1、The following report is a consultation analysis of John Deere Component Works costing structure. Included is a discussion of the existing cost system as well as a comparison with the proposal of the Activity Based Costing system. The solutions to the required discussion issues have been thoroughly p
2、repared and are hereby included. Problem Statement: The demand for John Deere Component Works (JDCW s) products has suffered due to the collapse of farmland value and commodity prices. A number of continuous failures in JDCW s competition for bids have placed an onus upon management to question its
3、current costing methods. As a result, an analysis must be made regarding the current costing methods in order to determine their validity and to aid the company in adopting a more sound costing system. Analysis John Deere Component Works was a subdivision of John Deere and Company which dealt exclus
4、ively with the manufacturing of tractor component parts. By the mid 1980 s found that its available excess capacity was increasing. To neutralize this problem JDCW attempted to take advantage of the efficiencies of its newly acquired automatic turning machines by bidding on parts offered from within
5、 the company. This lead to a direct bid of 275 of the 635 parts offered by John Deere and Company. Out of the possible 275 parts, JDCW was successful in the bidding of only 58 parts, which happened to be low volume parts. This became a concern for JDCW because its aim was to attain the bids that off
6、ered the higher volume parts, as to allow it to take advantage of its machines high volume efficiency. In reality, the problem for JDCW was not the number of bids they received, but the alarming discrepancy within its bid prices and that of its competitors. JDCW realized that something was wrong in
7、their accounting system, and decided to review its current cost structures. The existing cost system is strong in that it is simple and easy to maintain. Overhead allocation was based on direct labor hours, machine hours and material dollars. The use of standard costs allows JDCW to compare actual l
8、abor overhead costs with budgeted rates in order to determine the following years overhead costs. In fact, the old cost structure worked quite well in the past since the company produced a specialized line of products that was periodically consistent. This in the aspect that the products differed li
9、ttle or not at all in both unit and volume. However, this cost method does not provide the best system for JDCW s cost allocation. By using only three overhead rates the present system grossly undermines the true production costs since other activities of the production process are not acknowledged.
10、 The system also fails to compute material usage variances, which only further discredits the accuracy of the accounting cost structure. For more accurate measure of material usage, the quality assurance department must include this variance calculation in its weekly report. A further weakness is th
11、at the accounting department issues reports that only indicate how each area operates, rather than evaluating the performance of each area, which would prevent a constriction in cost efficiency. These weaknesses prevent JDCW from accurately accessing its true costs. Essentially, with the current cos
12、t system, managerial analyses is highly flawed due to a lack of crucial in-depth cost information. Failures in the existing cost system are due to several factors. First of all, when JDCW calculates its standard direct labour, direct machine hours, and total overhead, the volumes are calculated on a
13、 long-term basis. However, if the actual production volume is not for the long term it becomes a problem, this in the sense that it is difficult to modify the system as to accommodate for any increases or decreases in the production demand. Secondly, when JDCW updates its overhead rates for the upco
14、ming year, its forecasts are based on the previous years figures. This system is going to result in serious inaccuracies, especially when the company attempts to tackle production volumes that are completely“ alien ” to the companies historical production trends. An example being the bidding attempt
15、 on the 275 parts. This reflects the companys constricted cost system that revolves around a limited product diversity trend, instead of allowing for a correct forecast of diverse products that more realistically represent the volatile demand of the industry. Hence, it would only be logical to state
16、 that the JDCW s yearly updated overhead rates are inaccurately calculated. As foreshadowed, the standard accounting cost system used by the company is significantly out of date. This is because the system was originally designed to handle a direct labor intensive production process with little over
17、head costs. However, when the company changed its production process to a more automated system, it simultaneously increased its overhead costs. This dramatic overhead increase was embodied through increases in supervision, maintenance, electricity, and setups. Since more overhead costs were now bei
18、ng incurred, a new system had to be implemented to adapt to this new environment. These weaknesses further support the fact that JDCWs bids were continuously miscalculated in relation to their competitors. Using the existing system, management at JDCW continually under-costs its low-volume parts and
19、 over-costs its high volume parts. If its bids were to be based on the ABC method, JDCWs costs would be more accurate, and it would most likely acquire a higher number of bids. Since the production of low volume parts is less efficient than high volume parts, it is in the interest of JDCW to attain
20、higher volume bids. However, since its Standard Cost system is flawed, the bid proposals submitted by JDCW are also flawed. To clearly illustrate this point, a comparison of the two cost systems for part A103 highlights the discrepancy. Under the Standard Cost system, part A103 costs $22.80 while un
21、der the ABC method, the part costs $32.18. (See Appendix B) RECOMMENDATIONS It is imperative that JDCW change from Standard Costing to Activity Based Costing. This is essential because the Standard Cost system only works well in a stable production environment. With the advent of new technologies be
22、ing employed at JDCW, the Standard Cost system is incompatible and therefore makes it difficult for JDCW to attain precise figures. The ABC method, on the other hand, provides management with more accurate cost allocations, enabling it to make bids that truly represent its production costs. Since th
23、e standard system bases its costs on volume related overhead rates, costs that are product-related, batch-related or facility sustaining are not accurately allocated. If total overhead costs are based solely on a volume- related basis, distortions will result because not all costs are driven by prod
24、uction volume. (See Appendix A) With the ABC method, this problem is rectified. Since the ABC approach assumes that overhead costs can be traced directly to products, the total overhead costs are better allocated to the products, giving JDCW a closer indication of the behaviour of its overhead costs
25、. The ABC method allows overhead costs to be assigned to products according to the proportion of demand that each product places on that activity. Hence, creating more accurate product cost estimates. In implementing an ABC system, mangers will be motivated to consider a different set of actions fro
26、m that of the old cost system. They will be removed from relying solely on previous years figures and will most likely be involved in a more unstable production environment. Specifically, managerial decisions will include modifications of pricing, product mixes, and customer mixes; enhancing supplie
27、r and customer relations; improving the design of products and services; and performing activities more efficiently. Overall, managers that switch to an ABC approach will find the extra burden of planning and maintaining a wider variety of cost pools. SUMMARY AND CONCLUSION The issue that made JDCW
28、question its cost structure is the fact that its bids on part productions were out of line with those of its competitors. A closer look at the problem reveals that indeed the Standard Cost system currently in place is outdated. A more accurate system is needed to remain competitive, and in this situ
29、ation, the ABC approach is most commendable. BACKGROUND The John Deere Company has been operating in the farm equipment industry for 162 years. John Deere Component Works was established as a separate division of the John Deere Company during the 1970 s as continued growth created the need for incre
30、ased production space. JDCW had been structured to be a captive producer of parts for Deere s equipment divisions, particularly tractors. Thus it had to produce a wide variety of parts whose volume was relatively low. Due to low capacity during the mid 1980 s, the Gear and Special Products Division
31、of JDCW decided that complex machined parts offered a promising niche. Since this process required more automated machines, more overhead costs were to be incurred. As part of the strategy of the Gear and Special Products Division, it set out to market machine parts to the outside world. In order to
32、 obtain production orders Gear and Special Products decided to bid on 275 out of the 635 parts that Deere and Company offered. They soon found out, however, that its bid prices were not in line with those of its competitors, and since the key to successful competition in the outside world is price, JDCW had to rethink its pricing strategies. 6 Un it Un it Batch Batch Batch Product-Susta ining
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 山东交通学院《金融学概论》2023-2024学年第二学期期末试卷
- 上海南湖职业技术学院《大学信息技术》2023-2024学年第二学期期末试卷
- 湖南中医药大学《中国建筑史》2023-2024学年第二学期期末试卷
- 南方科技大学《工业通信与网络技术》2023-2024学年第二学期期末试卷
- 湖北工业大学工程技术学院《制浆造纸机械与设备》2023-2024学年第二学期期末试卷
- 浙江大学《经典本草与湖湘中医药文化》2023-2024学年第二学期期末试卷
- 黑龙江幼儿师范高等专科学校《兵器美学》2023-2024学年第二学期期末试卷
- 成都工贸职业技术学院《设计与开发课程设计》2023-2024学年第二学期期末试卷
- 内蒙古经贸外语职业学院《地理信息工程课程设计与实践》2023-2024学年第二学期期末试卷
- 湖南交通职业技术学院《空间文学与叙事》2023-2024学年第二学期期末试卷
- 认识危险(小班安全第一课)-图文
- 2024年国家基本公卫-老年人健康管理-考试复习题库(含答案)
- 第三讲:虹吸管及水泵的水力计算
- 网络系统集成(第二版) 课件第一章 网络系统集成绪论
- 真菌性角膜炎的护理
- 单肺通气与肺保护通气策略护理课件
- 科普作家协会会员
- 《钢铁是怎样炼成的》选择题100题(含答案)
- 垃圾中转站报告
- 新型显示行业Mini LED Micro LED Micro OLED多点开花产业链如何聚焦
- 市政工程试验检测培训教程
评论
0/150
提交评论