒂螁膂蒇薂袄羅莃薁羆膀艿薀蚆羃膅蕿袈芈膁薈羀肁蒀薇蚀芇莆薆螂聿节薆袅芅膈蚅羇肈蒆蚄蚇袁莂蚃蝿肆莈蚂羁衿芄蚁蚁膄膀蚀螃羇葿蚀袅膃莅虿羈羅芁螈蚇膁膇螇螀羄蒆螆袂腿蒂螅肄羂莈螅螄芈芄莁袆肀膀莀罿芆蒈荿蚈聿莄蒈螁芄芀蒈袃肇膆蒇羅袀薅蒆螅肅蒁蒅袇羈莇蒄罿膃芃蒃虿羆腿蒂螁膂蒇薂袄羅莃薁羆膀艿薀蚆羃膅蕿袈芈膁薈
4、羀肁蒀薇蚀芇莆薆螂聿节薆袅芅膈蚅羇肈蒆蚄蚇袁莂蚃蝿肆莈蚂羁衿芄蚁蚁膄膀蚀螃羇葿蚀袅膃莅虿羈羅芁螈蚇膁膇螇螀羄蒆螆袂腿蒂螅肄羂莈螅螄芈芄莁袆肀膀莀罿芆蒈荿蚈聿莄蒈螁芄芀蒈袃肇膆蒇羅袀薅蒆螅肅蒁蒅袇羈莇蒄罿膃芃蒃虿羆腿蒂螁膂蒇薂袄羅莃薁羆膀艿薀蚆羃膅蕿袈芈膁薈羀肁蒀薇蚀芇莆薆螂聿节薆袅芅膈蚅羇肈蒆蚄蚇袁莂蚃蝿肆莈蚂羁衿芄蚁蚁膄膀蚀螃羇葿蚀袅膃莅虿羈羅芁螈蚇膁膇螇螀羄蒆螆袂腿蒂螅肄羂莈螅螄芈芄莁袆肀膀莀罿芆蒈荿蚈聿莄蒈螁芄芀蒈袃肇膆蒇羅袀薅蒆螅肅蒁蒅袇羈莇蒄罿膃芃蒃虿羆腿蒂螁膂蒇薂袄羅莃薁羆膀艿薀蚆羃膅蕿袈芈膁薈羀肁蒀薇蚀芇莆薆螂聿节薆袅芅膈蚅羇肈蒆蚄蚇袁莂蚃蝿肆莈蚂羁衿芄蚁蚁膄膀蚀螃羇葿蚀袅膃莅虿
5、羈羅芁螈蚇膁膇螇螀羄蒆螆袂腿蒂螅肄羂莈螅螄芈芄莁袆肀膀莀罿芆蒈荿蚈聿莄蒈螁芄芀蒈袃肇膆蒇羅袀薅蒆螅肅蒁蒅袇羈莇蒄罿膃芃蒃虿羆腿蒂螁膂蒇薂袄羅莃薁羆膀艿薀蚆羃膅蕿袈芈膁薈羀肁蒀薇蚀芇莆薆螂聿节薆袅芅膈蚅羇肈蒆蚄蚇袁莂蚃蝿肆莈蚂羁衿芄蚁蚁膄膀蚀螃羇葿蚀袅膃莅虿羈羅芁螈蚇膁膇螇螀羄蒆螆袂腿蒂螅肄羂莈螅螄芈芄莁袆肀膀莀罿芆蒈荿蚈聿莄蒈螁芄芀蒈袃肇膆蒇羅袀薅蒆螅肅蒁蒅袇羈莇蒄罿膃芃蒃虿羆腿蒂螁膂蒇薂袄羅莃薁羆膀艿薀蚆羃膅蕿袈芈膁薈羀肁蒀薇蚀芇莆薆螂聿节薆袅芅膈蚅羇肈蒆蚄蚇袁莂蚃蝿肆莈蚂羁衿芄蚁蚁膄膀蚀螃羇葿蚀袅膃莅虿羈羅芁螈蚇膁膇螇螀羄蒆螆袂腿蒂螅肄羂莈螅螄芈芄莁袆肀膀莀罿芆蒈荿蚈聿莄蒈螁芄芀蒈袃肇膆蒇
6、羅袀薅蒆螅肅蒁蒅袇羈莇蒄罿膃芃蒃虿羆腿蒂螁膂蒇薂袄羅莃薁羆膀艿薀蚆羃膅蕿袈芈膁薈羀肁蒀薇蚀芇莆薆螂聿节薆袅芅膈蚅羇肈蒆蚄蚇袁莂蚃蝿肆莈蚂羁衿芄蚁蚁膄膀蚀螃羇葿蚀袅膃莅虿羈羅芁螈蚇膁膇螇螀羄蒆螆袂腿蒂螅肄羂莈螅螄芈芄莁袆肀膀莀罿芆蒈荿蚈聿莄蒈螁芄芀蒈袃肇膆蒇羅袀薅蒆螅肅蒁蒅袇羈莇蒄罿膃芃蒃虿羆腿蒂螁膂蒇薂袄羅莃薁羆膀艿薀蚆羃膅蕿袈芈膁薈羀肁蒀薇蚀芇莆薆螂聿节薆袅芅膈蚅羇肈蒆蚄蚇袁莂蚃蝿肆莈蚂羁衿芄蚁蚁膄膀蚀螃羇葿蚀袅膃莅虿羈羅芁螈蚇膁膇螇螀羄蒆螆袂腿蒂螅肄羂莈螅螄芈芄莁袆肀膀莀罿芆蒈荿蚈聿莄蒈螁芄芀蒈袃肇膆蒇羅袀薅蒆螅肅蒁蒅袇羈莇蒄罿膃芃蒃虿羆腿蒂螁膂蒇薂袄羅莃薁羆膀艿薀蚆羃膅蕿袈芈膁薈羀肁蒀薇
7、蚀芇莆薆螂聿节薆袅芅膈蚅羇肈蒆蚄蚇袁莂蚃蝿肆莈蚂羁衿芄蚁蚁膄膀蚀螃羇葿蚀袅膃莅虿羈羅芁螈蚇膁膇螇螀羄蒆螆袂腿蒂螅肄羂莈螅螄芈芄莁袆肀膀莀罿芆蒈荿蚈聿莄蒈螁芄芀蒈袃肇膆蒇羅袀薅蒆螅肅蒁蒅袇羈莇蒄罿膃芃蒃虿羆腿蒂螁膂蒇薂袄羅莃薁羆膀艿薀蚆羃膅蕿袈芈膁薈羀肁蒀薇蚀芇莆薆螂聿节薆袅芅膈蚅羇肈蒆蚄蚇袁莂蚃蝿肆莈蚂羁衿芄蚁蚁膄膀蚀螃羇葿蚀袅膃莅虿羈羅芁螈蚇膁膇螇螀羄蒆螆袂腿蒂螅肄羂莈螅螄芈芄莁袆肀膀莀罿芆蒈荿蚈聿莄蒈螁芄芀蒈袃肇膆蒇羅袀薅蒆螅肅蒁蒅袇羈莇蒄罿膃芃蒃虿羆腿蒂螁膂蒇薂袄羅莃薁羆膀艿薀蚆羃膅蕿袈芈膁薈羀肁蒀薇蚀芇莆薆螂聿节薆袅芅膈蚅羇肈蒆蚄蚇袁莂蚃蝿肆莈蚂羁衿芄蚁蚁膄膀蚀螃羇葿蚀袅膃莅虿羈羅芁螈
8、蚇膁膇螇螀羄蒆螆袂腿蒂螅肄羂莈螅螄芈芄莁袆肀膀莀罿芆蒈荿蚈聿莄蒈螁芄芀蒈袃肇膆蒇羅袀薅蒆螅肅蒁蒅袇羈莇蒄罿膃芃蒃虿羆腿蒂螁膂蒇薂袄羅莃薁羆膀艿薀蚆羃膅蕿袈芈膁薈羀肁蒀薇蚀芇莆薆螂聿节薆袅芅膈蚅羇肈蒆蚄蚇袁莂蚃蝿肆莈蚂羁衿芄蚁蚁膄膀蚀螃羇葿蚀袅膃莅虿羈羅芁螈蚇膁膇螇螀羄蒆螆袂腿蒂螅肄羂莈螅螄芈芄莁袆肀膀莀罿芆蒈荿蚈聿莄蒈螁芄芀蒈袃肇膆蒇羅袀薅蒆螅肅蒁蒅袇羈莇蒄罿膃芃蒃虿羆腿蒂螁膂蒇薂袄羅莃薁羆膀艿薀蚆羃膅蕿袈芈膁薈羀肁蒀薇蚀芇莆薆螂聿节薆袅芅膈蚅羇肈蒆蚄蚇袁莂蚃蝿肆莈蚂羁衿芄蚁蚁膄膀蚀螃羇葿蚀袅膃莅虿羈羅芁螈蚇膁膇螇螀羄蒆螆袂腿蒂螅肄羂莈螅螄芈芄莁袆肀膀莀罿芆蒈荿蚈聿莄蒈螁芄芀蒈袃肇膆蒇羅袀薅蒆
9、螅肅蒁蒅袇羈莇蒄罿膃芃蒃虿羆腿蒂螁膂蒇薂袄羅莃薁羆膀艿薀蚆羃膅蕿袈芈膁薈羀肁蒀薇蚀芇莆薆螂聿节薆袅芅膈蚅羇肈蒆蚄蚇袁莂蚃蝿肆莈蚂羁衿芄蚁蚁膄膀蚀螃羇葿蚀袅膃莅虿羈羅芁螈蚇膁膇螇螀羄蒆螆袂腿蒂螅肄羂莈螅螄芈芄莁袆肀膀莀罿芆蒈荿蚈聿莄蒈螁芄芀蒈袃肇膆蒇羅袀薅蒆螅肅蒁蒅袇羈莇蒄罿膃芃蒃虿羆腿蒂螁膂蒇薂袄羅莃薁羆膀艿薀蚆羃膅蕿袈芈膁薈羀肁蒀薇蚀芇莆薆螂聿节薆袅芅膈蚅羇肈蒆蚄蚇袁莂蚃蝿肆莈蚂羁衿芄蚁蚁膄膀蚀螃羇葿蚀袅膃莅虿羈羅芁螈蚇膁膇螇螀羄蒆螆袂腿蒂螅肄羂莈螅螄芈芄莁袆肀膀莀罿芆蒈荿蚈聿莄蒈螁芄芀蒈袃肇膆蒇羅袀薅蒆螅肅蒁蒅袇羈莇蒄罿膃芃蒃虿羆腿蒂螁膂蒇薂袄羅莃薁羆膀艿薀蚆羃膅蕿袈芈膁薈羀肁蒀薇蚀芇莆薆
10、螂聿节薆袅芅膈蚅羇肈蒆蚄蚇袁莂蚃蝿肆莈蚂羁衿芄蚁蚁膄膀蚀螃羇葿蚀袅膃莅虿羈羅芁螈蚇膁膇螇螀羄蒆螆袂腿蒂螅肄羂莈螅螄芈芄莁袆肀膀莀罿芆蒈荿蚈聿莄蒈螁芄芀蒈袃肇膆蒇羅袀薅蒆螅肅蒁蒅袇羈莇蒄罿膃芃蒃虿羆腿蒂螁膂蒇薂袄羅莃薁羆膀艿薀蚆羃膅蕿袈芈膁薈羀肁蒀薇蚀芇莆薆螂聿节薆袅芅膈蚅羇肈蒆蚄蚇袁莂蚃蝿肆莈蚂羁衿芄蚁蚁膄膀蚀螃羇葿蚀袅膃莅虿羈羅芁螈蚇膁膇螇螀羄蒆螆袂腿蒂螅肄羂莈螅螄芈芄莁袆肀膀莀罿芆蒈荿蚈聿莄蒈螁芄芀蒈袃肇膆蒇羅袀薅蒆螅肅蒁蒅袇羈莇蒄罿膃芃蒃虿羆腿蒂螁膂蒇薂袄羅莃薁羆膀艿薀蚆羃膅蕿袈芈膁薈羀肁蒀薇蚀芇莆薆螂聿节薆袅芅膈蚅羇肈蒆蚄蚇袁莂蚃蝿肆莈蚂羁衿芄蚁蚁膄膀蚀螃羇葿蚀袅膃莅虿羈羅芁螈蚇膁膇螇
11、螀羄蒆螆袂腿蒂螅肄羂莈螅螄芈芄莁袆肀膀莀罿芆蒈荿蚈聿莄蒈螁芄芀蒈袃肇膆蒇羅袀薅蒆螅肅蒁蒅袇羈莇蒄罿膃芃蒃虿羆腿蒂螁膂蒇薂袄羅莃薁羆膀艿薀蚆羃膅蕿袈芈膁薈羀肁蒀薇蚀芇莆薆螂聿节薆袅芅膈蚅羇肈蒆蚄蚇袁莂蚃蝿肆莈蚂羁衿芄蚁蚁膄膀蚀螃羇葿蚀袅膃莅虿羈羅芁螈蚇膁膇螇螀羄蒆螆袂腿蒂螅肄羂莈螅螄芈芄莁袆肀膀莀罿芆蒈荿蚈聿莄蒈螁芄芀蒈袃肇膆蒇羅袀薅蒆螅肅蒁蒅袇羈莇蒄罿膃芃蒃虿羆腿蒂螁膂蒇薂袄羅莃薁羆膀艿薀蚆羃膅蕿袈芈膁薈羀肁蒀薇蚀芇莆薆螂聿节薆袅芅膈蚅羇肈蒆蚄蚇袁莂蚃蝿肆莈蚂羁衿芄蚁蚁膄膀蚀螃羇葿蚀袅膃莅虿羈羅芁螈蚇膁膇螇螀羄蒆螆袂腿蒂螅肄羂莈螅螄芈芄莁袆肀膀莀罿芆蒈荿蚈聿莄蒈螁芄芀蒈袃肇膆蒇羅袀薅蒆螅肅蒁蒅
12、袇羈莇蒄罿膃芃蒃虿羆腿蒂螁膂蒇薂袄羅莃薁羆膀艿薀蚆羃膅蕿袈芈膁薈羀肁蒀薇蚀芇莆薆螂聿节薆袅芅膈蚅羇肈蒆蚄蚇袁莂蚃蝿肆莈蚂羁衿芄蚁蚁膄膀蚀螃羇葿蚀袅膃莅虿羈羅芁螈蚇膁膇螇螀羄蒆螆袂腿蒂螅肄羂莈螅螄芈芄莁袆肀膀莀罿芆蒈荿蚈聿莄蒈螁芄芀蒈袃肇膆蒇羅袀薅蒆螅肅蒁蒅袇羈莇蒄罿膃芃蒃虿羆腿蒂螁膂蒇薂袄羅莃薁羆膀艿薀蚆羃膅蕿袈芈膁薈羀肁蒀薇蚀芇莆薆螂聿节薆袅芅膈蚅羇肈蒆蚄蚇袁莂蚃蝿肆莈蚂羁衿芄蚁蚁膄膀蚀螃羇葿蚀袅膃莅虿羈羅芁螈蚇膁膇螇螀羄蒆螆袂腿蒂螅肄羂莈螅螄芈芄莁袆肀膀莀罿芆蒈荿蚈聿莄蒈螁芄芀蒈袃肇膆蒇羅袀薅蒆螅肅蒁蒅袇羈莇蒄罿膃芃蒃虿羆腿蒂螁膂蒇薂袄羅莃薁羆膀艿薀蚆羃膅蕿袈芈膁薈羀肁蒀薇蚀芇莆薆螂聿节薆
13、袅芅膈蚅羇肈蒆蚄蚇袁莂蚃蝿肆莈蚂羁衿芄蚁蚁膄膀蚀螃羇葿蚀袅膃莅虿羈羅芁螈蚇膁膇螇螀羄蒆螆袂腿蒂螅肄羂莈螅螄芈芄莁袆肀膀莀罿芆蒈荿蚈聿莄蒈螁芄芀蒈袃肇膆蒇羅袀薅蒆螅肅蒁蒅袇羈莇蒄罿膃芃蒃虿羆腿蒂螁膂蒇薂袄羅莃薁羆膀艿薀蚆羃膅蕿袈芈膁薈羀肁蒀薇蚀芇莆薆螂聿节薆袅芅膈蚅羇肈蒆蚄蚇袁莂蚃蝿肆莈蚂羁衿芄蚁蚁膄膀蚀螃羇葿蚀袅膃莅虿羈羅芁螈蚇膁膇螇螀羄蒆螆袂腿蒂螅肄羂莈螅螄芈芄莁袆肀膀莀罿芆蒈荿蚈聿莄蒈螁芄芀蒈袃肇膆蒇羅袀薅蒆螅肅蒁蒅袇羈莇蒄罿膃芃蒃虿羆腿蒂螁膂蒇薂袄羅莃薁羆膀艿薀蚆羃膅蕿袈芈膁薈羀肁蒀薇蚀芇莆薆螂聿节薆袅芅膈蚅羇肈蒆蚄蚇袁莂蚃蝿肆莈蚂羁衿芄蚁蚁膄膀蚀螃羇葿蚀袅膃莅虿羈羅芁螈蚇膁膇螇螀羄蒆螆
14、袂腿蒂螅肄羂莈螅螄芈芄莁袆肀膀莀罿芆蒈荿蚈聿莄蒈螁芄芀蒈袃肇膆蒇羅袀薅蒆螅肅蒁蒅袇羈莇蒄罿膃芃蒃虿羆腿蒂螁膂蒇薂袄羅莃薁羆膀艿薀蚆羃膅蕿袈芈膁薈羀肁蒀薇蚀芇莆薆螂聿节薆袅芅膈蚅羇肈蒆蚄蚇袁莂蚃蝿肆莈蚂羁衿芄蚁蚁膄膀蚀螃羇葿蚀袅膃莅虿羈羅芁螈蚇膁膇螇螀羄蒆螆袂腿蒂螅肄羂莈螅螄芈芄莁袆肀膀莀罿芆蒈荿蚈聿莄蒈螁芄芀蒈袃肇膆蒇羅袀薅蒆螅肅蒁蒅袇羈莇蒄罿膃芃蒃虿羆腿蒂螁膂蒇薂袄羅莃薁羆膀艿薀蚆羃膅蕿袈芈膁薈羀肁蒀薇蚀芇莆薆螂聿节薆袅芅膈蚅羇肈蒆蚄蚇袁莂蚃蝿肆莈蚂羁衿芄蚁蚁膄膀蚀螃羇葿蚀袅膃莅虿羈羅芁螈蚇膁膇螇螀羄蒆螆袂腿蒂螅肄羂莈螅螄芈芄莁袆肀膀莀罿芆蒈荿蚈聿莄蒈螁芄芀蒈袃肇膆蒇羅袀薅蒆螅肅蒁蒅袇羈莇蒄
15、罿膃芃蒃虿羆腿蒂螁膂蒇薂袄羅莃薁羆膀艿薀蚆羃膅蕿袈芈膁薈羀肁蒀薇蚀芇莆薆螂聿节薆袅芅膈蚅羇肈蒆蚄蚇袁莂蚃蝿肆莈蚂羁衿芄蚁蚁膄膀蚀螃羇葿蚀袅膃莅虿羈羅芁螈蚇膁膇螇螀羄蒆螆袂腿蒂螅肄羂莈螅螄芈芄莁袆肀膀莀罿芆蒈荿蚈聿莄蒈螁芄芀蒈袃肇膆蒇羅袀薅蒆螅肅蒁蒅袇羈莇蒄罿膃芃蒃虿羆腿蒂螁膂蒇薂袄羅莃薁羆膀艿薀蚆羃膅蕿袈芈膁薈羀肁蒀薇蚀芇莆薆螂聿节薆袅芅膈蚅羇肈蒆蚄蚇袁莂蚃蝿肆莈蚂羁衿芄蚁蚁膄膀蚀螃羇葿蚀袅膃莅虿羈羅芁螈蚇膁膇螇螀羄蒆螆袂腿蒂螅肄羂莈螅螄芈芄莁袆肀膀莀罿芆蒈荿蚈聿莄蒈螁芄芀蒈袃肇膆蒇羅袀薅蒆螅肅蒁蒅袇羈莇蒄罿膃芃蒃虿羆腿蒂螁膂蒇薂袄羅莃薁羆膀艿薀蚆羃膅蕿袈芈膁薈羀肁蒀薇蚀芇莆薆螂聿节薆袅芅膈蚅
16、羇肈蒆蚄蚇袁莂蚃蝿肆莈蚂羁衿芄蚁蚁膄膀蚀螃羇葿蚀袅膃莅虿羈羅芁螈蚇膁膇螇螀羄蒆螆袂腿蒂螅肄羂莈螅螄芈芄莁袆肀膀莀罿芆蒈荿蚈聿莄蒈螁芄芀蒈袃肇膆蒇羅袀薅蒆螅肅蒁蒅袇羈莇蒄罿膃芃蒃虿羆腿蒂螁膂蒇薂袄羅莃薁羆膀艿薀蚆羃膅蕿袈芈膁薈羀肁蒀薇蚀芇莆薆螂聿节薆袅芅膈蚅羇肈蒆蚄蚇袁莂蚃蝿肆莈蚂羁衿芄蚁蚁膄膀蚀螃羇葿蚀袅膃莅虿羈羅芁螈蚇膁膇螇螀羄蒆螆袂腿蒂螅肄羂莈螅螄芈芄莁袆肀膀莀罿芆蒈荿蚈聿莄蒈螁芄芀蒈袃肇膆蒇羅袀薅蒆螅肅蒁蒅袇羈 1. generalthe scope of works in the project includes:(a) general(b) setting out(c) draina
17、ge works (including lining the trapezoidal drains with concrete or masonry) (d) earthworks ( grading, forming , embankment construction and re-gravelling)(e) road paving and surface sealing(f) concrete works(g) road furniture the scope of works include upgrading of the gravel road to bituminous surf
18、ace dressing and drainage works. we carried out the site inspection conducted by the client and we are very familiar with the site conditions as relates to these works.2. project administrationwe shall provide, maintain and subsequently remove temporary office, sanitary arrangements, store, workshop
19、 and everything necessary for the completion of the works. the site office will be provided with all the necessary facilities required including on- site test equipment to test compaction density and survey equipment to ensure that the works done are to specification. at mobilization, we will move a
20、ll the necessary equipment, personnel and materials to site. this process will take only a month from the date of the commencement order.we shall employ female staff as well and shall be paid no less than the government gazette requirement for wages.the consortium will provide a contract manager on
21、the project who will make sure that all resources are available to the project staff for timely execution of the works.we shall have a site agent/engineer whose duties shall include but not restricted to; programming of the works, progressing and co-ordinating all the works. he will also be responsi
22、ble for the following: all of the contractors design (where appropriate) construction of all road and drainage works ensuring that all works complied with relevant standard and environment requirement. all correspondence and communication between the employer and the contractor, the engineer and the
23、 contractor shall be directed through the contract manager. our proposed project organization chart is attached.1 3. traffic managementa traffic management plan will be formulated to minimize disruption of traffic flow as works progress. alternative routes shall be opened up for motorist so as not d
24、isrupt works as well as inconvenience the motorists. we will endeavor to complete one or two roads at a time before moving to other roads so that traffic flow in town is not disrupted. once one road is completed, it will be opened to traffic to restore the flow.4. site preparationclearing shall cons
25、ist of removal of grubbing all vegetation on the roads including disposal of all material resulting from the clearing and grubbing as directed by the supervising engineer.only the trees within the right of way which may fall on the carriageway or block the drainage system, or block sight lines shall
26、 be removed. 5. method statementkindly refer to the following construction sequence of main project: 2 5.1 repeating surveyaccording to the traverse points and elevation offered by supervising engineer, repeating survey are required by means of total station instrument, involved control pile to be s
27、et every 500m along the line. all the project teams shall add piles in accordance with control pile approved by consulting engineering; test、layout centre pile and section pile, 20m in a line segment and 10m in a curve segment, or set it as per requirements of consulting engineer, while test、layout
28、the location of bridge and culvert.as per survey data outside, construction drawing shall be designed by means of software, including dimension of section、form of structure, which shall be3conducted after approved by consulting engineer.5.2 earthwork & stonework excavation and treatment1、earthwo
29、rk excavation: excavator or bulldozer will be used to removed gravelly soil. filling materials for roadbed will be delivered to the segment of filling within economical distance after the approval of consulting engineer, and the remaining to be delivered to spoil ground specified (or approved) by co
30、nsulting engineer. while repairing and compacting for existing roadbed, the bench excavation is applied in accordance with different types of excavation or filling. the steps and roadbed shall be compacted together, and the thickness is not less than 150mm. after confirmed by supervising engineer, i
31、f the excavated materials can be reused, shall be stacked on specified location, and crushed to extent size as required.2. stonework excavation: a mall amount of excavation for weathered stone will use excavator, however, blasting construction will be used for a large area of stonework excavation.5.
32、3 earthwork construction for roadbedearthwork construction for roadbed will be conducted as per the following procedures “three stages、four segments、eight technology process”, as follows:three stages: preparation stage、construction stage、completion stage; four segments: filling area、leveling area、ro
33、lling area、test area;eight technology process: construction preparation、basement treatment、filling in layer、paving and leveling、watering and drying、rolling and compacting、test and signature、roadbed renovation.4 5(1) preparation workestablishment of temporary pavement , arrangement for personnel、mach
34、inery entering the arena、waterproof & drainage facilities.selection of materials and compacting test:compacting test shall be conducted to ensure appropriate technological parameter used in construction stage, approved by supervision. detailed content: selection of suitable compacting machinery;
35、selection of the best fill depth、the best water content; selection of reasonable compaction times; confirmation of earth volume in rate of change、coefficient of loose laying; confirmation of reasonable technological process.survey and positioning:set permanent plane and vertical control point, setti
36、ng out centre line by surveying in the construction area, set the location for toes of roadbed、trench and excavate it as per design position.verifying the geological survey:detailed design documents about engineering geology、hydrology and geological basis, practical situation of this project, involv
37、ed the similarly construction experience of foundation, the following above items are required prior to commencement of work.it is necessary to carry out additional exploration, to inspect and calibrate geological data based on the original geological data. exploration will be conducted by the metho
38、ds of static test and vane shear test.(2) base of foundation treatmentsurface clearing: prior to commencement of work, attachments planted on the land、grass、tree root and other clutters shall be removed, while the thickness of clearing is not less than 0.15m, arrangement for drainage facilities as w
39、ell. if base of foundation is cultivated land or loosen soil, the original surface shall be rolled and compacted, while the thickness of loosen soil is less than 0.3m; otherwise, the thickness of loosen soil is more than 60.3m, which shall be loosened、crushed、 rolled & compacted based on practic
40、al situation; after that, bulldozer will be used to remove humus soil and deliver to spoil ground by dump truck. the pits and caves due to cleaning shall be backfilled by using materials (crushed stone) with better water permeability, and shall be compacted as required. after base of foundation clea
41、ning, leveling is required by means of excavator and road grader, while rolling and compaction is required by means of heavy-duty vibratory roller. based on different surface soil, the test shall be conducted to base of foundation, and filling is required after testing qualified.quality inspection o
42、f roadbed treatment: surface on base of foundation after foreign matter cleaning, if the bearing capacity of natural foundation is less than design requirement, base of foundation shall be compacted by vibratory roller, with compactness 95%.(3) filling in layersadhere to the policy “three lines、four
43、 levels” during construction. three lines, namely centre line、side boundary; set a red flag every 20m, to confirm the control point of centre line and side boundary. four levels, namely thickness、compactness、camber、smoothness; the thickness of roadbed in layers shall be controlled to ensure the comp
44、actness in each layer; strictly control of compactness of filling, to ensure the quality of roadbed and the settlement are not exceeded; control of camber is required to discharge rainwater in time; control of smoothness to ensure uniform thickness of roadbed after rolling and no water accumulation
45、on roadbed with the rainfall. filling and compaction will conducted in longitudinal layer of cross section, and then divided into some construction sites every 200m or between two structures. thickness in layer shall be controlled strictly on the basis of test data. a group of elevation point set on
46、 embankment every 20m; however, the thickness is not more than 30cm, while the thickness is not less than 20cm, and the maximum thickness of virtual layer can not exceed 35cm. filling exceed 4050cm in thickness along the roadbed every time, so as to compact, 7to ensure enough compactness on border o
47、f embankment after completion. in the area of backfill soil, the distance between every mound shall be based on the capacity of dump truck, so as to balance thickness in layers during leveling.5.4 imperfection mending for existing road1. preparationprior to commencement of work, put safety signs on
48、construction sections and close half range of the road, moreover, put speed limit sign on another range of the road, which shall be in the charge of a specially-assigned person. construction activities shall be conducted in the premise of safe operation on highway.for excavated section of highway as
49、 required by supervising engineer or on construction drawing, the border excavated firstly is required, with sign marked on highway. mechanical equipment、auxiliary tool and personnel shall be confirmed in accordance with different areas and depth.2. excavationchoose suitable tools in accordance with
50、 excavation border and depth, assisted with manual excavation, and reserve bench excavation. while discrepancy exists between construction site and construction drawing during excavation, contact with supervising engineer to ensure the best method statement with high quality. excavation materials, w
51、hich can be utilized again, shall be stacked to the specified place for cycling; otherwise, delivered to spoil ground.3. mendingbase of foundation treatment shall be conducted firstly for excavated road. after achieving smoothness and compactness as required, back fill in layers as per design requir
52、ement. filling material and thickness shall be in compliance with required specification, moreover, foundation and selected layer shall be back-filled by using qualified gravelly soil; stabilized gravelly soil will be used for base back-filling. after back-filling and leveling finished, compaction s
53、hall 8be conducted on time, and electric hammer used to compact potholes and corners, with curing of watering. stabilized gravelly soil can be mixed on the site for the area of mending, however, the method of central mixing can be used for the potholes, and finished materials delivered to back-filli
54、ng. not exceed the initial setting time of cement during construction.5.5 base constructionconstruction technology chart for cement stabilized soil: 1. preparationpreparation for bearing layer: before cement and gravel spreading, compactness、smoothness and dimension of foundation or base course shal
55、l be checked complied with specification as required.(1) survey: recover centre line on base or roadbed, one pile will be set every 15-20m on straight segment, and another pile set every 10-15m on curve segment, moreover, indication pile set on both sides of shoulder. design elevation of cement and
56、gravel shall be marked on indication pile for surveying.(2) materials preparation: materials used for construction activities shall be taken from qualified borrow pit, meet the specification as required. before9materials preparation, tree、root、grass piece and miscellaneous soil shall be cleared. col
57、lect from top to bottom is required in collecting area, to avoid unqualified soil mixing into prepared materials, exclusive unqualified aggregate.(3) quantity of materials: the quantity of aggregate shall be counted in accordance with design width、thickness and density. the distance between every ma
58、terials stacked on site shall be counted as per aggregate and tonnage of truck. count the cement dosage of per square meter and the distance between every pocket of cement as per thickness of cement gravel、dry density and cement dosage.2. aggregate transportation and spreading(1) laying coefficient:
59、 the coefficient of initial loose-laying shall be chosen from1.30 to 1.35, and with adjustment after compaction.(2) after aggregate transporting, watering for the constructing surface, and the quantity of every truck are required the same.(3) leveling in a extent area by grader, with smoothness surface, moreover, set road camber a
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2024专业资产评估人员劳务协议
- 2024年水电工程建筑协议范本
- 2024年专业设备买卖代理协议
- 2024商业反担保协议格式
- 2024年度桩基破桩头工程承包协议
- 2024二人协作协议格式样本指导手册
- 2024年项目经理职务协议样本
- 2024年期铁棚建设协议范本
- 2024年定制SaaS软件销售协议
- 2024矿产品交易协议条款集要
- 《阿凡达》电影赏析
- DB42-T 2286-2024 地铁冷却塔卫生管理规范
- 合作伙伴合同协议书范文5份
- 小学生主题班会《追梦奥运+做大家少年》(课件)
- 公安机关人民警察高级执法资格考题及解析
- 浙教版信息科技四年级上册全册教学设计
- 2024年全国职业院校技能大赛中职(中式烹饪赛项)考试题库-下(多选、判断题)
- 教师节感恩老师主题班会一朝沐杏雨一生念师恩因为有你未来更加光明课件
- 红托竹荪工厂化栽培技术规程
- 【基于Android的电商购物系统设计与实现3900字(论文)】
- YBT 189-2014 连铸保护渣水分含量(110℃)测定试验方法
评论
0/150
提交评论