



下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、graduationreportgraduationpractice isto complete the finalphase of theuniversityscourseto bethe most importantsection ofthepractice.practiceis everyqualifiedstudentsmust havean experiencethat allows usto enhance professionalismin thepractice ofawarenessand practice ofawareness.wepracticeduring the p
2、rocess oftrainingunits in theschool andsupport, moreguidance ofexperts, throughtrainingwelearned a lotin class,notsimplythe knowledge ofschoolfor ourfuturedesignand lay asolid foundation.at the same timeallowthemselvesto contactthe schoolfor the purpose ofinternshiptrainingof our ability, the five-w
3、eekinternshiptoincreasetheirability tohavea lot ofknowledge,greatly improved.graduationpurposeinternshipis designed to improvethe ability ofstudents andsocial contactsandto understand and master,verifyand consolidatelearnedbasic coursecontent.enable students tounderstand themodernhigh-rise buildingd
4、esign andthe actual constructionof electricaleasy toignore the problem, studentsintegrate theory with practice, love theprofessional,enthusiastic,committed tothinking ofchinas modernization drive.graduationcontentto achieve the aboveobjectivepractice, practicethe main contentshould include:1.underst
5、and theinternshipprocess andproduction organizationof productionmanagement.2.understand theperformance ofsomeelectrical productsand features.3.controllow-voltage distributionsystem design,weakpart of thedesign, lighting,part of thedesign, dynamicpart of the design,lightning protection and groundingp
6、art of the design.4.institute ofelectrical equipmentused inoperatingmethodsand the basicworking principle.although thispracticeis only3 weekstime, butduring that time,the theoryfor somecommonthings, withperceptual awareness,feelbenefit.here aresome ofmysummary ofthe internship period, andtheir feeli
7、ngs and experiences.to carry outtheirworkin the future, and thefuture workofgreat help tome.visitthe west campus,dongshengbuilding andcity halland linearlow-voltagepower distribution room, andthe laying ofthe roofthere areweaknesses inthe design ofsome ofmine.now i willexplainin detailthe buildingof
8、 thelightning protection and grounding1. basic principles:lightning protection design of technical measures should be the existing national standard lightning protection design of buildings for lightning protection, refer to building lightning protection design standard corresponding requirements, t
9、he use of ball lightning rod protection method, the use of other potentialjoin the most important safety measures.2. anti-cloud-to-measure, should meet the following requirements:(1) air terminals using the lightning rod, lightning protection zone (network), or a combination of both, it should be us
10、ed as a metal roof building air terminals, but should be consistent with regulatory requirements.containing radioactive material should not be used air terminals.the elimination of other forms of lightning, it should only be used with high pole tower roof was added to our building on.protrusions on
11、the roof, such as satellite and receiver antenna, holiday lights, aviation obstruction lights and air-cooled unit, the roof should be in the range of lightning protection devices, if not calculated by ball within the scope of protection should beseparate lightning rod, with protection, lightning pro
12、tection device connected with the roof.(2) deflectors should give priority to the use of reinforced concrete building columns or shear walls in the main bar, but also should use the building on fire ladders, steel columns, metal chimneys, etc., as deflectors.when the use of steel in reinforced concr
13、ete columns, steel columns as a natural drop, and also used as a grounding device based steel with no disconnect card, but it should be located in a number of suitable locations outside the bar connected with the column connecting plate,for the measurement, an external artificial grounding and equip
14、otential bonding for use.brick buildings surrounded by a separate deflectors in the external walls and the installation of 1.8 meters from the ground disconnected card.the 1.7 meters to 0.3 meters underground for some protective measures should be taken.(3) the use of grounding devices should give p
15、riority to the building of reinforced concrete base.a reinforced concrete ground beam, should in the beam reinforced with a ring grounding device; not reinforced concrete ground beam, it can not in the building surrounding strip of reinforced concrete base closed, galvanized flat steel with a direct
16、 lay-40x4pit in the outer groove to form a circular grounding.when the transformer and the work of the diesel generator neutral grounding, electrical protective earth grounding system work and share weak grounding device, the grounding resistance should be less than 1 euro.use common grounding, the
17、weak systems should their equipment room, and building insulation grounding stud, with more than 25 mm2 copper cable or wire welded steel pipe made through a separate drop, the foundations of buildingsconnected with the ground plate.weak system of general requirements for grounding resistance of les
18、s than 4 ohms, should be an independent ground system view often boxu chile to catch car owner thereupon low ash wood ho chant argon ? 0 meters.3. sideswipe against mine measures should meet the following requirements:height over 30 meters of reinforced concrete structures, steel structures, should
19、take the following anti-swipe mine and equipotential bonding of the protective measures:(1) steel frame and reinforced concrete should be connected to each other;(2) should be used within the steel column or reinforced concrete columns reinforced as a lightning protection device deflectors;(3) shoul
20、d be 30 meters and over the railings on the external walls, doors, windows and other large metal objects and lightning protection device is connected;(4) vertical laying of metal pipes and metal top and low-end devices to be connected with the mine;(5) columns and ring beam without the buildings, wa
21、lls should be laid at intervals of around three out of galvanized round steel 12 to do the grading rings, a combination of columns and ring beam, the use of steel for the ring beamgrading ring.all the building every three vertical metal pipe connected with a grading ring.grading ring should be conne
22、cted with the lightning protection device deflectors.4. lightning induction of measures, should meet the following requirements:(1) the protection of metal objects within the building ground, is the main measure lightning induction.therefore, the building housing the equipment, pipelines, and other
23、major metal frame should be close to receiving the grounding or electrical equipment, lightning protection grounding device(2) parallel to the laying of pipes, cables metal jacket structure and a long metal object, the spacing is less than 100mm should be used jumper wire, cross-junction spacing sho
24、uld not exceed 30m; crossing clearance less than 100mm, theshould be across the intersection.5. lightning invasion wave of measures, should meet the following requirements:(1) line of low voltage lines should be buried with the cable directly into the home end of the cable jacket or the protection o
25、f metal pipe on the device receiving the lightning protection and grounding; if connected to overhead lines should be changed into the household 50m cable, cable for connection atarrester should be installed, and with the cable metal sheath, steel and iron insulator feet, fittings, etc. together, th
26、e impulse grounding resistance should not exceed 10 ohms.if overhead wires are used, the arrester should be installed into office.(2) overhead and underground metal pipes, should be in and out of buildings and lightning protection grounding device connected at.fixed on the building of holiday lights, aviation obstruction lights and other electrical equipment of the line, should be based on the importance of building the mine to take corresponding measures invasive radio waves:a. no metal or electrical equipment protec
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 中兽医学知到课后答案智慧树章节测试答案2025年春甘肃农业大学
- 通辽职业学院《微型飞行器设计导论》2023-2024学年第二学期期末试卷
- 上海工程技术大学《道桥施工技术1》2023-2024学年第一学期期末试卷
- 陕西铁路工程职业技术学院《土木工程制图D》2023-2024学年第一学期期末试卷
- 山西同文职业技术学院《建设项目档案管理》2023-2024学年第二学期期末试卷
- 2024-2025学年湖南省岳阳市高中名校普通高考第二次适应性检测试题英语试题含解析
- 湖南司法警官职业学院《植物医学概论》2023-2024学年第二学期期末试卷
- 潍坊科技学院《电路原理实验》2023-2024学年第二学期期末试卷
- 湖南省常德市武陵区芷兰实验学校历史班2024-2025学年下学期高三语文试题1月阶段测试考试试卷含解析
- 公司诉讼制度优化建议
- 混凝土实测实量记录表
- 全国职业院校技能大赛(新材料智能生产与检测赛项)选拔赛试题库(300题)
- 幼儿园夏季护理培训
- 高等职业学校电梯工程技术专业实训教学条件建设标准(征求意见稿)
- 2024年锦州师范高等专科学校单招职业技能测试题库及答案解析
- 2024年国家电网招聘之通信类题库附参考答案(考试直接用)
- 《市场营销学 第3版》课件全套 段淑梅 第1-12章 市场营销概论-市场营销组合
- 大学生信息素养大赛考试题库及答案
- 儿童保健(康复)管理信息系统需求说明
- 文献检索与论文写作
- 《麻醉与BIS监测》课件
评论
0/150
提交评论