




下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、damthe first dam for which there are reliable records was build or the nile river sometime before 4000 b.c. it was used to divert the nile and provide a site for the ancient city of memphis .the oldest dam still in use is the almanza dam in spain, which was constructed in the sixteenth century. with
2、 the passage of time,materials and methods of construction have improved. making possible the erection of such large dams as the nurek dam, which is being constructed in the u.s.s.r. on the vaksh river near the border of afghanistan. this dam will be 1017ft(333m) high, of earth and rock fill. the fa
3、ilure of a dam may cause serious loss of life and property; consequently, the design and maintenance of dams are commonly under government surveillance. in the united states over 30,000 dams are under the control of state authorities. the 1972 federal dams safety act (pl92-367)requires periodic insp
4、ections of dams by qualified experts. the failure of the teton dam in idaho in june 1976 added to the concern for dam safety in the united states.1 type of dams dams are classified on the type and materials of construction, as gravity, arch, buttress ,and earth .the first three types are usually con
5、structed of concrete. a gravity dam depends on its own weight for stability and it usually straight in plan although sometimes slightly curved. arch dams transmit most of the horizontal thrust of the water behind them to the abutments by arch action and have thinner cross sections than comparable gr
6、avity dams. arch dams can be used only in narrow canyons where the walls are capable of withstanding the thrust produced by the arch action. the simplest of the many types of buttress dams is the slab type, which consists of sloping flat slabs supported at intervals by buttresses. earth dams are emb
7、ankments of rock or earth with provision for controlling seepage by means of dam may be included in a single structure. curved dams may combine both gravity and arch action to achieve stability. long dams often have a concrete river section containing spillway and sluice gates and earth or rock-fill
8、 wing dams for the remainder of their length.the selection of the best type of dam for a given site is a problem in both engineering feasibility and cost. feasibility is governed by topography, geology and climate. for example, because concrete spalls when subjected to alternate freezing and thawing
9、, arch and buttress dams with thin concrete section are sometimes avoided in areas subject to extreme cold. the relative cost of the various types of dams depends mainly on the availability of construction materials near the site and the accessibility of transportation facilities. dams are sometimes
10、 built in stages with the second or late stages constructed a decade or longer after the first stage.the height of a dam is defined as the difference in elevation between the roadway, or spillway crest, and the lowest part of the excavated foundation. however, figures quoted for heights of dams are
11、often determined in other ways. frequently the height is taken as the net height is taken as the net height above the old riverbed.2.forced on dams a dam must be relatively impervious to water and capable of resisting the forces acting on it. the most important of these forces are gravity (weight of
12、 dam) , hydrostatic pressure, uplift, ice pressure, and earthquake forces are transmitted to the foundation and abutments of the dam, which react against the dam with an equal and opposite force, the foundation reaction. the effect of hydrostatic forces caused by water flowing over the dam may requi
13、re consideration in special cases.the weight of a dam is the product of its volume and the specific weight of the material. the line of action of dynamic force passes through the center of mass of the cross section. hydrostatic force may act on both the upstream and downstream faces of the dam. the
14、horizontal component of the hydrostatic force is the force or unit width of dam it is where r is the specific weight of water and h is the depth of water .the line of action of this force is h/3 above the base of the dam .the vertical component of the hydrostatic force is equal to the weigh of water
15、 vertically above the face of the dam and passes through the center of gravity of this volume of water. water under pressure inevitably finds its way between the dam and its foundation and creates uplift pressures. the magnitude of the uplift force depends on the character of the foundation and the
16、construction methods. it is often assumed that the uplift pressure varies linearly from full hydrostatic pressure at the upstream face (heel)to full tail-water pressure at the downstream face (toe).for this assumption the uplift force u is u=r(h1+h2)t/2 where t is the base thickness of the dam and h
17、1and h2 are the water depths at the heel and toe of the dam,respectively. the uplift force will act through the center of area of the pressure trapezoid. actual measurements on dams indicate that the uplift force is much less than that given by eq.(2)various assumption have been made regarding the d
18、istribution of uplift pressures.the u.s.bureau of reclamation sometimes assumes that the uplift pressure on gravity dams varies linearly from two-thirds of full uplift at the heel to zero at the toe. drains are usually provided near the heel of the dam to permit the escape of seepage water and relie
19、ve uplift. 译文: 坝 据可靠记载,世界上第一座坝是公元前4000年以前在尼罗河上修建的。它使尼罗河改道,并为古老的孟菲斯提供城址。至今仍在使用的最古老的坝是16世纪修建的西班牙阿尔曼扎坝。随着岁月的流逝, 各种建筑材料和施工方法得到了改善,修建努列克这样的大坝才成为可能。该坝正在苏联境内靠近阿富汗边界的瓦赫什河上施工,是一座高达1017英尺(333米)的土石坝。大坝失事可能造成生命财产的严重损失。因此坝的设计和维修通常是在政府监督下进行的。美国有3万多座坝由各州政府控制着。1972年(美国)联邦大坝安全法(pl92-367)规定,必须由合格的专家对大坝进行定期检查。在1976年6月
20、爱达荷州泰托大坝失事后,美国对大坝安全更为关注。1. 坝的类型坝按其形式和建筑材料分为:重力坝拱坝支墩坝和土坝。前三种坝通常是用混凝土浇筑的。重力坝依靠自重维持稳定,通常在平面上呈直线状,不过有时略带点弧型。拱坝通过拱的作用把水的水平推力中的大部分传给拱座,因此,他的横截面比重力坝单薄些。拱坝只用于崖壁能承受拱作用所产生的推力的峡谷中。各种支墩坝中最简单的是平板坝,它是由许多支墩间隔地支撑着倾斜的面板。土坝是一种由土或石料填筑而成并借助于不透水的心墙或上游铺盖防渗透的土堤。在一座大坝的结构中可包含不止一种坝型。弧形坝可以把重力作用和拱作用结合起来,以利坝的稳定。长坝常常有一个包括溢洪道泄水闸在内的混凝土坝段,其余坝段是用土或石料填筑的副坝。对既定坝址选择最佳坝型是一个关系到工程可行性及其造价问题。工程可行性受地形地质及气候条件所支配。例如:由于混凝土遭受冻融作用的交替影响而引起剥落,因此在低温地区长避免采用断面单薄的混凝土拱坝或支墩坝。各类坝的造价主要取决于能否在工地附近取得建筑材料和各种运输工具能否进入。大坝有时分期建造,第二期或以后几期工程,往往在第一期
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 低血糖病人的护理措施
- 老年骨折病人的术后护理
- 全新物业服务管理协议
- 贷款担保协议
- 全职教师聘用合同二零二五年
- 二手房融资合作协议范例二零二五年
- 房地产楼盘认购协议书
- 2024四川九洲线缆有限责任公司招聘质量体系部质量技术岗测试笔试参考题库附带答案详解
- 2024中煤蒙陕能源销售有限公司招聘笔试参考题库附带答案详解
- 七下地理测试卷及答案
- 2024年湖南省高等学校对口招生考试英语试卷试题真题
- 公司2025年工会工作要点
- 2025年中国煤炭地质总局社会招聘20人笔试参考题库附带答案详解
- 2025内蒙古能源集团智慧运维公司社会招聘(105人)笔试参考题库附带答案详解
- 公共卫生应急管理调研报告范文
- 【9物一模】安徽合肥瑶海区2025年中考物理一模试卷
- 2025-2030中国食品灭菌设备行业市场发展趋势与前景展望战略研究报告
- 广东省深圳市宝安区10校联考2023-2024学年八年级下学期期中数学试题(含答案)
- 2025年全国中医医师定期考核中医专业理论知识考试题库及答案(共六套)
- 2024外研社英语七年级(下)词汇表
- 绿色建筑能源管理
评论
0/150
提交评论