西子奥的斯FOVF[行业相关]_第1页
西子奥的斯FOVF[行业相关]_第2页
西子奥的斯FOVF[行业相关]_第3页
西子奥的斯FOVF[行业相关]_第4页
西子奥的斯FOVF[行业相关]_第5页
已阅读5页,还剩14页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

1、BEING THE BEST AT WHAT WE DO 1 FOVF Control System Introduction OH-CON4421 System XOEC 2006-3 BEING THE BEST AT WHAT WE DO 2 OH-CON4421: elevator use LCBII,AMCB2, SIEI drive and gear machine Meaning of controller name BEING THE BEST AT WHAT WE DO 3 System introduce BEING THE BEST AT WHAT WE DO 4 LCB

2、II BEING THE BEST AT WHAT WE DO 5 Setting of LCBII installation parameters of OH-CO N4421 system is similar to MCS220M system| LSVF-W drive model M1-3-1-4Drive: 17 if ADO, set to 16 Two sensors for DZ signal M1-3-1-6DZ-TYP: 1 The distance of two sensors is about 60mm, and the length of vane is 250mm

3、 LCBII Parameters Setting BEING THE BEST AT WHAT WE DO 6 LSVF_W: DS Codes DS1 DS2 DS3Remark 111Stop and drive ready 110Run speed Ent No-Esc STARTUP Save config? 6. When finished the autotune, press key, the keypad wil l display: 7. Press the Enter key, then press the key twice 8. After finished the

4、autotune, press the Enter key to save the autotune parameters BEING THE BEST AT WHAT WE DO 13 AMCB2 interface board BEING THE BEST AT WHAT WE DO 14 AMCB2 BEING THE BEST AT WHAT WE DO 15 AMCB2 have 5 keys located below the display:, ,enter :back :shift P and F menu :add the parameters value :reduce t

5、he parameters value Enter:enter the F menu; conform the modification Keys of AMCB2 BEING THE BEST AT WHAT WE DO 16 Terminals of AMCB2 BEING THE BEST AT WHAT WE DO 17 Before the hoistway Self-study, you must conform th e following items: 1. Finished the motor autotune, conform all connect wire use fo

6、r autotune have removed the short wiring 2. Parameters of drive and AMCB2 have finished set ting 3. the elevator can run in inspection mode 4. Enter to the F menu of amcb2, and set the F24 to 0. the parameter only allow the elevator to inspect ion and learn run Hoistway Self-study BEING THE BEST AT

7、WHAT WE DO 18 Hoistway Self-study 5. switch the ERO to normal, set the parameter F0 of AMCB2 to 0, then press the Enter key to start 6. The car run down to bottom floor with low speed, then run up till the top floor to finish the hoistway Self-study 7. After hoistway self-study, the parameter F24 of AMCB2 will set to 1 automatically 8. You can get the self-study parameter form AMCB 2: P1P32: floor distance P34P35:1L

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论